Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Improved Manufacturability and Throughput of Ultra- Transparent, Super-Insulating Aerogels

AeroShield Materials produces a novel silica aerogel material with exemplary thermal performance and unprecedented optical clarity, offering the potential for super-insulating fenestration and insulated glass to reduce thermal losses in the built environment by billions of dollars every year. One of the most significant challenges facing AeroShield today is the total amount of time that is required to produce large monolithic aerogel samples. This overall process can require as much as 144 hours total, which can significantly hinder scale-up to an economically viable product. The purpose of this Phase 1 research was to continue development of our novel aerogel manufacturing process to reduce material processing time by up to 10x, greatly improving product throughput and reducing cost. AeroShield’s manufacturing process can be divided into 4 major stages, each with their own distinct set of parameters and time requirements. Under this Phase 1 award, AeroShield was able to identify and optimize a number of these parameters, including molding materials, solvent rinse conditions, critical point drying time, and annealing conditions. AeroShield also performed thorough analyses on how these optimized parameters affected important final characteristics of the gels, including optical clarity, thermal conductivity, and dimensional stability. This campaign culminated in the production of laboratory scale aerogel samples using significantly lower process times of both 36 and 18 total hours, which represent Phase 1 Target and Stretch goals. In order to achieve widespread market adoption, monolithic sheets of the aerogel material must be made to industry-standard sizes (8’ x 12’) at a cost that provides 5-7 year or less breakeven energy savings for consumers (<$2 sq/ft). The work performed under this Phase 1 award shows that time and materials required to make aerogel samples, which make up a significant portion of their overall cost, can be greatly reduced without sacrificing quality. AeroShield plans to use these optimized processes to produce larger, product-relevant sized aerogels in order to achieve target final material costs.

Wilke, Kyle↗

Environmental Trade-Offs for a Process Utilizing Aerobic Respiration for Biological Conversion of Cellulosic Biomass-Derived Sugars to Hydrocarbons (Renewable Diesel Blendstock): Cooperative Research and Development Final Report, CRADA Number CRD-18-00765, Project 1

Phase II work is meant to develop an advanced understanding of how production of a renewable diesel blendstock from lignocellulosic biomass feedstocks via aerobic respiration at different production scales affects emissions of criteria pollutants and greenhouse gases (GHGs), local and regional air quality. The results could inform decisions by stakeholders (e.g., industry, community, air quality planners, investors) regarding relationships and tradeoffs between multiple environmental impacts and the challenges and opportunities for the design and deployment of a sustainable biofuel supply chain.

09 BIOMASS FUELS↗

TRANSENSOR: Transformer Real-time Assessment INtelligent System with Embedded Network of Sensors and Optical Readout. Final Report

Utilities across the world are wrestling with evolving market dynamics, population growth and climate change. Distributed Energy Resources (DERs) such as solar photovoltaics, distributed generators and energy storage systems are becoming important parts of the U.S. energy mix. These factors are driving an increasing need for low-cost grid asset monitoring. Aside from being costly, traditional utility monitoring systems are not sufficiently robust and do not provide real-time visibility into the condition of grid assets such as transformers. Lack of accurate real-time measurements on performance has resulted in the use of lagging indicators, such as oil sample analysis. To address this need, an innovative embedded optical sensing technology, Transformer Real-time Assessment Intelligent System (TRANSENSOR) was developed, validated and demonstrated in this project. To date, TRANSENSOR has focused on transformers but is extendable to other grid assets. In addition to the technology being embedded into new transformers during manufacturing, a retrofit configuration that can be installed on existing transformers in the field was also developed. It is anticipated that the ability to retrofit existing transformers will help accelerate adoption of the underlying TRANSENSOR technology. Phase 1 of the project focused on laboratory development and qualification of the technology. Following iterations and exploration of relevant optical sensing modalities and multiplexed configurations of interest for the transformer environment, an effective candidate configuration was agreed upon, down-selected and custom-designed for embedding into General Electric (GE) network transformers. Two new GE 500 kilovolt ampere (kVA), 27 kilovolt (kV) distribution network transformers were built with embedded fiber-optic (FO) sensors and successfully qualified per industry standards at GE’s Shreveport, Louisiana facility during Phase 1 of the project. Following the successful completion of Phase 1, the team proceeded to Phase 2, which focused on a field demonstration of the technology. Over Phase 2, the first new GE transformer built with embedded fiber-optic sensors was installed in an above-ground cage and connected to the grid at Con Edison’s Astoria facility. A second transformer equipped with TRANSENSOR was installed in an underground vault. Additionally, an older (1982 year model) GE transformer in an above-ground cage was retrofitted with fiber- optic sensors and reconnected to the grid at ConEd’s facility. Analysis of data acquired from the sensors showed interesting correlations with transformer loading. Additionally, key events such as transformer low-voltage network connection, primary-side energizing, and a pressure loss event from an oil sampling were detected by the TRANSENSOR system. Online data processing/feature extraction algorithms for the second transformer in the underground vault detected key features and event alerts that were transmitted through a wireless 4G connection. The remote deployment concept showed promising results with data collection running for a total of 8 months across the three (3) GE transformers instrumented for the Phase 2 field demonstration. This sets the stage well for further development and commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dataset 1: A National and City Dataset on Human Factors in Pooled Rideshare, 2021

Dataset 1: A National and City Dataset on Human Factors in Pooled Rideshare, 2021. Dataset Description: Pooled Rideshare Acceptance Survey - Phase 1 (2021, N = 5,385). This dataset captures responses from a nationally representative sample of 5,385 adults across the United States to understand public acceptance, preferences, and behavioral intentions related to pooled rideshare (PR) services. The primary objective of this research is to provide actionable insights to inform the design, deployment, and policy development of sustainable shared mobility systems. Data was collected via an online survey administered through a national panel provider. Participants ranged in age from 18 to 95 years, and representation from all U.S. regions. The survey instrument was designed to explore numerous dimensions related to PR adoption including demographic traits, current travel habits, rideshare familiarity, trust, safety, environmental attitudes, and user experience preferences. Both rideshare users and non-users were included, offering a diverse range of perspectives. - Phase_1_Final - The dataset includes survey items developed from literature reviews, and prior field studies. Each row represents an individual respondent, and each column corresponds to a variable such as willingness to use pooled rideshare, attitudes toward specific service features, and sociodemographic data. The data is available in both .CSV and .SAV formats. - Phase_1_Final_MapFile - The accompanying data dictionary explains all variable labels, response scales, and codes. An .XLSX format of the full survey instrument is also included to support interpretation and reuse of the dataset.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operating a full tungsten actively cooled tokamak: overview of WEST first phase of operation

WEST is an MA class superconducting, actively cooled, full tungsten (W) tokamak, designed to operate in long pulses up to 1000 s. In support of ITER operation and DEMO conceptual activities, key missions of WEST are: (i) qualification of high heat flux plasma-facing components in integrating both technological and physics aspects in relevant heat and particle exhaust conditions, particularly for the tungsten monoblocks foreseen in ITER divertor; (ii) integrated steady-state operation at high confinement, with a focus on power exhaust issues. During the phase 1 of operation (2017–2020), a set of actively cooled ITER-grade plasma facing unit prototypes was integrated into the inertially cooled W coated startup lower divertor. Up to 8.8 MW of RF power has been coupled to the plasma and divertor heat flux of up to 6 MW m –2 were reached. Long pulse operation was started, using the upper actively cooled divertor, with a discharge of about 1 min achieved. This paper gives an overview of the results achieved in phase 1. Perspectives for phase 2, operating with the full capability of the device with the complete ITER-grade actively cooled lower divertor, are also described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

MSTL Re-Start Phase 1.5 Project Final Report

This document provides an overview of re-start efforts at Sandia National Laboratories (SNL), National Solar Thermal Test Facility (NSTTF), for the SNL Molten Salt Test Loop (MSTL). MSTL is one of the world’s only industrial-scale molten salt test systems, capable of testing commercial-scale thermal hydraulic equipment at an industrial scale, required for confident bankability of products. This work was facilitated as part of the Phase 1 re-start effort for facilitating forensics assessments to inform final refurbishments and upgrades costs and schedule information for revitalizing MSTL for use during a separate Phase 2 effort. This work was facilitated to further de-risk a Phase 2 effort pertaining to the tank and the pump, which were considered during Phase 1 to be high-risk items for a successful re-start. Impact from a successful re-start will allow SNL and other industrial molten salt systems companies, such as those in the Market Utilization Report provided in the Phase 1 submission package. An objective of this document is to also ensure longevity of utilization of MSTL after re start.

14 SOLAR ENERGY↗

MFIX DEM Enhancement for Industry-Relevant Flows (Final Report)

The overall goal of this two-phase project is to implement performance improvements of the Multiphase Flow with Interphase Exchanges (MFIX) Discrete Element Model (DEM) code that enable a transformative shift for industrial use. Prior to this effort, the largest simulations performed using MFIX are O(10 7 ) particles. This falls short of the O(10 9 ) particle simulations that must be completed on a timescale of days or weeks (vs. months or years) to enable simulations with physically-relevant domain sizes to be incorporated into industrial design cycles within five years. This was accomplished by tailoring best-in-class practices to bear on the unique challenges posed by the MFIX-DEM algorithm and code base. Scientific simulations (e.g., in cosmology, turbulent combustion) routinely use massively parallel computing to update far more particles in short wall clock times. Results from Phase 1 (1.5 years in duration) indicated significant gains in speed were possible for a wide range of benchmark cases. Moreover, a survey sent to >35 companies indicates that the timing is ideal for such an enhanced tool, with >80% of the respondents indicating that DEM is already value-added or will be within the next 5 years, and >70% of the respondents indicating that improved speed is the top computational priority. In Phase 2 (3.5 years in duration), the two major barriers that hinder industry from effectively using multiphase Computational Fluid Dynamics (CFD) to cut costs and improve performance, namely computational overhead and confidence in predictions, continued to be addressed. Regarding the former, the results from Phase 1 to guide the effort, with enhancements focused on an improved time-stepping algorithm and particle sorting. Four target problems of 1 billion particles each and increasing complexity were identified: homogeneous cooling, tumbler with continuous particle size distribution, discharge from a rectangular hopper and a cylindrical riser. Each of these were successfully simulated for relevant time scales (on order of seconds) using less than 24 hours of wall clock time. These represent the first 1-billion particle DEM simulations performed with MFIX, namely using the MFIX-Exa code. This code is currently under development at NETL in collaboration with Lawrence Berkeley National Laboratory. Regarding the second barrier on predictive uncertainty, experiments from Phase 1 (interacting nozzles - hydrodynamics only) and Phase 2 (very small-scale segregation experiments) were used to demonstrate the ability of two simplified approaches to uncertainty quantification (UQ). By limiting the number of particles, UQ based on the simplified treatment was compared to standard UQ, which was shown to have much higher computational demands. Experiments were also performed on a pilot-scale stripper unit to provide validation data for future CFD-DEM simulations and UQ.

20 FOSSIL-FUELED POWER PLANTS↗

The CYBER security – Competency Health and Maturity Progression (CYBER-CHAMP) model: Extending the National Initiative for Cybersecurity Education (NICE) Framework Across Organizational Security

Problem Statement: There is a pervasive talent deficit in the cybersecurity industry that prevents employers from being able to fill their open positions efficiently. A holistic approach to security is required to ensure organizations have adequate prevention and response capabilities in case of a cyberattack. Specifically, industrial control systems (ICS’s) and their operational technology (OT) components have become a constant target for cyberattacks. Research Questions: It is proposed that the NICE Framework should be extended in the following areas: 1) Include guidance regarding the job roles and competencies for both IT and OT professionals. 2) Offer step-by-step solutions, based on the work role mappings from the NICE Framework, to increase cybersecurity through employee training and education. 3) Provide a streamlined, lifecycle approach to building a cybersecurity program. Contribution: The CYBER security – Competency Health and Maturity Progression (CYBER-CHAMP©) model provides a customized solution for businesses to understand their education gaps in organizational security and target areas for improvement. Rationale: The Framework for Improving Critical Infrastructure Cybersecurity v1.1 addresses ICS but does not offer a measurement of cybersecurity maturity or clear methods to ascertain an organization’s current risk profile. In Phases 1 and 5 of the model, measurements are provided to help an organization build their current and target risk profiles. The NICE framework provides a structure for planning an IT cybersecurity workforce, but the OT aspects of cybersecurity are only briefly discussed. The model uses Phases 2-3 to examine the competencies of an organization’s workforce, which includes both IT and OT roles. Current frameworks do not offer next steps to increase an organization’s cybersecurity. During Phase 4, employees’ roles are mapped to training, education, and/or certifications from common vendors. Investigative Approach: The model provides measurements and metrics for both an organization’s status and continual improvement. This improvement methodology includes guidance for creating an overall strategic plan for security improvement via products designed to increase an organization’s operational readiness through workforce competency health. Lessons Learned: Depending on who was participating, there were contradicting answers given in Phase 1 due to different security cultures in the organization. This revelation has influenced the steps listed in the User’s Guide, where Phase 1’s first recommended step is to assemble a team that champions the facilitation and implementation of the model in the organization. During Phase 2, the discovery was made that organizations may be missing roles that are necessary to perform critical cybersecurity functions. By understanding the functional roles and competencies needed, they can contract or hire cybersecurity help to fill these gaps. Implications: Using the model, organizations can discuss quantitative measures for improvement as a business case for advancing their security program. Future research can validate and extend the present theory and model to a variety of environments. It is of interest to investigate additional security roles and knowledge domains that are used to build standardized cybersecurity curriculum.

97 MATHEMATICS AND COMPUTING↗

Single-phase Ru 1- x-y Mn x Co y O 2 nanoparticles as highly effective oxygen reduction electrocatalysts in alkaline media with enhanced stability and fuel-tolerance

Here, a series of single-phase binary and ternary ruthenium and transition metal oxide nanoparticles supported on Vulcan - Ru 1-x MnxO2/C, Ru1-xCoxO 2 /C, Ru 1-x-y MnxCo y O 2 /C, Ru 1-x Fe x O 2 /C, Ru 1-x Ni x O 2 /C and Ru 1-x V x O 2 /C, as well as RuO 2 /C, MnO 2 /C, Co 3 O 4 /C and Mn 3-x Co x O 4 /C - were synthesized via a facile method and studied for their oxygen reduction reaction (ORR) activity in alkaline media. Single-phase Ru 1-x Mn x O 2 /C, Ru 1-x-y Mn x Co y O 2 /C and Ru 1-x Co x O 2 /C catalysts significantly boosted ORR kinetics in alkaline media. Moreover, they were H 2 and methanol tolerant, and exhibited long term stability due to their single-phase structure. Ru 0.85 Mn 0.15 O 2 /C stood out as the most active catalyst among them. A volcano relationship of the ORR activity of these binary and ternary metal oxide catalysts vs. the O adsorption energy was found, with the maximum activity observed for the Ru 1-x Mn x O 2 /C, Ru 1-x-y Mn x Co y O 2 /C and Ru 1-x Co x O 2 /C catalysts due to their optimal O binding energy. These materials have potential applications as highly active ORR catalysts in alkaline fuel cells and metal-air batteries.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dose Rate Analysis of the WCS Consolidated Interim Storage Facility

This report describes a confirmatory calculation for a proposed consolidated interim storage facility (CISF) to support the US Nuclear Regulatory Commission’s review of the license application submitted by the Interim Storage Partners. The scope of this report is limited to an assessment of the annual dose from direct radiation associated with Phase 1 of the Waste Control Specialists (WCS) CISF and the determination of the minimum controlled area boundary based on the 10 CFR 72.104 limit of 25 mrem annual dose to the whole body. The confirmatory dose rate calculations used the source term and shielding calculation capabilities of the SCALE 6.2.3 computer code system. The calculation method employed in the confirmatory calculations uses a detailed Monte Carlo radiation transport simulation from source to dose rate. This method differs from the two-step method used in the safety analysis report (SAR), which requires determination of the photon and neutron energy and angular distributions on the cask external surface and then the use of this surface source in a new radiation transport calculation to determine dose rate as a function of distance from the storage facility. A simulation was made using the complete site geometry (all casks present) but with only one cask containing source, and a total of 467 independent calculations were performed to obtain the dose rate maps produced by each storage cask. Basic input data and assumptions used in the SAR (e.g., cask design parameters and design basis assembly characteristics) were used in this confirmatory calculation for consistency with the SAR. Local atmospheric conditions for skyshine calculations were simulated using US standard atmosphere data, which describe average air temperature, pressure, and density as a function of altitude. The determined minimum required distances from the WCS Phase 1 CISF to a contour defined by the 25 mrem annual dose limit were approximately 623 m (0.387 miles) in the N-NE direction, 594 m (0.369 miles) in the SSW direction, and 533 m (0.331 miles) in the E-SE direction and the W-NW direction. The annual dose results of the confirmatory calculation are in relatively good agreement with the annual dose values presented in the WCS SAR. The annual dose produced by the Phase 1 CISF at the nearest site boundary, 0.75 miles away from the CISF, was estimated by this study to be approximately 6.02E-02 ± 2.0E-04 mrem, which is significantly smaller than the 25 mrem annual dose limit provided in 10 CFR 72.104. The SAR annual dose rate value for the nearest site boundary was 7.52E-2 mrem, which included 7.73E-03 mrem due to postulated leakage of the FO-, FC-, and FF-canisters. A comparison with the dose rate values reported in the SAR for 16 detector locations, D1 through D16, on the protected area boundary is also included in this report. This comparison shows that the SAR determined higher annual dose values for detectors D1 through D14 by 12% to 45% and lower annual dose values for detectors D15 and D16 by 18% and 8%, respectively, as compared with this ORNL confirmatory calculation. Sensitivity studies have been performed to support a comprehensive review of the application. In these studies, the effects on dose rate of the modeled air volume, density, and humidity were analyzed. The sensitivity calculations showed that the air volume used in the Monte Carlo simulations was adequate and that a larger air volume would not further increase the dose rate due to skyshine contributions. The sensitivity analysis showed that simulation of local atmospheric conditions is important for the accuracy of dose rate estimates at large distances from the facility. Air humidity was demonstrated to have negligible effects on dose rate values for the simulated local atmospheric conditions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will catalyze economic growth and job creation through a coalition team of private industry, university, and state, local, and federal government entities. A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Higher Hall conductivity from a single wave function: Obstructions to symmetry-preserving gapped edge of (2+1)-dimensional topological order

A (2+1)D topologically ordered phase with U(1) symmetry may or may not have a symmetric gapped edge state, even if both thermal and electric Hall conductivity are vanishing. It has recently been discovered that there are “higher” versions of Hall conductivity valid for fermionic fractional quantum Hall (FQH) states that obstruct symmetry-preserving gapped edge states beyond thermal and electric Hall conductivity. In this paper, we show that one can extract higher Hall conductivity from a single wave function of an FQH state, by evaluating the expectation value of the “partial rotation” unitary, which is a combination of partial spatial rotation and a U(1) phase rotation. This result is verified numerically with the fermionic Laughlin state with 𝜈=1/3 and 1/5, as well as the non-Abelian Moore-Read state. Together with topological entanglement entropy, we prove that the expectation values of the partial rotation completely determine if a bosonic/fermionic Abelian topological order with U(1) symmetry has a symmetry-preserving gappable edge state or not. We also show that thermal and electric Hall conductivity of Abelian topological order can be extracted by partial rotations. Even in non-Abelian FQH states, partial rotation provides the Lieb-Schultz-Mattis type theorem constraining the low-energy spectrum of the bulk-boundary system. The generalization of higher Hall conductivity to the case with Lie group symmetry is also presented.

2-dimensional systems↗

Impacts of the boreal summer intraseasonal oscillation on precipitation extremes in Indonesia

The relationship between boreal summer intraseasonal oscillation (BSISO) and precipitation extremes over Indonesia is investigated using observational datasets from 30 years (1987–2016) of rain gauge measurements and the gridded Asian Precipitation–Highly Resolved Observational Data Integration Towards Evaluation of Water Resources from 1998 to 2015. The results indicate that the frequency of daily extreme precipitation events in Indonesia (defined as total precipitation above the 95th percentile) during extended boreal summer (May–August) is significantly modulated by BSISO, especially over the western and northern regions. Under the influences of BSISO1, the probability of the precipitation extremes over Sumatra and Borneo increases by 20–120% (relative to the seasonal probability) during phases 1–3 and approximately 50–80% over the eastern part of Borneo and Sulawesi during phase 4. Under BSISO2, the probability of the extremes increases up to 40% over Sumatra during phases 1 and 2 and up to 140% over Borneo and Sulawesi during phases 2 and 3. The increase in the probability of extreme summer precipitation is associated with enhanced large–scale moisture flux convergence and upward moisture transport induced by the active phases of BSISO. Finally, these results provide potential information for medium–to extended–range predictions of summer precipitation extremes in Indonesia.

54 ENVIRONMENTAL SCIENCES↗

WEST full tungsten operation with an ITER grade divertor

The mission of WEST (tungsten-W Environment in Steady-state Tokamak) is to explore long pulse operation in a full tungsten (W) environment for preparing next-step fusion devices (ITER and DEMO) with a focus on testing the ITER actively cooled W divertor in tokamak conditions. Following the successful completion of phase 1 (2016-2021), phase 2 started in December 2022 with the lower divertor made entirely of actively cooled ITER-grade tungsten mono-blocks. A boronization prior the first plasma attempt allowed for a smooth startup with the new divertor. Despite the reduced operating window due to tungsten, rapid progress has been made in long pulse operation, resulting in discharges with a pulse length of 100 s and an injected energy of around 300 MJ per discharge. Plasma startup studies were carried out with equatorial boron nitride limiters to compare them with tungsten limiters, while Ion Cyclotron Resonance Heating assisted startup was attempted. High fluence operation in attached regime, which was the main thrust of the first campaigns, already showed the progressive build up of deposits and appearance of dust, impacting the plasma operation as the plasma fluence increased. In total, the cumulated injected energy during the first campaigns reached 43 GJ and the cumulated plasma time exceeded 5 h. Demonstration of controlled X-Point Radiator regime is also reported, opening a promising route for investigating plasma exhaust and plasma-wall interaction issues in more detached regime. This paper summarises the lessons learned from the manufacturing and the first operation of the ITER-grade divertor, describing the progress achieved in optimising operation in a full W environment with a focus on long pulse operation and plasma wall interaction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Deployment Readiness Framework Subtask 1.1 (Literature Review)

Island and remote coastal communities face some of the most challenging environments for building, operating, and maintaining energy infrastructure, as well as the highest costs for electricity, fuels, and other essential energy sources. As sea-levels rise and storms become more intense and frequent, these communities and the energy infrastructure that supports coastal lives and livelihoods are also at increasing risk from natural hazards. To address these challenges, many coastal communities are envisioning energy solutions that will support the triple bottom line goals of the blue economy: economic growth, environmental sustainability, and social equity. Yet, island and remote coastal communities often face limited resources and capacity to tackle complex energy and coastal resilience issues. To support community-driven energy transitions in island and remote communities, and to better understand relationships between energy, community, and ecosystem resilience, the Department of Energy’s Water Power Technologies Office (WPTO) has initiated the development of a Deployment Readiness Framework (DRF). The objective of the work is to co-produce and test practical tools and approaches that assess the readiness of coastal communities for marine energy demonstration, deployment, and operation. The DRF aims to build on and support the Energy Transitions Initiative Partnership Program (ETIPP) and other community-oriented energy transition programs. This project is jointly led by Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL). The development of the DRF includes three main phases: 1) a learning phase involving stakeholder engagement and literature review to synthesize metrics of community readiness to advance through an energy transition and to understand the state of the research and practice of participatory science-policy processes in various sectors, 2) a design phase to define readiness approaches and tools that will be developed as part of the DRF, and 3) an implementation phase to create the applications and interfaces for WPTO and the national laboratories to interact with the DRF. All three phases include close collaboration with communities and end-users of the framework, first to identify gaps in the science and tools needed to achieve community-driven energy transition goals and second, to test and improve the framework iteratively. Through technical assistance programs like ETIPP and utilizing the completed DRF to understand the influencing factors which motivate or deter energy transitions, WPTO hopes to engage a number of near-term marine energy demonstration opportunities. Here we report on the results from the literature review (Subtask 1.1) to inform the stakeholder engagement (Subtask 1.2) and design phase (Task 2) of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Antiferromagnetic Fe Te 2 1 T - phase formation at the Sb 2 Te 3 / Ni 80 Fe 20 interface

Bilayer topological insulator/ferromagnet (TI/FM) heterostructures are promising for spintronic applications due to their low switching energy and therefore power efficiency. Until recently, the reactivity of TI with FM films was overlooked in the spin orbit-torque literature, even though there are reports that it is energetically favorable for TIs to react with transition metals and form interfacial layers. Here, in this study we fabricated a TI/FM heterostructure comprised of molecular beam epitaxy grown Sb 2 Te 3 and DC sputtered Ni 80 Fe 20 . Broadband ferromagnetic resonance revealed spin-pumping evident by the significant enhancement in Gilbert damping, which is likely a signature of the topological surface states or the presence of large spin-orbit-coupling in the adjacent Sb 2 Te 3 . With low-temperature magnetometry, an exchange bias is observed which indicates an exchange interaction between an antiferromagnet (AFM) and an adjacent FM. Cross-section high-angle annular dark field scanning transmission electron microscopy (HAADF-STEM) characterization of the Sb 2 Te 3 - Ni 80 Fe 20 bilayer revealed a complex interface showing diffusion of Fe and Ni into the Sb 2 Te 3 film yielding the formation of a FeTe 2 1T-type structural phase. Furthermore, density functional theory calculations revealed that the FeTe 2 1T-phase has an AFM ground state. Due to experimental limitations in the electron energy loss spectroscopy measurements precise chemistry of the interfacial phase could not be determined, therefore it is possible that the FeTe 2 1T and/or an intermixed (Fe 1-x Ni x )Te 2 1T is the AFM interfacial phase contributing to exchange bias in the system. This work emphasizes the chemical complexity of TI/FM interfaces that host novel, metastable magnetic topological phases and require more in-depth studies of other similar interfaces.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Sister Rod Destructive Examinations (FY2021) Appendix E Mechanical Testing

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. This report documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cooling rate dependence of charge density wave phases in 1 T -TaS 2 studied by scanning tunneling microscopy and x-ray diffraction

The role of dynamics in the charge density wave (CDW) phases of 1T-TaS 2 , especially in accessing metastable phases, is still under scrutiny. We investigated cooling rate dependence on low-temperature CDW phases in this material by scanning tunneling microscopy and x-ray diffraction. In the majority of cases, we found the typical low temperature commensurate CDW and identified no other differences between samples that were fast cooled vs slow cooled from room temperature. In rare cases (1/18 STM experiments and 1/30 XRD experiments), we found a multi-domain structure in the low temperature CDW. The domain structure and metallic behavior revealed by STM and STS measurements of this phase are in excellent agreement with the previously reported metallic mosaic CDW phase.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗