Search NASA⌕ Search

SEARCH · Search NASA

Results for “Secondary Waste Form Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

113 records · Page 7

The Disruption of Vessel-Spanning Bubbles with Sloped Fins in Flat-Bottom and 2:1 Elliptical-Bottom Vessels

Radioactive sludge was generated in the K-East Basin and K-West Basin fuel storage pools at the Hanford Site while irradiated uranium metal fuel elements from the N Reactor were being stored and packaged. The fuel has been removed from the K Basins, and currently, the sludge resides in the KW Basin in large underwater Engineered Containers. The first phase to the Sludge Treatment Project being led by CH2MHILL Plateau Remediation Company (CHPRC) is to retrieve and load the sludge into sludge transport and storage containers (STSCs) and transport the sludge to T Plant for interim storage. The STSCs will be stored inside T Plant cells that are equipped with secondary containment and leak-detection systems. The sludge is composed of a variety of particulate materials and water, including a fraction of reactive uranium metal particles that are a source of hydrogen gas. If a situation occurs where the reactive uranium metal particles settle out at the bottom of a container, previous studies have shown that a vessel-spanning gas layer above the uranium metal particles can develop and can push the overlying layer of sludge upward. The major concern, in addition to the general concern associated with the retention and release of a flammable gas such as hydrogen, is that if a vessel-spanning bubble (VSB) forms in an STSC, it may drive the overlying sludge material to the vents at the top of the container. Then it may be released from the container into the cell’s secondary containment system at T Plant. A previous study demonstrated that sloped walls on vessels, both cylindrical coned-shaped vessels and rectangular vessels with rounded ends, provided an effective approach for disrupting a VSB by creating a release path for gas as a VSB began to rise. Based on the success of sloped-wall vessels, a similar concept is investigated here where a sloped fin is placed inside the vessel to create a release path for gas. A key potential advantage of using a sloped fin compared to a vessel with a sloped wall is that a small fin decreases the volume of a vessel available for sludge storage by a very small fraction compared to a cone-shaped vessel. The purpose of this study is to quantify the capability of sloped fins to disrupt VSBs and to conduct sufficient tests to estimate the performance of fins in full-scale STSCs. Experiments were conducted with a range of fin shapes to determine what slope and width were sufficient to disrupt VSBs. Additional tests were conducted to demonstrate how the fin performance scales with the sludge layer thickness and the sludge strength, density, and vessel diameter based on the gravity yield parameter, which is a dimensionless ratio of the force necessary to yield the sludge to its weight.( ) Further experiments evaluated the difference between vessels with flat and 2:1 elliptical bottoms and a number of different simulants, including the KW container sludge simulant (complete), which was developed to match actual K-Basin sludge. Testing was conducted in 5-in., 10-in., and 23-in.-diameter vessels to quantify how fin performance is impacted by the size of the test vessel. The most significant results for these scale-up tests are the trend in how behavior changes with vessel size and the results from the 23-in. vessel. The key objective in evaluating fin performance is to determine the conditions that minimize the volume of a VSB when disruption occurs because this reduces the potential for material inside the STSC from being released through vents.

08 HYDROGEN↗

Electrolytically Assisted Surface Decontamination (EASD{sup TM}) for POCO Operations - 20282

NNL in collaboration with C-Tech Innovation Ltd and Sellafield Ltd has been exploring innovative technologies to enable a significant reduction of radiological hazards within facilities during the Post Operational Clean Out (POCO) phase of a nuclear plant's life cycle. Reducing the hazard by effectively decontaminating plants in-situ during POCO delivers huge cost reductions for future decommissioning operations. These cost reduction benefits are realized by reducing the number and complexity of remote operations as well as lowering the long-term waste disposal costs. Whilst chemical decontamination can achieve the desired level of decontamination, applying aggressive chemical reagents is hazardous, potentially difficult to control and requires there to be complimentary effluent treatment and waste routes. This work has aimed to develop flexible and controllable decontamination processes which could be operated without the additional complexity and issues associated with chemical decontamination. The processes needed to be relatively fast and effective to minimize the time operators would spend in an active area. In addition, there was a driver to produce decontamination methodologies which generated a secondary waste compatible with current routes and which takes advantage of current waste capacity. The strategy therefore was to come up with a solution that works with, rather than against, the science and engineering behind process plants at Sellafield. Electrolytically Assisted Surface Decontamination (EASD{sup TM}) is an innovative electrochemical decontamination process (developed by NNL and C-Tech Innovation Ltd) that can remove activity from contaminated metal in very short time periods. Application of the patented electric waveform to the surface when treating contaminated metal with nitric acid has been shown to significantly enhance the decontamination performance. When compared to proposed baseline washout procedures at Sellafield, the only change to the process is the applied electrical waveform which is temporary and controllable. The current causes dissolution of the metal surface being decontaminated which leads to activity transferring from the plant item into the nitric acid effluent stream. This innovation has the potential to transform the POCO process and allow a nitric acid based washout approach to deliver POCO quickly and cost effectively within the existing infrastructure. Several devices have now been designed that incorporate this EASD{sup TM} technology and enable the decontamination process to be applied to a range items commonly identified as being contaminated during nuclear decommissioning programmes such as pipework, tanks and hotspots of walls/floors. Inactive and active laboratory-scale testing has been completed using both simulated and 'real-life' contaminated (low level waste) metallic items retrieved from different nuclear sites. Active trials demonstrated that contaminated items could be treated to free release levels within minutes. Engineering scale tests are currently being performed, with guidance from Sellafield's system engineers and plant managers, to provide the necessary re-assurance the designed devices could be successfully deployed in an on-plant scenario. The final stage of this development work is to carry out an active demonstration of the decontamination technology on Thorp at Sellafield. This paper aims to highlight progress made to date with the EASD{sup TM} technology and, more specifically, the development of an in-situ decontamination device for deployment within radioactive pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVA Swab Kit: Tools and Techniques for Collecting Aseptic Samples from Crewed Space Missions

Introduction: When we send humans to search for life on other planets, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to assess and verify whether micro-organisms may be leaking/venting from our spacesuits. This requires collecting samples under Extravehicular Activity (EVA) conditions. Detailed, systematic research on forward contamination from robotic spacecraft has been steadily progressing since the Viking missions, but systematic studies of contamination from space suits has not been conducted in many years. The modern EMU (Extravehicular Mobility Unit) suit used by NASA is designed to leak at rates as high as 100 cc/min. Before humans land on Mars there is a critical need to understand the types and quantities of microbes that could be introduced via space suits. The Human Forward Contamination Assessment team at NASA’s Johnson Space Center (JSC) has developed a prototype EVA swab tool [1,2,3,4] designed for use in space to sample cleaned and uncleaned space suits to determine the present day microbial load and eventually the rate of leakage. The ability to assess microbial leakage early in advanced space suit and life support system design cycles will help avoid costly hardware redesign later. Test Objectives: The primary objective of EMU testing was to characterize the type of micro-organisms typically found on or near selected suit pressure joints under suit differential pressure conditions. Most human-borne microbes can fit through a 0.5 to 1.0 µm gap. Knowing which joints are more likely to leak will inform hardware design decisions. Knowing which types of micro-organisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. That data, in turn, will inform exploration mission operations and hardware design. The secondary objective of testing was to evaluate the interface between a fully suited test subject and the EVA swab tool at vacuum. Bulky EVA suits can restrict movement and limit visibility through the helmet visor. Fully suited testing is important for identifying tool design issues prior to flight. At exploration destinations, such as Mars, suited crew may be required to periodically sample their suits as part of an environmental monitoring protocol. Suit Microbial Sampling Results: This report details results of microbial swabs collected from current flight suit configurations worn by crew members assigned to upcoming ISS expedition missions as well as swabs collected from prototype suits intended for use on the Orion spacecraft. These tests were intended to characterize the types of contaminants found on flight suits under current, typical handling conditions. No attempt was made to change suit handling procedures, provide additional sterilization, or to limit typical potential contaminant sources. Using culture based techniques, we cultivated 235 CFU (colony forming units) comprised of 26 bacterial species and one fungal species on the outside of the suits. The fungal species and 14 of the bacterial species were unique to the suit surfaces and were not detected in any of the background samples collected within the chambers. We sequenced 755,434 ribosomal fragments on all of the suit surfaces from swab samples. 557,016 of these sequences represent DNA that survived at least 4 hours at vacuum. These sequences formed 2,464 OTU's (Operational Taxonomic Units, 97% similarity) showing low diversity in the samples. The most abundant sequences that survived vacuum belong to the genera Staphyloccocus, Ralstona, Bacillus and Rhodobacter all of which are common to the human microbiome. [5] See Danko et al., (2021) for more complete details of these first analyses. Further analysis of EVA suit materials with respect to the efficacy of various cleaning protocols and engineered containment solutions is planned to inform suit design for NASA’s Artemis Moon to Mars program crew testing. Swab Tool Function Results: The kit was demonstrated for fit and function in suited subject vacuum tests to determine how well the tool worked as an aseptic microbial sampling device as well as to identify any design elements that could be upgraded for EVA task specific improvement. It was found that sample acquisition efficacy could be enhanced by redesign of the sample canister to end-effector interface. Several modifications of the sample caddy assemblies to optimize EVA safety and functionality were also identified. Consequently, fabrication of the redesigned sample canister to end-effector assembly interfaces and and the sample caddy assemblies are required. Fabrication of sixteen flight sample canister assemblies (8 per each of two EVA Swab Kits) and two sample caddy assemblies are in process to be followed by hardware testing and certification to produce two flight-certified EVA Swab Kits for transport to ISS no earlier than summer of 2022. Sampling Strategy: The International Space Station is an ideal testbed for systematic studies of contamination from crewed vehicles since it has been continuously occupied for 20 years and exposed to non-terrestrial conditions. We will sample the exterior of the ISS during EVA using a purpose-built swab tool capable of maintaining sterility while undergoing temperature changes from -151 to +121°C under hard vacuum. Prior to each EVA, the project team will work with ISS mission managers to identify precise sampling locations, which will vary by EVA based on the translation paths and worksites scheduled for that particular EVA. Ideally, translation path handrails and areas near ECLSS (Environmental Control and Life Support System) external vent openings on a spacecraft would be assessed. There are currently more than a dozen ECLSS external vents on the ISS. Some are connected to systems that vent waste products, while others are intended to equalize cabin pressure. As EVA opportunity allows, microbial samples from any of these external vents would provide a valuable data point, though some will be more useful than others. Four criteria have been identified to help prioritize sampling sites near vents: • EVA Accessibility: To minimize cost, it is desired to piggy-back onto a planned EVA. Therefore, the sampling location must be readily accessible by an EVA crew • Type of Vented Products: Vent products that have been in direct contact with crew, such as cabin air, are more likely to contain microorganisms than vent products associated with isolated systems, such as experiment module combustion products. • Mass of Vented Products: Higher-flow vents are more likely to contain detectible levels of microbial contaminants than lower-flow vents. • Local Environment: Sample locations with relatively benign local conditions, such as warm surfaces shielded from direct ultraviolet (UV) radiation exposure, may be more likely to support microbial growth than locations with harsher local environmental conditions. Because EVA accessibility is the most important criteria, the proposal team worked with an astronaut and flight controllers using the Dynamic Onboard Ubiquitous Graphics (DOUG) tool. The DOUG virtual environment allows an operator to “fly” around the current ISS vehicle configuration to assess EVA translation paths, attach points, and keep-out zones. While analysis on station or rapid return to Earth would be preferable, samples collected from the exterior of the ISS have already been exposed to temperature variations between -157 and +121 °C as well as hard vacuum. Therefore, they should be fairly stable and robust. We hypothesize that samples collected from the ISS exterior could be stored for up to 6 months at -80°C without degradation. Sample canisters will be returned to Earth while frozen at -80°C for analysis, and sterilized canisters can be re-flown back to ISS to support additional sampling opportunities Relevance to NASA Exploration Objectives: These data will allow us to identify new or improved methods, technologies, and procedures for spacecraft sterilization and leakage mitigation to minimize the amount of contamination introduced to the environment by human explorers. This work is funded by NASA research grant: NNH18ZDA001N-PPR References: [1] Bell, M.S. et al. (2015) LPS XLVI, Abst. #1832 [2] Rucker et al. (2018) 42nd COSPAR (PPP.3) [3] Bell, M.S. et al. (2019) Mars Extant Life Conference, Abst. #5096.[4] Bell, M.S. et al., (2020) 43rd COSPAR (BO.2).[5] Danko D, et.al.,(2021)Front.Microbiol.12:608478.

Mary Suzanne Bell↗

Rapid AI-based Dissection of Ashes using Raman and XRF Spectroscopy (RADAR-X)

Waste-to-energy (WTE) facilities incinerate ~35 million tons of municipal solid waste annually in the United States. The incineration process reduces the mass and the volume of the waste fraction by over 75 and 95%, respectively. The fraction left after incineration remains as ash residues and is referred to as WTE ash, compromising of bottom and fly ash. In the United States, ~10 million tons of WTE ashes are generated annually and predominantly landfilled because of the lack of secondary end-use pathways. This incurs a significant financial burden (landfilling costs) on U.S. WTE facilities and also results in the loss of materials to the landfill. The primary objective of this research is to understand better the elemental and mineralogical composition of WTE ashes from diverse origins and find composition dependent upcycling pathways for diverting these ashes from landfills. This primary objective was addressed through three research tasks –(Task I) An AI-led Multi-Modal Approach for Compositional Analysis, (Task II) Developing a Dissolution-Based Test for Real Time Analysis, and (Task III) Establishing composition-dependent end uses. The chemical composition of WTE ash is dependent on two factors, i.e., the input waste composition and the operational parameters of a WTE facility (combustion conditions). Amongst these two factors, the input waste composition will likely show spatial and temporal variation. As a result, the chemical composition of WTE ash will also fluctuate. To understand the spatial and temporal variation in WTE ash composition, in Task I, we collected 128 ash samples (62 bottom ash and 66 fly ash samples) from 11 WTE facilities located in 11 U.S. states and characterized them via X-ray Fluorescence, powder X-ray Diffraction, and Raman Spectroscopy. The findings from this extensive characterization work indicated that the key elements in WTE fly ashes are Ca, Cl (greater than 10 wt. %), Si, S, K, Zn ( between 1 and 10 wt. %), Mg, Al, P, Ti, Fe, Cu, Br, and Pb (between 0.1 and 1 wt. %). Similarly, the key elements in WTE bottom ash fraction finer than 45μm are Ca (greater than 10 wt. %), Mg, Al, Si, S, Cl, K, Ti, Fe, Zn (between 1 and 10 wt. %), P, V, Cr, Mn, Cu, Br, and Pb (between 0.1 and 1 wt. %). Here, we note that the dominant fraction of WTE bottom ash is the coarse fraction. The coarse WTE bottom ash fraction (rich in silicon) was not characterized in this study because of excessive grinding requirements and their unsuitability as a supplementary cementitious material due to their coarse nature. The elements in WTE bottom ashes are present as calcite, anhydrite, vaterite, hydroxyapatite, quartz, bassanite, gehlenite, akermanite, hydrocalumite, and portlandite. Similarly, the mineralogical species present in WTE fly ashes are calcium chloride hydroxide, halite, calcite, anhydrite, sylvite, hydrocalumite, vaterite, hannebachite, quartz, and bassanite. Temporal variation in ash composition may also result in significant fluctuations in chemical compositions. Therefore, a WTE facility may need to monitor the ash composition (elemental and mineralogical composition) in real time. In Task I, we evaluated the possibility of using a portable X-ray fluorescence (XRF) spectrometer to monitor the elemental composition in real-time. Specifically, we collected XRF data on identical specimens via a portable XRF spectrometer (low-end) and a lab-based benchtop XRF spectrometer (high-end). The collected data was used to train an A.I. algorithm (portable XRF data as an input and benchtop XRF data as an output) to predict accurate elemental composition using portable XRF data. Finally, we developed a 2-minute photobleaching protocol to monitor the mineralogical characteristics of WTE ashes via Raman spectroscopy. Overall, the activities in Task I improved our understanding of ash composition and developed techniques to monitor elemental and mineralogical composition in near real-time. Based on the findings of Task I, we find that WTE ashes exhibit wide variability in mineralogy. For ICP-based elemental analysis, all the mineralogical species in WTE ashes must be brought into solution. This is traditionally accomplished with acid digestion using a combination of multiple acids. However, acid digestion with multiple acids is time-consuming and often fails to ensure complete digestion of the ash matrix. To address this limitation, in Task II, we developed an alkali-fusion-based digestion protocol using a combination of lithium tetraborate, lithium metaborate, and their combinations as possible alkali fluxes for digesting WTE ashes entirely and rapidly. The validity of the developed method was evaluated on two standard ash specimens, i.e., SRM 1633c coal fly ash and BCR-176R incineration fly ash specimen. The findings suggest that the developed protocol can ensure complete digestion of elements such as Al, Ba, Ca, Cr, Cu, Mg, Mn, P, Sr, V, Zn, Be, K, and rare earth elements. The recent changes in the energy market towards renewables and increased metal recycling have resulted in reduced supplies of supplementary cementitious materials (coal fly ash and slag). Therefore, in Task III, we evaluated the possibility of employing WTE ashes as SCMs. As the chemical composition of WTE ashes varies temporally (on an hourly basis), there was also a need to develop tests that can evaluate the suitability of material to act as supplementary cementitious material rapidly, i.e., in a few minutes. Therefore, in Task II, we also developed a rapid test to assess the suitability of a material to act as an SCM in 5 minutes. This represents a significant advance over the state-of-the-art R 3 test, which takes ~144 hours. This test was initially validated on amorphous aluminosilicates, such as calcined clays, and could be extended to evaluate other industrial by-products, such as WTE ashes. In Task III, we evaluated the possibility of employing WTE ashes for two applications, i.e., as an SCM and a lime substitute for clay stabilization. The findings from Task I indicated that WTE ashes are enriched in chlorine and, therefore, cannot be used directly as an SCM due to corrosion-related risks and altered hydration kinetics. Accordingly, we developed an ash treatment protocol to reduce the solubility of chlorine-containing species in WTE ashes. The developed treatment protocol also immobilized lead in certain mineral forms. As a result of the treatment, WTE ashes can be used as SCMs without any corrosion or heavy metal leaching concerns. The second application examined in this study was clay stabilization. WTE ashes are calcium-rich and can be an adequate lime replacement for clay stabilization. Our findings reveal that the sum of the concentrations of Ca(OH) 2 and CaClOH controls the clay stabilization capability of WTE ashes. In summary, in this work, we evaluated the elemental and mineralogical characteristics of U.S. WTE ashes from diverse origins and developed tests to evaluate the chemical characteristics of these ashes in real time through a portable XRF and a benchtop Raman spectrometer. Based on the chemical characteristics of these ashes, we developed an ash treatment process to enable the use of WTE ashes as an SCM and also evaluated the possibility of employing these ashes for clay stabilization. Overall, the findings from this work enables the diversion of WTE ashes from landfills for multiple end-uses, i.e., as an SCM or a lime substitute for clay stabilization.

36 MATERIALS SCIENCE↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗