Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Ground Testing A 20-Meter Inflation Deployed Solar Sail

Solar sails have been proposed for a variety of future space exploration missions and provide a cost effective source of propellantless propulsion. Solar sails span very large areas to capture and reflect photons from the Sun and are propelled through space by the transfer of momentum from the photons to the solar sail. The thrust of a solar sail, though small, is continuous and acts for the life of the mission without the need for propellant. Recent advances in materials and ultra-low mass gossamer structures have enabled a host of useful space exploration missions utilizing solar sail propulsion. The team of L Garde, NASA Jet Propulsion Laboratory (JPL), Ball Aerospace, and NASA Langley Research Center, under the direction of the NASA In-Space Propulsion Office (ISP), has been developing a scalable solar sail configuration to address NASA s future space propulsion needs. The 100-m baseline solar sail concept was optimized around the one astronomical unit (AU) Geostorm mission, and features a Mylar sail membrane with a striped-net sail suspension architecture with inflation-deployed sail support beams consisting of inflatable sub-Tg (glass transition temperature) rigidizable semi-monocoque booms and a spreader system. The solar sail has vanes integrated onto the tips of the support beams to provide full 3-axis control of the solar sail. This same structural concept can be scaled to meet the requirements of a number of other NASA missions. Static and dynamic testing of a 20m scaled version of this solar sail concept have been completed in the Space Power Facility (SPF) at the NASA Glenn Plum Brook facility under vacuum and thermal conditions simulating the operation of a solar sail in space. This paper details the lessons learned from these and other similar ground based tests of gossamer structures during the three year solar sail project.

Mann, Troy↗

MBSE Applications for the MSR SRC Mars Ascent Vehicle

The objective of the NASA Mars Sample Return (MSR) Campaign is to collect samples from the surface of Mars and return them to Earth for scientific research. The Mars Ascent Vehicle (MAV) will be integrated into a larger Mars Sample Retrieval Lander (SRL) for transit to and storage on Mars. After all Martian samples have been collected and loaded into the MAV payload assembly, MAV will deliver the samples from the Martian surface to Mars orbit. A separate spacecraft, the Earth Return Orbiter (ERO) will retrieve the samples from Mars orbit and return them to Earth. To address common systems engineering challenges associated with using traditional systems engineering practices on complex projects, the MAV systems engineering team has explored implementation of Model-Based Systems Engineering (MBSE) tools and languages. This paper describes the current state of implementation and development of the MAV MBSE model with the Systems Modeling Language (SysML) within the scope of the MAV Systems Requirement Cycle (SRC) systems engineering workflow. The MAV MBSE model has been developed within Magic Draw – a SysML editor commonly used to implement MBSE. The MAV MBSE model has been used to develop mission phase functional flow diagrams for the Concept of Operations, decompose mission to vehicle subsystem functions, develop a functional decomposition, derive functional requirements, trace requirements up to customer-imposed requirements, trace requirements within MAV requirement space, identify requirements trace gaps, define and map the physical design space architecture, allocate requirements to subsystems, develop validation items, define assembly, integration, and test (AI&T) operations, and trace these items across driving goals to develop an integrated digital thread of systems engineering information used to drive design specifications, decision making, and ultimately design verification and validation. Findings and results associated with implementing MBSE in these ways, alongside traditional methods will be discussed.

MBSE↗

MBSE Applications for the MSR SRC Mars Ascent Vehicle

The objective of the NASA Mars Sample Return (MSR) Campaign is to collect samples from the surface of Mars and return them to Earth for scientific research. The Mars Ascent Vehicle (MAV) will be integrated into a larger Mars Sample Retrieval Lander (SRL) for transit to and storage on Mars. After all Martian samples have been collected and loaded into the MAV payload assembly, MAV will deliver the samples from the Martian surface to Mars orbit. A separate spacecraft, the Earth Return Orbiter (ERO) will retrieve the samples from Mars orbit and return them to Earth. To address common systems engineering challenges associated with using traditional systems engineering practices on complex projects, the MAV systems engineering team has explored implementation of Model-Based Systems Engineering (MBSE) tools and languages. This paper describes the current state of implementation and development of the MAV MBSE model with the Systems Modeling Language (SysML) within the scope of the MAV Systems Requirement Cycle (SRC) systems engineering workflow. The MAV MBSE model has been developed within Magic Draw – a SysML editor commonly used to implement MBSE. The MAV MBSE model has been used to develop mission phase functional flow diagrams for the Concept of Operations, decompose mission to vehicle subsystem functions, develop a functional decomposition, derive functional requirements, trace requirements up to customer-imposed requirements, trace requirements within MAV requirement space, identify requirements trace gaps, define and map the physical design space architecture, allocate requirements to subsystems, develop validation items, define assembly, integration, and test (AI&T) operations, and trace these items across driving goals to develop an integrated digital thread of systems engineering information used to drive design specifications, decision making, and ultimately design verification and validation. Findings and results associated with implementing MBSE in these ways, alongside traditional methods will be discussed.

MBSE↗

Transition of AIRS Products to the National Weather Service

Short-term Prediction Research and Transition Center (SPoRT) is a proven community leader for transitioning satellite products to operational end users and is working hard to bring data from Atmospheric Infrared Sounder (AIRS) to forecasters. SPoRT products using AIRS data are currently or will soon be evaluated at WFOs and National Centers (1) T and q profiles: HWT, Alaska WFOs, HRD/OPC, HMT (2) Ozone profiles: HPC/OPC (3) Carbon Monoxide: Southern and Western Region WFOs SPoRT is actively evaluating differences between V5 and V6 profiles for selected cases and will continue to provide feedback to the AIRS team as V6 development efforts conclude.

Zavodsky, Bradley↗

NSI directed to continue SPAN's functions

During a series of network management retreats in June and July 1990, representatives from NASA Headquarters Codes O and S agreed on networking roles and responsibilities for their respective organizations. The representatives decided that NASA Science Internet (NSI) will assume management of both the Space Physics Analysis Network (SPAN) and the NASA Science Network (NSN). SPAN is now known as the NSI/DECnet, and NSN is now known as the NSI/IP. Some management functions will be distributed between Ames Research Center (ARC) and Goddard Space Flight Center (GSFC). NSI at ARC has the lead role for requirements generation and networking engineering. Advanced Applications and the Network Information Center is being developed at GSFC. GSFC will lead the NSI User Services, but NSI at Ames will continue to provide the User Services during the transition. The transition will be made as transparent as possible for the users. DECnet service will continue, but is now directly managed by NSI at Ames. NSI will continue to work closely with routing center managers at other NASA centers, and has formed a transition team to address the change in management. An NSI/DECnet working group had also been formed as a separate engineering group within NSI to plan the transition to Phase 5, DECnet's approach to Open System Integration (OSI). Transition is not expected for a year or more due to delays in produce releases. Plans to upgrade speeds in tail circuits and the backbone are underway. The proposed baseline service for new connections is up to 56 Kbps; 9.6 Kbps lines will gradually be upgraded as requirements dictate. NSI is in the process of consolidating protocol traffic, tail circuits, and the backbone. Currently NSI's backbone is fractional T1; NSI will go to full T1 service as soon as it is feasible.

Rounds, Fred↗

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Launch Vehicle↗

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Centaur↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth.The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two Stage to Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design featured a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) and a monopropellant Reaction Control System (RCS) is employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MSR↗

Exploration Medical Capability - Advancing Medical System Design and Risk-Informed Decision Making for Deep Space Exploration

BACKGROUND: Within NASA’s Human Research Program, the Exploration Medical Capability (ExMC) Element has three primary focus areas: clinical and scientific research, systems engineering and trade space analysis, and technology development and demonstrations. These focus areas feed into the overarching goal of enabling progressively Earth-Independent Medical Operations (EIMO), a new paradigm that will be necessary for future Artemis and Mars medical and vehicle systems. This EIMO end state aligns with NASA’s Moon to Mars Objectives, which clearly outline the need for NASA deep space exploration missions to reduce their reliance upon Earth and become increasingly autonomous, in preparation for the first human Mars mission. OVERVIEW: To advance exploration medical systems and ultimately, integrated crew health and performance systems, ExMC’s portfolio includes: funding ground development & testing of novel medical capabilities; creation of new approaches for the development of medical protocols and procedures; deployment of innovative technologies into analog environments; technology demonstrations in spaceflight; and eventual transition to operations of new capabilities for deep space exploration missions. The portfolio also includes: pharmaceutical research targeting stability, pharmacokinetics, and pharmacodynamics; integrated data architectures and clinical decision support tools; and systems engineering and trade space analysis tools to assist NASA in the development of future medical system models as well as the medical system requirements that can serve as a foundation for deep space exploration missions. All of these investments are done in a collaborative and coordinated fashion with other NASA stakeholders, such as the Environmental Control and Life Support Systems – Crew Health and Performance System Capability Leadership Team and the Health and Medical Technical Authority. DISCUSSION: In this presentation, ExMC will provide an overview of our work from across our portfolio, all of which will inform future EIMO efforts at NASA. ExMC’s research and development investments are targeted to reduce the human system risks associated with deep space exploration to the Moon and Mars.

Kris Lehnhardt↗

An Overview of Current Capabilities and Research Activities in the Airspace Operations Laboratory at NASA Ames Research Center

The Airspace Operations Laboratory at NASA Ames conducts research to provide a better understanding of roles, responsibilities, and requirements for human operators and automation in future air traffic management (ATM) systems. The research encompasses developing, evaluating, and integrating operational concepts and technologies for near-, mid-, and far-term air traffic operations. Current research threads include efficient arrival operations, function allocation in separation assurance and efficient airspace and trajectory management. The AOL has developed powerful air traffic simulation capabilities, most notably the Multi Aircraft Control System (MACS) that is used for many air traffic control simulations at NASA and its partners in government, academia and industry. Several additional NASA technologies have been integrated with the AOL's primary simulation capabilities where appropriate. Using this environment, large and small-scale system-level evaluations can be conducted to help make near-term improvements and transition NASA technologies to the FAA, such as the technologies developed under NASA's Air Traffic Management Demonstration-1 (ATD-1). The AOL's rapid prototyping and flexible simulation capabilities have proven a highly effective environment to progress the initiation of trajectory-based operations and support the mid-term implementation of NextGen. Fundamental questions about accuracy requirements have been investigated as well as realworld problems on how to improve operations in some of the most complex airspaces in the US. This includes using advanced trajectory-based operations and prototype tools for coordinating arrivals to converging runways at Newark airport and coordinating departures and arrivals in the San Francisco and the New York metro areas. Looking beyond NextGen, the AOL has started exploring hybrid human/automation control strategies as well as highly autonomous operations in the air traffic control domain. Initial results indicate improved capacity, low operator workload, good situation awareness and acceptability for controllers teaming with autonomous air traffic systems. While much research and development needs to be conducted to make such concepts a reality, these approaches have the potential to truly transform the airspace system towards increased mobility, safe and efficient growth in global operations and enabling many of the new vehicles and operations that are expected over the next decades. This paper describes how the AOL currently contributes to the ongoing air transportation transformation.

simulation↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two-year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth. The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two-Stage-to-Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design features a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) system and a monopropellant Reaction Control System (RCS) are employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MAV↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Integrated Stirling Convertor and Hall Thruster Test Conducted

An important aspect of implementing Stirling Radioisotope Generators on future NASA missions is the integration of the generator and controller with potential spacecraft loads. Some recent studies have indicated that the combination of Stirling Radioisotope Generators and electric propulsion devices offer significant trip time and payload fraction benefits for deep space missions. A test was devised to begin to understand the interactions between Stirling generators and electric thrusters. An electrically heated RG- 350 (350-W output) Stirling convertor, designed and built by Stirling Technology Company of Kennewick, Washington, under a NASA Small Business Innovation Research agreement, was coupled to a 300-W SPT-50 Hall-effect thruster built for NASA by the Moscow Aviation Institute (RIAME). The RG-350 and the SPT-50 shown, were installed in adjacent vacuum chamber ports at NASA Glenn Research Center's Electric Propulsion Laboratory, Vacuum Facility 8. The Stirling electrical controller interfaced directly with the Hall thruster power-processing unit, both of which were located outside of the vacuum chamber. The power-processing unit accepted the 48 Vdc output from the Stirling controller and distributed the power to all the loads of the SPT-50, including the magnets, keeper, heater, and discharge. On February 28, 2001, the Glenn test team successfully operated the Hall-effect thruster with the Stirling convertor. This is the world's first known test of a dynamic power source with electric propulsion. The RG-350 successfully managed the transition from the purely resistive load bank within the Stirling controller to the highly capacitive power-processing unit load. At the time of the demonstration, the Stirling convertor was operating at a hot temperature of 530 C and a cold temperature of -6 C. The linear alternator was producing approximately 250 W at 109 Vac, while the power-processing unit was drawing 175 W at 48 Vdc. The majority of power was delivered to the Hall thruster discharge circuit operating at 115 Vdc and 0.9 A. Testing planned for late 2001 will examine the possibility of directly driving the Hall thruster discharge circuit using rectified and filtered output from the Stirling alternator.

Mason, Lee S.↗

Medical System Requirements Development for Lunar Operations

The major health hazards of spaceflight include higher levels of damaging radiation, altered gravity, extended periods of isolation and confinement, a closed and potentially hostile living environment, and the stress associated with being a long distance from Earth. As we increase the duration of lunar stays with foreseeable communication latencies and disruptions, there will be a progressive need for crew to maintain their own health and independently respond to critical medical events. The Exploration Medical Capability element of the NASA Human Research Program is developing a set of Medical System requirements for lunar transit and surface operations. These requirements specify the capabilities, processes and procedures of a habitat Medical System needed for a range of conditions known to occur during spaceflight. Requirement text is written so as not to constrain innovative design solutions necessary for a resilient system. The requirement set includes attributes and functions the Medical System imposes on eight additional habitat systems. A key property of the Medical System is the provision of medical knowledge that will be stored, updated, analyzed, and secured within a Habitat Data System. A Task Performance Support System will aid in medical data acquisition and interpretation, crew training, medical condition prevention, diagnosis and treatment, provide interactive procedures, and track medical inventory. A Wellness System will focus on the provision of countermeasures to prevent, mitigate or treat adverse physical and behavioral health effects while the Medical System recommends adjustments to these countermeasures to maintain crew health. An Environmental Monitoring System will share out-of-bounds readings of air and water quality, acoustics, and radiation exposure levels with the Medical System to help identify issues before they affect crew health and performance. A Communications System will provide secured and private consultations between crew and the ground medical team and their loved ones on Earth. The Medical System also imposes requirements on a Research & Testbed System, fostering advanced medical science such as human research. A Waste Management System provides biohazard waste containment and waste disposal options (recycle and reuse). An Extravehicular Activity System supports crew health during lunar surface activities. And finally, a Maintenance Support System ensures that medical equipment is performing as expected. These requirements are being specifically developed for lunar surface operations but could help to identify Medical System requirements for any space habitat (e.g., I-Hab, commercial endeavors, etc.).

technology↗

Contributions to Climate Research Using the AIRS Science Team Version-5 Products

This paper compares recent spatial anomaly time series of OLR (Outgoing Longwave Radiation) and OLRCLR (Clear Sky OLR) as determined using CERES and AIRS observations over the time period September 2002 through June 2010. We find excellent agreement in OLR anomaly time series of both data sets in almost every detail, down to the 1 x 1 spatial grid point level. This extremely close agreement of OLR anomaly time series derived from observations by two different instruments implies that both sets of results must be highly stable. This agreement also validates to some extent the anomaly time series of the AIRS derived products used in the computation of the AIRS OLR product. The paper then examines anomaly time series of AIRS derived products over the extended time period September 2002 through April 2011. We show that OLR anomalies during this period are closely in phase with those of an El Nino index, and that recent global and tropical mean decreases in OLR and OLR(sub CLR) are a result of a transition from an El Nino condition at the beginning of the data record to La Nina conditions toward the end of the data period. This relationship can be explained by temporal changes of the distribution of mid-tropospheric water vapor and cloud cover in two spatial regions that are in direct response to El Nino/La Nina activity which occurs outside these spatial regions

Susskind, Joel↗

Creating Portfolio Management Concepts for Highly Agile and Innovative Government Research Programs Using Design Thinking and Lean Startup Methodologies

Managing a research and development (R&D) portfolio presents numerous challenges, such as prioritizing research areas, remaining agile, strategic workforce planning, and measuring return on investment, impact, and innovation. One government R&D program is charged with producing a high degree of innovative, transformational breakthroughs in aviation technology. A practical, structured methodology for strategically prioritizing emerging aviation R&D in such an environment is lacking. The existing multi-criteria decision aid tools are primarily utilized at an enterprise level, take months to set up and collect data, require large teams of experts, are used on an infrequent basis, and are not conducive to a highly innovative, high-risk portfolio. Prior to audaciously creating a new portfolio prioritization process, the exact challenges with portfolio management for R&D projects were identified using the design thinking and lean start-up methods. A key part of this discovery process was interviewing stakeholders, as well as other managers of organizations charged with producing innovative portfolios. These interviews, as well as additional techniques, were used to develop a deeper understanding of the challenges and, subsequently, lay the foundation for development of an effective portfolio prioritization process. Four potential concepts that represent key findings emerged: carefully selected criteria for portfolio assessment and selection, targeted portfolio turnover rate, dynamic portfolio prioritization framework, and streamlined transition or commercialization of R&D. Acting on any one of the resulting portfolio management concepts will increase the transparency and confidence in portfolio decisions and, ideally, result in a greater degree of transformational breakthroughs in aviation technology.

project portfolio management↗

Marquardt's Mach 4.5 Supercharged Ejector Ramjet (SERJ) High-Performance Aircraft Engine Project: Unfulfilled Aspirations Ca.1970

The Supercharged Ejector Ramjet (SERJ) engine developments of the 1960s, as pursued by The Marquardt Corporation and its associated industry team members, are described. In just three years, engineering work on this combined-cycle powerplant type evolved, from its initial NASA-sponsored reusable space transportation system study status, into a U.S. Air Force/Navy-supported exploratory development program as a candidate 4.5 high-performance military aircraft engine. Bridging a productive transition from the spaceflight to the aviation arena, this case history supports the expectation that fully-integrated airbreathing/rocket propulsion systems hold high promise toward meeting the demanding propulsion requirements of tomorrow's aircraft-like Spaceliner class transportation systems. Lessons to be learned from this "SERJ Story" are offered for consideration by today's advanced space transportation and combined-cycle propulsion researchers and forward-planning communities.

Escher, William J. D.↗