Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Coordinated operation of pumped-storage hydropower with power and water distribution systems

Small pumped-storage hydropower (PSH) units have gained popularity as distributed energy storage options that can provide flexibility to the operation of power distribution systems. Optimal operation of small PSH units is not only dependent on the energy storage provided to power distribution system, but also on the inflow and outflow of water from and to the water distribution system. Here, in this context, this paper develops an optimization model for coordinated operation of PSH units with power and water distribution systems. The proposed model optimizes the operation of water tanks, variable-speed pumps and PSH in pumping and generating modes to minimize the operation cost of power distribution system, while respecting the power flow constraints of power distribution and hydraulic constraints of water distribution system. Appropriate electricity tariffs are implemented to avoid additional expenses in water distribution system that can be enforced by its coordinated operation in favor of power distribution system. The proposed model is implemented on a 33-bus and a 123-bus test power distribution system connected to a 16-node test water distribution system. Results demonstrate the effectiveness of proposed model in tapping PSH flexibility to reduce the operation cost of power and water distribution systems, while meeting the power and water demands.

13 HYDRO ENERGY↗

Extended Pulse-Powered Humidity-Freeze Cycling for Testing Module-Level Power Electronics

An EMI suppression capacitor (polypropylene film type) failed by 'popcorning' due to vapor outgassing in pulse powered humidity-freeze cycles. No shorts or shunts could be detected despite mildly corroded metallization visible in the failed capacitor. Humidity-freeze cycling is optimized to break into moisture barriers. However, further studies will be required on additional module level power electronic (MLPE) devices to optimize the stress testing for condensation to precipitate any weakness to short circuiting and other humidity/bias failure modes.

14 SOLAR ENERGY↗

Results of the KRUSTY Warm Critical Experiments

The Kilowatt Reactor Using Stirling TechnologY (KRUSTY) was a prototypic nuclear-powered test of a 5-kW(thermal) Kilopower space reactor. This paper presents results from the KRUSTY warm critical experiments, which were completed prior to the final system test. The first set of criticals comprised cold or zero-power criticals; i.e., the core was not heated by fission power. These were followed by three warm criticals, where fission power heated the core to 200°C, 300°C, and 450°C, respectively. These criticals provided the data, confidence, and regulatory framework that were needed to proceed with the KRUSTY nuclear system test. The criticals also provided valuable data for the benchmarking of codes applicable to all nuclear systems. Finally, a comparison of KRUSTY results to pretest predictions is provided, and overall, the models matched the experimental results very closely.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Electrical and Quench Performance of the First MICE Coupling Coil

The first MICE Coupling Coil has been tested in a conduction-cooled environment in the new Solenoid Test Facility at Fermilab. We present an overview of the power and quench protection scheme, and report on the electrical and quench performance results obtained during cold power tests of the magnet.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Breakdown insensitive acceleration regime in a metamaterial accelerating structure

A new regime in radiofrequency (rf) breakdown, named the breakdown insensitive acceleration regime (BIAR), was observed in an 11.7 GHz metamaterial structure for wakefield acceleration driven by rf pulses with a duration of a few nanoseconds. In the BIAR, rf breakdown occurs without interrupting potential beam acceleration, resulting in greater resilience to breakdown. We have investigated the possibility that BIAR can support higher gradients by characterizing the breakdown in a high-power test. The peak gradient reached 190 MV / m when the structure was powered by 6 ns long rf pulses with 115 MW peak power. The short rf pulses were extracted from 65 MeV electron bunch trains with a total charge of up to 210 nC. This work has revealed the benefits of short-pulse acceleration by characterizing rf breakdown in the previously unexplored parameter space. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

An X-Band Ultra-High Gradient Photoinjector

High brightness beams appealing for XFELs and UEM essentially imply a high current and a low emittance. To obtain such beams we propose to raise the accelerating voltage in the gun mitigating repealing Coulomb forces. An ultra-high gradient is achieved utilizing a short-pulse technology. We have designed a room temperature X-band 1,5 cell gun that is able to inject 4 MeV, 100 pC bunches with as low as 0.15 mcm normalized transverse emittance. The gun is operated with as high gradients as 400 MV/m and fed by 200 MW, 10 ns RF pulses generated with Argonne Wakefield Accelerator (AWA) power extractor. We report results of low RF power tests, laser alignment test results, and successful gun conditioning results carried out at nominal RF power.

43 PARTICLE ACCELERATORS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

DESIGN AND MEASUREMENT OF THE 1.4 GHZ CAVITY FOR LEReC LINAC

The Low Energy RHIC electron Cooler (LEReC) is the first electron cooler based on rf acceleration of electron bunches. To further improve RHIC luminosity for heavy ion beam energies below 10 GeV/nucleon, a normal conducting RF cavity at 1.4 GHz was designed and fabricated for the LINAC that will provide longer electron bunches for the LEReC. It is a single cell cavity with effective cavity length shorter than half of the 1.4 GHz wavelength. This cavity was fabricated and tested on site at BNL to verify RF properties, i.e. the resonance frequency, fundamental power coupler (FPC) coupling strength, tuner system performance, and high-power tests. In this paper, we report the RF test results for this cavity.

43 PARTICLE ACCELERATORS↗

Wave Energy Prize - 1/20th Testing - RTI Wave Power Oscillating Wave Surge Converter

Data from the 1/20th scale testing data completed on the Wave Energy Prize for the RTI Wave Power team, including the 1/20th Test Plan, raw test data, video, photos, and data analysis results. The top level objective of the 1/20th scale device testing is to obtain the necessary measurements required for determining Average Climate Capture Width per Characteristic Capital Expenditure (ACE) and the Hydrodynamic Performance Quality (HPQ), key metrics for determining the Wave Energy Prize (WEP) winners.

1/20th scale↗

Generation of nanosecond THz pulses using a high gain ring resonator with a semiconductor switch

A 250 GHz quasi-optical ring resonator consisting of an input coupler and three mirrors has been designed and tested. A low-loss silicon wafer in the ring provides output coupling of the stored power when irradiated by a pulse from a 532 nm laser. The ring created 5.8 ns, 268 mW output power pulses when excited by a 17 mW, 250 GHz continuously operating input source, achieving a power gain of 16. In a fully tuned ring, higher gain is achievable. If the ring was used with a pulsed input source having a pulse length of several times the fill time, the ring could be used as an efficient pulse compressor with similar high gain. The resonator has a wide range of applications, including, at low power, spectroscopy and, at high power, testing of accelerator structures and materials.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

An Evaluation and Qualification of U.S.-Based Research Reactors for Irradiation Capabilities Supporting Advanced Nuclear Systems

Irradiation experiments are a prerequisite for evaluating nuclear reactor system designs, analyzing the performance of these systems, and obtaining licenses. Likewise, irradiation facilities are necessary for producing the radioisotopes used in industrial and medical applications. Recent developments in modeling and simulation capabilities and advancements in computational resources have further enabled the design of irradiation experiments for evaluating radiation-induced phenomena and determining nuclear fuel, material, and system design and safety criteria pertaining to both normal and accident scenarios. These computational tools and models require comprehensive experimental datasets acquired under prototypic radiation conditions—for exploring material and system performance under the uniquely harsh environments found in nuclear reactors—to enable verification and validation for qualification and licensing purposes. However, qualification of irradiation experimental facilities, primarily research and test reactors (RTRs), necessitates that their performance be evaluated based on the irradiation environment (e.g. flux, power, testing capabilities) using an appropriate scoring matrix. Although many university campus RTRs are available for research and development (R&D) activities and initiatives, this study focuses on evaluating and qualifying the irradiation facilities (mostly RTRs) within the United States that are suitable for advanced nuclear fuel, material, and system irradiation experiments aimed at establishing operational-performance limits and informing component and fuel designs so as to improve operational efficiencies and mitigate proliferation vulnerabilities, as well as for radioisotope production aimed at multipurpose applications. As a result, the findings of the present study support the acceleration of nuclear fuel and material qualifications, thus hastening new and advanced nuclear energy system demonstrations and radioisotope production efforts by using extended R&D.

irradiation experiment↗

Clicker Remote Resync Job Aid

1. Organize Clickers and Receivers; 2. Make sure Clickers are on and powered (test laser pointer function); 3. Take first receiver and plug it in to USB port in powered on PC; 4. Move mouse controller on Clicker; 5. Check to see if mouse pointer on screen moves and the orange light glows while moving mouse controller

97 MATHEMATICS AND COMPUTING↗

Magnetron R&D for high efficiency CW RF sources for industrial accelerators

The scheme of using high-efficiency magnetrons to drive radiofrequency accelerators has been demonstrated at 2450 MHz in CW mode *. Magnetron test stands at JLab and GA have been set up to further test the noise figure and the locking speed of the injection phase-lock method. For higher power applications, power combining experiments using a TM010 cavity-type combiner and a magic tee for the binary combiner while using a single clean injection signal has been carried out at 2450 MHz. The frequency pulling effect between the magnetron and a low-Q cavity has been shown to enhance the frequency locking bandwidth compared to the injection phase-lock alone. The principle has been studied by the equivalent circuit simulation, analytical model, and finally confirmed experimentally on the magnetrons. Due to the pandemic delay in 2020, the equivalent high power tests using a 75kW, 915MHz industrial magnetron will be done in 2021 and will be reported in a future paper.

Wang, H.↗

RF BREAKDOWN STUDIES USING PRESSURIZED CAVITIES

Many present and future particle accelerators are limited by the maximum electric gradient and peak surface fields that can be realized in RF cavities. Despite considerable effort, a comprehensive theory of RF breakdown has not been achieved and mitigation techniques to improve practical maximum accelerating gradients have had only limited success. Part of the problem is that RF breakdown in an evacuated cavity involves a complex mixture of effects, which include the geometry, metallurgy, and surface preparation of the accelerating structures and the make-up and pressure of the residual gas in which plasmas form. Studies showed that high gradients can be achieved quickly in 805 MHz RF cavities pressurized with dense hydrogen gas, as needed for muon cooling channels, without the need for long conditioning times, even in the presence of strong external magnetic fields. This positive result was expected because the dense gas can practically eliminate dark currents and multipacting. In this project we used this high pressure technique to suppress effects of residual vacuum and geometry that are found in evacuated cavities in order to isolate and study the role of the metallic surfaces in RF cavity breakdown as a function of magnetic field, frequency, and surface preparation. One of the interesting and useful outcomes of this project was the unanticipated collaborations with LANL and Fermilab that led to new insights as to the operation of evacuated normal-conducting RF cavities in high external magnetic fields. Other accomplishments included: (1) RF breakdown experiments to test the effects of SF6 dopant in H2 and He gases with Sn, Al, and Cu electrodes were carried out in an 805 MHz cavity and compared to calculations and computer simulations. The heavy corrosion caused by the SF6 components led to the suggestion that a small admixture of oxygen, instead of SF6, to the hydrogen would allow the same advantages without the corrosion in a practical muon beam line. (2) A 1.3 GHz RF test cell capable of operating both at high pressure and in vacuum with replaceable electrodes was designed, built, and power tested in preparation for testing the frequency and geometry effects of RF breakdown at Argonne National Lab. At the time of this report this cavity is still waiting for the 1.3 GHz klystron to be available at the Wakefield Test Facility. (3) Under a contract with Los Alamos National Lab, an 805 MHz RF test cavity, known as the All-Seasons Cavity (ASC), was designed and built by Muons, Inc. to operate either at high pressure or under vacuum. The LANL project to use the (ASC) was cancelled and the testing of the cavity has been continued under the grant reported on here using the Fermilab Mucool Test Area (MTA). The ASC is a true pillbox cavity that has performed under vacuum in high external magnetic field better than any other and has demonstrated that the high required accelerating gradients for many muon cooling beam line designs are possible. (4) Under ongoing support from the Muon Acceleration Program, microscopic surface analysis and computer simulations have been used to develop models of RF breakdown that apply to both pressurized and vacuum cavities. The understanding of RF breakdown will lead to better designs of RF cavities for many applications. An increase in the operating accelerating gradient, improved reliability and shorter conditioning times can generate very significant cost savings in many accelerator projects.

43 PARTICLE ACCELERATORS↗

On Leakage Current Measured at High Cell Voltages in Lithium-Ion Batteries

In this study, parasitic side reactions in lithium-ion batteries were examined experimentally using a potentiostatic hold at high cell voltage. The experimental leakage current measured during the potentiostatic hold was compared to the Tafel expression and showed poor agreement with the expected transfer coefficient values, indicating that a more complicated expression could be needed to accurately capture the physics of this side reaction. Here we show that cross-talk between the electrodes is the primary contribution to the observed leakage current after the relaxation of concentration gradients has ceased. This cross-talk was confirmed with experiments using a lithium-ion conducting glass ceramic (LICGC) separator, which has high conductance only for lithium cations. The cells with LICGC separators showed significantly less leakage current during the potentiostatic hold test compared to cells with standard microporous separators where cross-talk is present. In addition, direct-current pulse power tests show an impedance rise for cells held at high potentials and for cells held at high temperatures, which could be attributed to film formation from the parasitic side reaction. Based on the experimental findings, a phenomenological mechanism is proposed for the parasitic side reaction which accounts for cross-talk and mass transport of the decomposition products across the separator.

25 ENERGY STORAGE↗

Progress in the Development of the Nb 3 Sn MQXFB Quadrupole for the HiLumi Upgrade of the LHC

The high-luminosity upgrade of the Large Hadron Collider (HL-LHC) requires new high field and large-aperture quadrupole magnets for the low-beta inner triplets (MQXF). With a nominal operating gradient of 132.2 T/m in a 150 mm aperture and a conductor peak field of 11.3 T, the new quadrupole magnets are based on Nb 3 Sn superconducting technology. After a series of short models constructed in close collaboration by LARP (LHC Accelerator Research Program) and CERN, the development program is entering in the series production phase with CERN on one side and the US Accelerator Upgrade Project (US-AUP) on the other side assembling and testing full-length magnets. This paper describes the status of the development activities at CERN, in particular on the cold powering test of the first MQFXB prototype and on the construction of the second full scale prototype. Critical operations such as reaction heat treatment, coil impregnation and magnet assembly are discussed. Finally, the plan towards the series production is described.

43 PARTICLE ACCELERATORS↗

Extended Pulse-Powered Humidity-Freeze Cycling for Testing Module-Level Power Electronics

An EMI suppression capacitor (polypropylene film type) failed by 'popcorning' due to vapor outgassing in the pulse powered humidity-freeze cycles. No shorts or shunts could be detected despite mildly corroded metallization visible in the failed capacitor. Humidity-freeze cycling is optimized to break into moisture barriers. However, further studies will done on additional MLPE devices to optimize the stress testing for condensation to precipitate any weakness to short circuiting and other humidity/bias failure modes.

14 SOLAR ENERGY↗