Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduled arrival operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

An Evaluation of a Flight Deck Interval Management Algorithm Including Delayed Target Trajectories

NASA's first Air Traffic Management (ATM) Technology Demonstration (ATD-1) was created to facilitate the transition of mature air traffic management technologies from the laboratory to operational use. The technologies selected for demonstration are the Traffic Management Advisor with Terminal Metering (TMA-TM), which provides precise timebased scheduling in the terminal airspace; Controller Managed Spacing (CMS), which provides controllers with decision support tools enabling precise schedule conformance; and Interval Management (IM), which consists of flight deck automation that enables aircraft to achieve or maintain precise in-trail spacing. During high demand operations, TMA-TM may produce a schedule and corresponding aircraft trajectories that include delay to ensure that a particular aircraft will be properly spaced from other aircraft at each schedule waypoint. These delayed trajectories are not communicated to the automation onboard the aircraft, forcing the IM aircraft to use the published speeds to estimate the target aircraft's estimated time of arrival. As a result, the aircraft performing IM operations may follow an aircraft whose TMA-TM generated trajectories have substantial speed deviations from the speeds expected by the spacing algorithm. Previous spacing algorithms were not designed to handle this magnitude of uncertainty. A simulation was conducted to examine a modified spacing algorithm with the ability to follow aircraft flying delayed trajectories. The simulation investigated the use of the new spacing algorithm with various delayed speed profiles and wind conditions, as well as several other variables designed to simulate real-life variability. The results and conclusions of this study indicate that the new spacing algorithm generally exhibits good performance; however, some types of target aircraft speed profiles can cause the spacing algorithm to command less than optimal speed control behavior.

Swieringa, Kurt A.↗

Providing Housing, Food and Medical Support for 25,000 Katrina Evacuees with 12 Hours Notice: The Harris County Medical Support of the Superdome Evacuees

Hurricane Katrina was responsible for trapping 25,000 people in the New Orleans Superdome and isolating many others throughout Louisiana and Mississippi. The transport of these evacuees to the Reliant Park (Houston, Texas) used 500 buses each containing about 55 people. Processing the arriving evacuees included addressing their health status and medical needs as follows: an initial triage at disembarkation, a secondary triage in the Reliant Astrodome and Center, and definitive clinical care in the Reliant Arena "Katrina" Clinic. Baylor College of Medicine (BCM) physicians boarded buses and identified the sickest for emergency transport to Harris County Hospital District (HCHD) hospitals. BCM departments represented included pediatrics, family and community medicine, internal medicine, radiology, obstetrics and gynecology, orthopedics, surgery, and psychiatry. Astrodome and Center triage was managed by BCM physicians and staffed by HCHD Nurses and volunteers from Texas and beyond. The Reliant Astrodome, Center and Arena reached peak headcounts of 15,000,4500, and 2500, respectively Most evacuees visiting the triage sites in the Astrodome and Center were treated using "over-the-counter" medications with the remaining being transported to the "Katrina" clinic. The clinic was equipped with a lab, pharmacy, digital X-ray, and ultrasound machines in addition to electronic patient records created using 80 computer terminals. The Katrina clinic saw more than 15,000 patients during 15 days of operations (2,000 on the first full day), administered 10,000 tetanus shots, and filled thousands of prescriptions. At the peak of operations, the clinic saw 150 patients/hour with 25 physicians scheduled for each 12-hour shift. Approximately 900 people were transported to hospital emergency rooms. Within 3 weeks of arriving at the Reliant Park facilities, more than 90% of the families found permanent housing, enrolled children in schools, and found work. Using data obtained from manual and electronic medical records, this presentation will document the major milestones and lessons learned from this extraordinary project to help the Katrina evacuees.

Hamilton, Douglas↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Airspace Technology Demonstration 2 project is investigating Integrated Arrival-Departure-Surface air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the areas under study are departure release-time approval request (APREQ) traffic management initiatives. Scheduling departures at downstream points and complying with approved departure release times helps flights fit smoothly into busy traffic streams. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations over fourteen months beginning in January 2018. It describes APREQ-compliance improvements observed as the electronic negotiation process has matured and discusses contributing factors, including renegotiation of departure release times.

Call for release↗

Terminal area air traffic control simulation

To study the impact of advanced aeronautical technologies on operations to and from terminal airports, a computer model of air traffic movements was developed. The advantages of fast-time simulation are discussed, and the arrival scheduling and flight simulation are described. A New York area study, user's guide, and programmer's guide are included.

Source record↗

A Comparison of CTAS and Airline Time of Arrival Predictions

A statistically-based comparison of aircraft times of arrival between Center/TRACON Automation System (CTAS) air traffic control scheduling and airline predictions is presented. CTAS is found to provide much improved values, forming the foundation for airline operational improvements, as observed during an airline field trial of a CTAS display.

Heere, Karen R.↗

Airspace Technology Demonstration 2 (ATD-2): Integrated Arrival/Departure/Surface (IADS) System Demonstration, Technology Transfer Document Summary (ReadMe)

Airspace Technology Demonstration - 2 (ATD-2) is part of NASA's Airspace Technology Demonstrations (ATD) Project under its Airspace Operations and Safety Program (AOSP). ATD-2 is a multi-year research and development effort to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. In order to ensure that the products of this knowledge and technology transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders. This summary document and accompanying artifacts satisfy the first of three Research Transition Products (RTPs) defined in the IADS Research Transition Team (RTT) Plan. This transfer consists of NASA's ATD-2 Phase 1 Baseline IADS System capabilities.

IADS↗

Modeling and Simulating Airport Surface Operations with Gate Conflicts

The Surface Operations Simulator and Scheduler (SOSS) is a fast-time simulation platform used to develop and test future surface scheduling concepts such as NASAs Air Traffic Demonstration 2 of time-based surface metering at Charlotte Douglas International Airport (CLT). Challenges associated with CLT surface operations have driven much of SOSS development. Recently, SOSS functionality for modeling hardstand operations was developed to address gate conflicts, which occur when an arrival and departure wish to occupy the same gate at the same time. Because surface metering concepts such as ATD2 have the potential to increase gates conflicts as departure are held at their gates, it is important to study the interaction between surface metering and gate conflict management. Several approaches to managing gate conflicts with and without the use of hardstands were simulated and their effects on surface operations and scheduler performance compared.

Zelinski, Shannon↗

Modeling and Simulating Airport Surface Operations with Gate Conflicts

The Surface Operations Simulator and Scheduler (SOSS) is a fast-time simulation platform used to develop and test future surface scheduling concepts such as NASA's Air Traffic Demonstration 2 of time-based surface metering at Charlotte Douglass International Airport (CLT). Challenges associated with CLT surface operations have driven much of SOSS development. Recently, SOSS functionality for modeling harsdstand operations was developed to address gate conflicts, which occur when an arrival and departure wish to occupy the same gate at the same time. Because surface metering concepts such as ATD2 have the potential to increase gates conflicts as departures are held at their gates, it is important to study the interaction between surface metering and gate conflict management. Several approaches to managing gate conflicts with and without the use of hardstands were simulated and their effects on surface operations and scheduler performance compared.

Zelinski, Shannon↗

Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

Wilson, Sara R.↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

ATD-1 ATM Technology Demonstration-1 and Integrated Scheduling

Enabling efficient arrivals for the NextGen Air Traffic Management System and developing a set of integrated decision support tools to reduce the high cognitive workload so that controllers are able to simultaneously achieve safe, efficient, and expedient operations at high traffic demand levels.

Traffic Management↗

Highly Automated Arrival Management and Control System Suitable for Early NextGen

This is a presentation of previously published work conducted in the development of the Terminal Area Precision Scheduling and Spacing (TAPSS) system. Included are concept and technical descriptions of the TAPSS system and results from human in the loop simulations conducted at Ames Research Center. The Terminal Area Precision Scheduling and Spacing system has demonstrated through research and extensive high-fidelity simulation studies to have benefits in airport arrival throughput, supporting efficient arrival descents, and enabling mixed aircraft navigation capability operations during periods of high congestion. NASA is currently porting the TAPSS system into the FAA TBFM and STARS system prototypes to ensure its ability to operate in the FAA automation Infrastructure. NASA ATM Demonstration Project is using the the TAPSS technologies to provide the ground-based automation tools to enable airborne Interval Management (IM) capabilities. NASA and the FAA have initiated a Research Transition Team to enable potential TAPSS and IM Technology Transfer.

Swenson, Harry N.↗

Exploration of the Theoretical Physical Capacity of the John F. Kennedy International Airport Runway System

A design study was completed to explore the theoretical physical capacity (TPC) of the John F. Kennedy International Airport (KJFK) runway system for a northflow configuration assuming impedance-free (to throughput) air traffic control functionality. Individual runways were modeled using an agent-based, airspace simulation tool, the Airspace Concept Evaluation System (ACES), with all runways conducting both departures and arrivals on a first-come first-served (FCFS) scheduling basis. A realistic future flight schedule was expanded to 3.5 times the traffic level of a selected baseline day, September 26, 2006, to provide a steady overdemand state for KJFK runways. Rules constraining departure and arrival operations were defined to reflect physical limits beyond which safe operations could no longer be assumed. Safety buffers to account for all sources of operational variability were not included in the TPC estimate. Visual approaches were assumed for all arrivals to minimize inter-arrival spacing. Parallel runway operations were assumed to be independent based on lateral spacing distances. Resulting time intervals between successive airport operations were primarily constrained by same-runway and then by intersecting-runway spacing requirements. The resulting physical runway capacity approximates a theoretical limit that cannot be exceeded without modifying runway interaction assumptions. Comparison with current KJFK operational limits for a north-flow runway configuration indicates a substantial throughput gap of approximately 48%. This gap may be further analyzed to determine which part may be feasibly bridged through the deployment of advanced systems and procedures, and which part cannot, because it is either impossible or not cost-effective to control. Advanced systems for bridging the throughput gap may be conceptualized and simulated using this same experimental setup to estimate the level of gap closure achieved.

Neitzke, Kurt W.↗

En route position and time control of aircraft using Kalman filtering of radio aid data

Fixed-time-of-arrival (FTA) guidance and navigation is investigated as a possible technique capable of operation within much more stringent en route separation standards and offering significant advantages in safety, higher traffic densities, and improved scheduling reliability, both en route and in the terminal areas. This study investigated the application of FTA guidance previously used in spacecraft guidance. These FTA guidance techniques have been modified and are employed to compute the velocity corrections necessary to return an aircraft to a specified great-circle reference path in order to exercise en route time and position control throughout the entire flight. The necessary position and velocity estimates to accomplish this task are provided by Kalman filtering of data from Loran-C, VORTAC/TACAN, Doppler radar, radio or barometric altitude,and altitude rate. The guidance and navigation system was evaluated using a digital simulation of the cruise phase of supersonic and subsonic flights between San Francisco and New York City, and between New York City and London.

Mcgee, L. A.↗

A Novel Application of TMA to Converging Runway Operations in a Simulated NextGen Environment

In 2013, the Airspace Operations Laboratory at NASA Ames Research Center conducted a human-in-the-loop simulation that examined the feasibility of applying a number of Next Generation Air Transportation System (NextGen) solutions to complex arrival operations in and around the New York metroplex. The delivery of arrivals to Newark Liberty International Airport (EWR) was the focus of this simulation, which involved extending the Terminal Sequencing and Spacing (TSS) scheduling capability to precisely schedule arrivals to intersecting runways 22 Left and 11. An important enabler for the concept was the availability of a dependent runway scheduler that was able to coordinate arrival times between aircraft landing on intersecting runways. At the time of the study, there was no functionality within the TSS scheduler to automatically create the dependent runway schedules. Instead, a Traffic Management Coordinator (TMC) manually created a de-conflicted schedule, which allowed for the concept to be tested as well as provided valuable insight into the tool requirements for a dependent runway scheduler. Throughout the course of preparations for the simulation, the individual serving as the TMC developed a number of strategies and procedures for manually adjusting the Scheduled Time of Arrival (STA) of the EWR arrivals in order to ensure that adequate spacing was provided between runway 22L and 11 arrival pairs. This paper describes the strategies and procedures that were developed and details how they were successfully applied during the simulation. Results will also be presented that shed additional light on exactly how the schedules were manipulated and their impact on delivery performance and safety. Ideas for additional TSS enhancements and next steps, based on participant feedback, will also be presented.

Homola, Jeffrey↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2 Field Evaluation, Trajectory Option Set, Pre↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2↗

Scheduling Aircraft Landings under Constrained Position Shifting

Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

Balakrishnan, Hamsa↗