Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Package”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The earth resources experiment package on Skylab and proposed resource investigations.

In late 1973, NASA plans to launch a three-man experimental space station, the Skylab Workshop. Technical specifications regarding the instrumental facilities of the space station are presented, giving attention to the multispectral photographic facility, the IR spectrometer, the multispectral scanner, the L-band radiometer, and the S-193 sensor. The S-193 sensor will provide data applicable to studying varying ocean surfaces, wave conditions, sea and lake ice, ocean clouds, weather prediction, and soil types. All data from the sensors will be recorded on film and analog magnetic tape for return at the end of each manned period of Skylab.

Park, A. B.↗

SeaTrack: Ground station orbit prediction and planning software for sea-viewing satellites

An orbit prediction software package (Sea Track) was designed to assist High Resolution Picture Transmission (HRPT) stations in the acquisition of direct broadcast data from sea-viewing spacecraft. Such spacecraft will be common in the near future, with the launch of the Sea viewing Wide Field-of-view Sensor (SeaWiFS) in 1994, along with the continued Advanced Very High Resolution Radiometer (AVHRR) series on NOAA platforms. The Brouwer-Lyddane model was chosen for orbit prediction because it meets the needs of HRPT tracking accuracies, provided orbital elements can be obtained frequently (up to within 1 week). Sea Track requires elements from the U.S. Space Command (NORAD Two-Line Elements) for the satellite's initial position. Updated Two-Line Elements are routinely available from many electronic sources (some are listed in the Appendix). Sea Track is a menu-driven program that allows users to alter input and output formats. The propagation period is entered by a start date and end date with times in either Greenwich Mean Time (GMT) or local time. Antenna pointing information is provided in tabular form and includes azimuth/elevation pointing angles, sub-satellite longitude/latitude, acquisition of signal (AOS), loss of signal (LOS), pass orbit number, and other pertinent pointing information. One version of Sea Track (non-graphical) allows operation under DOS (for IBM-compatible personal computers) and UNIX (for Sun and Silicon Graphics workstations). A second, graphical, version displays orbit tracks, and azimuth-elevation for IBM-compatible PC's, but requires a VGA card and Microsoft FORTRAN.

Lambert, Kenneth S.↗

Science and Observation Recommendations for Future NASA Carbon Cycle Research

Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.

McClain, Charles R.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Remote sensing technologies for Space Missions in the second half of the nineties' decade

The remote sensing research and technology to be used in the development of future NASA missions are discussed, with consideration given to earth sciences, planetary sciences, solar physics, and astrophysics. The remote sensing missions planned in the four application areas, their payload packages, and the particular instruments that will make up these packages are described. The advanced technologies to be used include systems and devices that address the detection of radiation in the radio, microwave, millimeter wave, submillimeter wave, IR, visible, UV, X-ray, and gamma-ray parts of the spectrum, including supporting technologies, such as optics, liquid cryogen transfer systems, and 'smart' sensors.

Sokoloski, M. M.↗

Hybrid Propulsion Technology Program, phase 1. Volume 1: Executive summary

The study program was contracted to evaluate concepts of hybrid propulsion, select the most optimum, and prepare a conceptual design package. Further, this study required preparation of a technology definition package to identify hybrid propulsion enabling technologies and planning to acquire that technology in Phase 2 and demonstrate that technology in Phase 3. Researchers evaluated two design philosophies for Hybrid Rocket Booster (HRB) selection. The first is an ASRM modified hybrid wherein as many components/designs as possible were used from the present Advanced Solid Rocket Motor (ASRM) design. The second was an entirely new hybrid optimized booster using ASRM criteria as a point of departure, i.e., diameter, thrust time curve, launch facilities, and external tank attach points. Researchers selected the new design based on the logic of optimizing a hybrid booster to provide NASA with a next generation vehicle in lieu of an interim advancement over the ASRM. The enabling technologies for hybrid propulsion are applicable to either and vehicle design may be selected at a downstream point (Phase 3) at NASA's discretion. The completion of these studies resulted in ranking the various concepts of boosters from the RSRM to a turbopump fed (TF) hybrid. The scoring resulting from the Figure of Merit (FOM) scoring system clearly shows a natural growth path where the turbopump fed solid liquid staged combustion hybrid provides maximized payload and the highest safety, reliability, and low life cycle costing.

Source record↗

The Maneuver Planning Process for the Microwave Anisotropy Probe (MAP) Mission

The Microwave Anisotropy Probe (MAP) was successfully launched from Kennedy Space Center's Eastern Range on June 30, 2001. MAP will measure the cosmic microwave background as a follow up to NASA's Cosmic Background Explorer (COBE) mission from the early 1990's. MAP will take advantage of its mission orbit about the Sun-Earth/Moon L2 Lagrangian point to produce results with higher resolution, sensitivity, and accuracy than COBE. A strategy comprising highly eccentric phasing loops with a lunar gravity assist was utilized to provide a zero-cost insertion into a lissajous orbit about L2. Maneuvers were executed at the phasing loop perigees to correct for launch vehicle errors and to target the lunar gravity assist so that a suitable orbit at L2 was achieved. This paper will discuss the maneuver planning process for designing, verifying, and executing MAP's maneuvers. A discussion of the tools and how they interacted will also be included. The maneuver planning process was iterative and crossed several disciplines, including trajectory design, attitude control, propulsion, power, thermal, communications, and ground planning. Several commercial, off-the-shelf (COTS) packages were used to design the maneuvers. STK/Astrogator was used as the trajectory design tool. All maneuvers were designed in Astrogator to ensure that the Moon was met at the correct time and orientation to provide the energy needed to achieve an orbit about L2. The Mathworks Matlab product was used to develop a tool for generating command quaternions. The command quaternion table (CQT) was used to drive the attitude during the perigee maneuvers. The MatrixX toolset, originally written by Integrated Systems, Inc., now distributed by Mathworks, was used to create HiFi, a high fidelity simulator of the MAP attitude control system. HiFi was used to test the CQT and to make sure that all attitude requirements were met during the maneuver. In addition, all ACS data plotting and output were generated in MatrixX. A final test used FlatSat, a real-time hardware-in-the-loop simulator, which used identical MAP flight code to simulate operations on the spacecraft. Simulations in FlatSat allowed the MAP team to verify maneuver commands, timing, and spacecraft configuration before the commands were sent up to the spacecraft for execution. The MAP maneuver team successfully pieced together all of these COTS tools for designing MAP's maneuvers and MAP is now collecting data at L2.

Mesarch, Michael A.↗

Monolithic Microwave Integrated Circuit (MMIC) Phased Array Demonstrated With ACTS

Monolithic Microwave Integrated Circuit (MMIC) arrays developed by the NASA Lewis Research Center and the Air Force Rome Laboratory were demonstrated in aeronautical terminals and in mobile or fixed Earth terminals linked with NASA's Advanced Communications Technology Satellite (ACTS). Four K/Ka-band experimental arrays were demonstrated between May 1994 and May 1995. Each array had GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The 30-GHz transmit array used in uplinks to ACTS was developed by Lewis and Texas Instruments. The three 20-GHz receive arrays used in downlinks from ACTS were developed in cooperation with the Air Force Rome Laboratory, taking advantage of existing Air Force integrated-circuit, active-phased-array development contracts with the Boeing Company and Lockheed Martin Corporation. Four demonstrations, each related to an application of high interest to both commercial and Department of Defense organizations, were conducted. The location, type of link, and the data rate achieved for each of the applications is shown. In one demonstration-- an aeronautical terminal experiment called AERO-X--a duplex voice link between an aeronautical terminal on the Lewis Learjet and ACTS was achieved. Two others demonstrated duplex voice links (and in one case, interactive video links as well) between ACTS and an Army high-mobility, multipurpose wheeled vehicle (HMMWV, or "humvee"). In the fourth demonstration, the array was on a fixed mount and was electronically steered toward ACTS. Lewis served as project manager for all demonstrations and as overall system integrator. Lewis engineers developed the array system including a controller for open-loop tracking of ACTS during flight and HMMWV motion, as well as a laptop data display and recording system used in all demonstrations. The Jet Propulsion Laboratory supported the AERO-X program, providing elements of the ACTS Mobile Terminal. The successful performance of experimental, proof-of-concept MMIC K/Ka-band arrays developed with U.S. industry in field demonstrations with ACTS indicates that high density MMIC integration at 20 and 30 GHz is indeed feasible. The successful development and demonstration of the MMIC array systems was possible only because of significant intergovernmental and Government/industry cooperation and the high level of teamwork within Lewis. The results provide a strong incentive for continuing the focused development of MMIC-array technology for satellite communications applications, with emphasis on packaging and cost issues, and for continuing the planning and conducting of other appropriate demonstrations or experiments of phased-array technology with ACTS. Given the present pressures on reducing funding for research and development in Government and industry, the extent to which this can be continued in a cooperative manner will determine whether MMIC array technology will make the transition from the proof-of-concept level to the operational system level.

Source record↗

Graphics Processing Unit (GPU) Devices

This presentation will include information about Graphics Processing Unit (GPU) technology, NASA Electronic Parts and Packaging (NEPP) tasks and their purpose, collaborations, a roadmap, NEPP partners, results to date, and future plans.

Single Event Effects (SEE)↗

Chicago Energy Efficiency Planning and Analysis and Integrated Retrofit Strategy Validation in Single-Family Homes

In June 2020, the project team comprised of Elevate and the National Renewable Energy Laboratory (NREL), with advisory roles from the City of Chicago and Commonwealth Edison, initiated a three-year project with the U.S. Department of Energy to inform communitywide energy planning at a local scale and validate advanced retrofit packages that achieve at least 50% energy savings in existing homes. The project team has characterized Chicago’s single-family and 2-4 unit housing stock and energy use using the ResStock™ modeling tool, and with that information developed advanced whole home energy retrofit packages for single family and 2-4 unit homes that can reduce energy use by at least 50% and support climate, air quality, and other goals. This report presents an analysis of the technical potential of applying these retrofit packages at a City-wide scale, and a roadmap for rapidly scaling up retrofit programs to improve Chicago’s housing stock and target investments in the neighborhoods that need it most. The main goals of the analysis are to: 1) develop a Chicago-specific single-family and 2-4 unit building retrofit prioritization strategy; 2) identify opportunities for beneficial electrification in communities and home types that stand to benefit most; and 3) assess costs and savings potential for retrofit investments at a household and city scale, in terms of energy use, bill impacts, carbon emissions, and other outcomes.

14 SOLAR ENERGY↗

Computer network environment planning and analysis

The GSFC Computer Network Environment provides a broadband RF cable between campus buildings and ethernet spines in buildings for the interlinking of Local Area Networks (LANs). This system provides terminal and computer linkage among host and user systems thereby providing E-mail services, file exchange capability, and certain distributed computing opportunities. The Environment is designed to be transparent and supports multiple protocols. Networking at Goddard has a short history and has been under coordinated control of a Network Steering Committee for slightly more than two years; network growth has been rapid with more than 1500 nodes currently addressed and greater expansion expected. A new RF cable system with a different topology is being installed during summer 1989; consideration of a fiber optics system for the future will begin soon. Summmer study was directed toward Network Steering Committee operation and planning plus consideration of Center Network Environment analysis and modeling. Biweekly Steering Committee meetings were attended to learn the background of the network and the concerns of those managing it. Suggestions for historical data gathering have been made to support future planning and modeling. Data Systems Dynamic Simulator, a simulation package developed at NASA and maintained at GSFC was studied as a possible modeling tool for the network environment. A modeling concept based on a hierarchical model was hypothesized for further development. Such a model would allow input of newly updated parameters and would provide an estimation of the behavior of the network.

Dalphin, John F.↗

STS-86 Day 07 Highlights

On this seventh day of the STS-86 mission, the flight crew, Cmdr. James D. Wetherbee, Jr., Pilot Michael J. Bloomfield, Mission Specialists Scott E. Parazynski, Jean-Loup Chretien, Vladimir G. Titov, Wendy B. Lawrence and Mike Foale are seen in preparations for a planned five-hour spacewalk to retrieve four experiment packages and to test tools and techniques for construction of the International Space Station. Parazynski and Titov are seen floating out of a hatch on Atlantis' tunnel adapter in front of the Orbiter Docking System to begin their spacewalk. They then affix a 121-pound instrument called a Solar Array Cap to the Docking Module for future use by Russian cosmonauts to seal off a suspected breach in the hull of the Spektr Module.

Source record↗

Apollo 17

This is the Press Kit that was given to the various media outlets that were interested in covering the Apollo 17 mission. It includes information about the moon, lunar science, concentrating on the planned mission. The kit includes information about the flight, and the trajectory, planned orbit insertion maneuvers, the extravehicular mission events, a comparison with the Apollo 16, a map of the lunar surface, and the surface activity, information about the Taurus-Littrow landing site, the planned science experiments, the power source for the experiment package and diagrams of some of the instrumentation that was used to perform the experiments.

Garrett, David↗

Aerial Data Acquisition Platform for Firefront Monitoring

Over the past century, wildfires have grown in their destructive tendencies, and have become a threat to civilian lives, infrastructure, and emergency officials. The 2021 NASA Academy at Langley Research Center was tasked with utilizing NASA technology to increase situational awareness and communication amongst both incident officials and the public. With this mission in mind, the Data Acquisition sub-team chose to develop an outline for a small unmanned aircraft system (UAS) package including required specifications, a payload layout, and mission planning. The proposed system would be capable of mapping firelines at a speed of about 9.8 m/s for periods of up to 3.6 hours. The system would also be able to gather near real time data at a lower cost than currently utilized systems.

Firefront monitoring↗

Using Modern Methodologies with Maintenance Software

Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

Scrum↗

Ares I-X First Flight Loss of Vehicle Probability Analysis

As part of the Constellation (Cx) Program development effort, several test flights were planned to prove concepts and operational capabilities of the new vehicles being developed. The first test, involving the Eastern Test Range, is the Ares I-X launched in 2009. As part of this test, the risk to the general public was addressed to ensure it is within Air Force requirements. This paper describes the methodology used to develop first flight estimates of overall loss of vehicle (LOV) failure probability, specifically for the Ares I-X. The method described in this report starts with the Air Force s generic failure probability estimate for first flight and adjusts the value based on the complexity of the vehicle as compared to the complexity of a generic vehicle. The results estimate a 1 in 9 probability of failure. The paper also describes traditional PRA methods used in this assessment, which were then combined with the updated first flight risk methodology to generate inputs required by the malfunction turn analysis to support estimate of casualty (Ec) calculations as part of the Final Flight Data Package (FFDP) delivered to the Eastern Range for Final Flight Plan Approval.

Bigler, Mark A.↗

Standard high-reliability integrated circuit logic packaging

A family of standard, high-reliability hardware used for packaging digital integrated circuits is described. The design transition from early prototypes to production hardware is covered and future plans are discussed. Interconnections techniques are described as well as connectors and related hardware available at both the microcircuit packaging and main-frame level. General applications information is also provided.

Slaughter, D. W.↗

Planned development of the space shuttle vehicle

Information pertaining to the planned development of the space shuttle vehicle is presented. The package contains: (1) President's statement; (2) Dr. Fletcher's statement; (3) space shuttle fact sheet; (4) important reasons for the space shuttle.

Source record↗