Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Bayesian Analysis for Risk Assessment of Selected Medical Events in Support of the Integrated Medical Model Effort

The Exploration Medical Capability project is creating a catalog of risk assessments using the Integrated Medical Model (IMM). The IMM is a software-based system intended to assist mission planners in preparing for spaceflight missions by helping them to make informed decisions about medical preparations and supplies needed for combating and treating various medical events using Probabilistic Risk Assessment. The objective is to use statistical analyses to inform the IMM decision tool with estimated probabilities of medical events occurring during an exploration mission. Because data regarding astronaut health are limited, Bayesian statistical analysis is used. Bayesian inference combines prior knowledge, such as data from the general U.S. population, the U.S. Submarine Force, or the analog astronaut population located at the NASA Johnson Space Center, with observed data for the medical condition of interest. The posterior results reflect the best evidence for specific medical events occurring in flight. Bayes theorem provides a formal mechanism for combining available observed data with data from similar studies to support the quantification process. The IMM team performed Bayesian updates on the following medical events: angina, appendicitis, atrial fibrillation, atrial flutter, dental abscess, dental caries, dental periodontal disease, gallstone disease, herpes zoster, renal stones, seizure, and stroke.

Gilkey, Kelly M.↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Probabilistic Risk Assessment of a Sustained Lunar Presence

The Artemis Base Camp will be our first sustainable foothold on the lunar frontier. The base camp includes a lunar surface habitat, power systems, and infrastructure needed to develop capabilities on future missions to Mars. NASA Probabilistic Risk Assessment (PRA) methodologies tend to focus on in-flight Loss of Crew (LOC) or Loss of Vehicle (LOV) risk estimates for short mission durations. However, lunar habit support systems and power generation systems will need to continuously operate. Existing risk methodologies will need to adapt to understand risk drivers in new environments under different operating conditions, such as lunar dust and increased micro-meteoroid exposure. Insights from the nuclear and oil industries can provide guidance to NASA risk practitioners to tackle this new challenge.

risk assessment↗

The Integrated Medical Model: A Risk Assessment and Decision Support Tool for Human Space Flight Missions

This slide presentation reviews the Integrated Medical Model (IMM) and its use as a risk assessment and decision support tool for human space flight missions. The IMM is an integrated, quantified, evidence-based decision support tool useful to NASA crew health and mission planners. It is intended to assist in optimizing crew health, safety and mission success within the constraints of the space flight environment for in-flight operations. It uses ISS data to assist in planning for the Exploration Program and it is not intended to assist in post flight research. The IMM was used to update Probability Risk Assessment (PRA) for the purpose of updating forecasts for the conditions requiring evacuation (EVAC) or Loss of Crew Life (LOC) for the ISS. The IMM validation approach includes comparison with actual events and involves both qualitative and quantitaive approaches. The results of these comparisons are reviewed. Another use of the IMM is to optimize the medical kits taking into consideration the specific mission and the crew profile. An example of the use of the IMM to optimize the medical kits is reviewed.

Kerstman, Eric L.↗

Improvements to the Ionizing Radiation Risk Assessment Program for NASA Astronauts

To perform dosimetry and risk assessment, NASA collects astronaut ionizing radiation exposure data from space flight, medical imaging and therapy, aviation training activities and prior occupational exposure histories. Career risk of exposure induced death (REID) from radiation is limited to 3 percent at a 95 percent confidence level. The Radiation Health Office at Johnson Space Center (JSC) is implementing a program to integrate the gathering, storage, analysis and reporting of astronaut ionizing radiation dose and risk data and records. This work has several motivations, including more efficient analyses and greater flexibility in testing and adopting new methods for evaluating risks. The foundation for these improvements is a set of software tools called the Astronaut Radiation Exposure Analysis System (AREAS). AREAS is a series of MATLAB(Registered TradeMark)-based dose and risk analysis modules that interface with an enterprise level SQL Server database by means of a secure web service. It communicates with other JSC medical and space weather databases to maintain data integrity and consistency across systems. AREAS is part of a larger NASA Space Medicine effort, the Mission Medical Integration Strategy, with the goal of collecting accurate, high-quality and detailed astronaut health data, and then securely, timely and reliably presenting it to medical support personnel. The modular approach to the AREAS design accommodates past, current, and future sources of data from active and passive detectors, space radiation transport algorithms, computational phantoms and cancer risk models. Revisions of the cancer risk model, new radiation detection equipment and improved anthropomorphic computational phantoms can be incorporated. Notable hardware updates include the Radiation Environment Monitor (which uses Medipix technology to report real-time, on-board dosimetry measurements), an updated Tissue-Equivalent Proportional Counter, and the Southwest Research Institute Radiation Assessment Detector. Also, the University of Florida hybrid phantoms, which are flexible in morphometry and positioning, are being explored as alternatives to the current NASA computational phantoms.

Semones, E. J.↗

Collision Avoidance Short Course: Conjunction Assessment Risk Analysis - NASA Robotic CARA: Theory - Part I:

Satellite conjunction assessment is perhaps the fastest growing area in space situational awareness and protection with military, civil and commercial satellite owner-operators embracing more and more sophisticated processes to avoid the avoidable - namely collisions between high value space assets and orbital debris. NASA and Centre National d'Etudes Spatiales (CNES) have collaborated to offer an introductory short course on all the major aspects of the conjunctions assessment problem. This half-day course will cover satellite conjunction dynamics and theory. Joint Space Operations Center (JsPOC) conjunction data products, major risk assessment parameters and plots, conjunction remediation decision support, and present and future challenges. This briefing represents the NASA portion of the course.

Conjunction↗

Proceedings from the 2001 NASA Occupational Health Conference: Risk Assessment and Management in 2001

This Conference convened approximately 86 registered participants of invited guest speakers, NASA presenters, and a broad spectrum of the Occupational Health disciplines representing NASA Headquarters and all NASA Field Centers. Two days' Professional Development Courses on Exposure Assessment Strategies and Statistics and on Advanced Cardiac Life Support training and recertification preceded the Conference. With the theme, 'Risk Assessment and Management in 2001,' conferees were first provided updates from the Program Principal Center Office and the Headquarters Office. Plenary sessions elaborated on several topics: biological terrorism, OSHA recordability, Workers' Compensation issues, Federal ergonomic standards, bridging aerospace medicine and occupational health-especially in management of risk in spaceflight, and EAP operations with mission failures. A keynote address dealt with resiliency skills for 21st century workers and two NASA astronaut speakers highlighted a tour of the Johnson Space Center. During discipline specific breakout sessions, current issues in occupational health management and policy, credentialing and privileging, health risk assessment, measurement and standardization, audits, database development, prevention and rehabilitation, international travel and infection control, employee assistance, nursing process, and environmental health were presented.

Roberson, Sheri↗

The Use of the Satellite Breakup Risk Assessment Model (SBRAM) to Characterize Collision Risk to Manned Spacecraft

NASA uses environment models such as ORDEM96 to characterize the long-term orbital debris collision hazard for spacecraft in LEO. Occasionally, however, there are breakups of satellites or rocket bodies that create enhanced collision hazard for a period of time. This enhanced collision hazard can pose increased risks to space operations - especially those involving manned missions where the tolerance for risk is very low. NASA has developed SBRAM to simulate the enhanced debris environment in the days and weeks that follow such a breakup. This simulation provides the kind of risk probabilities that can be used by mission planners to consider if changes are warranted for the mission. Announcements of breakups come to NASA from US Space Command as soon as they are identified. The pre-breakup orbit and time of breakup are used to determine the initial conditions of the explosion. SBRAM uses the latest explosion models developed at NASA to simulate a debris cloud for the breakup. The model uses a Monte Carlo technique to create a random debris cloud from the probability distributions in the breakup model. Each piece of debris randomly created in the cloud is propagated in a deterministic manner to include the effects of drag and other orbital perturbations. The detailed geometry of each simulated close approach to the target spacecraft is noted and logged and the collision probability is computed using an estimated probability density in down-range and cross-range positions of both the target spacecraft and debris object. The collision probability is computed from the overlap of these probability densities for each close-approach geometry and summed over all computed conjunctions. Cloud propagation runs over the desired time interval are then repeated until the scale of the collision risk can be estimated to a desired precision. This paper presents an overview of the SBRAM model and a number of examples, both real and hypothetical, to demonstrate its use. In addition, a number of different examples are shown how the data can be used by decision makers on issues such as spacecraft orientation and timing of EVAs.

Matney, Mark J.↗

Probabilistic Risk Assessment for Bone Fracture - Bone Fracture Risk Module (BFxRM)

This presentation summarizes the concepts, development, and application of NASA's Bone Fracture Risk Module (BFxRM). The overview includes an assessmnet of strenghts and limitations of the BFxRM and proposes a numebr of discussion questions to the panel regarding future development avenues for this simulation system.

Monte Carlo Method↗

Pre-flight risk assessment in emergency medical service (EMS) helicopters

A preflight risk assessment system (SAFE) was developed at NASA-Ames Research Center for civil EMS operations to assist pilots in making a decision objectively to accept or decline a mission. The ability of the SAFE system to predict risk profiles was examined at an EMS operator. Results of this field study showed that the usefulness of SAFE was largely dependent on the type of mission flown.

Shively, Robert J.↗

Advances in Entry Modeling for Impact Risk Assessment

A summary of recent advancements in the detailed modeling of asteroid atmospheric entry processes made through NASA’s Asteroid Threat Assessment Project (ATAP) is presented. Understanding, and accurately modeling these processes and their associated uncertainties is critical to predicting all downstream impact effects, such as blast wave and thermal damage footprints. Furthermore, there is (perhaps thankfully) a dearth of empirical data for large impactors of the kind that would pose a threat to human populations, on which to anchor and/or validate models used in risk assessments. Therefore, we must rely heavily on detailed theoretical and numerical modeling to develop robust assessments for decision makers. To that end, ATAP has made some significant progress in advancing the capabilities in this area. Two areas in particular are highlighted in the present work: meteoroid ablation mechanisms, and bolide luminosity. The first research area – meteoroid ablation mechanisms – has focused on performing novel high-enthalpy wind tunnel experiments on meteorites and meteorite analogs, and utilizing the resulting data to develop high-fidelity models for impactor mass loss at scale. These efforts have resulted in several insights. Of note, these data suggest a differential vaporization process where volatiles are liberated preferentially when the asteroidal material is subject to high heat, while refractory components remain in the molten layer on the surface. A numerical model has been developed which considers this phenomena, and its effect on the bulk impactors effective heat of ablation is examined. The second research thrust that is discussed is focused on accurate modeling of impactor radiation phenomena. While another submission to the conference will discuss the application of our approach to thermal ground damage modeling, here, we present an overview of our extensive efforts to utilize available ground- and space-based observations of large bolides (~1m diameter, and above) to inform and validate our detailed modeling approaches. These methods have been shown to accurately reconstruct the detailed spectra for the Benesov bolide, as well as approximate the burn footprint for the Tunguska event. Recent effort has focused on reconciling light curve data from multiple sources (all-sky camera networks, GLM, US government sensors), using our validated model, and providing a calibrated model for luminous efficiency which can then be utilized to infer impactor properties such as shape, mass, and composition. This work will be demonstrated through an exemplar case study focusing on a large bolide event with observational data (e.g. Chelyabinsk, Flensburg, etc.). Finally, our team’s assessment on the current maturity of atmospheric entry models, and priorities for future research will be provided.

ATAP↗

Response of Silicon-Based Linear Energy Transfer Spectrometers: Implication for Radiation Risk Assessment in Space Flights

There is considerable interest in developing silicon-based telescopes because of their compactness and low power requirements. Three such telescopes have been flown on board the Space Shuttle to measure the linear energy transfer spectra of trapped, galactic cosmic ray, and solar energetic particles. Dosimeters based on single silicon detectors have also been flown on the Mir orbital station. A comparison of the absorbed dose and radiation quality factors calculated from these telescopes with that estimated from measurements made with a tissue equivalent proportional counter show differences which need to be fully understood if these telescopes are to be used for astronaut radiation risk assessments. Instrument performance is complicated by a variety of factors. A Monte Carlo-based technique was developed to model the behavior of both single element detectors in a proton beam, and the performance of a two-element, wide-angle telescope, in the trapped belt proton field inside the Space Shuttle. The technique is based on: (1) radiation transport intranuclear-evaporation model that takes into account the charge and angular distribution of target fragments, (2) Landau-Vavilov distribution of energy deposition allowing for electron escape, (3) true detector geometry of the telescope, (4) coincidence and discriminator settings, (5) spacecraft shielding geometry, and (6) the external space radiation environment, including albedo protons. The value of such detailed modeling and its implications in astronaut risk assessment is addressed. c2001 Elsevier Science B.V. All rights reserved.

manned↗

Overview of Probabilistic Risk Assessment at NASA: Past, Present and Future

PRA (Probabilistic Risk Assessment) adds the "probability" dimension to the traditional "deterministic" dimension of engineering and safety analyses. Although PRA, as a discipline, has been the evolutionary product of only the last couple of decades, much of the underlying methodology has been in use for a long time. In fact, the concept of probability for describing the likelihood that rare events happen is ancient and dates from Ancient Greece. Our vision is for NASA to achieve world-class state-of-the-art capability in performing and using PRA in technical and management decisions. Since NASA is a leader in many technical fields in which it is involved, we hope, before long, to see NASA become a leader in this field also.

Stamatelatos, Michael G.↗

Simulation for Prediction of Entry Article Demise (SPEAD): An Analysis Tool for Spacecraft Safety Analysis and Ascent/Reentry Risk Assessment

For the purpose of performing safety analysis and risk assessment for a potential off-nominal atmospheric reentry resulting in vehicle breakup, a synthesis of trajectory propagation coupled with thermal analysis and the evaluation of node failure is required to predict the sequence of events, the timeline, and the progressive demise of spacecraft components. To provide this capability, the Simulation for Prediction of Entry Article Demise (SPEAD) analysis tool was developed. The software and methodology have been validated against actual flights, telemetry data, and validated software, and safety/risk analyses were performed for various programs using SPEAD. This report discusses the capabilities, modeling, validation, and application of the SPEAD analysis tool.

Ling, Lisa↗

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless if the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the NASA PRA and present a future dynamic option for software and PRA. Space Launch Vehicle Software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data, respectively. Software uncertainty will also be discussed. We determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Novack, Steven↗

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk Assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless of whether the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the National Aeronautics and Space Administration (NASA) PRA and present a future dynamic option for software and PRA. Space Launch Vehicle software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data. Software uncertainty will also be discussed. It is determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Steven D. Novack↗

Satellite Conjunction Assessment Risk Analysis for "Dilution Region" Events: Issues and Operational Approaches

An important activity within Space Traffic Management is the detection and prevention of possible on-orbit collisions between space objects. The principal parameter for assessing collision likelihood is the probability of collision, which is widely accepted among conjunction assessment practitioners; but it possesses a known deficiency in that it can produce a false sense of safety when the orbital position uncertainties for the conjuncting objects are high. The probability of collision is said to be “diluted” in such a situation and to understate the possible risk; certain approaches have been recommended by researchers to provide (largely conservative) risk estimates and remediation methodologies in these cases. The present analysis explores two of the main proposals for quantifying and remediating possible risk in the dilution region and quantifies their operational implications. These implications with regard to imputed additional workload are considerable, especially in anticipating the conjunction event levels expected with the deployment of the USAF Space Fence radar. This effort has been undertaken as part of a larger enterprise that seeks to clarify the philosophical and statistical underpinnings of the conjunction risk assessment process. The analysis presented herein argues that a form of hypothesis testing is implicitly used in conjunction assessment risk analysis, and that there are a number of conceptual and practical reasons for constructing the associated null hypothesis to counsel against a satellite conjunction remediation action. In short, it is concluded that, for the purposes of determining whether a conjunction remediation action should be pursued, dilution-region probabilities of collision should be treated no differently from those produced under other circumstances.

Probability of collision↗