Search NASA⌕ Search

SEARCH · Search NASA

Results for “SECARB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Final Report on Reservoir Modeling (SECARB Phase III Work Product 4.2.4.c)

The SECARB Partnership Anthropogenic Test, located in the Southeast Unit of the Citronelle oilfield will inject CO 2 into the saline waters of the Cretaceous Paluxy sandstone formation for three years. In order to accurately model the injection, migration, and long-term fate of CO 2 in the subsurface, GEM, a Computer Modeling Group software program for transport and geochemical modeling, was selected for the simulation. GEM is a very robust compositional reservoir simulator, with all the necessary options available for modeling CO 2 trapping mechanisms (including solubility, residual gas and mineralization). This simulation tool is widely known and used in the petroleum and sequestration industries. A reservoir model was built, based on a previously developed comprehensive picture of the subsurface geology at the site (Work Product 4.2.1.d - Report on Subsurface Characterization for the Anthropogenic Test Project Site). This report describes in details the different inputs that were used to create the model as well as the results of the injection scenario in terms of achievable injection rates, plume extent and pressure response.

01 COAL, LIGNITE, AND PEAT↗

Develop Safety Plan for Installation and Operation of the Observation Wells (SECARB Phase III Task 3.1.3a [Early] Project at Cranfield)

Sandia Technologies developed and deployed a worker health and safety plan for the CFU31_F2 and CFU 31F3 observation wells, covering the SECARB activities following drilling the wells to total depth. The purpose of this health and safety plan (HASP) is to assign responsibilities, establish personnel protection standards, specify safe operating procedures, and provide for contingencies that may arise during the Cranfield Phase III Monitor Well installation. This HASP has been developed in accordance with Sandia Technologies, LLC (Sandia) safety and health standard operating procedures. Specific programs and procedures, as required by site activities, are identified herein.

01 COAL, LIGNITE, AND PEAT↗

Drill and Complete CO 2 Observation Wells (SECARB Work Product 5.2.2.b)

The following report contains details on the drilling and completion of the new wells D-9-8#2 and D-9-9#2, as well as the recompletion work for the previously temporarily abandoned D-4-13 and D-4-14 wells. Each of the four wells will be used for observation activities for the SECARB Phase III Anthropogenic Test. A drilling and completion narrative and an as built description of the well including drawings and material specifications for the D-9- 8#2 and D-9-9#2 are outlined in this report. An outline of the recompletion procedure for the D-4-13 and D-4-14 wells is also included.

01 COAL, LIGNITE, AND PEAT↗

Decision Point on Anthropogenic Test (SECARB Work Product 6.2.1.a)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.

01 COAL, LIGNITE, AND PEAT↗

Transportation Design and Products Specification (SECARB Phase III Work Product 6.2.2.a)

The SECARB Anthropogenic Test at the Citronelle oil field in Mobile County, Alabama is the largest fully integrated coal-fired carbon capture, transportation and storage project in the United States. Constructed and funded by Southern Company and Mitsubishi Heavy Industries, the CO 2 capture facility at Alabama Power’s 2,657-megawatt Plant Barry captures up to 500 metric tons of CO 2 per day, the equivalent emissions from 25 MW of the plant’s power generation. Captured CO 2 is transported to the mature Citronelle oil field atop a 16,380 acre (66.3 km2 of surface area), geologic salt dome. Citronelle oil field is operated by Denbury Onshore, LLC. The CO 2 is injected through ten perforated intervals in the injection well casing at depths ranging from 9,436 ft to 9,800 ft into the porous and permeable sandstones of the Paluxy Formation. This report describes the transportation design and product specifications for captured CO 2 transported from the capture facility to the underground storage reservoir. CO 2 is transported through approximately 12 miles of pipeline from Plant Barry’s capture facility and is injected into the saline aquifer sandstones of the Paluxy formation at Citronelle oil field. The following outlines the details and characteristics of each point of transportation and the quality of CO 2 being transported.

01 COAL, LIGNITE, AND PEAT↗

CO 2 Procurement Plan and Agreement (SECARB Phase III Work Product 7.2.1.a)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the US. This report will highlight the essential pieces necessary to bring CO 2 from the capture facility at Plant Barry to the Anthropogenic Test Site. They are: 1) the capture facility, 2) the pipeline and 3) the well site injection equipment.

01 COAL, LIGNITE, AND PEAT↗

Inject and Store from 33,000 up to 182,500 metric tons of CO 2 (SECARB Phase III Work Product 8.2.2.a)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage, and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.

01 COAL, LIGNITE, AND PEAT↗

Inject and Store from 33,000 up to 182,500 metric tons of CO 2 (2013) (SECARB Phase III Work Product 8.2.2.b)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage, and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA. The material in this Report is intended for general information only.

01 COAL, LIGNITE, AND PEAT↗

Inject and Store from 33,000 up to 182,500 metric tons of CO 2 (2014) (SECARB Phase III Work Product 8.2.2.c)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage, and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA. The material in this report is intended for general information only.

01 COAL, LIGNITE, AND PEAT↗

SECARB Surface Monitoring Plan

This report documents the status of planning for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tools sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

SECARB Complete Subcontract and Begin Deployment of Surface Monitoring Plan

This report documents the status of planning and progresses for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tool sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL. Post-Injection Period Reservoir Modeling Report

The Southeast Carbon Sequestration Partnership (SECARB) Anthropogenic Test is a U.S. Department of Energy funded fully integrated carbon capture and storage initiative designed to demonstrate deep underground injection and containment of anthropogenic CO 2 sourced from Alabama Power’s Plant Barry. From August 20, 2012 to September 1, 2014, a total of 114,014 metric tonnes of CO 2 were transported via pipeline from Plant Barry and stored in a saline aquifer under a portion of the Citronelle Field operated by Denbury Onshore, LLC near Citronelle, Alabama. A major component of this project was to test and develop techniques to monitor, verify and account (MVA) for the CO 2 stored in the aquifer by the project. A suite of technologies were applied and developed to demonstrate non-endangerment of underground sources of drinking water (USDW’s) and to ensure that CO2 does not migrate out of intended zones within the subsurface. This involved several levels of monitoring: 1) Surface monitoring, 2) shallow groundwater monitoring, 3) deep reservoir monitoring and experimental MVA activities. Numerical models were developed to determine the project’s Area of Review (AoR) and to investigate the simulated advancement of the CO 2 plume through the subsurface aquifer for 30 years after the end of injection. An initial baseline area of review of 1,700 ft. was established. The key results demonstrating non-endangerment of USDW’s are presented.

01 COAL, LIGNITE, AND PEAT↗