Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Restoration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoitaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Decoding Resilience by Modeling Outage and Restoration Processes in Distribution Grids: A Pittsburgh Case Study

Climate-induced extreme weather events, such as floods and heatwaves, pose significant challenges to the resilience of urban power distribution grids. This paper examines the outage and restoration dynamics of Pittsburgh's power grid during the flood event in April 2024 and three heatwaves in June, July, and August 2024. We introduce a comprehensive modeling framework that integrates outage and restoration processes, enabling the quantification of resilience metrics, including total customer-hours of power outage, maximum residual values, and restoration durations across various ZIP codes. Our analysis highlights spatial disparities in outage impacts and restoration efficiencies, with ZIP Code 15222 experiencing the highest cumulative disruptions, while ZIP Code 15217 shows lower susceptibility. By linking statistical trends with weather events, this study underscores the critical need for targeted infrastructure upgrades and advanced restoration strategies. Furthermore, the proposed framework offers valuable insights for planning and managing resilient power systems in the face of increasing climate stress.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Ledger Technology for Fault Tolerant Distribution Grid Operations

This paper explores the potential of distributed ledger technology (DLT) to improve fault-tolerant grid operations by leveraging its core features as an immutable, decentralized ledger, a distributed, consensus-based agreement process, and a distributed state-replication engine. Distribution power systems deliver electricity to millions of customers; however, they are susceptible to various threats that can result in customer interruptions. These include faults caused by adverse weather conditions, natural disasters, vegetation growth, equipment failure, and malicious attacks. To minimize the effects of these faults, fault-handling approaches rely on network knowledge to isolate affected areas and reconnect unaffected areas, reducing the number of affected customers while maintaining safety. Here, we present a trusted data-sharing architecture that enables independent, distributed actors to reconstruct the pre-fault system state by enabling distributed resources to make appropriate decisions with limited network/system information. Although the process requires some data sharing between switch-delimited areas, the approach limits the amount of private information shared, preserving customers' privacy and business-sensitive information. We include three use cases that form a foundation for third parties to develop functional solutions that can eventually be deployed in the field. The gross error detection method used within switch-delimited areas can identify sensor errors and accurately detect circuit breaker states. The evaluation of possible reconnection while preserving data ownership resulted in a voltage magnitude difference smaller than 0.001% from the OpenDSS power flow solution that has full system knowledge, which is below the expected power flow tolerance. The approach offers a promising opportunity for improving fault-tolerant distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Restoring Critical Loads In Resilient Distribution Systems using A Curriculum Learned Controller

In this paper, we propose a curriculum learned reinforcement learning (RL) controller to facilitate distribution system critical load restoration (CLR), leveraging RL's fast online response and its outstanding optimal sequential control capability. Like many grid control problems, CLR is complicated due to the large control action space and renewable uncertainty in a heavily constrained non-linear environment with strong intertemporal dependency. The nature of the problem oftentimes causes the RL policy to converge to a poor-performing local optimum if learned directly. To overcome this, we design a two-stage curriculum in which the RL agent will learn generation control and load restoration decision under different scenarios progressively. Via curriculum learning, the trained RL controller is expected to achieve a better control performance, with critical loads restored as rapidly and reliably as possible. Using the IEEE 13-bus test system, we illustrate the performance of the RL controller trained by the proposed curriculum-based method.

curriculum learning↗

Orchestrating the Restoration of Wind-Dominant Grids from Blackouts (Final Report of Award No. DE-SC0021410)

This is the final report of Award No. DE-SC0021410: “Orchestrating the Restoration of Wind-Dominant Grids from Blackouts.” It: (1) summarizes the technical/scientific accomplishments, (2) lists the publications containing scientific details of the accomplishments, (3) reports several dissemination activities, (4) names new research grants as consequence of this project, (5) lists the project team funded by the project, and (6) concludes the project.

17 WIND ENERGY↗

Overload protection system for power inverter

An overload protection system for a power inverter utilized a first circuit for monitoring current to the load from the power inverter to detect an overload and a control circuit to shut off the power inverter, when an overload condition was detected. At the same time, a monitoring current inverter was turned on to deliver current to the load at a very low power level. A second circuit monitored current to the load, from the monitoring current inverter, to hold the power inverter off through the control circuit, until the overload condition was cleared so that the control circuit may be deactivated in order for the power inverter to be restored after the monitoring current inverter is turned off completely.

Nagano, S.↗

Non-isolated 30 kW class arcjet PCU

A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. Some testing with hydrogen arcjets was also carried out at NASA LeRC. This system concept is now the design base for the ATTD program.

Wong, See-Pok↗

Evaluation of Centralized Model-Based FLISR in a Lab Setup: Preprint

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Annealing of radiation damage in 0.1- and 2-ohm-centimeter Silicon solar cells

Isochronal and isothermal annealing studies were conducted on 0.1 and 2 ohm centimeter n(+)/p silicon cells after irradiation by 1 MeV electrons at fluences of 10 to the 14th power, 5 times 10 to the 14th power, and 10 to the 15th power per square centimeter. For the 0.1 ohm centimeter cells, reverse annealing was not observed in the isochronal data. However, reverse annealing was observed between approximately 200 and 325 C in the isochronal data of the 2 ohm centimeter cells. Isothermal annealing of 0.1 ohm centimeter cells at 500 C restored pre-irradiation maximum power P sub max within 20 minutes at fluence = 10 to the 14th power, in 180 minutes at fluence = 5 times 10 to the 14th power and to 92 percent of pre-irradiation P sub max in 180 minutes for fluence = 10 to the 15th power. Annealing at 450 C was found inadequate to restore 0.1 ohm centimeter cell performance within reasonable times for all fluence levels. By comparison, at 450 C, the P sub max of 2 ohm centimeter cells was restored within 45 minutes, for the two highest fluence levels, while for the lowest fluence, restoration was completed within 15 minutes. Spectral response data indicate that, for both resistivities, degradation occurs predominantly in the cells p-type base region.

Weinberg, I.↗

ANS Winter 2024 Summary: Optimizing the ATF-2Ramp Power Profile

When the Halden Boiling Water Reactor closed down in 2018, a need to restore the capability for in-reactor power ramp testing arose. Such testing is valuable for studying pellet-clad interaction phenomena in nuclear fuels. The data from these studies is of great interest to a number of research programs, including the accident-tolerant fuel (ATF) program at Idaho National Laboratory (INL). In 2022, Woolstenhulme et al. proposed several power ramp testing ideas using facilities at INL, including irradiation in the Transient Reactor Test Facility (better known as TREAT) and the Advanced Test Reactor (ATR) [1]. Worrall et al. [2] and Labossiere-Hickman et al. [3] subsequently performed feasibility studies for the ATR testing options in 2023. This summary further investigates the three-pin trefoil design (Fig. 1) for the proposed ATF-2Ramp Experiment discussed in Labossiere-Hickman et al. [3]. ATF-2Ramp is designed to operate in the center flux trap (CFT) of the ATR during a powered axial locator mechanism (PALM) cycle: a short, variable-powered cycle with an asymmetric power distribution. Previously, it was shown that tailoring the thickness of the hafnium (Hf) neutron shields (“mini-shrouds”) surrounding each pin offered a degree of control sufficient to achieve the programmatic linear heat generation rate (LHGR) targets for ATF-2Ramp during the high-power period of a PALM cycle. New work involves shortening the experiment test train for consistency with the fuel pins in ATF-2D [4] and then shaping the axial power profile of the three test pins.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy: Preprint

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Dynamic Distribution System Restoration Strategy for Resilience Enhancement: Preprint

In electric power distribution systems, distributed energy re-sources (DERs) can act as controllable power sources and support utility operators to minimize power outages after ex-treme weather events (e.g., hurricane, earthquake, wildfire) and thus help enhance the grid's resilience. Meanwhile, the influ-ences of extreme events and the capabilities of DERs are dy-namic and difficult to predict. Hence, the desired distribution system restoration strategy should be able to evolve according to real-time fault/disturbance information and the availabil-ity of DERs. In this paper, we propose a new dynamic distribu-tion system restoration strategy to enhance system resilience against potential hazards. An efficient reconfiguration algo-rithm is developed to eliminate the use of integer variables to relieve the computational burden. Model predictive control is implemented to adjust the system topology and DER opera-tion setpoints based on the updated fault information and DER forecasts. The effectiveness of the proposed restoration model in enhancing distribution system resilience is validated through an IEEE 123-bus test system. Simulation results also validate that the proposed restoration model can mitigate the occurrence of unexpected events and the fluctuations of DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rapidly Viable Sustained Grid

Rapid recovery of power flow, possibly after a blackout, is a crucial need arising in scenarios that are increasingly becoming more frequent; here, solutions for rapid viability of power while the grid is being restored are urgently needed to keep critical infrastructure (CI) online. Increasingly, after the initial recovery phase, sustenance of reliable power requires assistive services to the grid for long periods of time. Even though the need is urgent, there is only sparse effort present toward a comprehensive framework/strategy for making power rapidly viable with an emphasis on sustained grid ancillary services; which is the focus of this proposal. The proposed concept envisions four phases. In the first phase, when a large portion of power is disrupted (see Figure 1(a)), emphasis is on bringing CI online with the objective of maximizing the time horizon of power viability using resources available at the CI. In the second phase (Figure 1(b)), neighborhood resources are tightly coordinated that forms the CI’s central-core (CC) to provide guaranteed viability of CI over a longer horizon. In the third phase, self-organizing power networks are expanded in a distributed layer supporting the central-core (Figure 1(c)). In the fourth phase, separate CI-networks coalesce and are controlled in a coordinated fashion to provide grid ancillary services (AS), such as primary frequency control and enhancing grid resiliency. With time, system efficiencies and penetration of renewables increase, while the time-horizon of guaranteed sustenance of CI is maximized. Under proposed work, the concept will be instantiated with a focus on medical centers as CI. Comprehensive power hardware in the loop strategies and emulated field tests will guide and validate devised solutions. A strong T2M effort to commercialize resulting technology is outlined. The proposed technology will be transformative for the grid. It will fundamentally change the way large contingencies are managed where power systems and critical infrastructure transition from being fragile to being robust using intelligent, self-organizing control for coordinating resources, enhanced resiliency and use of sustainable energy sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗