Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Waste Chemistry Envelope for the Determination of Pitting Corrosion Susceptibility - 19554

Liquid radioactive wastes at the Hanford and Savannah River sites are stored in large underground carbon steel tanks. The high-level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life (i.e., greater than 60 years). Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. Administrative programs are in place to mitigate potential corrosion mechanisms and thereby maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. Waste chemistry and temperature control are the means by which corrosion degradation of the waste tanks is minimized. Chemistry controls are based on in-situ coupon tests, waste tank experience, and laboratory testing. These requirements comprise the technical standards for corrosion control. The standards are utilized then as guidelines for operational procedures. The present waste chemistry controls for the Hanford DSTs were established in the 1980's in response to tank failures caused by stress corrosion cracking (SCC) at the DOE Savannah River Site (SRS). Portions of the SRS chemistry limits, which were developed at the Savannah River National Laboratory (SRNL) were coupled with corrosion testing results from Pacific Northwest National Laboratories (PNNL) and adopted for corrosion control of the double-shell tank (DST) waste at the Hanford Site. Since that time, the temperatures of the waste in the DSTs have decreased to less than 50 deg. C in most cases as the radioactive material has decayed. As a consequence, new chemistry controls were formulated for SCC in 2010. This testing however, did not address that potential for pitting in the supernatant and at the liquid-air interface. Indeed, initial tests indicated that the inhibitor requirements for SCC would be insufficient for the prevention of pitting. In addition to lower waste temperatures, future retrieval and process changes may impact the DST waste chemistry. Initial projections suggest that the waste chemistry of the DSTs may shift to a broader range of pH and higher aggressive anion concentrations (e.g., chloride, sulfate, etc.) than the wastes that are presently stored. Additionally, processes within the vitrification facility may result in streams that are returned to the tank farm for evaporation. These streams may also contain high concentrations of aggressive species. SRNL investigated the propensity for pitting of the carbon steel waste tanks at current and projected DST waste chemistries. A statistically designed series of tests provided a pitting factor that relates the ratio of the inhibitor species to the aggressive species and the probability of observing pitting. An acceptable pitting factor was determined and was utilized for the development of a new chemistry envelope. The new chemistry envelope was compared to the envelope that was established for SCC and was determined to be bounding. Validation of the new chemistry envelope was performed via model simulations and comparison with historical experimental results and approaches to establishing chemistry envelopes. The new chemistry envelope will eventually be part of an overall assessment of the condition of the tanks and any changes made to the overall structural integrity program for the Hanford DSTs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applications of Optimal Building Energy System Selection and Operation

Berkeley Lab has been developing the Distributed Energy Resources Customer Adoption Model (DER-CAM) for several years. Given load curves for energy services requirements in a building microgrid (u grid), fuel costs and other economic inputs, and a menu of available technologies, DER-CAM finds the optimum equipment fleet and its optimum operating schedule using a mixed integer linear programming approach. This capability is being applied using a software as a service (SaaS) model. Optimisation problems are set up on a Berkeley Lab server and clients can execute their jobs as needed, typically daily. The evolution of this approach is demonstrated by description of three ongoing projects. The first is a public access web site focused on solar photovoltaic generation and battery viability at large commercial and industrial customer sites. The second is a building CO2 emissions reduction operations problem for a University of California, Davis student dining hall for which potential investments are also considered. And the third, is both a battery selection problem and a rolling operating schedule problem for a large County Jail. Together these examples show that optimization of building u grid design and operation can be effectively achieved using SaaS.

25 ENERGY STORAGE↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

OctoFAS: A Two-Level Fair Scheduler That Increases Fairness in Network-Based Key-Value Storage

We identified a fairness problem in a network-based key-value storage system using Intel Storage Performance Development Kit (SPDK) in a multitenant environment. In such an environment, each tenant’s I/O service rate is not fairly guaranteed compared to that of other tenants. To address the fairness problem, we propose OctoFAS, a two-level fair scheduler designed to improve overall throughput and fairness among tenants. The two-level scheduler of OctoFAS consists of (i) inter-core scheduling and (ii) intra-core scheduling. Through inter-core scheduling, OctoFAS addresses the load imbalance problem that is inherent in SPDK on the storage server by dynamically migrating I/O requests from overloaded cores to underloaded cores, thereby increasing overall throughput. Intra-core scheduling prioritizes handling requests from starving tenants over well-fed tenants within core-specific event queues to ensure fair I/O services among multiple tenants. OctoFAS is deployed on a Linux cluster with SPDK. Through extensive evaluations, we found that OctoFAS ensures that the total system throughput remains high and balanced, while enhancing fairness by approximately 10% compared to the baseline, when both scheduling levels operate in a hybrid fashion.

97 MATHEMATICS AND COMPUTING↗

Lifting and Dropping VMs to Dynamically Transition Between Time- and Space-sharing for Large-Scale HPC Systems

As HPC environments increasingly integrate with edge based systems, system architectures will need to handle a broader class of workloads and scheduling requirements. One result of this shift will be the need to simultaneously support bulk-synchronous parallel (BSP) and on-demand service based applications on the same infrastructure. This in turn will require that future resource management approaches utilize both space-shared as well as time-shared resource scheduling strategies. In this work we introduce the concept of "VM-lifting'' (and its inverse "VM-Dropping'') which allows dynamically switching an HPC workload between space-shared and time-shared scheduling regimes. Our work targets co-kernel based HPC system software environments, in which multiple specialized OS kernels execute natively on dedicated physical resource partitions inside a single compute node. With VM-lifting, a native co-kernel can be migrated at runtime to and from locally hosted Virtual Machine Environments due to changing scheduling requirements of the node. This allows an HPC node to be dynamically (re-)configured as either a time-shared Infrastructure-as-a-Service (IaaS) resource or a dedicated space shared resource based on the current workload demands. We have implemented this approach in the context of the Hobbes Exascale System Software stack and have demonstrated that a node can be reconfigured with minimal impact on the running applications.

Gordon, Nick↗

Controlling Wind Turbines for Secondary Frequency Regulation: An Analysis of AGC Capabilities Under New Performance Based Compensation Policy: Preprint

As wind energy becomes a larger portion of the world's energy portfolio there has been an increased interest for wind turbines to control their active power output to provide ancillary services which support grid reliability. One of these ancillary services is the provision of frequency regulation, also referred to as secondary frequency control or automatic generation control (AGC), which is often procured through markets which recently adopted performance-based compensation. A wind turbine with a control system developed to provide active power ancillary services can be used to provide frequency regulation services. Simulations have been performed to determine the AGC tracking performance at various power schedule set-points, participation levels, and wind conditions. The performance metrics used in this study are based on those used by several system operators in the US. Another metric that is analyzed is the damage equivalent loads (DELs) on turbine structural components, though the impacts on the turbine electrical components are not considered. The results of these single-turbine simulations show that high performance scores can be achieved when there is sufficient wind resource available. The capability of a wind turbine to rapidly and accurately follow power commands allows for high performance even when tracking rapidly changing AGC signals. As the turbine de-rates to meet decreased power schedule set-points there is a reduction in the DELs, and the participation in frequency regulation has a negligible impact on these loads.

17 WIND ENERGY↗

Controlling Wind Turbines for Secondary Frequency Regulation: An Analysis of AGC Capabilities Under New Performance Based Compensation Policy

As wind energy becomes a larger portion of the world's energy portfolio there has been an increased interest for wind turbines to control their active power output to provide ancillary services which support grid reliability. One of these ancillary services is the provision of frequency regulation, also referred to as secondary frequency control or automatic generation control (AGC), which is often procured through markets which recently adopted performance-based compensation. A wind turbine with a control system developed to provide active power ancillary services can be used to provide frequency regulation services. Simulations have been performed to determine the AGC tracking performance at various power schedule set-points, participation levels, and wind conditions. The performance metrics used in this study are based on those used by several system operators in the US. Another metric that is analyzed is the damage equivalent loads (DELs) on turbine structural components, though the impacts on the turbine electrical components are not considered. The results of these single-turbine simulations show that high performance scores can be achieved when there are insufficient wind resources available. The capability of a wind turbine to rapidly and accurately follow power commands allows for high performance even when tracking rapidly changing AGC signals. As the turbine de-rates to meet decreased power schedule set-points there is a reduction in the DELs, and the participation in frequency regulation has a negligible impact on these loads.

17 WIND ENERGY↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters’ use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as we are currently keeping credentials active for approximately 15 experiments, each with 1-3 different credentials, and distributing those credentials to 2-20 submit points per experiment, with those numbers steadily increasing. To address these issues, we created and deployed a Managed Tokens service. The service is written in Go, taking advantage of that language’s native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points. When experimenters schedule jobs to be submitted, these distributed vault tokens are used to access a Hashicorp Vault instance (run separately from the Managed Tokens service), and previously-stored refresh tokens there are used to obtain the bearer token that is submitted with the job. We will discuss here the design of the Managed Tokens service, including elaborating on certain choices we made with regards to concurrent operations, configuration, monitoring, and deployment.

Bhat, Shreyas↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Vehicle to Grid Frequency Regulation Capacity Optimal Scheduling for Battery Swapping Station Using Deep Q-Network

Battery swapping stations (BSSs) are ideal candidates for fast frequency regulation services (FFRS) due to their large battery stock capacity. In addition, BSSs can precharge batteries for customers and the batteries that are not in charging can provide a stable regulation capacity to the market. However, uncertainties, such as ACE signals and the EV per-hour visit counts, introduce stochastic nonlinear dynamics into the operation of a BSS-based FFRS. Currently, there is no quantification method to ensure its optimal economical operation. To close this gap, in this article, we propose a novel deep Q-learning-based FFRS capacity dynamic scheduling strategy. This method can autonomously schedule the hourly regulation capacity in real time to maximize the BSSx0027;s revenue for providing FFRS. Case studies using real-world data verify the efficacy of the proposed work.

25 ENERGY STORAGE↗

BigData Express: Toward Schedulable, Predictable, and High-Performance Data Transfer

Big Data has emerged as a driving force for scientific discoveries. Large scientific instruments (e.g., colliders, and telescopes) generate exponentially increasing volumes of data. To enable scientific discovery, science data must be collected, indexed, archived, shared, and analyzed, typically in a widely distributed, highly collaborative manner. Data transfer is now an essential function for science discoveries, particularly within big data environments. Although significant improvements have been made in the area of bulk data transfer, the currently available data transfer tools and services can not successfully address the high-performance and time-constraint challenges of data transfer required by extreme-scale science applications for the following reasons: disjoint end-to-end data transfer loops, cross-interference between data transfers, and existing data transfer tools and services are oblivious to user requirements (deadline and QoS requirements). Fermilab has been working on the BigData Express project to address these problems. BigData Express seeks to provide a schedulable, predictable, and high-performance data transfer service for big data science. The BigData Express software is being deployed and evaluated at multiple research institutions, which include UMD, StarLight, FNAL, KISTI, KSTAR, SURFnet, Ciena, and other sites. Meanwhile, the BigData Express research team is collaborating with the StarLight International/National Communications Exchange Facility to deploy BigData Express at various research platforms, including Pacific Research Platform, National Research Platform, and Global Research Platform. It is envisioned that we are working toward building a high-performance data transfer federation for big data science.

Lu, Qiming↗

Coordinated PEV Charging for Distribution System Management

Plug-in electric vehicles (PEVs) can help to reduce worldwide dependence on petroleum and carbon emissions. In the past a few years, PEVs have received considerable attention as an eco-friendly and cost-effective alternative to conventional gasoline vehicles. PEVs consume higher power from the grid during charging compared to conventional residential loads. Therefore, the emerging fleet of PEVs will introduce a considerable amount of additional load on power system. On the other hand, majority of PEVs are parked for more than 90% of the time, making them ideal for providing various services through Electric Vehicle Supply Equipment (EVSE), a.k.a. charging stations which are PEVs’ connection points to the power system. In this project, coordinated PEV charging are developed to provide distribution system services, considering PEV characteristics, realistic travel pattern, charging behaviors, and EVSE power rating and availability. The main efforts and contributions are summarized as follows. • Mobility models and EVSE charging capability/availability are indispensable for evaluating PEV charging coordination strategies and developing PEV charging control. Many existing studies utilize simplified mobility models assuming that the entire vehicle fleet returns home in the evening and is parked at home until the next morning. Some other PEV models better represent diversified home arrival and departure time, but cannot capture varying charging flexibility and capability at different locations, and therefore are not appropriate to study the impacts of public EVSE on PEV load and utilization. In this work, a mobility and charging flexibility model is proposed to better represent the temporal availability and varying charging capability from PEV onboard charger and EVSE. • Based on the mobility model, a generalized optimization method is proposed to evaluate different PEV charging coordination strategies. In existing literature, different algorithms and methods need to be designed to evaluate each charging strategy from both vehicle owners’ and system’s perspective. With the optimization method proposed in this work, different charging control strategies can be studied and compared by only updating objective functions. Moreover, optimization tricks are provided to convert the optimization problems to equivalent linear programming problems, which can be efficiently solved with existing solvers. • An innovative scheduling and control framework is proposed to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of EVSE is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the simplified charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging control can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. • The proposed charging strategy evaluation and smart charging control methods are applied to one of the prototypical feeders developed by the Pacific Northwest National Laboratory (PNNL) for case studies. Detailed trip information extracted from the National Household Travel Survey (NHTS) is used to represent travel and parking patterns. Different scenarios are simulated to evaluate the performance of the proposed methods and understand how PEV mobility and public EVSE availability affect PEV load and potential grid services.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distribution System State Estimation With High Penetration of Demand Response Enabled Loads

Demand-side operations incentivize utility customers to take part in various grid services. A demand response enabled load (DREL) is a flexible grid asset that schedules electricity consumption in response to a time-of-use (TOU) energy price. Consequently, its energy profile differs from that of a conventional load that is insensitive to price. This difference may cause new challenges for distribution system state estimation (DSSE). It is well known that DSSE often needs to use pseudo-measurements based on historic load profiles to increase system observability. However, historic profiles of conventional loads are not representative of DREL behaviors. Additionally, the inaccuracy impacts DSSE results and other DSSE-dependent operations. In this paper, we propose an online pseudo-measurement generation approach for DSSE with DRELs. We formulate an optimization model to represent DRELs self-adjusting actions. Sampling-based stochastic optimization techniques are proposed to account for uncertainties in DRELs. A set of representative DREL behavior data corresponding to the samples are used to characterize DREL pseudo-measurements. Case studies with modified IEEE 123-bus test system verify the validity of the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NARAC Meteorological Monitoring Tower Maintenance Report: Submarine Base Group Two, Sub Base New London NEWLBASE2 Tower

Comments: The roof-based tower is located on Building 17 on Naval Submarine Base New London. Tower installation date is unknown. A second GFCI outlet in-line with the standard GFCI in the logger enclosure is mounted on conduit out of the tower base pedestal. The roof surface has been replaced and is now safe to walk on. The tower was not climbed during this maintenance visit. After the maintenance visit in 2018, the tower was deemed unsafe to climb due to age, corrosion, and deterioration of the tower components. The wind, air temperature, and relative humidity sensors located on the upper part of the tower require climbing of the tower for servicing and could not be accessed for inspection and maintenance. The tower is scheduled for replacement in FY2023. Tasks to be Completed: Tower system replacement / relocation. Consider replacement or bypassing of the suspect precipitation gauge signal connector.

99 GENERAL AND MISCELLANEOUS↗

National Security Technology Incubator Business Plan

This document contains a business plan for the National Security Technology Incubator (NSTI), developed as part of the National Security Preparedness Project (NSPP) and performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This business plan describes key features of the NSTI, including the vision and mission, organizational structure and staffing, services, evaluation criteria, marketing strategies, client processes, a budget, incubator evaluation criteria, and a development schedule. The purpose of the NSPP is to promote national security technologies through business incubation, technology demonstration and validation, and workforce development. The NSTI will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The vision of the NSTI is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety, security, and protection of the homeland. The NSTI is operated and managed by the Arrowhead Center, responsible for leading the economic development mission of New Mexico State University (NMSU). The Arrowhead Center will recruit business with applications for national security technologies recruited for the NSTI program. The Arrowhead Center and its strategic partners will provide business incubation services, including hands-on mentoring in general business matters, marketing, proposal writing, management, accounting, and finance. Additionally, networking opportunities and technology development assistance will be provided.

99 GENERAL AND MISCELLANEOUS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗