At least 127 records · Page 7

Planning and Analyses Performed to Install Halden’s Advanced Control Room Concept in the Human Systems Simulation Laboratory

The United States (U.S.) Department of Energy (DOE) sponsors the Light Water Reactor Sustainability (LWRS) Program, which has the goal of sustaining U.S. nuclear assets through conducting high-quality, value-added research and development (R&D) that provides the technical bases to extend the operating life of commercial NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics, conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in NPPs. LWRS program researchers have been conducting R&D that enables the modernization of the I&C technologies in NPP main control rooms and have authored numerous reports on those research activities. Interestingly, however, virtually all of the control room modernization activities that have been researched in collaboration with various U.S. utility partners has been on upgrades that are the first steps to position these legacy control rooms for further full nuclear plant modernization. So, while many nuclear utility owners and operators have taken the first steps toward the digitalization of the control room I&C, LWRS program researchers are not aware of what any utility’s end-state vision is for full control room modernization. Thus, the purpose of this LWRS R&D activity is to start developing an advanced control room interface concept for legacy NPPs and to demonstrate it in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) so that utility partners can see what a potential end state is for their control room upgrade activities. The end state shows what a fully modernized control room looks like and how it works, and is the result of HFE and I&C work to transition the existing control room and its concept of operations to a new advanced control room configuration. This report documents the planning and analyses performed to install an advanced control room concept in the HSSL. Future LWRS reports will document the process to set up the HSSL and the gPWR with the HSI developed in Halden, and then document how LWRS program researchers at INL and Halden are supporting the capability to conduct future studies by creating additional HSIs that support control room modernization.

99 GENERAL AND MISCELLANEOUS↗

Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator is also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Innovative Patient Room Lighting System with Integrated Spectrally Adaptive Control

In December of 2013, the U.S. Department of Energy’s SSL R&D Program released a Funding Opportunity Announcement (FOA), that for the first time, contained opportunities for comprehensive application-specific system development. The FOA included opportunities for two applications, one of which was a Patient Room. Philips Lighting Research North America, submitted a proposal for the Patient Room application, and was selected for the complete project award. The award amount was for $497,127, with a Philips Research co-funding commitment 165,709 dollars. The total project value was 662,836 dollars. This project sought to redefine lighting for the patient room application. The goal was to deliver an innovative LED patient suite (patient room and bathroom) lighting system solution that was 40% more energy-efficient than traditional fluorescent incumbent technologies, and would meet all the visual and non-visual needs of patients, caregivers and visitors, and improve the patient experience. State-of-the-art multichannel LED platforms and control technologies that would provide spectral tuning and become part of an intelligent, connected lighting system drove the solution. The project was scoped into four main task areas that included a) System Concept Creation, b) Identification of the Luminaire Portfolio, c) Development of the Connected Lighting Infrastructure, and d) System Performance Validation. Each of the four main tasks were completed and validated extensively over the course the 2 ½ year project. The system concept was created by first developing a lighting design that demonstrated best practices for patient room lighting – illuminance and uniformity for task performance, reduced glare, and convenient controls, in addition to giving patients control over the lighting in their environment. A framework was defined to deliver circadian support via software behaviors. Through that process luminaires were identified from the Philips portfolio that were adaptable – by their form, dimensions, and optical materials – to mix multicolor LED platforms uniformly and deliver target design lumen levels. The Blue Sky luminaire was selected for the patient bed area to give the illusion of skylight while providing white light on the patient bed. Luminaires used existing 2-channel tunable white LED boards, and newly developed 4-channel LED boards. Red-Orange, Blue, Green, and Blue-shifted Yellow LED chips were selected based on spectral characteristics and their ability to produce high quality white light. 4-channel Power over Ethernet (PoE) drivers were developed and firmware written so they would communicate with both 2- and 4-channel boards. These components formed the backbone of the connected lighting infrastructure. Software, flexible and nuanced in its complexity, was written to set behaviors for myriad lighting scenes in the room throughout the 24 hour day – and all could be overridden by manual controls. This included a dynamic tunable white program, three color changing automatic programs that simulated degrees of sunrise to sunset palettes, and an amber night lighting system that offered visual cues for postural stability to minimize the risk of falls. All programs were carefully designed to provide visual comfort for all occupants, support critical task performance for staff, and to support the patient’s 24hr rhythms. A full scale mockup room was constructed in the Philips Cambridge Lab. The lighting system was installed, tested and functionality demonstrated to ensure smooth operation of system components – luminaires, drivers, PoE switches, wall controls, patient remote, and daylight and occupancy sensors. How did the system perform? It met visual criteria, confirmed by calculations, simulations and measurements in the field. It met non-visual criteria, confirmed by setting circadian stimulus (CS) targets and performing calculations using the calculator developed by the Lighting Research Center. Finally, human factors validation studies were conducted to gain insight from real end users in the healthcare profession; surveys were administered, data analyzed, and audio comments captured. The general consensus was positive, with requests to pilot the system in their hospitals. The importance of the research completed under this grant is that it allowed the exploration and development of a unique lighting system, one that would deliver a blend of visual and non-visual criteria in patient room design for today’s healthcare environment. The research investigated the area of multichannel LED technology, multichannel Power over Ethernet (PoE) drivers and their integration with automatic and manual controls as a system – uncovering and meeting challenges along the way. It married visual needs of patients and staff with support for 24 hour rhythms, placing value on the wellbeing of the patient – while successfully saving energy over incumbent technologies. Indications are that the market is ready and willing to invest – multiple healthcare facilities are in line to pilot this system, recognizing its value beyond energy to patient and staff well-being. Its value to the public can best be expressed by a patient support coordinator who, after spending several hours in the room being immersed in the lighting, analyzing all its features, commented: “This re-writes lighting for healthcare”.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating situation awareness in the control room: the development and initial testing of the process awareness and situation understanding (PASU) measure - 267

What should we ask the control room crew about when evaluating situation awareness? Currently available freeze probe techniques concentrate on trends of process parameters. Analysis of control room work shows that there are far more involved in control room crews' Situation Awareness (SA). The Process Awareness and Situation Understanding (PASU) measure has been developed from an analysis of control room work and includes probing the crew about the status of safety functions and main plant systems such as coolant supply, ordinary and emergency power supply, main reactor parameters, and main plant parameters. Results from a nuclear control room evaluation showed that the crew's overview of safety functions developed differently across scenario phases compared to the crew's overview of main process parameters. SA in the nuclear control room seems to be a multifaceted phenomenon and valid measurement needs to cover its aspects. Initial empirical testing showed that PASU was sensitive to scenario phases and related to other performance indicators. PASU, or measures based on similar principles, can be a valid and useful probe based technique for use in the evaluation of control room design and control room work. The measure will fill a gap in the research literature and will serve as an example of SA measurement with utility for control room evaluation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-D-BRE-03: Dosimetric Impact of In-Air Spot Size Variations for Commissioning a Room-Matched Beam Model for Pencil Beam Scanning Proton Therapy

Purpose: To quantitatively evaluate dosimetric consequence of spot size variations and validate beam-matching criteria for commissioning a pencil beam model for multiple treatment rooms. Methods: A planning study was first conducted by simulating spot size variations to systematically evaluate dosimetric impact of spot size variations in selected cases, which was used to establish the in-air spot size tolerance for beam matching specifications. A beam model in treatment planning system was created using in-air spot profiles acquired in one treatment room. These spot profiles were also acquired from another treatment room for assessing the actual spot size variations between the two treatment rooms. We created twenty five test plans with targets of different sizes at different depths, and performed dose measurement along the entrance, proximal and distal target regions. The absolute doses at those locations were measured using ionization chambers at both treatment rooms, and were compared against the calculated doses by the beam model. Fifteen additional patient plans were also measured and included in our validation. Results: The beam model is relatively insensitive to spot size variations. With an average of less than 15% measured in-air spot size variations between two treatment rooms, the average dose difference was −0.15% with a standard deviation of 0.40% for 55 measurement points within target region; but the differences increased to 1.4%±1.1% in the entrance regions, which are more affected by in-air spot size variations. Overall, our single-room based beam model in the treatment planning system agreed with measurements in both rooms < 0.5% within the target region. For fifteen patient cases, the agreement was within 1%. Conclusion: We have demonstrated that dosimetrically equivalent machines can be established when in-air spot size variations are within 15% between the two treatment rooms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Bridging the gap: adapting advanced display technologies for use in hybrid control rooms

The Institute for Energy Technology (IFE), runs the OECD Halden Reactor Project (HRP), featuring a state-of-the-art research simulator facility in Halden, Norway, called HAMMLAB. HAMMLAB serves two main purposes: the study of human behaviour in interaction with complex process systems; and the development, test and evaluation of prototype control centres and their individual systems. By studying operator performance in HAMMLAB and integrating the knowledge gained into new designs, the HRP contributes to improving operational safety, reliability, efficiency and productivity. The U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program has contracted IFE to assist DOE national laboratory staff at Idaho National Laboratory (INL) in adapting HAMMLAB design concepts for the purpose of control room modernization at nuclear power plants in the U.S. In support of this effort, the DOE has built a simulator research facility at INL called the Human Systems Simulation Laboratory (HSSL). The HSSL is centered on control room modernization, in which industry provided plant instrumentation and controls are modified for upgrade opportunities. The HSSL houses the LWRS simulator, which is a reconfigurable full-scale and full-scope control room simulator. Consisting of 45 large touchscreens on 15 panels, the LWRS simulator is currently using this glass top technology to digitally represent and replicate the functionality of the analog I&C systems in existing control rooms. The LWRS simulator is reconfigurable in that different plant training simulator models obtained from the utilities can be run on the panels, and the panels can be physically moved and arranged to mimic the layout of those control rooms. The glass top technology and reconfigurability capabilities allow the LWRS simulator to be the research platform that is necessary to design, prototype, and validate human-system interface (HSI) technologies that can replace existing analog I&C. IFE has recently assisted INL in establishing the technical infrastructure for implementation of HSI prototypes from HAMMLAB into the HSSL to demonstrate relevant control room replacement systems in support of the LWRS program. In March, 2014, IFE delivered the first HSI prototype utilizing this infrastructure — a large screen overview display for INL's simulator. The co-operation now continues by developing Procedure Support Displays targeted for operators in hybrid control room settings. These prototypes are being validated with U.S. reactor operators in the HSSL and optimized to enhance their performance. This research serves as a crucial stepping stone toward incorporation of advanced display technologies into conventional main control rooms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of Mutual Awareness in Analog vs. Digital Control Rooms

Control rooms in nuclear power plants are complex, collaborative working environments rife with potential for human error. As control rooms evolve from analog to digital interface environments, crew communication strategies must change as well. Operators in the analog control room operate the plant and communicate with each other with the help of control boards with large control panels, meters, and switches. Reactor operators could choose a particular set of controls on the particular control board which corresponds to the part of the system of interest. Visual display units (VDU), which became a fixture in the control rooms with the shift to digital human-machine interfaces (HMI), bring benefits for safety and flexibility combining information from various sources. With the increase in automation and the use of digital HMIs operators received their personal sitting workstations where they are able to navigate and operate the plant. The amount of information increased as well as the complexity of monitoring and analyzing the system states. Also computerized systems cause operators to get absorbed by their personal screens and reduce interaction between the crew members. Therefore, the collaboration and coordination of task demands requires vigilance and mutual awareness. The level of automation has an influence on the level of mutual awareness experienced by operators in the control rooms. Teams function to carry out highly interdependent tasks, requiring synthesis and sharing of information to achieve common goals. Improving the performance of the team necessitates the operators to focus on the system, the surrounding environment, and situational awareness about the system states. Collaboration of team members is critical when employing the digital operating systems as the acute awareness of the overall progress of the group and individual activities of the operators drives the team to the desired end-states of the plant operations. Out-of-the loop (OOTL) performance problems can be referred to as the lack of supervisory control, system monitoring, and information processing in the digital HMIs. Under some circumstances Senior Reactor Operators (SRO) struggle to follow the actions of other Reactor Operators (RO) because with the new digital interfaces SROs lose track of how the procedures are carried out by ROs, which results in the loss of three way communication. Mutual awareness plays a significant role in keeping the SROs in the loop of plant operations. This paper will investigate, through literature review and expert interviews, the impact and human errors attributed to the increasing complexity of new digital main control rooms. Comparison of the new digital interfaces with the analog interfaces in nuclear power plants has the potential to shed light on increasing mutual awareness and three way communications between the SROs and ROs. Further, identification of the human errors and human actions can provide beneficial information, suggesting significant and critical improvements that can be implemented in the main control rooms to increase safety and reliability of new technology. Additionally, insights on mutual awareness for analog vs. digital control rooms can serve to improve human reliability.

99 GENERAL AND MISCELLANEOUS↗

Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

On the production of neutrons in laminated barriers for 10 MV medical accelerator rooms

When space limitations are primary constraints, laminated barriers with metals can be an option to provide sufficient shielding for a radiotherapy treatment room. However, if a photon clinical beam with end point energy of 10 MeV or higher interacts with the metal inside the barriers neutrons are ejected and can result in an exposure problem inside and outside the vault. The empirical formulae existing in the literature to estimate neutron dose equivalents beyond laminated barriers do not take into account neutron production for spectra below 15 MV. In this work, the Monte Carlo code MCNP was used to simulate the production and transport of photoneutrons across primary barriers of 10 MV accelerator treatment rooms containing lead or steel, in order to obtain the ambient dose equivalents produced by these particles outside the room and in the patient plane. It was found that the neutron doses produced are insignificant when steel is present in the primary barriers of 10 MV medical accelerators. On the other hand, the results show that, in all cases where lead sheets are positioned in the primary barriers, the neutron ambient dose equivalents outside the room generally exceed the shielding design goal of 20 {mu}Sv/week for uncontrolled areas, even when the lead sheets are positioned inside the treatment room. Moreover, for laminated barriers, the photoneutrons produced in the metals are summed with the particles generated in the accelerator head shielding and can represent a significant component of additional dose to the patients. In this work, it was found that once lead sheets are positioned inside the room, the neutron ambient dose equivalents can reach the value of 75 {mu}Sv per Gray of photon absorbed dose at the isocenter. However, for all simulated cases, a tendency in the reduction of neutron doses with increasing lead thickness can be observed. This trend can imply in higher neutron ambient dose equivalents outside the room for thinner lead sheets. Therefore, when a medical accelerator treatment room is designed with laminated barriers to receive equipment with an end point energy equal to or higher than 10 MeV, not only the required shielding thickness for photon radiation attenuation should be considered, but also the dose due to photoneutrons produced in the metal, which may involve an increase of the lead thickness or even the use of neutron shielding.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-T-217: A Comprehensive Monte-Carlo Study of Out-Of-Field Secondary Neutron Spectra in a Scanned-Beam Proton Therapy Treatment Room

Purpose: To simulate secondary neutron radiation-fields produced at different positions during phantom irradiation inside a scanning proton therapy gantry treatment room. Further, to identify origin, energy distribution and angular emission as function of proton beam energy. Methods: GEANT4 and FLUKA Monte-Carlo codes were used to model the relevant parts of the treatment room in a gantry-equipped pencil beam scanning proton therapy facility including walls, floor, metallic gantry-components, patient table and the homogeneous PMMA target. The proton beams were modeled based on experimental beam ranges in water and spot shapes in air. Neutron energy spectra were simulated at 0°, 45°, 90° and 135° relative to the beam axis at 2m distance from isocenter, as well as 11×11 cm2 fields for 75MeV, 140MeV, 200MeV and for 118MeV with 5cm PMMA range-shifter. The total neutron energy distribution was recorded for these four positions and proton energies. Additionally, the room-components generating secondary neutrons in the room and their contributions to the total spectrum were identified and quantified. Results: FLUKA and GEANT4 simulated neutron spectra showed good general agreement in the whole energy range of 10{sup −}9 to 10{sup 2} MeV. Comparison of measured spectra with the simulated contributions of the various room components helped to limit the complexity of the room model, by identifying the dominant contributions to the secondary neutron spectrum. The iron of the bending magnet and counterweight were identified as sources of secondary evaporation-neutrons, which were lacking in simplified room models. Conclusion: Thorough Monte-Carlo simulations have been performed to complement Bonner-sphere spectrometry measurements of secondary neutrons in a clinical proton therapy treatment room. Such calculations helped disentangling the origin of secondary neutrons and their dominant contributions to measured spectra, besides providing a useful validation of widely used Monte-Carlo packages in comparison to experimental data. Cluster of Excellence of the German Research Foundation (DFG) “Munich-Centre for Advanced Photonics (MAP)”.

60 APPLIED LIFE SCIENCES↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Simulations of Empty Room Collapse and Reconsolidation at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geologic repository for defense-related nuclear waste. If left undisturbed, the virtually impermeable rock salt surrounding the repository will isolate the nuclear waste from the biosphere. If humans accidentally intrude into the repository in the future, then the likelihood of a radionuclide release to the biosphere will depend significantly on the porosity and permeability of the repository itself. Room ceilings and walls at the WIPP tend to collapse over time, causing rubble piles to form on floors of empty rooms. The surrounding rock formation will gradually compact these rubble piles until they eventually become solid salt, but the length of time for a rubble pile to reach a certain porosity and permeability is unknown. This report details the first efforts to build models to predict the porosity and permeability evolution of an empty room as it closes. Conventional geomechanical numerical methods would struggle to model empty room collapse and rubble pile consolidation, so three different meshless methods, the Immersed Isogeometric Analysis Meshfree, Reproducing Kernel Particle Method (RKPM), and the Conformal Reproducing Kernel method, were assessed. First, the meshless methods and the finite element method each simulated gradual room closure, without ceiling or wall collapse. All three methods produced equivalent room closure predictions with comparable computational speed. Second, the Immersed Isogeometric Analysis Meshfree method and RKPM simulated two-dimensional empty room collapse and rubble pile consolidation. Both methods successfully simulated large viscoplastic deformations, fracture, and rubble pile rearrangement to produce qualitatively realistic results. In addition to geomechanical simulations, the flow channels in damaged salt and crushed salt were measured using micro-computed tomography, and input into a computational fluid dynamics simulation to predict the salt's permeability. Although room for improvement exists, the current simulation approaches appear promising.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Navier-Stokes Simulation of Airconditioning Facility of a Large Modem Computer Room

NASA recently assembled one of the world's fastest operational supercomputers to meet the agency's new high performance computing needs. This large-scale system, named Columbia, consists of 20 interconnected SGI Altix 512-processor systems, for a total of 10,240 Intel Itanium-2 processors. High-fidelity CFD simulations were performed for the NASA Advanced Supercomputing (NAS) computer room at Ames Research Center. The purpose of the simulations was to assess the adequacy of the existing air handling and conditioning system and make recommendations for changes in the design of the system if needed. The simulations were performed with NASA's OVERFLOW-2 CFD code which utilizes overset structured grids. A new set of boundary conditions were developed and added to the flow solver for modeling the roomls air-conditioning and proper cooling of the equipment. Boundary condition parameters for the flow solver are based on cooler CFM (flow rate) ratings and some reasonable assumptions of flow and heat transfer data for the floor and central processing units (CPU) . The geometry modeling from blue prints and grid generation were handled by the NASA Ames software package Chimera Grid Tools (CGT). This geometric model was developed as a CGT-scripted template, which can be easily modified to accommodate any changes in shape and size of the room, locations and dimensions of the CPU racks, disk racks, coolers, power distribution units, and mass-storage system. The compute nodes are grouped in pairs of racks with an aisle in the middle. High-speed connection cables connect the racks with overhead cable trays. The cool air from the cooling units is pumped into the computer room from a sub-floor through perforated floor tiles. The CPU cooling fans draw cool air from the floor tiles, which run along the outside length of each rack, and eject warm air into the center isle between the racks. This warm air is eventually drawn into the cooling units located near the walls of the room. One major concern is that the hot air ejected to the middle isle might recirculate back into the cool rack side and cause thermal short-cycling. The simulations analyzed and addressed the following important elements of the computer room: 1) High-temperature build-up in certain regions of the room; 2) Areas of low air circulation in the room; 3) Potential short-cycling of the computer rack cooling system; 4) Effectiveness of the perforated cooling floor tiles; 5) Effect of changes in various aspects of the cooling units. Detailed flow visualization is performed to show temperature distribution, air-flow streamlines and velocities in the computer room.

Source record↗

Tritium Removal System for Airtight Room in High-flux Advanced Neutron Application Reactor (HANARO) - 12110

An Airtight room was installed to prevent the diffusion of tritium from the instrument room to other areas in HANARO. It was isolated by a robust structure and the inside was closed tightly. A Tritium removal system located outside the instrument room was connected to the airtight room to lower the tritium concentration when the workers enter the room for maintenance of the instruments. The tritium concentration and the dew point in the airtight room were continuously measured during the operation of the tritium removal system. The data were analyzed by using a model. There was a difference between the measured tritium concentration and the one obtained by the model. It is believed that the difference is due to the change of the generation rate of tritium which would increase as the dew point becomes lower. Based on this assumption, the previous equation was revised to better express the performance of the tritium removal system. It was re-estimated that the change of tritium concentration in an airtight room could be predicted well by using a model and equation proposed in the previous study. It was confirmed that there was a definite difference between the measured tritium concentration and the one obtained by equation from the model. It is believed that the difference is due to the change of the generation rate of tritium which would increase as the dew point becomes lower. Based on this assumption, the generation rate of tritium was controlled to have higher value and the change of tritium concentration in airtight room could be more correctly predicted. By using the revised equation, the tritium removal system would be operated more effectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplemental Radiological Survey Plan for the Lease of the Rooms Associated with C107 of Building K-1006 at the East Tennessee Technology Park, Oak Ridge, Tennessee

In 1998, a portion of Bldg. K-1006 was leased to the Community Reuse Organization of East Tennessee (CROET) as part of the reindustrialization efforts at the East Tennessee Technology Park (ETTP). The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include rooms C107, C107-A, C107-B, C107-C, and C107-D. The lease of these rooms is now desired. These rooms comprise the area to be surveyed. The building was constructed as a laboratory facility to support the gaseous diffusion uranium enrichment process. It also contains offices and administrative spaces for laboratory personnel. After the gaseous diffusion process was shut down in the mid-1980s, the building was used to provide research and development support to ETTP environmental, safety, and health programs; the Toxic Substances Control Act Incinerator; the Central Neutralization Facility; and other multi-site waste treatment activities. It also served as the chemistry laboratory for the Environmental Technology Technical Services Organization. The activities currently conducted in Bldg. K-1006 utilize a variety of analytical techniques. Some of the major techniques being employed are X-ray analysis, electron microanalysis, and spectrochemical analysis. In 1998, a portion of Bldg. K-1006 was leased to CROET as part of the reindustrialization efforts at ETTP. The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include Rooms C107, C107-A, C107-B, C107-C, and C107-D. Some demolition of furniture and decontamination activities has taken place for Rooms C 107 and C 107-B since the last radiological survey of those rooms. In March 2009, a final remedial action (RA) was performed for the Bldg. K-1006 north basement sump. The Bldg. K-1006 north basement sump is a nominal 30-in.-diameter, 36-in.-deep concrete structure in the north corner of room C107B. The building receives groundwater in-leakage that is periodically pumped to the sewer system via this float-controlled pump. Solids in the bottom of the sump consisted of an estimated 1-ft{sup 3} coarse-grained material that varied in thickness from 0 to 4 in. with no suspended fraction. The RA consisted of removing the water in the sump and then removing and sampling the solids. The solids were mixed with grout after removal and allowed to set. The solids were then disposed off-site at an approved disposal facility. The building sump will remain until the K-1006 building is demolished. The actions for the K- 1006 sump are described in the revised Phased Construction Completion Report for Exposure Unit (EU) Z2-33, which received regulatory approval in December 2009.

54 ENVIRONMENTAL SCIENCES↗