Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Ultrasonic Jet Bat Deterrent System Advancement

General Electric Renewable Energy (GE) and the Department of Energy (DOE) worked to develop a project with an objective to increase confidence in acoustic ultrasonic bat deterrent technologies in wind turbines, by mitigating stakeholder investment risks that currently hinder the adoption of deterrent technologies. Many wind turbine sites utilize a bat conservation plan that curtail wind turbines and stop energy production. Curtailment is a known bat impact mitigation solution that has an history of environmental regulatory acceptance. To help support a solution that allows for simultaneous bat conservation and energy production with regulatory acceptance of acoustic bat deterrents, GE proposed a study to compare four treatments: control (no curtailment or deterrent), deterrent only, deterrent plus curtailment, and curtailment only. The concept was to provide a direct comparison of bat deterrent and curtailment effectiveness within the same wind farm and bat migration season. This comparison was intended to advocate for the adoption of bat deterrents with a large-scale field study by addressing customer concerns on regulatory acceptance of deterrents. The study was to be hosted at a forested habitat site during a bat migration season, by Stony Creek Energy, LLC (SCE), the owner of the Orangeville Wind Farm (OWF) in the state of New York. Included was a behavioral study plan with two turbines to monitor bat flight paths with thermal imaging cameras.

17 WIND ENERGY↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification of RESRAD-BUILD Code Version 4

This report documents the verification of the RESRAD-BUILD code, Version 4.0, which was released on December 22, 2022. Two earlier reports verifying Versions 3.0 and 3.1, respectively, were published in 2001 (Kamboj, et al. 2001) and 2003 (Tetra Tech NUS 2003). Version 4.0 of the RESRAD-BUILD code has many new features and modeling enhancements over the earlier versions, including the previously released Version 3.5. Chapter 2 of this report focuses on verifying the external dose and risk modeling for point, line, area, and volume sources, as well as for floor deposition. Besides verification, the external radiation doses calculated by RESRAD-BUILD were also benchmarked with those calculated by the MCNP code (Briemeister 1993). Section J.3 of the RESRAD-BUILD User’s Manual Vol. 1 (Yu et al. 2022) documents the results of that benchmarking effort. Chapter 3 of this report focuses on verifying the ventilation modeling, from checking the remaining source inventory, releases of radionuclides to the air, air concentrations and deposited floor concentrations over time, to the radiation dose and risk associated with inhalation, ingestion, and air submersion, with and without vacuuming. The verification efforts involve designing spreadsheets to perform calculations the same as or like those performed by the RESRAD-BUILD code and then comparing the spreadsheet results with those produced by the code. When the results agree or the differences are within acceptable range, the accuracy of model implementation in the code is verified. In addition to model implementation, the implementation of key functions and features that facilitate the modeling or the use of the code were also verified during the release testing of the code. Appendix A presents the test cases developed for these verification testing, and Appendix B presents the testing results that verify proper implementation of key functions and features.

54 ENVIRONMENTAL SCIENCES↗

Reducing heat load density with asymmetric and inclined double-crystal monochromators: principles and requirements revisited

Asymmetric double-crystal monochromators (aDCMs) and inclined DCMs (iDCMs) can significantly expand the X-ray beam footprint and consequently reduce the heat load density and gradient. Based on rigorous dynamical theory calculations, the major principles and properties of aDCMs and iDCMs are presented to guide their design and development, particularly for fourth-generation synchrotrons. In addition to the large beam footprint, aDCMs have very large bandwidths (up to ∼10 eV) and angular acceptance, but the narrow angular acceptance of the second crystal requires precise control of the relative orientations and strains. Based on Fourier coupled-wave diffraction theory calculations, it is rigorously proved that the iDCM has almost the same properties as the conventional symmetric DCM, including the efficiency, angular acceptance, bandwidth, tuning energy range and sensitivity to misalignment. The exception is that, for the extremely inclined geometry that can achieve very large footprint expansion, the iDCM has (beneficially) a larger bandwidth and wider angular acceptance. Inclined diffraction has the `rho-kick effect' that can be cancelled by the second reflection of the iDCM (even with misalignment), except that inhomogeneous strains may cause non-uniform rho-kick angles. At present, fabrication/mounting-induced strains pose low risk since they can be controlled to <0.5 µrad over large areas. The only uncertain challenge is the thermally induced strains, yet it is estimated that these strains are naturally lowered by the large footprint and may be further mitigated by optimized cryogenic cooling to the 1–2 µrad level. Overall, aDCMs and iDCMs have more stringent requirements than normal DCMs, but they are feasible schemes in practice.

asymmetric monochromator↗

BayoTech Risk and Modeling Support of NM Gas Site

The BayoTech hydrogen generation system has been evaluated in terms of safety considerations at the NM Gas site. The consequence of a leak in different components in the system was evaluated in terms of plume dispersion and overpressure. Additionally, the likelihood of a leak scenario for different hydrogen components was identified. The worst-case plume dispersion cases, full-bore leaks, resulted in relatively large plumes. However, these cases were noted to be far less likely than the partial break cases that were evaluated. The partial break cases resulted in nearly negligible plume lengths. Similarly, the overpressure analysis of the full-bore break scenarios resulted in much larger overpressures than the partial break cases (which resulted in negligible overpressure at the lot line). There were several cases evaluated in the analysis that represented leak scenarios from both hydrogen and natural gas sources. Generally, the natural gas leak scenarios resulted in a smaller horizontal impact than that of hydrogen leaks. The worst-case consequence from a hydrogen leak resulted from the compressors, storage pods, or dispensing system. To consider the safety features that may isolate the leak, the consequence was evaluated at different times after the leak event to show the reduction of pressure. After 2 seconds, the plume dispersion from this event is contained within the perimeter of the site. The worst-case consequences show that the plume may disperse to adjacent facilities and to the street. When considering both likelihood and consequence, the risk may be considered low because the maximum frequency of a full-bore leak from any component within the hydrogen compound is 8.2 E-5/yr. This means that a full-bore leak is expected to occur less than once every 10,000 years. The risk can be further reduced by implementing mitigative countermeasures, such as CMU walls along the sides of the equipment compound. This would reduce the overall consequence of the worst-case dispersion scenarios (horizontal impact of plume). In terms of siting and safety analysis, the NFPA 2 code was used to provide a high-level evaluation of the current site plan. The most limiting equipment in terms of set-back distance are the compressors/storage units because of the high-pressure hydrogen. The site layout was evaluated for an acceptable location for the compression/storage unit based on NFPA 2 set-back distances. It is important to note that the NFPA 2 set-back distances consider both likelihood and consequence. This is important because the worst-case results evaluated herein also represent the least likely leak scenario. Other site-specific considerations were evaluated, including the parking shade structure with photovoltaic cells and refueling vehicles. These issues were dispositioned and determined to not present a safety risk.

08 HYDROGEN↗

White Paper: Research & Development for the Time at Temperature Approach

Recent advancements in nuclear power research are greatly improving reactor safety and performance through the development of Accident Tolerant Fuel (ATF) and Low-Enriched Uranium Plus (LEU+). These innovations can address Departure from Nucleate Boiling (DNB) margins, which are vital for reactor safety. DNB happens when the coolant switches to film boiling, significantly decreasing heat transfer and posing a risk of fuel cladding failure. The U.S. Nuclear Regulatory Commission (NRC) employs conservative DNB criteria, which can potentially restrict the operational flexibility and efficiency of reactors. The Time at Temperature (TaT) approach could provide a more detailed and adaptable operational guideline by establishing acceptable time-temperature limits, accounting for the duration a material can withstand elevated temperatures without losing its integrity. This method allows reactors to operate more efficiently and safely, offering additional operational margins, faster power adjustments, and improved fuel cycle economics. TaT criteria allow for higher power levels and more flexible responses to operational transients, particularly applicable for anticipated operational occurrences (AOOs) that result in short durations of post-DNB conditions. It enhances plant operational flexibility, allows faster startup times, and enables quicker power level adjustments, optimizing fuel loading patterns and improving fuel cycle economics. Implementing TaT limits reduces core design constraints, lowers fuel usage, and reduces costs, essential for the long-term sustainability of Light Water Reactors (LWRs). TaT maximizes the use of advanced fuel technologies like ATF and LEU+, further enhancing their economic and environmental benefits. To apply the TaT approach in existing LWRs, collaborative research activities among various DOE-sponsored programs are essential. These efforts should incorporate fuel experiments, physics-based high-fidelity modeling, ML-based surrogate modeling, and optimization techniques. This whitepaper proposes four research and development areas: 1) Investigation of the feasibility of new operations of LWR with updated safety limits; 2) Assessment of reactor operation limits through uncertainty reduction; 3) Evaluation of power uprate in virtual environment; and 4) Lattice and reactor core design for power uprate. Each area includes why this research is in need and a suggested scope of work. These comprehensive research areas ensure practical and beneficial advancements for existing reactors, translating innovations in nuclear fuel and cladding technology into improved reactor performance and safety.

42 - ENGINEERING↗

Cognitive behavioural therapy targeting cardiac anxiety post-myocardial infarction: results from two sequential pilot studies

Abstract Aims Cardiac anxiety, which is cardiac-related fear and avoidance behaviours, is common following myocardial infarction (MI) and has been associated with increased risk for cardiovascular events. However, there are currently no treatments specifically designed to target cardiac anxiety. The aim of the two pilot studies was to evaluate an exposure-based cognitive behavioural therapy protocol (MI-CBT) targeting cardiac anxiety following MI, assessing feasibility, acceptability, and the intervention's potential for reducing cardiac anxiety and improving health-related quality of life (QoL). Methods and results A series of two sequential, uncontrolled pilot studies were conducted. In Pilot Study 1 (n = 15), MI-CBT was delivered via face-to-face videoconference, while Pilot Study 2 (n = 23) was delivered online. Patients with a history of MI (≥6 months before assessment, type 1 ST- or non-ST-segment elevation MI, and elevated cardiac anxiety as per clinical interview) were included. The interventions lasted 8 weeks and were therapist-led, with key components including exposure to cardiac-related symptoms and reduction of avoidance behaviours. Participants completed self-rated assessments, including the Cardiac Anxiety Questionnaire (CAQ) and the 12-Item Short Form Health Survey (SF-12), at baseline, post-treatment, and 6-month follow-up. Treatment adherence and satisfaction were high. Cognitive behavioural therapy led to a large reduction in cardiac anxiety, as measured by the CAQ (P < 0.001), and significant improvements in health-related QoL, as measured by the SF-12 (P < 0.001), in both pilot studies. Conclusion These studies suggest that exposure-based CBT is a feasible, acceptable, and promising approach to reduce cardiac anxiety and improve QoL following MI. A randomized controlled trial should be conducted to evaluate the efficacy of the intervention.

Johnsson, Amanda (ORCID:0009000862983934)↗

Trust and consequences: Role of community science, perceptions, values, and environmental justice in risk communication

Risk communication is often viewed as imparting information and perhaps as a two-way dialogue. Risk communication inadequacies on the part of both “communicator” and “community members” can lead to adverse consequences and amplify environmental justice disparities. The paper suggests a transformational approach where risk communicators must learn to trust community experts and their knowledge base (and act upon it), where risk information imparted by risk communicators addresses what communities are most concerned about (as well as risk from specific chemicals or radionuclides), and where risk information and assessments address underlying issues and disparities, as well as cultural traditions (among others). Providing risk probabilities is no longer sufficient; western science may not be enough, and community and native scientific knowledge is needed. Risk communication (or information transfer) for environmental risks that are ongoing usually applies to low-income, minority communities—people living in dense inner cities, rural communities, Native American communities—or to people living near a risky facility. Communication within this context requires mutual trust, listening and respect, as well as acceptance of indigenous and community knowledge as equally valuable. Examples are given to illustrate a community perspective.

97 MATHEMATICS AND COMPUTING↗

Process Control Plan to Monitor Acceptable Levels of Flux and other residues

IPC J-STD –001G, Amendment 1 requires that the assembler have a sampling plan to assure that the process remains in control once qualified and validated. It is well documented that electrochemical failures occur at component sites where flux residues are not fully activated. It is also well known that specific components have a higher risk of electrochemical failure. Selecting a control plan that monitors the process and its performance on challenging components provides assurance that the process maintains control once established during process qualification. The test board used to qualify the process establishes an upper and lower spec limit for each of the component types on the test board. Surface Insulation Resistance upper and lower control limits, using challenging components that are representative of production hardware, represent a golden process condition. The golden image is a measure of process deviations that represents the performance of a resistance curve within a specific period. The objective is to judge whether the process in or out of control.

42 ENGINEERING↗

Sampling Size Optimization for Bioburden Density Estimation in Planetary Protection

Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.

97 - MATHEMATICS AND COMPUTING↗

Loss-of-Coolant Accident Analysis of a High-Burnup Pressurized Water Reactor Core Design Using Gadolinia-Doped UO 2

High-burnup and extended enrichment fuels are of interest for extending the cycle lengths of pressurized water reactors from 18 to 24 months. Changes to the fuel design and core loading scheme have potentially significant safety implications due to power distribution effects, reduced thermal conductivity, and/or increased plenum pressures due to additional burnable poison loadings. Additionally, higher burnups result in increased material degradation and risk of fuel fragmentation, relocation, and dispersal (FFRD). A representative 24-month core design using gadolinia-doped UO 2 was analyzed for performance under large-break (LB) loss-of-coolant accident (LOCA) conditions using PARCS, RELAP5-3D, and BISON. Furthermore, all considered acceptance criteria were met, with no cases exceeding the 1477 K maximum cladding temperature or the post-quench ductility oxidation limit of 17% equivalent cladding reacted. Full-core FFRD susceptibility was estimated to be approximately 455 kg, though high uncertainties exist with current approaches for computing susceptibility. Undoped fuel rods are more likely to be limiting due to higher linear heat rates. Relatively high burnup and linear heat rate rods located in second batch assemblies are of greatest safety significance during LB LOCA for this high-burnup core design.

High burnup↗

Quantifying Uncertainty in PV Energy Estimates Final Report

Uncertainty in PV energy estimates is "one of the most critical areas of lack of understanding" according to independent engineers, financiers, PV model developers, and other industry stakeholders. The primary problem is a lack of rigorous, transparent, widely accepted methods for quantifying uncertainty in energy production estimates. Uncertainty in energy production estimates arises from variability of the solar resource, inexact PV performance models and their parameters, and system reliability considerations. Uncertainty in annual energy production is frequently calculated for larger projects in order to quantify financial risk. Key statistics for energy, such as the P-values "P50" and "P90" (the annual energy values that are exceeded in future years with 50\% and 90\% probability, respectively) are used by financing institutions to calculate the repayment risk for the project. The current methods to estimate these statistics are typically proprietary, specialized, and involve significant post-processing of commercial performance model results. This black-box approach leads to inconsistent P-value estimates from different parties, which reduces investors' confidence in the results. Since the financial community bases its risk assessment on these estimates, reduced confidence increases perceived project risk, and consequently financing costs. The goal of this project was to establish a set of best practices for quantifying uncertainty in energy production estimates, including identifying what sources of uncertainty must be considered with clear definitions and metrics, determining which sources are the biggest drivers of uncertainty, and providing a computationally efficient framework for combining different sources of uncertainty that is flexible enough to accommodate substitutions of data or methods when better information is available. We engaged a wide set of stakeholders to ensure industry endorsement and adoption, and leveraged complementary projects investigating individual sources of uncertainty in great detail, as well as others' work that started down this path.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

DOE Investments in Environmentally Acceptable Lubricants for Hydropower Applications Fact Sheet

Environmentally acceptable lubricants (EALs) are defined as lubricants that meet U.S. Environmental Protection Agency (EPA) standards for “biodegradability, toxicity, and bioaccumulation potential that minimize their likely adverse consequences in the aquatic environment, compared to conventional lubricants.” Restrictions from state, local, and federal agencies, as well as a growing awareness of the environmental risks associated with petroleumbased lubricants, have shifted government and industry to seek out high-performing EALs. The U.S. Department of Energy (DOE) is working to reduce the environmental impacts of hydropower development and operation by investing in tools and methods to develop, demonstrate, and validate EAL materials.

water, environment, hydropower, EALs↗

Basis for Dose and Reactor Safety Design Criteria for Army Regulation AR 50–7 and DA Pamphlet

This report describes the basis used to develop the radiological dose acceptance and design criteria contained in the draft updates to Army Regulation 50–7 (AR 50–7) Army Reactor Program and its accompanying draft Department of the Army (DA) Pamphlet (PAM), Army Reactor Program Procedures. These criteria will apply to Army nuclear reactors that fall under AR 50–7 and its accompanying DA PAM and ensure alignment with the overall objectives of the Army Reactor Program. The development basis for the radiological dose and design criteria supports a modern, technology-neutral, risk-informed, and performance-based approach to Army regulation of reactors and the demonstration of “adequate protection of the public.” To establish these criteria that support the Army’s unique operational requirements, multiple well-known and well-established standards and their supporting documentation were reviewed to ensure consistency with existing regulatory safety levels, including guidance from U.S. and international sources. These include the U.S. Nuclear Regulatory Commission’s (NRC’s) regulations and policy, the Canadian Nuclear Safety Commission’s (CNSC’s) regulatory documents, the International Atomic Energy Agency’s (IAEA’s) safety standards, as well as industry input that is tailored specifically to advanced microreactors. This report walks through the key definitions and associated references used for these criteria, which are outlined in Section 2.0. Based on these definitions, the dose acceptance criteria were established for various receptors for routine reactor operations (Section 3.2), design basis accidents (Section 3.3), and beyond design basis accidents (Section 3.4). Comparisons of multiple national and international dose limits are provided in these sections. Lastly, Section 4.0 outlines the reactor safety design criteria contained in the draft DA PAM and their associated bases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The effect of monitoring complexity on stakeholder acceptance of CO2 geological storage projects in the US gulf coast region

Environmental monitoring at geologic CO 2 storage sites is required by regulations for the purposes of environmental protection and emissions accounting in the case of leakage to surface. However, another very important goal of environmental monitoring is to assure stakeholders that the project is monitored for safety and effectiveness. With current efforts to optimize monitoring for cost-effectiveness, the question remains: will optimization of monitoring approaches degrade stakeholder assurance, or do heavily-instrumented sites communicate higher risk to a stakeholder? We report the results of a stakeholder survey in Gulf Coast states of the US where carbon capture and storage (CCS) is developing quickly. We rely on a 2 by 2 factorial experiment in which we manipulate message complexity (complex v. simple) and social norm (support from scientists v. support from community members). Subjects were randomly assigned to one of four conditions: 1) complex message with scientist support; 2) complex message with community member support; 3) simple message with scientist support; or 4) simple message with community member support. In addition to the experimental stimuli, subjects were also asked about their need for cognition, attitudes toward science and scientists, attitudes about climate change and support for carbon capture and storage (CCS). Our sample is drawn from residents in states bordering the western Gulf of Mexico (Texas, Louisiana, Florida) where CO 2 geologic storage is being planned both onshore and offshore. The results offer important implications for public outreach efforts to key stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Intelligent Manufacturing for Extreme Environments Conference Proceedings

The Intelligent Manufacturing for Extreme Environments (IMEE) workshop was held at the Center for Advanced Energy Studies (CAES) in Idaho Falls, Idaho, May 2–3, 2023, in support of the United States (U.S.) National Science Foundation (NSF) Established Program to Stimulate Competitive Research: Workshop Opportunities (EPSCoR-WO) program. This workshop featured keynote speakers, panels, and breakout sessions with 58 participants. Nuclear reactors need to operate under extreme service conditions, such as high temperatures, corrosive environments, and high-radiation doses. Hence, reactor components must be able to withstand those conditions. The participants envision a future where on demand manufacture of components for small modular reactors (SMRs), microreactors, and other advanced reactor designs are possible. In this future, regulatory bodies accept validated manufacturing processes and standardized feedstocks, thus eliminating the need for individual component testing. However, the necessary technologies and regulatory policies needed for this future do not exist today. Successful innovation would revolutionize the nuclear power sector, enable fast commercial development, create economic opportunities in the U.S., reduce the carbon footprint and associated risks, and promote a skilled and highly competitive workforce. The objective of the workshop was to convene world-class experts, researchers, educators, and students to identify gaps and envision solutions for five interrelated challenges for intelligent manufacturing in extreme environments. The key outcomes of the conference were: (1) to take the opportunity for researchers and educators to network and form collaborations; and (2) to produce a full report to inform policy-makers, industry, and the academic community of various challenges and opportunities in the nuclear energy sector.

36 MATERIALS SCIENCE↗

Developing energy flexibility in clusters of buildings: A critical analysis of barriers from planning to operation

This paper examines building energy flexibility at an aggregated level and addresses the main barriers and research gaps for the development of this resource across three design and development phases: market and policy, early planning and design, and operation. We review methodologies and tools and discuss barriers, challenges, and opportunities, incorporating policy, economic, technical, professional, and social perspectives. Although various legal and regulatory frameworks exist to foster the development of energy flexibility for small buildings, financing mechanisms are limited with a significant number of perceived risks undermining private investment. For the early planning and design phase, planners and designers lack appropriate tools and face interoperability challenges, which often results in insufficient consideration of demand response programs. The review of the operational phase highlighted the socio-technical challenges related to both the complexity of deployment and communication, as well as privacy and acceptability issues. Finally, the paper proposes a number of targeted research directions to address challenges and promote greater energy flexibility deployments, including capturing building demand side dynamics, improving baseline estimations and developing seamless connectivity between buildings and districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗