Search NASA⌕ Search

SEARCH · Search NASA

Results for “STAGE SEPARATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A provisional regulatory gene network for specification of endomesoderm in the sea urchin embryo

We present the current form of a provisional DNA sequence-based regulatory gene network that explains in outline how endomesodermal specification in the sea urchin embryo is controlled. The model of the network is in a continuous process of revision and growth as new genes are added and new experimental results become available; see http://www.its.caltech.edu/~mirsky/endomeso.htm (End-mes Gene Network Update) for the latest version. The network contains over 40 genes at present, many newly uncovered in the course of this work, and most encoding DNA-binding transcriptional regulatory factors. The architecture of the network was approached initially by construction of a logic model that integrated the extensive experimental evidence now available on endomesoderm specification. The internal linkages between genes in the network have been determined functionally, by measurement of the effects of regulatory perturbations on the expression of all relevant genes in the network. Five kinds of perturbation have been applied: (1) use of morpholino antisense oligonucleotides targeted to many of the key regulatory genes in the network; (2) transformation of other regulatory factors into dominant repressors by construction of Engrailed repressor domain fusions; (3) ectopic expression of given regulatory factors, from genetic expression constructs and from injected mRNAs; (4) blockade of the beta-catenin/Tcf pathway by introduction of mRNA encoding the intracellular domain of cadherin; and (5) blockade of the Notch signaling pathway by introduction of mRNA encoding the extracellular domain of the Notch receptor. The network model predicts the cis-regulatory inputs that link each gene into the network. Therefore, its architecture is testable by cis-regulatory analysis. Strongylocentrotus purpuratus and Lytechinus variegatus genomic BAC recombinants that include a large number of the genes in the network have been sequenced and annotated. Tests of the cis-regulatory predictions of the model are greatly facilitated by interspecific computational sequence comparison, which affords a rapid identification of likely cis-regulatory elements in advance of experimental analysis. The network specifies genomically encoded regulatory processes between early cleavage and gastrula stages. These control the specification of the micromere lineage and of the initial veg(2) endomesodermal domain; the blastula-stage separation of the central veg(2) mesodermal domain (i.e., the secondary mesenchyme progenitor field) from the peripheral veg(2) endodermal domain; the stabilization of specification state within these domains; and activation of some downstream differentiation genes. Each of the temporal-spatial phases of specification is represented in a subelement of the network model, that treats regulatory events within the relevant embryonic nuclei at particular stages. (c) 2002 Elsevier Science (USA).

Non-NASA Center↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

A family portrait of lanmodulin selectivity for enhanced rare-earth separations

Proteins offer a molecular design space to create bespoke ligands for the separation of critical metals like rare earth elements (REs). However, data-intensive approaches to tune metalloprotein selectivity are constrained by the low-throughput nature of existing characterization methods. Here we invented an assay called ‘SpyTag-Catcher Immobilization of Lanmodulin for Assaying Metal-Binding Selectivity’ (SpyCI-LAMBS) to measure metalloprotein selectivity en masse. This 96-format workflow was used to study the selectivity of 621 lanmodulin (LanM) orthologs for 15 REs, revealing eight distinct selectivity profiles based on sequence-to-function analyses. We discovered >200 LanMs with stronger selectivity against low-value LaIII relative to the prototypical LanM. This includes a LanM that can perform a challenging one-stage separation of PrIII from LaIII with up to >99.9 mol% purity and 83% yield. SpyCI-LAMBS is a powerful tool that can rapidly collect high-fidelity selectivity data to inform metal ion separations and machine-learning-assisted metalloprotein design.

59 BASIC BIOLOGICAL SCIENCES↗

Influence of Combined Whole-Body Vibration Plus G-Loading on Visual Performance

Recent engineering analyses of the integrated Ares-Orion stack show that vibration levels for Orion crews have the potential to be much higher than those experienced in Gemini, Apollo, and Shuttle vehicles. Of particular concern to the Constellation Program (CxP) is the 12 Hz thrust oscillation (TO) that the Ares-I rocket develops during the final ~20 seconds preceding first-stage separation, at maximum G-loading. While the structural-dynamic mitigations being considered can assure that vibration due to TO is reduced to below the CxP crew health limit, it remains to be determined how far below this limit vibration must be reduced to enable effective crew performance during launch. Moreover, this "performance" vibration limit will inform the operations concepts (and crew-system interface designs) for this critical phase of flight. While Gemini and Apollo studies provide preliminary guidance, the data supporting the historical limits were obtained using less advanced interface technologies and very different operations concepts. In this study, supported by the Exploration Systems Mission Directorate (ESMD) Human Research Program, we investigated display readability-a fundamental prerequisite for any interaction with electronic crew-vehicle interfaces-while observers were subjected to 12 Hz vibration superimposed on the 3.8 G loading expected for the TO period of ascent. Two age-matched groups of participants (16 general population and 13 Crew Office) performed a numerical display reading task while undergoing sustained 3.8 G loading and whole-body vibration at 0, 0.15, 0.3, 0.5, and 0.7 g in the eyeballs in/out (x-axis) direction. The time-constrained reading task used an Orion-like display with 10- and 14-pt non-proportional sans-serif fonts, and was designed to emulate the visual acquisition and processing essential for crew system monitoring. Compared to the no-vibration baseline, we found no significant effect of vibration at 0.15 and 0.3 g on task error rates (ER) or response times (RT). Significant degradations in both ER and RT, however, were observed at 0.5 and 0.7 g for 10-pt, and at 0.7 g for 14-pt font displays. These objective performance measures were mirrored by participants' subjective ratings. Interestingly, we found that the impact of vibration on ER increased with distance from the center of the display, but only for vertical displacements. Furthermore, no significant ER or RT aftereffects were detected immediately following vibration, regardless of amplitude. Lastly, given that our reading task required no specialized spaceflight expertise, our finding that effects were not statistically distinct between our two groups is not surprising. The results from this empirical study provide initial guidance for evaluating the display readability trade-space between text-font size and vibration amplitude. However, the outcome of this work should be considered preliminary in nature for a number of reasons: 1. The single 12 Hz x-axis vibration employed was based on earlier load-cycle models of the induced TO environment at the end of Ares-I first stage flight. Recent analyses of TO mitigation designs suggest that significant concurrent off-axis vibration may also occur. 2. The shirtsleeve environment in which we tested fails to capture the full kinematic and dynamic complexity of the physical interface between crewmember and the still-to-bematured helmet-suit-seat designs, and the impact these will have for vibration transmission and consequent performance. 3. By examining performance in this reading and number processing task, we are only assessing readability, a first and necessary step that in itself does not directly address the performance of more sophisticated operational tasks such as vehicle-health monitoring or manual control of the vehicle.

readability↗

Investigation of the McDonnell-Douglas orbiter and booster shuttle models in proximity at Mach numbers 2.0 to 6.0. Volume 7: Proximity data at Mach 4 and 6, interference free and launch vehicle data

Aerodynamic data obtained from a space shuttle abort stage separation wind tunnel test are presented. The .00556 scale models of the orbiter and booster configuration were tested in close proximity using dual balances during the time period of April 21 to April 27 1971. Data were obtained for both booster and orbiter over an angle of attack range from -10 to 10 deg for zero degree sideslip angle. The models were tested at several relative incidence angles and separation distances and power conditions. Plug nozzles utilizing air were used to simulate booster and orbiter plumes at various altitudes along a nominal ascent trajectory. Powered conditions were 100, 50, 25 and 0 percent of full power for the orbiter and 100, 50 and 0 percent of full power for the booster. Pitch control effectiveness data were obtained for both booster and orbiter with power on and off. In addition, launch vehicle data with and without booster power were obtained utilizing a single balance in the booster model. Data were also obtained with the booster canard off in close proximity and for the launch configuration.

Trimmer, L. L.↗

Apollo/Saturn 5 Postflight Trajectory - SA-513 Skylab 1 Mission. Tracking and Flight Reconstruction

The postflight trajectory for the Apollo/Saturn V SA-513 Skylab I flight is presented. An analysis is included of the orbital and powered flight trajectories of the launch vehicle, the orbital trajectory of the spent S-II stage, and the free flight impact trajectory of the expended S-IC stage. Launch vehicle trajectory dependent parameters are provided in earth-fixed launch site, launch vehicle navigation, and geographic polar coordinate systems. The time history of the trajectory parameters for the launch vehicle is presented from guidance reference release to the transfer to ATM control. Tables of significant launch vehicle parameters at engine cutoff, stage separation, and workshop orbit insertion are included. Figures of such parameters as altitude, surface and cross range, and the magnitude of total velocity and acceleration as a function of range time for the powered flight trajectory are given.

Source record↗

The Nike-Black Brant V development program

The Nike-Black Brant V represents a combined U.S.-Canadian program to achieve a 40 percent increase in apogee performance over that of the unboosted BBV, with minimum component modification and no meaningful increase in flight environment levels. The process of achieving these objectives is described, in particular optimization of sustainer coast period and roll history, and the techniques used to ensure good stage separation. Details of the structural test program and subsequent successful vehicle proving flight are provided. Basic performance data are preented, with an indication of the further potential offered by Terrier boost.

Sevier, H.↗