Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

TESTING THE RELIABILITY OF CLUSTER MASS INDICATORS WITH A SYSTEMATICS LIMITED DATA SET

We present the mass-X-ray observable scaling relationships for clusters of galaxies using the XMM-Newton cluster catalog of Snowden et al. Our results are roughly consistent with previous observational and theoretical work, with one major exception. We find two to three times the scatter around the best-fit mass scaling relationships as expected from cluster simulations or seen in other observational studies. We suggest that this is a consequence of using hydrostatic mass, as opposed to virial mass, and is due to the explicit dependence of the hydrostatic mass on the gradients of the temperature and gas density profiles. We find a larger range of slope in the cluster temperature profiles at r {sub 500} than previous observational studies. Additionally, we find only a weak dependence of the gas mass fraction on cluster mass, consistent with a constant. Our average gas mass fraction results argue for a closer study of the systematic errors due to instrumental calibration and analysis method variations. We suggest that a more careful study of the differences between various observational results and with cluster simulations is needed to understand sources of bias and scatter in cosmological studies of galaxy clusters.

79 ASTRONOMY AND ASTROPHYSICS↗

Automatic Radiated Susceptibility Test System for Payload Equipment

An automatic radiated susceptibility test system (ARSTS) was developed for NASA Lewis Research Center's Electro-magnetic Interference laboratory. According to MSFC-SPEC 521B, any electrical or electronic equipment that will be transported by the spacelab and space shuttle must be tested for susceptibility to electromagnetic interference. This state-of-the-art automatic test system performs necessary calculations; analyzes, processes, and records a great quantity of measured data; and monitors the equipment being tested in real-time and with minimal user intervention. ARSTS reduces costly test time, increases test accuracy, and provides reliable test results.

Ngo, Hoai T.↗

Testing the Reliability of Cluster Mass Indicators with a Systematics Limited Dataset

We present the mass X-ray observable scaling relationships for clusters of galaxies using the XMM-Newton cluster catalog of Snowden et al. Our results are roughly consistent with previous observational and theoretical work, with one major exception. We find 2-3 times the scatter around the best fit mass scaling relationships as expected from cluster simulations or seen in other observational studies. We suggest that this is a consequence of using hydrostatic mass, as opposed to virial mass, and is due to the explicit dependence of the hydrostatic mass on the gradients of the temperature and gas density profiles. We find a larger range of slope in the cluster temperature profiles at radii 500 than previous observational studies. Additionally, we find only a weak dependence of the gas mass fraction on cluster mass, consistent with a constant. Our average gas mass fraction results also argue for a closer study of the systematic errors due to instrumental calibration and modeling method variations between analyses. We suggest that a more careful study of the differences between various observational results and with cluster simulations is needed to understand sources of bias and scatter in cosmological studies of galaxy clusters.

Juett, Adrienne M.↗

Statistical significance test for transition matrices of atmospheric Markov chains

Low-frequency variability of large-scale atmospheric dynamics can be represented schematically by a Markov chain of multiple flow regimes. This Markov chain contains useful information for the long-range forecaster, provided that the statistical significance of the associated transition matrix can be reliably tested. Monte Carlo simulation yields a very reliable significance test for the elements of this matrix. The results of this test agree with previously used empirical formulae when each cluster of maps identified as a distinct flow regime is sufficiently large and when they all contain a comparable number of maps. Monte Carlo simulation provides a more reliable way to test the statistical significance of transitions to and from small clusters. It can determine the most likely transitions, as well as the most unlikely ones, with a prescribed level of statistical significance.

Vautard, Robert↗

Testing for PV Reliability (Presentation)

The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

14 SOLAR ENERGY↗

Towards validation of combined-accelerated stress testing through failure analysis of polyamide-based photovoltaic backsheets

Abstract Novel methods for advancing reliability testing of photovoltaic (PV) modules and materials have recently been developed. Combined-accelerated stress testing (C-AST) is one such method which has demonstrated reliable reproduction of some field-failures which were not reproducible by standard certification tests. To increase confidence and assist in the development of C-AST, and other new testing protocols, it is important to validate that the failure modes observed and mechanisms induced are representative of those observed in the field, and not the product of unrealistic stress conditions. Here we outline a method using appropriate materials characterization and modelling to validate the failure mechanisms induced in C-AST such that we can increase confidence in the test protocol. The method is demonstrated by applying it to a known cracking failure of a specific polyamide (PA)-based backsheet material. We found that the failure of the PA-based backsheet was a result of a combination of stress factors. Photo-oxidation from ultra-violet (UV) radiation exposure caused a reduction in fracture toughness, which ultimately lead to the cracking failure. We show that the chemical and structural changes observed in the backsheet following C-AST aging were also observed in field-aged samples. These results increase confidence that the conditions applied in C-AST are representative of the field and demonstrates our approach to validating the failure mechanisms induced.

14 SOLAR ENERGY↗

A Ground-Based Comparison of the Muscle Atrophy Research and Exercise System (MARES) and a Standard Isokinetic Dynamometer

PURPOSE: 1) To compare the test-to-test reliability of Muscle Atrophy Research and Exercise System (MARES) with a standard laboratory isokinetic dynamometer (ISOK DYN) and; 2) to determine if measures of peak torque and total work differ between devices. METHODS: Ten subjects (6M, 4F) completed two trials on both MARES and an ISOK DYN in a counterbalanced order. Peak torque values at 60 deg & 180 deg / s were obtained from five maximal repetitions of knee extension (KE) and knee flexion (KF). Total work at 180 deg / s was determined from the area under the torque vs. displacement curve during twenty maximal repetitions of KE and KF. Reliability of measures within devices was interpreted from the intraclass correlation coefficient (ICC) and compared between devices using the ratio of the within-device standard deviations. Indicators of agreement for the two devices were evaluated from: 1) a calculation of concordance (rho) and; 2) the correlation between the mean of measures versus the delta difference between measures (m u vs delta). RESULTS: For all outcome measures ICCs were high for both the ISOK DYN (0.95-0.99) and MARES (0.90-0.99). However, ratios of the within-device standard deviation were 1.3 to 4.3 times higher on MARES. On average, a wide range (3.3 to 1054 Nm) of differences existed between the values obtained. Only KE peak torque measured at 60 deg & 180 deg / s showed similarities between devices (rho = 0.91 & 0.87; Pearson's r for m u vs delta = -0.22 & -0.37, respectively). CONCLUSION: Although MARES was designed for use in microgravity it was quite reliable during ground-based testing. However, MARES was consistently more variable than an ISOK DYN. Future longitudinal studies evaluating a change in isokinetic peak torque or total work should be limited within one device.

Hackney, K. J.↗

Techniques for control of long-term reliability of complex integrated circuits. I - Reliability assurance by test vehicle qualification.

Development of an alternate approach to the conventional methods of reliability assurance for large-scale integrated circuits. The product treated is a large-scale T squared L array designed for space applications. The concept used is that of qualification of product by evaluation of the basic processing used in fabricating the product, providing an insight into its potential reliability. Test vehicles are described which enable evaluation of device characteristics, surface condition, and various parameters of the two-level metallization system used. Evaluation of these test vehicles is performed on a lot qualification basis, with the lot consisting of one wafer. Assembled test vehicles are evaluated by high temperature stress at 300 C for short time durations. Stressing at these temperatures provides a rapid method of evaluation and permits a go/no go decision to be made on the wafer lot in a timely fashion.

Van Vonno, N. W.↗