Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Remote Manipulator System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The evolution of automation and robotics in manned spaceflight

The evolution of automation on all manned spacecraft including the Space Shuttle is reviewed, and a concept for increasing automation and robotics from the current Shuttle Remote Manipulator System (RMS) to an autonomous system is presented. The requirements for robotic elements are identified for various functions on the Space Station, including extravehicular functions and functions within laboratory and habitation modules which expand man's capacity in space and allow selected teleoperation from the ground. The initial Space Station will employ a telerobot and necessary knowledge based systems as an advisory to the crew on monitoring, fault diagnosis, and short term planning and scheduling.

Moser, T. L.↗

Simulation of man-machine interaction on shuttle payload manipulator

The main objective of this simulation was to evaluate the feasibility of a simplified control system for a remote manipulator for space shuttle payloads. The motion commanded by the operator through the control system to the six degree of freedom manipulator approximates that of a backhoe. Compatibility of low arm damping, heavy payloads, small clearances in the shuttle cargo bay and stringent mission timelines were evaluated. The effects of various devices to enhance visual cues were evaluated. Phase I of the simulation was capture of a payload flying free in space relative to the shuttle. Phase II was simulation of cargo stowage into a mockup of the space shuttle cargo bay. A shuttle remote manipulator control station mockup including TV monitors and hand controllers is used in the simulation. Results evaluating various parameters of the control system and the task, including arm flexibility, are presented.

Hookway, R. O.↗

Supervisory autonomous local-remote control system design: Near-term and far-term applications

The JPL Supervisory Telerobotics Laboratory (STELER) has developed a unique local-remote robot control architecture which enables management of intermittent bus latencies and communication delays such as those expected for ground-remote operation of Space Station robotic systems via the TDRSS communication platform. At the local site, the operator updates the work site world model using stereo video feedback and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. The operator can then employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the object under any degree of time-delay. The remote site performs the closed loop force/torque control, task monitoring, and reflex action. This paper describes the STELER local-remote robot control system, and further describes the near-term planned Space Station applications, along with potential far-term applications such as telescience, autonomous docking, and Lunar/Mars rovers.

Zimmerman, Wayne↗

EVA assembly of large space structure element

The results of a test program to assess the potential of manned extravehicular activity (EVA) assembly of erectable space trusses are described. Seventeen tests were conducted in which six "space-weight" columns were assembled into a regular tetrahedral cell by a team of two "space"-suited test subjects. This cell represents the fundamental "element" of a tetrahedral truss structure. The tests were conducted under simulated zero-gravity conditions. Both manual and simulated remote manipulator system modes were evaluated. Articulation limits of the pressure suit and zero gravity could be accommodated by work stations with foot restraints. The results of this study have confirmed that astronaut EVA assembly of large, erectable space structures is well within man's capabilities.

Bement, L. J.↗

Telerobotic assembly of space station truss structure

Discussed are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRNS); (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, Grahme↗

Telerobotic assembly of space station truss structures

Discussed here are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRMS); and (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, G.↗

STS-74 Space Shuttle Mission Report

The STS-74 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-third flight of the Space Shuttle Program, the forty-eighth flight since the return-to-flight, and the fifteenth flight of the Orbiter Atlantis (OV-104). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-74; three Phase 11 SSME's that were designated as serial numbers 2012, 2026, and 2032 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-076. The RSRM's, designated RSRM-51, were installed in each SRB and the individual RSRM's were designated as 360TO51 A for the left SRB, and 360TO51 B for the right SRB. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and perform life sciences investigations. The Russian Docking Module (DM) was berthed onto the Orbiter Docking System (ODS) using the Remote Manipulator System (RMS), and the Orbiter docked to the Mir with the DM. When separating from the Mir, the Orbiter undocked, leaving the DM attached to the Mir. The two solar arrays, mounted on the DM, were delivered for future Russian installation to the Mir. The secondary objectives of the flight were to perform the operations necessary to fulfill the requirements of the GLO experiment (GLO-4)/Photogrammetric Appendage Structural Dynamics Experiment Payload (PASDE) (GPP), the IMAX Cargo Bay Camera (ICBC), and the Shuttle Amateur Radio Experiment-2 (SAREX-2). Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (GMT)) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

Ground Control Station Development for the Dexterous Orbital Servicing System

The Dexterous Orbital Servicing System (DOSS) flight test program is being developed by NASA to verify the ability to utilize telerobotics for servicing Space Station Alpha. The development of a ground control station for Earth based control of DOSS is described. This flight test program provides a manipulator which is mounted on a multi-purpose experiment support structure in a Space Shuttle bay.

remote robotic control dexterous orbital servicing↗

Space Station/Orbiter berthing dynamics during an assembly flight

A large-angle, multi-body, dynamic modeling capability was developed to help validate numerical simulations of the dynamic motion and control forces which occur while berthing Space Station Freedom to the Shuttle Orbiter during early assembly flights. The paper describes the dynamics and control of the station, the attached Shuttle Remote Manipulator System, and the Orbiter during a maneuver from a gravity-gradient attitude to a torque equilibrium attitude using the station reaction control jets. The influence of the elastic behavior of the station and of the remote manipulator system on the attitude control of the station/Orbiter system during the maneuver is investigated. The flexibility of the station and the arm had only a minor influence on the attitude control of the system during the maneuver.

Cooper, Paul A.↗

STS-121: Discovery Mission Overview Briefing

Tony Ceccacci, Lead STS-121 Space Shuttle Flight director, and Rick LaBrode, Lead STS-121 ULF 1.1 International Space Station Flight Director, are shown in this STS-121 Discovery mission overview. Ceccacci begins with an overview of the mission and gives the mission goals. He also presents various slides of the STS-121 payload that includes: 1) Orbiter Docking System; 2) Integrated Cargo Carrier (ICC); 3) Multipurpose Logistics Module (MPLM); 4) TPS Sample Box Assembly; 5) Shuttle Remote Manipulator System (SRMS); and 6) Orbiter Boom Sensor System (OBSS). He shows a video presentation on the various processes involved in the inspections of the Orbiter that include: 1) Unberthing OBSS; 2) Starboard wing leading edge survey; 3) Wing leading edge passes; 4) Nose cap surveys; 5) Port side surveys; and 6) Docking with the International Space Station. Ceccacci ends his presentation with discussing the work performed from flight day 1 to flight day 14. Rick LaBrode begins with discussing the on-orbit status of the Expedition 13 crew. He then presents a video of the MPLM installation, forward hatch of MPLM, resupply stowage platform, resupply stowage racks, and Oxygen Generator System (OGS) rack. Questions are answered from the media.

Source record↗

Remote manipulator dynamic simulation

A simulator to generate the real time visual scenes required to perform man in the loop investigations of remote manipulator application and design concepts for the space shuttle is described. The simulated remote manipulator consists of a computed display system that uses a digital computer, the electronic scene generator, an operator's station, and associated interface hardware. A description of the capabilities of the implemented simulation is presented. The mathematical models and programs developed for the simulation are included.

Wild, E. C.↗

Predictive momentum management for a space station measurement and computation requirements

An analysis is made of the effects of errors and uncertainties in the predicting of disturbance torques on the peak momentum buildup on a space station. Models of the disturbance torques acting on a space station in low Earth orbit are presented, to estimate how accurately they can be predicted. An analysis of the torque and momentum buildup about the pitch axis of the Dual Keel space station configuration is formulated, and a derivation of the Average Torque Equilibrium Attitude (ATEA) is presented, for the case of no MRMS (Mobile Remote Manipulation System) motion, Y vehicle axis MRMS motion, and Z vehicle axis MRMS motion. Results showed the peak momentum buildup to be approximately 20000 N-m-s and to be relatively insensitive to errors in the predicting torque models, for Z axis motion of the MRMS was found to vary significantly with model errors, but not exceed a value of approximately 15000 N-m-s for the Y axis MRMS motion with 1 deg attitude hold error. Minimum peak disturbance momentum was found not to occur at the ATEA angle, but at a slightly smaller angle. However, this minimum peak momentum attitude was found to produce significant disturbance momentum at the end of the predicting time interval.

Adams, John Carl↗

Simulation of the assembly dynamics and control of Space Station Freedom

A large-angle, flexible, multi-body, dynamic modelling capability has been developed to help validate numerical simulations of the dynamic motion and control forces which occur during berthing of Space Station Freedom to the Shuttle Orbiter in the early assembly flights. This paper outlines the dynamics and control of the Station, the attached Shuttle Remote Manipulator System, and the Orbiter. The simulation tool developed for the analysis is described and the results of two simulations are presented. The first is a simulated maneuver from a gravity-gradient attitude to a torque equilibrium attitude using the Station reaction control jets. The second simulation is the berthing of the Station to the Orbiter with the Station control moment gyros actively maintaining an estimated torque equilibrium attitude. The influence of the elastic dynamic behavior of the Station and of the Remote Manipulator System on the attitude control of the Station/Orbiter system during each maneuver was investigated. The flexibility of the Station and the arm were found to have only a minor influence on the attitude control of the system during the maneuvers.

Cooper, Paul A.↗

Modelling and simulation of Space Station Freedom berthing dynamics and control

A large-angle, flexible, multibody, dynamic modeling capability has been developed to help validate numerical simulations of the dynamic motion and control forces which occur during berthing of Space Station Freedom to the Shuttle Orbiter in the early assembly flights. This paper outlines the dynamics and control of the station, the attached Shuttle Remote Manipulator System, and the orbiter. The simulation tool developed for the analysis is described and the results of two simulations are presented. The first is a simulated maneuver from a gravity-gradient attitude to a torque equilibrium attitude using the station reaction control jets. The second simulation is the berthing of the station to the orbiter with the station control moment gyros actively maintaining an estimated torque equilibrium attitude. The influence of the elastic dynamic behavior of the station and of the Remote Manipulator System on the attitude control of the station/orbiter system during each maneuver was investigated. The flexibility of the station and the arm were found to have only a minor influence on the attitude control of the system during the maneuvers.

Cooper, Paul A.↗

Zvezda Launch Coverage

Footage shows the Proton Rocket (containing the Zvezda module) ready for launch at the Baikonur Cosmodrome in Kazakhstan, Russia. The interior and exterior of Zvezda are seen during construction. Computerized simulations show the solar arrays deploying on Zvezda in space, the maneuvers of the module as it approaches and connects with the International Space Station (ISS), the installation of the Z1 truss on the ISS and its solar arrays deploying, and the installations of the Destiny Laboratory, Remote Manipulator System, and Kibo Experiment Module. Live footage then shows the successful launch of the Proton Rocket.

Source record↗

Development and Deployment of Robonaut 2 to the International Space Station

The development of the Robonaut 2 (R2) system was a joint endeavor with NASA and General Motors, producing robots strong enough to do work, yet safe enough to be trusted to work near humans. To date two R2 units have been produced, designated as R2A and R2B. This follows more than a decade of work on the Robonaut 1 units that produced advances in dexterity, tele-presence, remote supervision across time delay, combining mobility with manipulation, human-robot interaction, force control and autonomous grasping. Design challenges for the R2 included higher speed, smaller packaging, more dexterous fingers, more sensitive perception, soft drivetrain design, and the overall implementation of a system software approach for human safety, At the time of this writing the R2B unit was poised for launch to the International Space Station (ISS) aboard STS-133. R2 will be the first humanoid robot in space, and is arguably the most sophisticated robot in the world, bringing NASA into the 21st century as the world's leader in this field. Joining the other robots already on ISS, the station is now an exciting lab for robot experiments and utilization. A particular challenge for this project has been the design and certification of the robot and its software for work near humans. The 3 layer software systems will be described, and the path to ISS certification will be reviewed. R2 will go through a series of ISS checkout tests during 2011. A taskboard was shipped with the robot that will be used to compare R2B's dexterous manipulation in zero gravity with the ground robot s ability to handle similar objects in Earth s gravity. R2's taskboard has panels with increasingly difficult tasks, starting with switches, progressing to connectors and eventually handling softgoods. The taskboard is modular, and new interfaces and experiments will be built up using equipment already on ISS. Since the objective is to test R2 performing tasks with human interfaces, hardware abounds on ISS and the crew will be involved to help select tasks that are dull, dirty or dangerous. Future plans for R2 include a series of upgrades, evolving from static IVA (Intravehicular Activity) operations, to mobile IVA, then EVA (Extravehicular Activity).

Ambrose, Robert O.↗

All resistojet control of the NASA dual keel Space Station

This paper describes a control system that uses small (0.1-N) hydrogen-fueled, high-expansion-ratio resistojets to control a Space Station's position and attitude. The number and size of the resistojets is calculated based on requirements for stationkeeping, compensation for steady-state gravity-gradient and aerodynamic torques, momentum loading due to mobile remote manipulator motion, Shuttle Orbiter docking, and translational evasive maneuvering. The all-resistojet control system performs continuous orbit maintenance while keeping the linear accelerations on the spacecraft lower than they would be without any control system operating.

Paluszek, M. A.↗

Computer simulation of environmental, hazard scenarios in space

The development of the Advanced Computer Graphics Laboratory at NASA/JSC will enable NASA engineers to utilize state-of-the-art computer systems to simulate and analyze current and planned space missions. These systems utilize computer graphics to animate automated satellite rendezvous and docking, satellite servicing, tether operations, as well as remote manipulator activities and assembly of large space structures including the space station. These computer simulations enhance the engineering evaluation of possible hazardous scenarios in space by allowing users to view from any point in space these activities and determine if any potential problem could occur.

Brown, R. H.↗