Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

TEAMER: Electrically Engaged Undulation System for Unmanned Underwater Vehicles

This TEAMER RFTS 1 (Request for Technical Support) project supported the flume tank testing of a long range, high endurance unmanned underwater vehicle (UUV) to monitor maritime space. Today, battery-powered remotely operated vehicles (ROVs) lack the duration to make persistent, wide-area data collection possible.The proposed solution, an Electrically Engaged UnduLation (EEL) drone, can sustain missions for longer duration through hydrodynamic energy harvesting. Power is provisioned via the piezoelectric effect, a material-led phenomenon that converts applied stress into electricity. The EEL subsystems include power, propulsion, navigation, ballast, telemetry, and instrumentation. By mimicking the gait of aquatic eels, EEL can counter currents during maneuvering and level-flight. The identified opportunity is in the future capability of extreme endurance UUVs in swarms. The specific goal for the EEL development is to expand the spatio-temporal coverage of the existing ocean observation mission by overcoming significant challenges of autonomous robotics. Some of the challenges presented include novel compliant mechanism for robust actuation, bio-inspired design to emulate efficient locomotion, smart material-based energy harvesting for sustained power, and swarming architecture through enabled autonomy.

16 TIDAL AND WAVE POWER↗

Automated Activation and Deactivation of a System Under Test

The MPLM Automated Activation/Deactivation application (MPLM means Multi-Purpose Logistic Module) was created with a three-fold purpose in mind: 1. To reduce the possibility of human error in issuing commands to, or interpreting telemetry from, the MPLM power, computer, and environmental control systems; 2. To reduce the amount of test time required for the repetitive activation/deactivation processes; and 3. To reduce the number of on-console personnel required for activation/ deactivation. All of these have been demonstrated with the release of the software. While some degree of automated end-item commanding had previously been performed for space-station hardware in the test environment, none approached the functionality and flexibility of this application. For MPLM activation, it provides mouse-click selection of the hardware complement to be activated, activates the desired hardware and verifies proper feedbacks, and alerts the user when telemetry indicates an error condition or manual intervention is required. For MPLM deactivation, the product senses which end items are active and deactivates them in the proper sequence. For historical purposes, an on-line log is maintained of commands issued and telemetry points monitored. The benefits of the MPLM Automated Activation/ Deactivation application were demonstrated with its first use in December 2002, when it flawlessly performed MPLM activation in 8 minutes (versus as much as 2.4 hours for previous manual activations), and performed MPLM deactivation in 3 minutes (versus 66 minutes for previous manual deactivations). The number of test team members required has dropped from eight to four, and in actuality the software can be operated by a sole (knowledgeable) system engineer.

Poff, Mark A.↗

Power Operations of the Mars Exploration Rovers

The rovers of the National Aeronautics and Space Administration’s (NASA) Mars Exploration Rovers (MER) project, Spirit (MER-A) and Opportunity (MER-B), safely landed on the surface of Mars three weeks apart during January 2004. Spirit and Opportunity were built and operated by the Jet Propulsion Laboratory (JPL), which is managed by the California Institute of Technology (Caltech) for NASA. Spirit landed at Gusev Crater, 14.8 degrees south of the equator, and operated continuously on the surface of Mars from January 4, 2004 until last contact from Spirit on March 22, 2010. Opportunity landed at Meridiani Planum, a location 2.5 degrees south of the Martian equator. Opportunity operated continuously on the Martian surface from January 25, 2004 until the last received transmission from Opportunity on June 10, 2018. The goal of the MER project was to determine if Mars ever had a habitable environment, in particular, if it ever had water. During their missions, both Spirit and Opportunity found evidence that liquid water once flowed on the surface of Mars. Both Spirit and Opportunity used a 1.33 m2 triple-junction solar array as their power sources. Based on observations of the original Mars rover, the Sojourner rover of the Mars Pathfinder mission that landed on Mars on July 4, 1997, the expectation was that the Martian dust would rapidly accumulate on the solar arrays of Spirit and Opportunity, and that the rovers would not have enough energy to continue operations after 90 Martian days (sols). Instead, due in part to lower dust accumulation rates than expected and numerous dust cleaning events, the Spirit and Opportunity rovers continued to operate on the Martian surface for over 2000 sols (MER-A) and 5000 sols (MER-B), respectively. During this time, the rovers experienced multiple Martian winters and several dust storms. Because the sources of solar array energy loss were known, the solar array energy output offered a method to scientifically estimate the loading and aeolian removal of dust from the solar arrays each sol. The MER Power operations team called this value that they calculated the solar array Dust Factor (DF). Dust Factor was defined as the fraction of sunlight that penetrates the accumulated dust on the surface of the solar array. A Dust Factor of 1.0 would indicate that the solar array was perfectly clean. A Dust Factor of 0.6 would indicate that only 60% of the available sunlight was able to penetrate the accumulated dust on the solar arrays. The MER Power subsystem operations team used the Multi-Mission Power Analysis Tool (MMPAT) to perform these Dust Factor calculations. The MMPAT software tool modeled the behavior of the solar arrays and the batteries as they interacted with the spacecraft power loads over the mission timeline. MMPAT also had knowledge (through telemetry and user inputs) of telemetered Power subsystem voltages and currents, atmospheric opacity (Tau), rover surface location, rover attitude, the planetary tilt and distance of Mars from the sun based on day of year, the instantaneous elevation of the sun based on time of day, temperatures (internal and external), terrain masking, and shadowing (due to the camera mast and antennas). Once all of the known sources of array energy loss are accounted, the remaining difference between the expected array energy and the actual array energy determines the solar array Dust Factor. The assumptions made while determining the Dust Factor are 1) that the single measured atmospheric opacity value (Tau) is constant over the course of the entire sol, 2) there is no measurable solar cell degradation, 3) there are no shorted strings and therefore, 4) all unexpected solar array energy losses are due to accumulated dust on the solar array. Although it cannot provide an absolute measure of dust loading, the determination of solar array Dust Factor provides a useful way of tracking dust accumulation and aeolian dust removal trends on Martian spacecraft. Any spacecraft on the Martian surface is vulnerable to dust, especially solar-powered spacecraft. The Spirit and Opportunity rovers were operational on the Martian surface for much longer than expected due in part to aeolian removal of dust from their solar arrays. The first few dust removal events were a pleasant surprise to the MER operations teams; however, over time a pattern began to arise. In over three Mars Years on the surface, the Power operations team tracked the solar array Dust Factor at Gusev Crater (location of MER-A) and observed that there were several significant dust removal and deposition events in Mars Year (MY) 27, even in the absence of a large dust storm. In MY 28 at Gusev Crater, the large atmospheric opacity (Tau) increase lagged significant dust removal events. Overall at Gusev Crater, there was a pattern of steady dust accumulation on the solar arrays, with a small number of significant dust cleaning events. At Meridiani Planum, where Opportunity rover operated for over seven Mars Years (late MY 26 to mid MY 34), a clear and consistent pattern of dust movement emerged. Meridiani Planum had a predictable, seasonally dependent pattern of gradual and continuous dust accumulation and removal. In summary, this paper explains the reasons for the development of the solar array Dust Factor and how it was used in mission operations. In particular, this paper describes the MMPAT software package, how it models array energy, including the important assumptions, model inputs and sources of error. And finally, this paper will show how the calculated solar array Dust Factor was used at Gusev Crater and Meridiani Planum to predict dust accumulation rates and weather patterns, and the importance of this generated data set for current and future solar- powered missions to Mars, such as the InSight lander and the planned Mars Sample Return rover.

Chin, Keith B.↗

Semi-Supervised, Non-Intrusive Disaggregation of Nodal Load Profiles With Significant Behind-the-Meter Solar Generation

It is of imperative interests for regional transmission organizations (RTOs) to effectively extract actual load profiles at transmission nodes with significant behind-the-meter solar generation, which remains a gap in the existing technology paradigm. This paper proposes an explicit yet efficient linear estimator to disaggregate actual load profiles at transmission buses with significant behind-the-meter (BTM) solar generations. The proposed estimator is based on disaggregating (i.e., extracting) at locations close to transmission buses under consideration. Further, to overcome the lack of “ground truth” and validate the performance of the proposed algorithms, we first propose semi-supervised mechanisms with parameter tuning as well as unsupervised clustering and leverage the unique characteristics of zero-crossing points in BTM solar peaking behaviors, which we refer to as “Zone-to-Node (Z2N)” methods. Next, we further propose a bi-level Node-to-Node (N2N) framework that improves the overall disaggregation performances compared to Z2N. Numerical results are presented using real-world data at PJM Interconnection.

14 SOLAR ENERGY↗

Artificial Retina Project: Electromagnetic and Thermal Effects

This award supported the investigation on electromagnetic and thermal effects associated with the artificial retina, designed in collaboration with national laboratories, universities, and private companies. Our work over the two years of support under this award has focused mainly on 1) Design of new telemetry coils for optimal power and data transfer between the implant and the external device while achieving a significant size reduction with respect to currently used coils; 2) feasibility study of the virtual electrode configuration 3) study the effect of pulse shape and duration on the stimulation efficacy.

60 APPLIED LIFE SCIENCES↗

OSO spacecraft manual

Spacecraft manual for OSO - telemetry system, command system, power supply and distribution, antenna system, experiment complement, temperature monitoring, and launch program

OSO↗

ERTS-1 flight evaluation report, 23 April - 23 July 1973

The flight performance of the ERTS-1 satellite is analyzed for orbits 3810 to 5100. Systems analyzed include: orbital parameters, power subsystem, attitude control, telemetry, orbit adjust, thermal control, and data collection. Documents and reports related to the evaluation are also included.

Source record↗

Systems design study of the Pioneer Venus spacecraft. Appendices to volume 1, sections 3-6 (part 1 of 3)

The design is described of the Venus probe windows, which are required to measure solar flux, infrared flux, aureole, and cloud particles. Window heating and structural materials for the probe window assemblies are discussed along with the magnetometer. The command lists for science, power and communication requirements, telemetry sign characteristics, mission profile summary, mass properties of payloads, and failure modes are presented.

Source record↗

Orbiting solar observatory /OSO/

Description of the OSO spin-stabilized spacecraft capable of conducting eleven experiments in studying the sun, the earth, and other space objects. The OSO provides controlled electric power, thermal control, a telemetry and command interface, tape-recorded data storage, and precisely timed orbital and orientation information. A chart indicating experiments carried out on nine OSO missions is included.

Oertel, G. K.↗

The SAS-3 delayed command system

To meet the requirements arising from the increased complexity of the power, attitude control and telemetry systems, a full redundant high-performance control section with delayed command capability was designed for the Small Astronomy Satellite-3 (SAS-3). The relay command system of SAS-3 is characterized by 56 bystate relay commands, with capability for handling up to 64 commands in future versions. The 'short' data command service of SAS-1 and SAS-2 consisting of shifting 24-bit words to two users was expanded to five users and augmented with a 'long load' data command service (up to 4080 bits) used to program the telemetry system and the delayed command subsystem. The inclusion of a delayed command service ensures a program of up to 30 relay or short data commands to be loaded for execution at designated times. The design and system operation of the SAS-3 command section are analyzed, with special attention given to the delayed command subsystem.

Hoffman, E. J.↗

The High Energy Astronomy Observatory X-ray Telescope

The High Energy Astronomy Observatory-Mission B (HEAO-B) is a satellite observatory for the purpose of performing a detailed X-ray survey of the celestial sphere. Measurements will be made of stellar radiation in the range 0.2 through 20 keV. The primary viewing requirement is to provide final aspect solution and internal alignment information to correlate an observed X-ray image with the celestial sphere to within one-and-one-half arc seconds. The Observatory consists of the HEAO Spacecraft together with the X-ray Telescope. The Spacecraft provides the required attitude control and determination system, data telemetry system, space solar power system, and interface with the launch vehicle. The X-ray Telescope includes a high resolution mirror assembly, optical bench metering structure, X-ray detectors, detector positioning system, detector electronics and aspect sensing system.

Miller, R.↗

Miniaturized physiological data telemetry system

Portable digital physiological data telemetry system uses less power, is more compact, and provides better data integrity than two previous systems designed to similar specifications. It has 13 data channels and two-way voice communication.

Portnoy, W. M.↗

LANDSAT-2 and LANDSAT-3 Flight evaluation report

Flight performance analysis of LANDSAT 2 and LANDSAT 3 are presented for the period July 1978 to October 1978. Spacecraft operations and orbital parameters are summarized for each spacecraft. Data are provided on the performance and operation of the following subsystems onboard the spacecraft: power; attitude control; command/clock; telemetry; orbit adjust; magnetic moment compensating assembly; unified S band/premodulation processor; electrical interface; thermal narrowband tape recorders; wideband telemetry; attitude measurement sensor; wideband video tape recorders; return beam vidicon; multispectral scanner subsystem; and data collections.

Winchester, T. W.↗

Planetary spacecraft as optical instrument platforms

The pointing system, telemetry rate, thermal control, power, command, and available mass of planetary spacecraft are described. A comparison of the pointing and stability capabilities of the three-axis stabilized spacecraft and the spin stabilized spacecraft is presented. The development of a hybrid spacecraft, which combines the spin and three-axis design, is examined. The attitude control and articulation system, and the instruments of the Galileo, a hybrid spacecraft, are analyzed.

Vescelus, F. E.↗

Design summary of a geostationary facility utilized as a communications platform

This paper describes the technical aspects of a geostationary platform facility that makes maximum use of the planned NASA space station and its elements, mainly the orbital maneuvering vehicle (OMV) and the orbital transfer vehicles (OTV). The platform design concept is described, with emphasis on the key technologies utilized to configure the platform. Key systems aspects include a design summary with discussion of the controls, telemetry, command and ranging, power, propulsion, control electronics, thermal control subsystems, and space station interfaces. The use of the facility as a communications platform is developed to demonstrate the attractiveness of the concept. The economic benefits are discussed, as well as the concept of servicing for payload upgrade.

Barberis, N. J.↗

Automated workstation for the operation of spacecraft engineering subsystems

This paper addresses the development of a workstation that exploits automated tools to enable an operator to monitor concurrently several engineering subsystems and/or several space missions. The use of artificial intelligence and advanced graphics capabilities to achieve fast prototypes is discussed. The monitoring of engineering telemetry data from the Power and Pyro Subsystem of the Galileo spacecraft is emphasized.

Bahrami, K. A.↗