Search NASA⌕ Search

SEARCH · Search NASA

Results for “Raw”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

User's guide for the Solar Backscattered Ultraviolet (SBUV) and the Total Ozone Mapping Spectrometer (TOMS) RUT-S and RUT-T data sets: October 31, 1978 to November 1, 1980

Raw data from the Solar Backscattered Ultrviolet/Total Ozone Mapping Spectrometer (SBUV/TOMS) Nimbus 7 operation are available on computer tape. These data are contained on two separate sets of RUTs (Raw Units Tapes) for SBUV and TOMS, labelled RUT-S and RUT-T respectively. The RUT-S and RUT-T tapes contain uncalibrated radiance and irradiance data, housekeeping data, wavelength and electronic calibration data, instrument field-of-view location and solar ephemeris information. These tapes also contain colocated cloud, terrain pressure and snow/ice thickness data, each derived from an independent source. The "RUT User's Guide" describes the SBUV and TOMS experiments, the instrument calibration and performance, operating schedules, and data coverage, and provides an assessment of RUT-S and -T data quality. It also provides detailed information on the data available on the computer tapes.

Fleig, A. J.↗

SEASAT synthetic-aperture radar data user's manual

The SEASAT Synthetic-Aperture Radar (SAR) system, the data processors, the extent of the image data set, and the means by which a user obtains this data are described and the data quality is evaluated. The user is alerted to some potential problems with the existing volume of SEASAT SAR image data, and allows him to modify his use of that data accordingly. Secondly, the manual focuses on the ultimate focuses on the ultimate capabilities of the raw data set and evaluates the potential of this data for processing into accurately located, amplitude-calibrated imagery of high resolution. This allows the user to decide whether his needs require special-purpose data processing of the SAR raw data.

Pravdo, S. H.↗

Multibeam single frequency synthetic aperture radar processor for imaging separate range swaths

A single-frequency multibeam synthetic aperture radar for large swath imaging is disclosed. Each beam illuminates a separate ""footprint'' (i.e., range and azimuth interval). The distinct azimuth intervals for the separate beams produce a distinct Doppler frequency spectrum for each beam. After range correlation of raw data, an optical processor develops image data for the different beams by spatially separating the beams to place each beam of different Doppler frequency spectrum in a different location in the frequency plane as well as the imaging plane of the optical processor. Selection of a beam for imaging may be made in the frequency plane by adjusting the position of an aperture, or in the image plane by adjusting the position of a slit. The raw data may also be processed in digital form in an analogous manner.

Jain, A.↗

Doppler lidar signal and turbulence study

Comparison of the second moments of the Doppler lidar signal with aircraft and tower measured parameters is being carried out. Lidar binary data tapes were successfully converted to ASCII Code on the VAX 11/780. These data were used to develop the computer programs for analyzing data from the Marshall Space Flight Center field test. Raw lidar amplitude along the first 50 forward and backward beams of Run No. 2, respectively was plotted. Plotting techniques for the same beams except with the amplitude thresholded and range corrected were developed. Plotting routines for the corresponding lidar width of the first 50 forward and backward beams were also established. The relationship between raw lidar amplitude and lidar width was examined. The lidar width is roughly constant for lidar amplitudes less than 120 dB. A field test with the NASA/MSFC ground based Doppler lidar, the instrumented NASA B-57B gust gradient aircraft, and the NASA/MSFC eight tower array was carried out. The data tape for the lidar was received and read. The aircraft data and tower data are being digitized and converted to engineering units. Velocities computed sequentially along each of the lidar beams beginning at 16:40:00, May 12, 1983 were plotted for Run No. 1.

Frost, W.↗

Materials processing in space

Processing-refining of raw materials from extraterrestrial sources is detailed for a space materials handling facility. The discussion is constrained to those steps necessary to separate desired components from raw or altered input ores, semi-purified feedstocks, or process scrap and convert the material into elements, alloys, and consumables. The materials are regarded as originating from dead satellites and boosters, lunar materials, and asteroids. Strong attention will be given to recycling reagent substances to avoid the necessity of transporting replacements. It is assumed that since no aqueous processes exist on the moon, the distribution of minerals will be homogeneous. The processing-refining scenario will include hydrochemical, pyrochemical, electrochemical, and physical techniques selected for the output mass rate/unit plant mass ratio. Flow charts of the various materials processing operations which could be performed with lunar materials are provided, noting the necessity of delivering several alloying elements from the earth due to scarcities on the moon.

Waldron, R. D.↗

An integrated software system for geometric correction of LANDSAT MSS imagery

A system for geometrically correcting LANDSAT MSS imagery includes all phases of processing, from receiving a raw computer compatible tape (CCT) to the generation of a corrected CCT (or UTM mosaic). The system comprises modules for: (1) control of the processing flow; (2) calculation of satellite ephemeris and attitude parameters, (3) generation of uncorrected files from raw CCT data; (4) creation, management and maintenance of a ground control point library; (5) determination of the image correction equations, using attitude and ephemeris parameters and existing ground control points; (6) generation of corrected LANDSAT file, using the equations determined beforehand; (7) union of LANDSAT scenes to produce and UTM mosaic; and (8) generation of output tape, in super-structure format.

Parada, N. D. J.↗

A Preliminary Assessment of LANDSAT-4 Thematic Mapper Data

The results of a preliminary assessment of both raw and NASA processed Thematic Mapper (TM) data are discussed. Geometric correction of NASA processed TM data was carried out. Correction was possible to within 3 pixels in the along track direction and 2 pixels in the across track direction. A preliminary evaluation of TM imagery provided by the NASA LANDSAT Assessmemt System for geometric accuracy and map information content was performed on samples of imagery. The initial indications were that bands 3, 5 and 7 contain the most useful cartographic information. The resolution of rural and urban detail as well as the fit to plotted map detail was found to be improved over LANDSAT MSS, and such images may provide adequate revision information for 1:250,000 maps in areas where it is not currently profitable to use LANDSAT MSS. The relative gains and offsets for each detector in each band of raw data were calculated in a study of the radiometric correction of TM data. This was done for different subscenes as well as a full scene and the variation of the results with direction of scan and position of subscene were studied.

Goodenough, D. G.↗

Investigation of LANDSAT D Thematic Mapper geometric performance: Line to line and band to band registration

The geometric accuray of LANDSAT TM raw data of Toulouse (France) raw data of Mississippi, and preprocessed data of Mississippi was examined using a CDC computer. Analog images were restituted on the VIZIR SEP device. The methods used for line to line and band to band registration are based on automatic correlation techniques and are widely used in automated image to image registration at CNES. Causes of intraband and interband misregistration are identified and statistics are given for both line to line and band to band misregistration.

Begni, G.↗

Ground test article for deployable space structure systems

The ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.

Malloy, G. D.↗

Analysis of estimation algorithms for CDTI and CAS applications

Estimation algorithms for Cockpit Display of Traffic Information (CDTI) and Collision Avoidance System (CAS) applications were analyzed and/or developed. The algorithms are based on actual or projected operational and performance characteristics of an Enhanced TCAS II traffic sensor developed by Bendix and the Federal Aviation Administration. Three algorithm areas are examined and discussed. These are horizontal x and y, range and altitude estimation algorithms. Raw estimation errors are quantified using Monte Carlo simulations developed for each application; the raw errors are then used to infer impacts on the CDTI and CAS applications. Applications of smoothing algorithms to CDTI problems are also discussed briefly. Technical conclusions are summarized based on the analysis of simulation results.

Goka, T.↗

A metallurgical route to solar-grade silicon

The aim of the process is to produce silicon for crystallization into ingots that can be sliced to wafers for processing into photovoltaic cells. If the potential purity can be realized, the silicon will also be applicable for ribbon pulling techniques where the purification during crystallization is negligible. The process consists of several steps: selection and purification of raw materials, carbothermic reduction of silica, ladle treatment, casting, crushing, leaching, and melting. The leaching step is crucial for high purity, and the obtainable purity is determined by the solidification before leaching. The most difficult specifications to fulfill are the low contents of boron, phosphorus, and carbon. Boron and phosphorus can be excluded from the raw materials, but the carbothermic reduction will unavoidably saturate the silicon with carbon at high temperature. During cooling carbon will precipitate as silicon carbide crystals, which will be harmful in solar cells. The cost of this solar silicon will depend strongly on the scale of production. It is as yet premature to give exact figures, but with a scale of some thousand tons per year, the cost will only be a few times the cost of ordinary metallurgical silicon.

Schei, A.↗

Toward a spartan scenario for use of lunar materials

The present discussion has the objective to identify those raw materials for use in manufacture which can most readily be obtained from lunar materials as they are currently known. The state of lunar exploration is incomplete, and concentrated ores may exist for elements now regarded as rare or dispersed. This paper provides a description of minimum possibilities, based on the notion of making do with the least feasible amounts of separation and processing. The discussion is limited to the most abundant materials observed at lunar sites visited by the Apollo missions. The ground rules for use of lunar products are considered along with the tools required to carry out any significant production of raw materials for manufacture, and lunar surface conditions. Readily available materials include unprocessed regolith and minimally processed regolith. A few examples of processing methods are provided, giving attention to thermal release of gases, hydrogen reduction of ilmenite, carbonyl processing, electrolysis of molten silicate, and destructive distillation.

Haskin, L. A.↗

Large scale topography of Io

To investigate the large scale topography of the Jovian satellite Io, both limb observations and stereographic techniques applied to landmarks are used. The raw data for this study consists of Voyager 1 images of Io, 800x800 arrays of picture elements each of which can take on 256 possible brightness values. In analyzing this data it was necessary to identify and locate landmarks and limb points on the raw images, remove the image distortions caused by the camera electronics and translate the corrected locations into positions relative to a reference geoid. Minimizing the uncertainty in the corrected locations is crucial to the success of this project. In the highest resolution frames, an error of a tenth of a pixel in image space location can lead to a 300 m error in true location. In the lowest resolution frames, the same error can lead to an uncertainty of several km.

Gaskell, R. W.↗

System Turns SAR Images Into Maps

Postprocessing system for synthetic-aperture radar (SAR) transforms raw images from natural rotated and distorted SAR reference frame into geocoded images. Images automatically corrected to remove slant-range nonlinearities and Doppler skew. Produces multiple-frame mosaics for large-scale mapping. Does not require tedious manual registration of representative "tie" points in raw SAR imagery with known locations on Earth.

Curlander, J. C.↗

In-orbit calibration adjustment of the Nimbus-7 SMMR

The procedure for converting raw antenna signals (counts) from the Nimbus-7 Scanning Multichannel Microwave Radiometer (SMMR) to microwave radiances is described. The procedure entails taking the raw data stored on TAT data tapes, applying an interim prelaunch calibration, correcting for polarization mixing, and finally adjusting the calibration so that the observations conform to model calculations of oceanic radiances. The results are stored on TCT data tapes with the same format as the TATs, i.e., the basic sampling interval of the SMMR is retained. The properties of the TCTs are compared with those of the other basic SMMR radiance data product, the CELL tapes, in which the integrated fields-of-view (IFOVs) have been averaged into cells with coarser sampling intervals and in which the prelaunch calibration is the final one used.

Gloersen, Per↗

Characterization of ZrO2-Y2O3 thermal spray powder systems

The overall objective is to establish the interrelation between the raw material in the coating process and the performance of the coating deposit. It is anticipated that these interrelations will help establish more precise specifications for the procurement of the raw materials. Some of the preliminary results of the program are presented.

Mantkowski, Thomas E.↗

The Alaska SAR processor

The Alaska SAR processor was designed to process over 200 100 km x 100 km (Seasat like) frames per day from the raw SAR data, at a ground resolution of 30 m x 30 m from ERS-1, J-ERS-1, and Radarsat. The near real time processor is a set of custom hardware modules operating in a pipelined architecture, controlled by a general purpose computer. Input to the processor is provided from a high density digital cassette recording of the raw data stream as received by the ground station. A two pass processing is performed. During the first pass clutter-lock and auto-focus measurements are made. The second pass uses the results to accomplish final image formation which is recorded on a high density digital cassette. The processing algorithm uses fast correlation techniques for range and azimuth compression. Radiometric compensation, interpolation and deskewing is also performed by the processor. The standard product of the ASP is a high resolution four-look image, with a low resolution (100 to 200 m) many look image provided simultaneously.

Carande, R. E.↗

An Alternative Derivation of the Nimbus 7 Total Solar Irradiance Variations

Nimbus 7 solar irradiance values have been made available to the scientific community through the open literature (e.g., Hickey et al., 1988) and through NASA data centers. A comparison of these measurements to the Solar Maximum Mission/Active Cavity Radiometer Irradiance Monitor (SSM/ACRIM) time series indicated differences which might be caused in part by the method of converting the Nimbus 7 raw data counts to solar irradiance values. In an effort to see if the derivation of the solar irradiance could be improved, the raw counts were extracted from the tapes and analyzed to see how a new algorithm could be constructed. The basic form of the calibration remains the same as in the previous solar irradiance derivations. However, the input values to the equation differ from what was used before. In particular, improved values of the Earth-sun distance are incorporated and new temperature sensitivities were derived. Several problems with the instrument were uncovered which previously had not been noticed. The sun did not appear to cross the center of field of the radiometer but was systematically off by 1.5 to 2.5 degrees. The analog to digital convertor changed its properties in July 1980. The gain of the electronics apparently increased by 0.03 percent in September 1987. Applying these and other changes in the processing, the day to day variations appear much more like the SMM observations. In fact, the Nimbus 7 observations are sufficiently stable that a problem with the SSM observations in the spin mode period of 1981 to 1984 can be detected when the two time series are compared.

Hoyt, Douglas V.↗