Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the 2013 GTO Workshop on Geothermal Code Comparison

Pacific Northwest National Laboratory (PNNL) is supporting the Department of Energy (DOE) Geothermal Technologies Office (GTO) in organizing and executing a model comparison activity. This project is directed at testing, diagnosing differences, and demonstrating modeling capabilities of a worldwide collection of numerical simulators for evaluating geothermal technologies. A key element of the project was the planning and implementation of a one-day project kickoff workshop, held February 14, 2013 in Palo Alto, CA. The primary goals of the workshop were to 1) introduce the project and its objectives to potential participating team members, and 2) develop an initial set of test problem descriptions for use in the execution stage. This report summarizes the outcomes of the workshop.

15 GEOTHERMAL ENERGY↗

DOE Award No.: DE-FE0023919 Phase 4 Scientific/Technical Report

This is the Phase 4 Report for the ‘Deepwater Methane Hydrate Characterization and Scientific Assessment or Genesis of Methane Hydrates in the Gulf of Mexico (GOM2)’ research project (DOE Award No. DE-FE0023919). The report summarizes activities from October 1, 2019 to September 30, 2020. The project is led by the University of Texas at Austin (UT). The project objective is to gain insight into the nature, formation, occurrence and physical properties of methane hydrate-bearing sediments for the purpose of methane hydrate resource appraisal through the planning and execution of drilling, coring, logging, testing and analytical activities that assess the geologic occurrence, regional context, and characteristics of marine methane hydrate deposits in the Gulf of Mexico outer continental shelf (OCS). We published a dedicated American Association of Petroleum Geologists Bulletin volume describing initial results from the UT-GOM2-1 expedition in Sept. 2020. This is part 1 of a multi-volume commitment by AAPG to this project. We further confirmed that the natural gas in hydrate at GC-955 was formed by primary microbial processes (>76.1 %). The in-situ effective permeability hydrate-bearing sandy silts at the GC-955 reservoir ranges from 0.1 md (1.0×10-16 m2) to 2.4 md (2.4×10-15m2) in cores with 83% to 93% hydrate saturation. The intrinsic permeability (the single phase permeability) is estimated from reconstituted samples to be ~12 md (1.2×10-14 m2) to ~41 md (4.1×10-14 m2). We used observation and models to interpret that the core degradation that is found in pressure cores is due to dissociation of the methane hydrate in the outer circumference of the core and dissolution of that methane into the fresh pore water that the core is stored with. We are designing approaches to minimize this core loss in the future. We spent an enormous amount of effort to further improve the ability of the pressure coring tool (the PCTB) to pressure seal correctly. We completed upgrading the upper section of the PCTB to address poor pressure. We successful tested the modifications at Geotek’s test facility in Salt Lake City (Bench Test II). We completed a Land Test of the PCTB at the Schlumberger Cameron Test and Training Facility (CTTF). The tool did not seal in 6 out of 7 tests and we clearly demonstrated that cuttings were wedging in the ball valve assembly, keeping the ball valve from sealing. We reproduced the failure mechanism observed during the land test at Salt Lake City and confirmed the sensitivity of the ball valve assembly to grit. Geotek designed and tested 9 modifications to address this issue and the PCTB is now 100% successfully sealing in the presence of grit. Our science expedition is scheduled for spring 2022 and we are fully focused on preparing for this. UT and Ohio State completed a Shallow Hazard Assessment report for each proposed UT-GOM2-2 drilling location, pursuant to 30 CFR 250.214(f) and 250.244 (f). The Shallow Hazard Reports will accompany the UT-GOM2-2 Exploration Plan that is submitted to BOEM, and completes the geological and geophysical analysis for UT-GOM2-2 permitting efforts. We updated the UT-GOM2-2 Operations Plan (Version 1). We completed the UT-GOM2-2 Science and Sample Distribution Plan (Version 1). We evaluated the scope, budget, and schedule that would result from using a commercial vessel. We developed detailed drilling schedule, mud volume, and resource estimates. We developed a vessel specification document and a well plan, and sent these documents to prospective vessel contractors.

03 NATURAL GAS↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Snowmass’21 Accelerator Frontier

Snowmass’21 is decadal particle physics community planning study. It provides an opportunity for the entire particle physics community to come together to identify and document a scientific vision for the future of particle physics in the U.S. and its international partners. Snowmass will define the most important questions for the field of particle physics and identify promising opportunities to address them. The P5, Particle Physics Project Prioritization Panel, will take the scientific input from Snowmass and develop a strategic plan for U.S. particle physics that can be executed over a 10 year timescale, in the context of a 20-year global vision for the field. Here we present the goals, progress and plans of the Snowmass’21 Accelerator Frontier.

43 PARTICLE ACCELERATORS↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Informationincludes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studieswith descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

14 SOLAR ENERGY↗

Pre-commercial Demonstration of Direct Non-iterative State Estimator for Operational Use of Synchrophasor Management Systems

The objective of this project was to demonstrate functionality and performance of a Direct Non-iterative State Estimator (DNSE) integrated with NYPA’s Energy Management System (EMS) and with enhanced Real Time Dynamics Monitoring System (RTDMS) synchrophasor platform from Electric Power Group (EPG). DNSE is designed to overcome a major obstacle to operational use of Synchro-Phasor Management Systems (SPMS) by providing to synchrophasor management systems (SPMS) applications a consistent and a complete synchrophasor data foundation in the same way that a traditional EMS State Estimator (SE) provides to EMS applications. Specifically, DNSE is designed to use synchrophasor measurements collected by a central PDC, Supervisory Control and Data Acquisition (SCADA) measurements, and Energy Management System (EMS) network model, to obtain the complete state of the utility’s operating model at rates that are close to the synchrophasor data rates. In this way, the system is comprehensive in that it does not only cover the part of the network that is “visible” via synchrophasors, but also the part that is only “visible” through the SCADA measurements. Visualization needs associated with the use of DNSE results are fulfilled through suitably enhanced Real Time Dynamics Monitoring System (RTDMS), with the enhancements implemented by EPG. This project had the following goals in mind: To advance the deployment of commercial grade DNSE software application that relies on synchrophasor and SCADA data ; Apply DNSE at other utilities, to address a generic and fundamental need for “clean” operational data for synchrophasor applications; Provide means for “live” estimated data access by control system operators; Enhance potential for situational awareness through full system operational model coverage; Sub-second execution rate of the Direct Non-iterative State Estimator, eventually at a near-phasor data rate execution speed, i.e. < 0.1 sec. Anticipated benefits from this projects are: Enhanced reliability and improvements in the economic efficiency of bulk power system planning and operations; Providing “clean” data to other synchrophasor applications; Enhancement of situational awareness by providing the full operational model updated at near synchrophasor rate; A production-grade software tool that incorporate synchrophasor and SCADA data; Provides a basis for development of next generation monitoring and control applications, based on both SCADA and PMU data. Quanta Technology (QT) team worked in collaboration with Electric Power Group (EPG) whose team has enhanced its commercial Real Time Dynamics Monitoring System (RTDMS) to accommodate the requirements posed by DNSE application. EPG also provided its ePDC and Model-less Data Conditioning (PDVC) software for integration with DNSE+. QT developed the system requirements for DNSE; developed system architecture and defined interfaces between internal DNSE components. The core DNSE algorithm with all surrounding interfaces was named DNSE+. Since the DNSE development was done in a simulated system environment, QT used its PMU simulator that was enhanced during this project for development and factory acceptance testing (FAT). SCADA data in this stage was simulated by commercial PSS/e software. The output of DNSE are estimates of System states in C37.118-2 format, sent to RTDMS for further processing and display. As the number of these states is large, it was necessary to expand the C37.111-2 standard to accommodate large data sets. This enhancement was implemented in RTDMS. The demonstration of pre-production DNSE technology was done at NYPA using streaming field data from NYPA PMUs and from its RTUs through their SCADA system. NYPA provided ICCP interface as well as Common Information Model (CIM). The relevance of the DNSE+ application is that it provides state estimation of the power system based on hybrid set of data, consisting of both available PMU data and SCADA measurements. As this is a direct, non-iterative method of calculation of the system states, if does not suffer from convergence issues which is potential problem for conventional state estimators. Also, it can take any available PMU measurements, so it does not need to have a high percentage of PMU coverage needed in the case of Linear State Estimator. As the DNSE calculates synchrophasors of the system states (both phase and absolute value) as sub-second rate, this application can provide a basis for development of next generation of applications based both on SCADA and PMU data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Net Zero Energy Buildings Roadmap

In preparation for the time-phased net zero energy requirement for new federal buildings starting in 2020, set forth in Executive Order 13514, NASA requested that the National Renewable Energy Laboratory (NREL) to develop a roadmap for NASA's compliance. NASA detailed a Statement of Work that requested information on strategic, organizational, and tactical aspects of net zero energy buildings. In response, this document presents a high-level approach to net zero energy planning, design, construction, and operations, based on NREL's first-hand experience procuring net zero energy construction, and based on NREL and other industry research on net zero energy feasibility. The strategic approach to net zero energy starts with an interpretation of the executive order language relating to net zero energy. Specifically, this roadmap defines a net zero energy acquisition process as one that sets an aggressive energy use intensity goal for the building in project planning, meets the reduced demand goal through energy efficiency strategies and technologies, then adds renewable energy in a prioritized manner, using building-associated, emission- free sources first, to offset the annual energy use required at the building; the net zero energy process extends through the life of the building, requiring a balance of energy use and production in each calendar year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Beneficial Integration of Energy Storage and Load Management with Photovoltaic (PV)

In recent years, a number of industry activities have aimed at addressing the integration challenges posed by the variability and uncertainty of higher penetration of renewable generation sources, like solar photovoltaic (PV) – one of the key objectives of the Sustainable and Holistic Integration of Energy Storage and Solar PV (SHINES) program launched by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE). This EPRI led Beneficial Integration of Energy Storge, and Load Management with PV project aimed to design, develop, and demonstrate end-to-end distributed energy resource (DER) integration solution to build on these activities. EPRI led project team designed and implemented a local controller that uses model predictive control (MPC) algorithm to optimally manage DERs on site by planning for a receding horizon while executing the control settings for the first step of its plan. The team has also developed a system controller to interface with the local controller to demonstrate the hierarchical control and how it can leverage DER capabilities to address challenges like over voltage and thermal limit violations which typically limits the DER hosting capacity of distribution feeders. Team has demonstrated how the local controller with optimization algorithm can effectively manage controllable loads like HVAC, water heater, and pool pumps to allow for greater integration of PV with relatively smaller energy storage system requirements. Optimal utilization of the load control can also reduce the depth of discharge of batteries to meet grid export/import limit from behind-the-meter (BTM) DERs. Proper utilization of DER capabilities via local control intelligence, like the one developed and demonstrated in this project can help the industry to address integration challenges of higher penetration of solar PV in economically efficient manner. This can help to accelerate deployment of clean renewable energy systems at lower societal cost.

14 SOLAR ENERGY↗

FROM REQUIREMENTS CAPTURE TO SILICON: A MODEL-DRIVEN SYSTEMS ENGINEERING APPROACH TO RAPID DESIGN, PROTOTYPING AND DEVELOPMENT USED IN THE OAK RIDGE NATIONAL LABORATORY'S COGNITIVE RADIO PROGRAM

The performance and complexity of the signal processing hardware accessible to SDR/CR/RADAR designers has quickly out-paced the available design tools. The advances in Digital Signal Processors (DSP) both fixed- and floating-point, Field Programmable Gate Arrays (FPGA), and multicore processors have enabled rapid prototyping and deployment of platforms that can be dynamically reconfigured in the field to implement a variety of SDR/CR/RADAR waveforms. Until recently the process of creating waveforms meant starting with high-level mathematical models and simulations and then creating production quality code that can operate on this variety of specialized hardware using either hand coding or vendor specific tools, which are typically limited to single processor solutions. This paper discusses an integrated model-driven design process and tool-flow used in ORNL's Cognitive Radio Program. It describes how the process and tool-flow are used on a variety of SDR and CR projects and in the development of a software-defined RADAR environment simulator. It describes how, from a single Simulink model, a single deadlock free real-time multiprocessor application is created and executed on a network of heterogeneous processors. We also describe recent progress on extending the process/tool-flow to design digital ASICs and our plans for future extensions. We close by highlighting the benefits being realized from applying this design flow to SDR/CR/RADAR projects at ORNL: (1) a significant reduction in the time required to develop, prototype, implement and test SDR/CR/RADAR waveforms, (2) increased reusability/retargetabilty of SDR/CR/RADAR designs and signal processing library components, (3) the ability to quickly port SDR/CR/RADAR waveforms to different hardware systems and processor types, (4) improvements in documentation, and (5) traceability of system components back to original requirements.

97 MATHEMATICS AND COMPUTING↗

FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.

54 ENVIRONMENTAL SCIENCES↗

Collaborative Research and Development Program on Explosive Detection Technology

In September 2013, at the 6th Permanent Coordinating Group Meeting between the U.S Department of Energy (DOE) and the French Institut de Radioprotection et de Sureté Nucléaire (IRSN), France expressed an interest in bilateral cooperation with the United States because its newly revised regulations that require enhanced explosives detection capabilities at nuclear and radiological facilities. In the ensuing years, PNNL (DOE/NNSA) and IRSN sought to identify an area of collaboration within explosives detection that would leverage the specific technical strengths of each organization. Based upon awareness of each other’s technical acumen gleaned from the scientific literature on explosives detection, it was clear that specific organizations within each nation could provide the needed expertise to enable enhancement of explosives detection through a collaborative development effort. The French lnstitut Saint-Louis was determined to be an optimal partner for IRSN to develop a collaboration with DOE/NNSA using PNNL’s detection team in this effort. Thus, the dialog was started between the technical experts at each organization to define where complementary expertise in explosives detection could be best leveraged. The technical plans and objectives of this project were sound with promising results. In the end, the joint action sheet was not implemented. The challenge with executing the project was in the complexity of getting a signed agreement between DOE, IRSN and ISL. Most of the obstacles surrounded the ability to protect intellectual property and obtain an agreement which included all of the parties. At a high level, this report documents the interactions and attempt to develop a cooperative framework for explosives detection development from FY 2014 through FY 2020.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Explosive Demolition of a Fire-Water Tower At East Tennessee Technology Park, Oak Ridge TN

On June 17, 2006, the Department of Energy (DOE) successfully demolished a {approx}60 year old fire-water tower (K-1206-E), located at the East Tennessee Technology Park (ETTP) in Oak Ridge, TN, using strategically placed explosive charges. The subject demolition project was executed by MCM Management Corporation and Demolition Dynamics under the management of DoE's prime contractor Bechtel Jacobs Company LLC (BJC). The K-1206-E Fire Water Tower (Tower) supported the ETTP fire water protection system from the mid- 1950's until 1991. The 378,500-L (100,000-gallon) Tower, elevated 53-m (175-feet) above grade, was located in a grassy area within 152-m (500-feet) of several other occupied facilities. Electrical, control circuits and supply water servicing the Tower were deactivated in 2003. Free liquids and sludge were removed from the tank prior to demolition. Demolition of a facility employing explosive demolition at a federal site in the 'post-9/11 era' was a substantial challenge. The subject paper discusses: - the planning and coordination steps that were taken to successfully overcome the challenges prior to the demolition of the empty, deactivated Tower; - the method used for the engineered demolition of the Tower; and - the factors responsible for the successful execution of this demolition project. At least two previous attempts were made to demolish the Tower. In the first attempt, the execution of the project was deferred by the re-allocation of funds. In the subsequent attempt in 2004, the execution of this project was postponed due to concerns that an adjacent facility would have to shut down operations during the duration of mobilization and execution of the project and thereby incur potential financial losses. A total of 51 cubic meters (1,800 cubic feet) of demolition debris was generated, which was compliantly disposed of at a local landfill followed by site restoration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Glycolic Acid Flowsheet in the Defense Waste Processing Facility (DWPF) - 17348

The disposition of high level waste (HLW) into canistered waste forms began at Savannah River Site (SRS) in 1996. For its entire processing history, DWPF has added formic acid as a pretreatment step in producing acceptable melter feed from incoming waste sludges sent from the HLW Tank Farms. While this process has been used to successfully produce more than 4,000 radioactive canisters, the addition of formic acid and its tendency to catalytically decompose in the presence of trace quantities of noble metals adds substantial process complexity in order to safely accommodate hydrogen generation and pH shifting during batch operations. Research efforts have been in progress for several years to identify a chemical surrogate for formic acid which performs the essential process functions without the associated negative consequences. The final analytical work to demonstrate the effectiveness of glycolic acid in the DWPF is nearly complete and a project team has been created to safely integrate the new acid into the chemical process. The project team is currently executing an implementation schedule which addresses safety basis development, revision to operations procedures and training, facility modifications, chemical procurement, and updated process monitoring. Introduction of glycolic acid into DWPF is currently scheduled to take place in early 2017, beginning with a blended flowsheet of glycolic and formic acid and ultimately transitioning to glycolic-only processing. This paper provides an overview of planned glycolic acid flowsheet implementation in the DWPF. This paper discusses several issues related to implementing such a significant change to the chemical process including: 1) Process chemistry differences between the two flowsheets with quantitative comparison for several properties of interest; 2) Technical approach to hazards analysis and safety basis development strategy; 3) Status of project execution for major deliverables; and 4) Path forward for facility modifications related to legacy formic acid support equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Weight Radioisotope Heater Unit User’s Guide

This user's guide provides an overview of Light Weight Radioisotope Heater Units (LWRHU), including aspects of its physical design and performance under normal operations. This guide also identifies the planning and execution involved in launching a nuclear payload. Physical characteristics, interfaces, and environmental characteristics of the LWRHU are discussed in detail. Information relating to project management interfaces and effort.

07 ISOTOPE AND RADIATION SOURCES↗