Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Lao Power Sector Vulnerability Assessment and Resilience Action Plan

This purpose of this work is to develop a power sector resilience action plan for the Lao PDR (resilience action plan). The resilience action plan provides strategies to address the key vulnerabilities identified in a previous vulnerability assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Throughput Discovery of Thermoelectric Materials (Final Report)

New materials form the heart of advances in energy technologies; however, the actual synthesis and characterization of new materials remains an enormous bottleneck. In this award, the research team focused on developing new approaches overcome this bottleneck. The approach involved depositing at high (supersonic) velocity multiple crystalline materials at a substrate while controlling the resulting film composition. The film could then be annealed to create a homogeneous alloy that was suitable for characterization. High throughput characterization tools were developed in parallel. The research focused on thermoelectric materials, which convert the flow of heat into electrical power. The development of new thermoelectric materials with high power conversion efficiency could displace traditional mechanical heat engines (e.g. turbines).

30 DIRECT ENERGY CONVERSION↗

Disruption modelling for engineering and physics design of ST-E1 fusion power plant

Plasma disruptions represent a critical challenge for high-performance tokamak operations, as they can compromise machine integrity and reduce operational availability. Although future fusion devices essentially need to incorporate strategies to minimise disruption occurrence, complete avoidance remains unattainable. Consequently, assessing and characterising unmitigated disruption consequences is fundamental for the design and qualification of next-generation fusion power plants. This work supports the pre-conceptual design of ST-E1, a low aspect-ratio Tokamak Fusion Power Plant developed by Tokamak Energy Ltd., by presenting a comprehensive disruption modelling approach applied across different design stages. The methodology integrates both physics and engineering considerations to evaluate the impact of disruptions on machine performance and structural integrity. From an engineering perspective, several ST-E1 layout options were analysed to investigate the electromagnetic response of key components under disruption-induced loads, enabling comparison between alternative design solutions. On the physics side, a broad set of disruption scenarios was explored, scanning operational space parameters, plasma-material interactions, and associated thermal loads. Furthermore, the study examined variations in disruption behaviour arising from different reference equilibria, focusing on a range starting from Double Null to Single Null configurations, reflecting the increasing up-down asymmetry consequences. The results reveal significant contrasts in plasma dynamics and structures electromagnetic behaviour between configurations, highlighting the importance of disruption modelling in guiding design choices. These analyses have proven instrumental in shaping ST-E1 development, offering critical insights for mitigating risks and optimising future fusion power plant designs.

Borowiec, Katarzyna [ORNL] (ORCID:0000000335911739↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Optimization of Fairing Geometry for ORPC Modular RivGen Power System: Cooperative Research and Development (Final Report)

The work will optimize the hydrodynamic performance and flow augmentation of Ocean Renewable Power Company's (ORPC) modular fairing for their cross-flow marine hydrokinetic (MHK) turbine, using a computational fluid dynamics study. The influence of the fairing cross-sectional shape and rotor-fairing spacing will be assessed, to maximize power production and minimize structural loads.

16 TIDAL AND WAVE POWER↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Ocean Energy for Ocean Worlds

Energy systems generating power from ocean waves, currents, tides, and thermal and salinity gradients are being developed to power oceanographic instrumentation and autonomous vehicles in Earth’s oceans. Exploration missions enabled or extended with in-situ energy harvesting on Earth may be similar to those on extra-terrestrial ocean worlds including mapping, biogeochemical sampling, acoustic monitoring, search for building blocks of life, and physical oceanographic characterization. With the addition of ocean energy available at the point of observation, data can be collected on larger spatial and temporal scales, enabling more comprehensive missions on other worlds. Power resource characteristics (e.g. current speed, variability) will similarly need to be assessed. Earth and extra-terrestrial ocean missions share vast technical challenges including high expense, need for advanced autonomy, ability to survive in the harshest environments, and limited communications or opportunities for intervention. Marine energy systems may be the only option for in-situ generation in certain scenarios (e.g., under a thick layer of ice) or advantageous over onboard energy storage options that may interfere with the natural environment (e.g., radioisotope thermoelectric generators). This work provides an overview of existing marine energy technology pertaining to ocean observations, highlights emerging research and development and new funding and program initiatives, explores similarities in mission requirements between terrestrial and extra-terrestrial applications, and suggests innovation pathways towards enabling high-value ocean world exploration powered by ocean energy.

Cavagnaro, Robert J.↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

AMAROK: A Radio Frequency Development Platform for High-Power, Full-Scale Positive Ion Sources for DIII-D Neutral Beam Injectors

Next-generation neutral beam injection (NBI) systems demand RF ion sources capable of efficiently coupling >120 kW at 2–4-MHz frequencies, yet existing designs face voltage standoff and impedance-matching challenges. To address this, the advanced multicoil antenna for RF operations at kilowatts (AMAROK) was developed as a high-power RF inductively coupled plasma (ICP) source delivering up to 200 kW in the 2–4-MHz range via four phase-controlled generators for flexible power sharing. Two antenna designs—a single-strap multiturn (MT) and a multistrap single-turn (ST) design—were evaluated to optimize resonance, impedance matching, and power coupling across plasma loads. Here, a semi-analytical self-resonant frequency (SRF) model, validated experimentally, predicts resonance trends for arbitrary turn counts and tubing diameters, enabling rapid antenna optimization. Strap-to-strap mutual inductance in the ST configuration showed strong spatial dependence, guiding generator operation and total load inductance. These insights informed a custom π -topology matching network, achieving stable impedance matching over a wide range of plasma-driven loads. Collectively, these results position AMAROK as a versatile testbed for advancing high-power RF source technology in fusion NBI applications.

DIII-D↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Mitigation Process Testing at Nevada Solar One

The National Renewable Energy Laboratory (NREL) and Acciona Solar Power (ASP) developed and installed a process that addresses the issue of hydrogen buildup in Acciona's Nevada Solar One power plant. Our method selectively removes hydrogen from the expansion tanks of the power plant to control hydrogen levels in the circulating heat-transfer fluid (HTF). During previous work, we developed a sensor that measures hydrogen partial pressure in the expansion-tank headspace gas. We demonstrated that our sensor measures hydrogen levels over a wide range of partial pressure from 10 mbar down to 0.003 mbar. More recently, we conceived and developed an integrated process module that performs both hydrogen sensing and separating functions. The sensor/separator measures hydrogen partial pressure in the headspace gas in the same way as our original sensor design. Additionally, the integrated module separates hydrogen from the headspace gas to reduce hydrogen to the level needed to maintain the performance of receivers in the collector field. Laboratory testing at NREL showed that the sensor function had an accuracy of +/-7%, and the hydrogen extraction rate for separator function was consistent with our modeling predictions. The primary benefit of this module is its simple design, both in terms of function and incorporation into the HTF subsystem of the power plant. Most recently, NREL and ASP completed installation and initial testing of a mitigation process at ASP's Nevada Solar One power plant in Boulder City, Nevada. In this paper, we report on the completed installation, initial testing, and plans to bring the process to full automation, so that it can be operated unattended on a daily schedule.

chemical elements↗

A series representation of the discrete fractional Laplace operator of arbitrary order

Although fractional powers of non-negative operators have received much attention in recent years, there is still little known about their behavior if real-valued exponents are greater than one. In this article, we define and study the discrete fractional Laplace operator of arbitrary real-valued positive order. Here a series representation of the discrete fractional Laplace operator for positive non-integer powers is developed. Its convergence to a series representation of a known case of positive integer powers is proven as the power tends to the integer value. Furthermore, we show that the new representation for arbitrary real-valued positive powers of the discrete Laplace operator is consistent with existing theoretical results.

97 MATHEMATICS AND COMPUTING↗

Hydrogen Considerations Tree: Executive Deck [Slides]

The Hydrogen Considerations Tree is designed to enhance the understanding and capabilities of U.S. Agency for International Development Missions and country partners, empowering them to make informed decisions regarding potential support for hydrogen and its derivatives, such as e-fuels, hydrogen carriers, or ammonia, within their respective nations. Moreover, the Considerations Tree is designed to provide fundamental and applied information for the identification of deployment, regulation, policy priorities for hydrogen technologies in the context of each country or region. Key topics are organized into a "considerations tree," enabling stakeholders to systematically and holistically address technical, regulatory, economic, environmental, social, and analytical questions.

08 HYDROGEN↗

PHIL Interface Design for Use With a Voltage-Regulated Amplifier

Power hardware-in-the-loop (PHIL) has emerged as a leading strategy to thoroughly assess the impact of proprietary inverter controls on a specific power system. The development of a PHIL test bed typically involves an inverter under test, a power amplifier, controllable DC supply, and a digital real-time simulator (DRTS) to simulate the power system under study. As a result of PHIL nonidealities, a form of digital compensation within the DRTS is used, which is commonly referred to as a PHIL interface. Many existing methods use legacy power amplifiers that do not contain internal voltage regulation. These existing interface methods are based around a voltage regulator within the DRTS and do not consider the interaction with the controls in newer amplifiers. In this study, a three-step approach of PHIL interface development for modern power amplifiers with built-in voltage regulation is introduced and is validated in hardware with a 30-kW grid-following inverter.

DRTS↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

The U.S. Nuclear Regulatory Commission has developed regulations regarding the siting and design of nuclear power plants (NPPs) that are aimed at addressing various natural hazards, including flooding. Flood barriers are designed to prevent water from entering NPP areas containing structures, systems, and components (SSCs) important to safety. The barriers are used at NPPs along with drains, sumps, pumps, valves, plugs, and site grading as part of the plant flood protection features that protect SSCs from experiencing external or internal flooding and mitigate the effects of flooding on NPP operations. The performance of flood protection features, including flood barriers at NPPs, has been an ongoing concern. Domestic and international operational experience provides clear indications that flood barrier performance has significant safety implications, especially for aging NPPs. The observed deficiencies show that flood barriers should be designed and installed properly, then adequately tested, inspected, and maintained in order to ensure that they perform their intended functions during flooding events. Here, this paper reviews available information related to flood barriers employed at U.S. NPPs and provides an overview and categorization of NPP flood barriers. It identifies potential domestic and international flood barrier testing facilities, including operating and decommissioned U.S. NPPs. Finally, this paper presents the technical and logistical considerations that should be made when developing specific testing strategies and protocols for flood barriers, such as the selection of flood barriers, test locations, testing approach, performance criteria, and testing parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants (Reduced Order Model Development Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a reduced order model library that can be used to represent coal-fired power plants. The models are transient and physics-based. Model classes in the library that correspond to different components in CFPPs are presented with physical explanations and representative results. Also, the use of the library to build an overall model for a representative CFPP is presented along with simulation results.

20 FOSSIL-FUELED POWER PLANTS↗

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗

Modeling and Simulation Development Pathways to Accelerating KP-FHR Licensing (Final Report)

This project assembles a strong U.S. industry and national laboratory team to complete scope of work. Kairos Power (KP), headquartered in Alameda, CA, is the leader of this effort and has built an internal team of highly competent engineers and managers with extensive combined experience in nuclear power, conventional power, product development, and licensing. INL, ANL, and LANL bring unique capabilities in advanced reactor R&D and licensing. The project funding source is the result of FOA No. 0001817, U. S. Industry Opportunities for Advanced Nuclear Technology Development. There has been on-going work and this Access Cooperative Research and Development Agreement (CRADA) will cover the remaining work scope of FOA 0001817. KP is implementing innovative strategies that can reduce the cost and accelerate the initial demonstration of the Kairos Power Fluoride-salt-cooled, High-temperature Reactor (KP-FHR) to meet the needs of the U.S. electricity market by 2030. Licensing of the KP-FHR could be significantly accelerated using advanced computing methods with sufficient predictive capabilities to be able to extrapolate potential response of the structure in different scenarios. However, currently used computational methods heavily rely on empirical fits and cannot be used for extrapolation. The scope focuses on improving the modeling capability in the NEAMS Grizzly structural mechanics code and the NEAMS BISON fuel performance code and the NEAMS SAM systems analysis code. This work leverages the expertise and know-how gathered in three DOE National Laboratories – INL, ANL, and LANL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗