Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reconnaissance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

An Overview of the Mars Reconnaissance Orbiter (MRO) Science Mission

The Mars Reconnaissance Orbiter (MRO) is the latest addition to the suite of missions on or orbiting Mars as part of the NASA Mars Exploration Program. Launched on 12 August 2005, the orbiter successfully entered Mars orbit on 10 March 2006 and finished aerobraking on 30 August 2006. Now in its near-polar, near-circular, low-altitude (approximately 300 km), 3 p.m. orbit, the spacecraft is operating its payload of six scientific instruments throughout a one-Mars-year Primary Science Phase (PSP) of global mapping, regional survey, and targeted observations. Eight scientific investigations were chosen for MRO, two of which use either the spacecraft accelerometers or tracking of the spacecraft telecom signal to acquire data needed for analysis. Six instruments, including three imaging systems, a visible-near infrared spectrometer, a shallow-probing subsurface radar, and a thermal-infrared profiler, were selected to complement and extend the capabilities of current working spacecraft at Mars. Whether observing the atmosphere, surface, or subsurface, the MRO instruments are designed to achieve significantly higher resolution while maintaining coverage comparable to the current best observations. The requirements to return higher-resolution data, to target routinely from a low-altitude orbit, and to operate a complex suite of instruments were major challenges successfully met in the design and build of the spacecraft, as well as by the mission design. Calibration activities during the seven-month cruise to Mars and limited payload operations during a three-day checkout prior to the start of aerobraking demonstrated, where possible, that the spacecraft and payload still had the functions critical to the science mission. Two critical events, the deployment of the SHARAD radar antenna and the opening of the CRISM telescope cover, were successfully accomplished in September 2006. Normal data collection began 7 November 2006 after solar conjunction. As part of its science mission, MRO will also aid identification and characterization of the most promising sites for future landed missions, both in terms of safety and in terms of the scientific potential for future discovery. Ultimately, MRO data will advance our understanding of how Mars has evolved and by which processes that change occurs, all within a framework of identifying the presence, extent, and role of water in shaping the planet s climate over time.

astronomical instruments↗

Lunar Reconnaissance Orbiter (LRO) Navigation Overview

This viewgraph presentation is an overview of the Lunar Reconnaissance Orbiter (LRO), with emphasis on the navigation and plans for the mission. The objective of the LRO mission is to conduct investigations that will be specifically target to prepare for and support future human exploration of the Moon. There is a review of the scientific instruments on board the LRO and an overview of the phases of the planned trajectory.

Lamb, Rivers↗

Lunar Reconnaissance Orbiter FlatSat

This viewgraph presentation reviews the use of FlatSat as a platform for use during flight integration and testing (I&T) of the Lunar Reconnaissance Orbiter (LRO). Included in the presentations are requirements for the facility, a diagram of the LRO FlatSat lab, and discussion of the operational documentation, facility scheduling, and issues and lessons learned.

Wright, Michael↗

Mars Reconnaissance Orbiter Wrapper Script

The MRO OLVM wrapper script software allows Mars Reconnaissance Orbiter (MRO) sequence and spacecraft engineers to rapidly simulate a spacecraft command product through a tool that simulates the onboard sequence management software (OLVM). This script parses sequence files to determine the appropriate time boundaries for the sequence, and constructs the script file to be executed by OLVM to span the entirety of the designated sequence. It then constructs script files to be executed by OLVM, constructs the appropriate file directories, populates these directories with needed input files, initiates OLVM to simulate the actual command product that will be sent to the spacecraft, and captures the results of the simulation run to an external file for later review. Additionally, the tool allows a user to manually construct the script, if desired, and then execute the script with a simple command line.

Gladden, Roy↗

Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

Garcia, Gonzalo↗

Development, Qualification and Integration of the Optical Fiber Array Assemblies for the Lunar Reconnaissance Orbiter

The NASA Goddard Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufacturing at GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and LIDAR. Described here is an account of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO.

Ott, Melanie N.↗

The Optical Fiber Array Bundle Assemblies for the NASA Lunar Reconnaissance Orbiter

The United States, National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC), Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware assemblies for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufactured at NASA GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and lidar. These assemblies were developed in coordination with Diamond Switzerland, and the NASA GSFC Mechanical Systems Division. The assemblies represent a strategic enhancement for NASA's Laser Ranging and Laser Radar (LIDAR) instrument hardware by allowing light to be moved to alternative locations that were not feasible in past space flight implementations. An account will be described of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO. The LRO is scheduled to launch end of 2008.

Ott, Melanie N.↗

Special ISO Class 6 Cleanroom for the Lunar Reconnaissance Orbiter (LRO) Project

The parameters and restrictions for a horizontal flow ISO Class 6 Clean room to support the assembly of the new LRO (Lunar Reconnaissance Orbiter) were unusual. The project time line was critical. A novel Clean room design was developed and built within the time restraints. This paper describes the design criteria, timing, successful performance, and future benefits of this unique Clean room project.

Matthews, Richard A.↗

Mars Reconnaissance Orbiter Uplink Analysis Tool

This software analyzes Mars Reconnaissance Orbiter (MRO) orbital geometry with respect to Mars Exploration Rover (MER) contact windows, and is the first tool of its kind designed specifically to support MRO-MER interface coordination. Prior to this automated tool, this analysis was done manually with Excel and the UNIX command line. In total, the process would take approximately 30 minutes for each analysis. The current automated analysis takes less than 30 seconds. This tool resides on the flight machine and uses a PHP interface that does the entire analysis of the input files and takes into account one-way light time from another input file. Input flies are copied over to the proper directories and are dynamically read into the tool s interface. The user can then choose the corresponding input files based on the time frame desired for analysis. After submission of the Web form, the tool merges the two files into a single, time-ordered listing of events for both spacecraft. The times are converted to the same reference time (Earth Transmit Time) by reading in a light time file and performing the calculations necessary to shift the time formats. The program also has the ability to vary the size of the keep-out window on the main page of the analysis tool by inputting a custom time for padding each MRO event time. The parameters on the form are read in and passed to the second page for analysis. Everything is fully coded in PHP and can be accessed by anyone with access to the machine via Web page. This uplink tool will continue to be used for the duration of the MER mission's needs for X-band uplinks. Future missions also can use the tools to check overflight times as well as potential site observation times. Adaptation of the input files to the proper format, and the window keep-out times, would allow for other analyses. Any operations task that uses the idea of keep-out windows will have a use for this program.

Khanampompan, Teerapat↗

NESC Independent Review of the Mars Reconnaissance Orbiter (MRO) Contamination Thermal/Vacuum (T/V) Anomaly Technical Consultation Report

The NESC eras requested by the NASA Jet Propulsion Laboratory (JPL) to conduct an independent review of the Mars Reconnaissance Orbiter (MRO) Thermal/Vacuum (T/V) Anomaly Assessment. Because the anomaly resulted in the surface contamination of the MRO, selected members of the Materials Super Problem Resolution Team (SPRT) and the NASA technical community having technical expertise relative to contamination issues were chosen for the independent review. The consultation consisted of a review of the MRO Project's reported response to the assessment findings, a detailed review of JPL technical assessment final report, and detailed discussions with the JPL assessment team relative to their findings.

Sutter, James K.↗

A High Power Density Power System Electronics for NASA's Lunar Reconnaissance Orbiter

A high power density, modular and state-of-the-art Power System Electronics (PSE) has been developed for the Lunar Reconnaissance Orbiter (LRO) mission. This paper addresses the hardware architecture and performance, the power handling capabilities, and the fabrication technology. The PSE was developed by NASA s Goddard Space Flight Center (GSFC) and is the central location for power handling and distribution of the LRO spacecraft. The PSE packaging design manages and distributes 2200W of solar array input power in a volume less than a cubic foot. The PSE architecture incorporates reliable standard internal and external communication buses, solid state circuit breakers and LiIon battery charge management. Although a single string design, the PSE achieves high reliability by elegantly implementing functional redundancy and internal fault detection and correction. The PSE has been environmentally tested and delivered to the LRO spacecraft for the flight Integration and Test. This modular design is scheduled to flight in early 2009 on board the LRO and Lunar Crater Observation and Sensing Satellite (LCROSS) spacecrafts and is the baseline architecture for future NASA missions such as Global Precipitation Measurement (GPM) and Magnetospheric MultiScale (MMS).

Hernandez-Pellerano, A.↗

Lunar Reconnaissance Orbiter (LRO) Rapid Thermal Design Development

The Lunar Reconnaissance Orbiter (LRO) project had a rapid development schedule starting with project conception in spring of 2004, instrument and launch vehicle selection late in 2005 and then launch in early 2009. The lunar thermal environment is one of the harshest in our solar system with the heavy infrared loading of the moon due to low albedo, lack of lunar atmosphere, and low effective regolith conduction. This set of constraints required a thermal design which maximized performance (minimized radiator area and cold control heater power) and minimized thermal hardware build at the orbiter level (blanketing, and heater service). The orbiter design located most of the avionics on an isothermalized heat pipe panel called the IsoThermal Panel (ITP). The ITP was coupled by dual bore heat pipes to an Optical Solar Reflector (OSR) covered heat pipe radiator. By coupling all of the avionics to one system, the hardware was simplified. The seven instruments were mainly heritage instruments which resulted in their desired radiators being located by their heritage design. This minimized instrument redesigns and therefore allowed them to be delivered earlier, though it resulted in a more complex orbiter level blanket and heater service design. Three of the instruments were mounted on a tight pointing M55J optical bench that needed to be covered in heaters to maintain pointing. Two were mounted to spacecraft controlled radiators. One was mounted to the ITP Dual Bores. The last was mounted directly to the bus structure on the moon facing panel. The propulsion system utilized four-20 pound insertion thrusters and eight-5 pound attitude control thrusters (ACS) in addition to 1000 kg of fuel in two large tanks. The propulsion system had a heater cylinder and a heated mounting deck for the insertion thrusters which coupled most of the propulsion design together simplifying the heater design. The High Gain Antenna System (HGAS) and Solar Array System (SAS) used dual axis actuator gimbal systems. HGAS required additional boom heaters to cool the approximately 10 W of RF losses thru the rotary joints and wave guides from the 40 W Ka system. By design this module needed a fair amount of heater, blanketing, and radiator complexity. The SAS system required a separate cable wrap radiator to help cool the Solar Array harness which dissipated 30 W thru the actuators and cable wraps. This module also was complex.

Baker, Charles↗

Mars Reconnaissance Orbiter (MRO): The Next Step in Mars Exploration

This slide presentation reviews the Mars Reconnaissance Orbiter (MRO), and the science strategy that motivates the exploration of Mars. The MRO is one of several missions that are planned to enhance our understanding of the planet. Included in this presentation is a review of the schedule for the MRO, the science objectives of the mission, the payloads that ae planned for MRO, and the hoped for science that will be attained from them. A review of the mission, from launch to the primary science relay is reviewed and an overview of the orbiter is shown. The presentation details the payloads, and the expected data from the instruments.

water↗

Lunar Reconnaissance Orbiter (LRO) Sun Safe Mode

The Lunar Reconnaissance Orbiter (LRO), a spacecraft designed and built at the National Aeronautics and Space Administration s (NASA) Goddard Space Flight Center (GSFC) in Greenbelt, MD, was launched on June 18, 2009 from Cape Canaveral. It is currently in orbit about the Moon taking detailed science measurements and providing a highly accurate mapping of the suface in preparation for the future return of astronauts to a permanent moon base. Onboard the spacecraft is a complex set of algorithms designed by the attitude control engineers at GSFC to control the pointig for all operational events, including anomalies that require the spacecraft to be put into a well known attitude configuration for a sufficiently long duration to allow for the investigation and correction of the anomaly. GSFC level requirements state that each spacecraft s control system design must include a configuration for this pointing and lso be able to maintain a thermally safe and power positive attitude. This stable control algorithm for anomalous events is commonly referred to as the safe mode and consists of control logic thatwill put the spacecraft in this safe configuration defined by the spacecraft s hardware, power and environment capabilities and limitations. The LRO Sun Safe mode consists of a coarse sun-pointing set of algorithms that puts the spacecraft into this thermally safe and power positive attitude and can be achieved wihin a required amount of time from any initial attitude, provided that the system momentum is within the momentum capability of the reaction wheels. On LRO the Sun Safe mode makes use of coarse sun sensors (CSS), an inertial reference unit (IRU) and reaction wheels (RW) to slew the spacecraft to a solar inertial pointing. The CSS and reaction wheels have some level of redundancy because of their numbers. However, the IRU is a single-point-failure piece of hardware. Without the rate information provided by the IRU, the Sun Safe control algorithms could not maintain the required pointing, so a sub-mode of the Sun Safe mode that does not use the IRU was designed. This submode, referred to as the Sun Safe Gyroless control mode, consists of an algorithm that estimates rate information from the CSS and the RW measurements. RW momentum information is used to estimate the body rate parallel to the target sunline, which CSS alone would not be able to observe. Sun Safe can be autonomously, or via ground command, entered from any other control mode and in the event the IRU is not providing rate information, the control mode is switched to the gyroless submode. This paper looks at the design of the Sun Safe modes and discusses the constraints placed on the algorithm and how the mode wored around these constraints. Items of particular interest include CSS placement on the Solar Array (SA) and its implications to design, estimation of body rate information for the Sun Safe Gyroless control mode, and the effect of solar eclipse on each of the Sun Safe modes. Placing CSS on the SA was necessary for the means to put the Sun along the targeted sun-line, nominally normal to the SA panels, for all operational considerations. This had design implications for determining a sun vector during normal SA operations, if one or both gimbals become inoperable and when the SA is in a stowed configuration. The ability of body rate estimation in Sun Safe Gyroless not only uses CSS sun vector data but requires RW momentum measuremens to estimate rates parallel to the sun-line. LRO encounters solar eclipses of some length for most of its orbits about the Moon. With the lack of CSS measurement data a design was implemented in both Sun Safe and Sun Safe Gyroless, they differ because of having or not having IRU measurement data, to carry the spacecraft through these eclipse periods. This paper also includes some discussion of sun avoidance and how it affected design decisions during nominal and eclipse perids for each of the Sun Safe modes.

Garrick, Joseph↗

Lunar Reconnaissance Orbiter (LRO) Guidance, Navigation and Control (GN&C) Overview

The National Aeronautics and Space Administration s (NASA) Lunar Reconnaissance Orbiter (LRO) launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle and into a direct insertion trajectory to the oon. LRO, which was designed, built, and operated by the NASA Goddard Space Flight Center in Greenbelt, MD, is gathering crucial data on the lunar environment that will help astronauts prepare for long-duration lunar expeditions. The mission has a nominal life of 1 year as its seven instruments find safe landing sites, locate potential resources, characterize the radiation environment, and test new technology. To date, LRO has been operating well within the bounds of its requirements and has been collecting excellent science data images taken from the LRO Camera Narrow Angle Camera of the Apollo landing sites appeared on cable news networks. A significant amount of information on LRO s science instruments is provided at the LRO mission webpage. LRO s Guidance, Navigation and Control (GN&C) subsystem is made up of an onboard attitude control system (ACS) and a hardware suite of sensors and actuators. The LRO onboard ACS is a collection of algorithms based on high level and derived requirements, and reflect the science and operational events throughout the mission lifetime. The primary control mode is the Observing mode, which maintains the lunar pointing orientation and any offset pointing from this baseline. It is within this mode that all science instrument calibrations, slews and science data is collected. Because of a high accuracy requirement for knowledge and pointing, the Observing mode makes use of star tracker (ST) measurement data to determine an instantaneous attitude pointing. But even the star trackers alone do not meet the tight requirements, so a six-state Kalman Filter is employed to improve the noisy measurement data. The Observing mode obtains its rate information from an inertial reference unit (IRU) and in the event of an IRU failure, the rate data is be derived from the star tracker, but with degraded pointing performance. The Delta-V control mode responsibility is to maintain attitude pointing during the cruise trajectory, insertion burns and lunar orbit maintenance by adjustments made to the spacecraft s velocity magnitude and vector direction. The ACS also provides for a thruster based system momentum management algorithm (known as Delta-H) to maintain the system and wheel momentum to within acceptable levels. In the event an anomaly causes the LRO spacecraft to lose the ability to maintain its current attitude pointing, a Sun Safe mode is included in the ACS for the purpose of providing a known power and thermally safe coarse inertial sun attitude for an indefinite period of time, within the manageable limits of the reaction wheels. The Sun Safe mode is also the initial spacecraft control mode off of the launch vehicle and provides for a means to null tip-off rates immediately after separation. The nominal configuration is to use the IRU for rate information in the controller. In the event of a gyro failure a gyroless control mode was developed that computes rate information from the CSS data.

Garrick, Joseph↗

Integration and Testing of the Lunar Reconnaissance Orbiter Attitude Control System

Throughout the Lunar Reconnaissance Orbiter (LRO) Integration and Testing (I&T) phase of the project, the Attitude Control System (ACS) team completed numerous tests on each hardware component in ever more flight like environments. The ACS utilizes a select group of attitude sensors and actuators. This paper chronicles the evolutionary steps taken to verify each component was constantly ready for flight as well as providing invaluable trending experience with the actual hardware. The paper includes a discussion of each ACS hardware component, lessons learned of the various stages of I&T, a discussion of the challenges that are unique to the LRO project, as well as a discussion of work for future missions to consider as part of their I&T plan. LRO ACS sensors were carefully installed, tested, and maintained over the 18 month I&T and prelaunch timeline. Care was taken with the optics of the Adcole Coarse Sun Sensors (CSS) to ensure their critical role in the Safe Hold mode was fulfilled. The use of new CSS stimulators provided the means of testing each CSS sensor independently, in ambient and vacuum conditions as well as over a wide range of thermal temperatures. Extreme bright light sources were also used to test the CSS in ambient conditions. The integration of the two SELEX Galileo Star Trackers was carefully planned and executed. Optical ground support equipment was designed and used often to check the performance of the star trackers throughout I&T in ambient and thermal/vacuum conditions. A late discovery of potential contamination of the star tracker light shades is discussed in this paper. This paper reviews how each time the spacecraft was at a new location and orientation, the Honeywell Miniature Inertial Measurement Unit (MIMU) was checked for data output validity. This gyro compassing test was performed at several key testing points in the timeline as well as several times while LRO was on the launch pad. Sensor alignment tests were completed several times to ensure that hardware remained on a rigid platform.

Simpson, Jim↗

Solar Array Disturbances to Spacecraft Pointing During the Lunar Reconnaissance Orbiter (LRO) Mission

The Lunar Reconnaissance Orbiter (LRO), the first spacecraft to support NASA s return to the Moon, launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle. It was initially inserted into a direct trans-lunar trajectory to the Moon. After a five day transit to the Moon, LRO was inserted into the Lunar orbit and successfully lowered to a low altitude elliptical polar orbit for spacecraft commissioning. Successful commissioning was completed in October 2009 when LRO was placed in its near circular mission orbit with an approximate altitude of 50km. LRO will spend at least one year orbiting the Moon, collecting lunar environment science and mapping data, utilizing a suite of seven instruments to enable future human exploration. The objective is to provide key science data necessary to facilitate human return to the Moon as well as identification of opportunities for future science missions. LRO's instrument suite will provide the high resolution imaging data with sub-meter accuracy, highly accurate lunar cartographic maps, mineralogy mapping, amongst other science data of interest. LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing Mode", provides Lunar nadir, off-nadir, and inertial fine pointing for the science data collection and instrument calibration. This controller combines the capability of fine pointing with on-demand large angle full-sky attitude reorientation. It provides simplicity of spacecraft operation as well as additional flexibility for science data collection. A conventional suite of ACS components is employed in the Observing Mode to meet the pointing and control objectives. Actuation is provided by a set of four reaction wheels developed in-house at NASA Goddard Space Flight Center (GSFC). Attitude feedback is provided by a six state Kalman filter which utilizes two SELEX Galileo Star Trackers for attitude updates, and a single Honeywell Miniature Inertial Measurement Unit (MIMU) to provide body rates for attitude propagation. Rate is computed by differentiating accumulated angle provided by the MIMU. The Observing Mode controller is required to maintain fine pointing while a large fully-articulated solar array (SA) maintains its panel normal to the solar incidence. This paper describes the disturbances to the attitude control resulting from the SA articulation. Observing Mode performance in the presence of this disturbance was assessed while the spacecraft was in an initial elliptical low altitude orbit during the commissioning phase, which started about two weeks after launch and lasted for 90 days. LRO demonstrated excellent pointing performance during Observing Mode nadir and inertial attitude target operations during this phase. Transient LRO attitude errors observed during commissioning resulted primarily from three sources, Diviner instrument calibrations, RW zero crossings, and SA articulation. Even during times of considerable disturbance from SA articulation, the attitude errors were maintained below the statistical attitude error requirement level of 15 arc-sec (3 sigma).

Calhoun, Philip↗