Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Path planning for robotic truss assembly

A new Potential Fields approach to the robotic path planning problem is proposed and implemented. Our approach, which is based on one originally proposed by Munger, computes an incremental joint vector based upon attraction to a goal and repulsion from obstacles. By repetitively adding and computing these 'steps', it is hoped (but not guaranteed) that the robot will reach its goal. An attractive force exerted by the goal is found by solving for the the minimum norm solution to the linear Jacobian equation. A repulsive force between obstacles and the robot's links is used to avoid collisions. Its magnitude is inversely proportional to the distance. Together, these forces make the goal the global minimum potential point, but local minima can stop the robot from ever reaching that point. Our approach improves on a basic, potential field paradigm developed by Munger by using an active, adaptive field - what we will call a 'flexible' potential field. Active fields are stronger when objects move towards one another and weaker when they move apart. An adaptive field's strength is individually tailored to be just strong enough to avoid any collision. In addition to the local planner, a global planning algorithm helps the planner to avoid local field minima by providing subgoals. These subgoals are based on the obstacles which caused the local planner to fail. A best-first search algorithm A* is used for graph search.

Sanderson, Arthur C.↗

ESSOPE: Towards S/C operations with reactive schedule planning

The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

Wheadon, J.↗

Planning Complex Projects Automatically

Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

Henke, Andrea L.↗

ISLE: Intelligent Selection of Loop Electronics. A CLIPS/C++/INGRES integrated application

The Intelligent Selection of Loop Electronics (ISLE) system is an integrated knowledge-based system that is used to configure, evaluate, and rank possible network carrier equipment known as Digital Loop Carrier (DLC), which will be used to meet the demands of forecasted telephone services. Determining the best carrier systems and carrier architectures, while minimizing the cost, meeting corporate policies and addressing area service demands, has become a formidable task. Network planners and engineers use the ISLE system to assist them in this task of selecting and configuring the appropriate loop electronics equipment for future telephone services. The ISLE application is an integrated system consisting of a knowledge base, implemented in CLIPS (a planner application), C++, and an object database created from existing INGRES database information. The embedibility, performance, and portability of CLIPS provided us with a tool with which to capture, clarify, and refine corporate knowledge and distribute this knowledge within a larger functional system to network planners and engineers throughout U S WEST.

Fischer, Lynn↗

SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

Frank, Jeremy↗

Plan Execution Interchange Language (PLEXIL)

Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.

Estlin, Tara↗

System Architecture Modeling for Technology Portfolio Management using ATLAS

Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

Thompson, Robert W.↗

Optimal Planning and Problem-Solving

CTAEMS MDP Optimal Planner is a problem-solving software designed to command a single spacecraft/rover, or a team of spacecraft/rovers, to perform the best action possible at all times according to an abstract model of the spacecraft/rover and its environment. It also may be useful in solving logistical problems encountered in commercial applications such as shipping and manufacturing. The planner reasons around uncertainty according to specified probabilities of outcomes using a plan hierarchy to avoid exploring certain kinds of suboptimal actions. Also, planned actions are calculated as the state-action space is expanded, rather than afterward, to reduce by an order of magnitude the processing time and memory used. The software solves planning problems with actions that can execute concurrently, that have uncertain duration and quality, and that have functional dependencies on others that affect quality. These problems are modeled in a hierarchical planning language called C_TAEMS, a derivative of the TAEMS language for specifying domains for the DARPA Coordinators program. In realistic environments, actions often have uncertain outcomes and can have complex relationships with other tasks. The planner approaches problems by considering all possible actions that may be taken from any state reachable from a given, initial state, and from within the constraints of a given task hierarchy that specifies what tasks may be performed by which team member.

Clemet, Bradley↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

Robot Sequencing and Visualization Program (RSVP)

The Robot Sequencing and Visualization Program (RSVP) is being used in the Mars Science Laboratory (MSL) mission for downlink data visualization and command sequence generation. RSVP reads and writes downlink data products from the operations data server (ODS) and writes uplink data products to the ODS. The primary users of RSVP are members of the Rover Planner team (part of the Integrated Planning and Execution Team (IPE)), who use it to perform traversability/articulation analyses, take activity plan input from the Science and Mission Planning teams, and create a set of rover sequences to be sent to the rover every sol. The primary inputs to RSVP are downlink data products and activity plans in the ODS database. The primary outputs are command sequences to be placed in the ODS for further processing prior to uplink to each rover. RSVP is composed of two main subsystems. The first, called the Robot Sequence Editor (RoSE), understands the MSL activity and command dictionaries and takes care of converting incoming activity level inputs into command sequences. The Rover Planners use the RoSE component of RSVP to put together command sequences and to view and manage command level resources like time, power, temperature, etc. (via a transparent realtime connection to SEQGEN). The second component of RSVP is called HyperDrive, a set of high-fidelity computer graphics displays of the Martian surface in 3D and in stereo. The Rover Planners can explore the environment around the rover, create commands related to motion of all kinds, and see the simulated result of those commands via its underlying tight coupling with flight navigation, motor, and arm software. This software is the evolutionary replacement for the Rover Sequencing and Visualization software used to create command sequences (and visualize the Martian surface) for the Mars Exploration Rover mission.

Cooper, Brian K.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Crew Autonomy through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

Crew Autonomy Through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

Leveraging Automated Fiber Placement Computer Aided Process Planning Framework for Defect Validation and Dynamic Layup Strategies

Process planning represents an essential stage of the Automated Fiber Placement (AFP) workflow. It develops useful and efficient machine processes based upon the working material, composite design, and manufacturing resources. The current state of process planning requires a high degree of interaction from the process planner and could greatly benefit from increased automation. Therefore, a list of key steps and functions are created to identify the more difficult and time-consuming phases of process planning. Additionally, a set of metrics must exist by which to evaluate the effectiveness of the manufactured laminate from the machine code created during the Process Planning stage. Layup strategies, in addition to dog ears, stagger shifts, steering constraints, and starting points, represented the group of functions labeled as process optimization and ranked the highest in terms of priority for automation. The laminates resulting from the selected parameters are evaluated through the occurrences of principal defect metrics such as fiber gaps, overlaps, angle deviation and steering violations. This document presents an automated software solution to the layup strategy and starting point selection phase of process planning. A series of ply scenarios are generated with variations of these ply parameters and evaluated according to a set of metrics entered by the Process Planner. These metrics are generated through use of the Analytical Hierarchy Process (AHP), where relative importance between each of the fiber features are defined. The ply scenarios are selected which reduce the overall fiber feature scores based on the defects the Process Planner wishes to minimize.

HiCAM↗

Automated Fiber Placement Through Thickness Defect Stacking Optimization

In its 2022 commercial market outlook, Boeing forecasted an 80% increase in the global fleet through 2041 compared to 2019 pre-pandemic levels. This sharp rise in demand will drive pressure onto airframe manufacturers to ramp up production and find more efficient ways to design and manufacture airplanes. Complicating this challenge is the industry’s recent transformation from traditional metal-based airframes towards hybrid composite-metal aircraft. While composites have been used in aviation for decades, aircraft manufacturers are still struggling to design and manufacture quality parts at a high rate. Automated Fiber Placement (AFP) is one of the main manufacturing techniques used to produce large-scale composite parts. After a design has been created, a manufacturing strategy has to be developed based on the working material, part geometry, and machine capabilities. This process planning stage is essential to the AFP workflow and currently requires a high level of manual input from an experienced process planner. In an effort to automate and optimize this stage, the Computer Aided Process Planning (CAPP) module was developed. CAPP assists process planners in identifying optimal starting point location and layup strategy for each ply of a laminate. This Ply-Level Optimization (PLO) phase operates on the quantification of ply quality through predictable geometry-based defects such as gaps, overlaps, angle deviation, and steering. As you move from PLO to Laminate-Level Optimization (LLO) the design space grows exponentially, emphasizing the need for automated optimization. The work presented in this thesis expands CAPP’s functionality by comparing the planned fiber paths through the thickness of the laminate to mitigate stacked area defects and achieve an optimal laminate-level manufacturing strategy. Within CAPP, predicted gap and overlap defects are imported from Vericut Composites Programming (VCP) and then discretized to streamline the through-thickness comparison. Two objective functions are used to score different combinations of ply layup strategies based on defect stacking both globally and locally. Four combinatorial optimization algorithms were coupled with these objective functions to investigate the laminate-level manufacturing strategy design space and converge on the optimal plan. These algorithms were evaluated based on accuracy and efficiency through virtual testing on a complex tool surface. A separate LLO approach was developed to achieve near-optimal laminates in significantly less time. The end result is a software package which greatly reduces the required input from process planners, shortening the design-build cycle time and improving part quality.

AFP↗

On-Board Planning for New Millenium Deep Space One Autonomy

The Deep Space One (DS1) mission, scheduled to fly in 1998, will be the first NASA spacecraft to feature an on-board planner. The planner is part of an artificial intelligence based control architecture that comprises the planner/scheduler, a plan execution engine, and a model-based fault diagnosis and reconfiguration engine...This paper describes the on-board planning and scheduling component of the DS1 autonomy architecture.

Deep↗

Visual‐Analytics Bridge Complexity and Accessibility for Robust Urban Water Planning

Urban water resources planning is complicated by unprecedented uncertainty in supply and demand. Real‐world planning often simplifies the full range of uncertainty faced by a system into a limited set of deterministic scenarios to enhance accessibility for decision‐makers and the public. However, overlooking uncertainty can expose the system to failures. On the other end of the spectrum, academically developed tools for scenario analysis rigorously quantify the combined effects of multiple sources of uncertainty, but the practical application of these models is limited by the challenges of information visualization and communication of results. In short, municipal water supply planners lack access to planning frameworks that effectively integrate a rigorous treatment of uncertainty with accessible, user‐friendly visual and interactive tools to enhance user accessibility. In this work, we fill this gap by proposing Visual‐Robust Decision Making, and demonstrate an application for the city of Santa Barbara (SB), CA. Santa Barbara faces multiple uncertainties from pending state and federal regulations to changing hydrology and water demand. The city seeks to increase its water portfolio robustness by expanding its seawater desalination plant, but must decide how much capacity to add. We introduce computational tools that assess uncertainty across nine uncertain drivers identified with the help of water planners in SB. To allow public participation in the desalination expansion decision, we develop interactive visual‐analytics to aid decision‐makers and stakeholders in navigating complex scenario analysis outcomes. Our results quantify the tradeoffs between increased capacity and system robustness and aim to enhance participation and uncertainty characterization of urban water planning efforts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing heat resilience coordination in networks of plans

Networks of plans coordinating on hazard mitigation can limit losses. We offer a novel network analysis methodology to investigate how networks of plans explicitly coordinate, and the purpose and nature of coordination. We illustrate the method using networks of plans shaping heat resilience in seven Arizona cities. The network analysis can help planners to identify influential plans that need to be high quality, peripheral plans, and potential governance silos. Furthermore, investigation into plan roles offers an ontological lens into how plans network, consult, and share information. The nature of coordination varies by purpose. General plans are cited for goals, while hazard mitigation plans are referenced for heat fact base. Transportation plans cite goals and fact base in other transportation plans, but rarely cite other plan types. Furthermore, these findings will help planners to consider the roles and merits of different plans while integrating hazards across the next generation of networks of plans.

coordination↗