Search NASA⌕ Search

SEARCH · Search NASA

Results for “Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Preparing Students to Work in Diverse Settings and Across Distance: Inter-University, Interdisciplinary Capstone Teams

NASA's Psyche Mission is engaged with a growing number of capstone teams pursuing topics relevant to the mission, including partnering with four universities to trial cross-university teaming. Creating interdisciplinary capstone teams with students from different universities provides an opportunity to prepare students to engage with a diversity of disciplines and collaborate in remote teams in the workplace. Additionally, through such capstones, universities may gain access to non-local, specialized technical mentors and to disciplines not offered at their institutions. An added benefit is providing greater fidelity to NASA space missions, which involve teams working together at a distance. We discuss early lessons learned from the first three inter-university, interdisciplinary capstone teams participating with the Psyche mission and discuss plans for improvement and future expansion.

Bowman, C. D. D.↗

Lessons Learned in Concurrent Mission and Systems Design at NASA Glenn Research Center: Almost Fifteen Years of the Compass Team

This paper is a retrospective of the lessons learned during the almost 15-year history of the Compass concurrent mission and systems design team at NASA’s Glenn Research Center (GRC). It examines the key factors in the team’s evolution from a temporary group gathered to perform a single study to the successful, sustainable team it is today. Compass is a matrixed team of experts with various technical backgrounds and personalities. They collaborate over a two-week period either physically in a dedicated meeting space, or virtually to design a space system (Spacecraft, stage, science package, etc). Over the years, because of the rapid nature of the design studies, the team leadership has iterated on the optimal team member personality makeup, facility elements and tools as well as NASA GRC management support necessary to lead to sustained success.

systems engineering↗

Supervised Autonomy for Communication-Degraded Subterranean Exploration by a Robot Team

The importance of autonomy in robotics is magnified when the robots need to be deployed and operated in areas that are too dangerous or not accessible for humans, ranging from disaster areas (to assist in emergency situations) to Mars exploration (to uncover the mystery of our neighboring planet). The DARPA Subterranean (SubT) Challenge presents a great opportunity and a formidable robotics challenge to foster such technological advancement for operations in extreme and underground environments. Robot teams are expected to rapidly map, navigate, and search underground environments including natural cave networks, tunnel systems, and urban underground infrastructure. Subterranean environments pose significant challenges for manned and unmanned operations due to limited situational awareness. In the first phase of the DARPA Subterranean Challenge (held in August 2019; targeting underground tunnels and mines), Team CoSTAR, led by NASA JPL, placed second among 11 teams across the world, accurately mapping several kilometers of two mine systems and localizing 17 target objects in the course of four one-hour missions. While the main goal of Team CoSTAR at the end of this threeyear challenge (August 2021) is a fully autonomous robotic solution, this paper describes Team CoSTAR’s results in the first phase of the challenge (August 2019), focusing on supervised autonomy of a multi-robot team under severe communication constraints. This paper also presents the design and initial results obtained from field test campaigns conducted in various tunnel-like environments, leading to the competition.

Otsu, Kyohei↗

Results from NASA Agile Teams Study

In order to meet the demands of the current global economy, a study of agile teams at NASA was conducted by the NASA Engineering and Safety Center (NESC) to explore how the Agency can become more adaptable and flexible due to several influences, including the maturity and availability of digital tools and NASA’s increased reliance on commercial providers. NESC Technical Discipline Teams (TDTs) perform annual studies to understand the needs of their stakeholders, establish a state of the discipline, and inform strategic planning efforts. As part of the 2022 interview series, the Systems Engineering TDT utilized the dissertation work of Dr. Jackelynne Silva-Martinez that focused on NASA agile teams. The Systems Engineering TDT partnered with the Software and Human Factors TDTs on the formulation of interview questions and subsequent solicitation of customer inputs, which helped attract diverse agile teams across the Agency. 34 participants were interviewed, including civil servants and contractors, with open-ended questions related to their teams’ adoption and transition to agile. Participants were also questioned about their perceptions of the implementation of agile approaches across the Agency. Results showed a consistent framing of agile as incremental knowledge growth, a way of showing progress, and as the incorporation of frequent customer feedback. However, participants emphasized a lack of a common understanding of agile across the Agency, which sometimes caused managers and engineers to be reluctant to accept and support them. Results also showed the most successful agile teams had formal training with over five years of agile experience, used retrospectives, and tailored their agile processes for their specific situation and needs. This paper provides details of the interview responses gathered in the study and suggests actions for NASA to become more agile.

NASA↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing Interaction Uncertainty in Human-Machine Teams

With the increasing use and adoption of artificial intelligence (AI), the reliability of modern data systems will be driven by a tighter teaming between human experts and intelligent machine teammates. As in the case of human-human teams, the success of human-machine teams will also rely on clear communication about mutual goals and actions. In this paper, we combine related literature from cognitive psychology, human-machine teaming, uncertainty in data analysis, and multi-agent systems to propose a new form of uncertainty: interaction uncertainty for characterizing bidirectional communication in human-machine teams. We map the causes and effects of interaction uncertainty and outline potential ways to mitigate uncertainty for mutual trust in a high-consequence real-world scenario.

uncertainty, data analytics, interaction, trust, h↗

External Peer Review Team Report for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nye County, Nevada, Revision 0

The peer review team commends the Navarro-Intera, LLC (N-I), team for its efforts in using limited data to model the fate of radionuclides in groundwater at Yucca Flat. Recognizing the key uncertainties and related recommendations discussed in Section 6.0 of this report, the peer review team has concluded that U.S. Department of Energy (DOE) is ready for a transition to model evaluation studies in the corrective action decision document (CADD)/corrective action plan (CAP) stage. The DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) clarified the charge to the peer review team in a letter dated October 9, 2014, from Bill R. Wilborn, NNSA/NFO Underground Test Area (UGTA) Activity Lead, to Sam J. Marutzky, N-I UGTA Project Manager: “The model and supporting information should be sufficiently complete that the key uncertainties can be adequately identified such that they can be addressed by appropriate model evaluation studies. The model evaluation studies may include data collection and model refinements conducted during the CADD/CAP stage. One major input to identifying ‘key uncertainties’ is the detailed peer review provided by independent qualified peers.” The key uncertainties that the peer review team recognized and potential concerns associated with each are outlined in Section 6.0, along with recommendations corresponding to each uncertainty. The uncertainties, concerns, and recommendations are summarized in Table ES-1. The number associated with each concern refers to the section in this report where the concern is discussed in detail.

54 ENVIRONMENTAL SCIENCES↗

Level-2 Milestone 5588: Deliver Strategic Plan and Initial Scalability Assessment by Advanced Architecture and Portability Specialists Team

This report documents the fact that the work in creating a strategic plan and beginning customer engagements has been completed. The description of milestone is: The newly formed advanced architecture and portability specialists (AAPS) team will develop a strategic plan to meet the goals of 1) sharing knowledge and experience with code teams to ensure that ASC codes run well on new architectures, and 2) supplying skilled computational scientists to put the strategy into practice. The plan will be delivered to ASC management in the first quarter. By the fourth quarter, the team will identify their first customers within PEM and IC, perform an initial assessment and scalability and performance bottleneck for next-generation architectures, and embed AAPS team members with customer code teams to assist with initial portability development within standalone kernels or proxy applications.

97 MATHEMATICS AND COMPUTING↗

Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

Raiman, Laura B.↗

A status of the Turbine Technology Team activities

The recent activities of the Turbine Technology Team of the Consortium for Computational Fluid Dynamics (CFD) Application in Propulsion Technology is presented. The team consists of members from the government, industry, and universities. The goal of this team is to demonstrate the benefits to the turbine design process attainable through the application of CFD. This goal is to be achieved by enhancing and validating turbine design tools for improved loading and flowfield definition and loss prediction, and transferring the advanced technology to the turbine design process. In order to demonstrate the advantages of using CFD early in the design phase, the Space Transportation Main Engine (STME) turbines for the National Launch System (NLS) were chosen on which to focus the team's efforts. The Turbine Team activities run parallel to the STME design work.

Griffin, Lisa W.↗

Space shuttle solid rocket booster main parachute damage reduction team report

This report gives the findings of the space shuttle solid rocket booster main parachute damage reduction team. The purpose of the team was to investigate the causes of main parachute deployment damage and to recommend methods to eliminate or substantially reduce the damage. The team concluded that the two primary causes of significant damage during deployment are vent entanglement and contact of the parachutes with the main parachute support structure. As an inexpensive but effective step towards damage reduction, the team recommends modification of the parachute packing procedure to eliminate vent entanglement. As the most effective design change, the team recommends a pilot chute-deployed soft-pack system. Alternative concepts are also recommended that provide a major reduction in damage at a total cost lower than the pilot chute-deployed soft pack.

Watts, G.↗

NASA Science Institutes Plan. Report of the NASA Science Institutes Team: Final Publication (Incorporating Public Comments and Revisions)

This NASA Science Institute Plan has been produced in response to direction from the NASA Administrator for the benefit of NASA Senior Management, science enterprise leaders, and Center Directors. It is intended to provide a conceptual framework for organizing and planning the conduct of science in support of NASA's mission through the creation of a limited number of science Institutes. This plan is the product of the NASA Science Institute Planning Integration Team (see Figure A). The team worked intensively over a three-month period to review proposed Institutes and produce findings for NASA senior management. The team's activities included visits to current NASA Institutes and associated Centers, as well as approximately a dozen non-NASA research Institutes. In addition to producing this plan, the team published a "Benchmarks" report. The Benchmarks report provides a basis for comparing NASA's proposed activities with those sponsored by other national science agencies, and identifies best practices to be considered in the establishment of NASA Science Institutes. Throughout the team's activities, a Board of Advisors comprised of senior NASA officials (augmented as necessary with other government employees) provided overall advice and counsel.

Source record↗

STS-121: Discovery Mission Management Team Briefing

The briefing opened with Bruce Buckingham (NASA Public Affairs) introducing John Shannon (Chairman, Mission Management Team, JSC), John Chapman (External Tank Project Manager), Mike Leinbach (Shuttle Launch Director), and 1st Lt. Kaleb Nordgren (USAF 45th Weather Squadron). John Shannon reported that the team for hydrogen loading was proceeding well and the external tank detanking was completed. During detanking the inspection team cracked foam caused by condensation and ice formation as the tank expanded and contracted. Aerothermal analysis and analysis fro ice formation will be completed before launch. John Chapman explained the mechanics of the external tank design, the foam cracking, bracket design, etc. Mike Leinbach discussed the inspection teams and their inspection final inspection for ice formation before and after external tank filling. The inspection team of eight very experienced personnel also use telescopes with cameras to find any problems before launch. Kaleb Nordgren discussed weather and said there was a 40% chance of weather prohibiting launch. The floor was the opened for questions from the press.

Source record↗

The Role of a Multidimensional Concept of Trust in the Performance of Global Virtual Teams

This paper focuses on the concept of trust as an important ingredient of effective global virtual team performance. Definitions of trust and virtual teams are presented. The concept of trust is developed from its unilateral application (trust, absence of trust) to a multidimensional concept including cognitive and affective components. The special challenges of a virtual team are then discussed with particular emphasis on how a multidimensional concept of trust impacts these challenges. Propositions suggesting the multidimensional concept of trust moderates the negative impacts of distance, cross cultural and organizational differences, the effects of electronically mediated communication, reluctance to share information and a lack of hi story/future on the performance of virtual teams are stated. The paper concludes with recommendations and a set of techniques to build both cognitive and affective trust in virtual teams.

Bodensteiner, Nan Muir↗

Results from the NASA Capability Roadmap Team for In-Situ Resource Utilization (ISRU)

On January 14, 2004, the President of the United States unveiled a new vision for robotic and human exploration of space entitled, "A Renewed Spirit of Discovery". As stated by the President in the Vision for Space Exploration (VSE), NASA must "... implement a sustained and affordable human and robotic program to explore the solar system and beyond " and ".. .develop new technologies and harness the moon's abundant resources to allow manned exploration of more challenging environments." A key to fulfilling the goal of sustained and affordable human and robotic exploration will be the ability to use resources that are available at the site of exploration to "live off the land" instead of bringing everything from Earth, known as In-Situ Resource Utilization (ISRU). ISRU can significantly reduce the mass, cost, and risk of exploration through capabilities such as: mission consumable production (propellants, fuel cell reagents, life support consumables, and feedstock for manufacturing & construction); surface construction (radiation shields, landing pads, walls, habitats, etc.); manufacturing and repair with in-situ resources (spare parts, wires, trusses, integrated systems etc.); and space utilities and power from space resources. On January 27th, 2004 the President's Commission on Implementation of U.S. Space Exploration Policy (Aldridge Committee) was created and its final report was released in June 2004. One of the report's recommendations was to establish special project teams to evaluate enabling technologies, of which "Planetary in situ resource utilization" was one of them. Based on the VSE and the commission's final report, NASA established fifteen Capability Roadmap teams, of which ISRU was one of the teams established. From Oct. 2004 to May 2005 the ISRU Capability Roadmap team examined the capabilities, benefits, architecture and mission implementation strategy, critical decisions, current state-of-the-art (SOA), challenges, technology gaps, and risks of ISRU for future human Moon and Mars exploration. This presentation will provide an overview of the ISRU capability, architecture, and implementation strategy examined by the ISRU Capability Roadmap team, along with a top-level review of ISRU benefits, resources and products of interest, and the current SOA in ISRU processes and systems. The presentation will also highlight the challenges of incorporating ISRU into future missions and the gaps in technologies and capabilities that need to be filled to enable ISRU.

Sanders, Gerald B.↗

Improving Human/Autonomous System Teaming Through Linguistic Analysis

An area of increasing interest for the next generation of aircraft is autonomy and the integration of increasingly autonomous systems into the national airspace. Such integration requires humans to work closely with autonomous systems, forming human and autonomous agent teams. The intention behind such teaming is that a team composed of both humans and autonomous agents will operate better than homogenous teams. Procedures exist for licensing pilots to operate in the national airspace system and current work is being done to define methods for validating the function of autonomous systems, however there is no method in place for assessing the interaction of these two disparate systems. Moreover, currently these systems are operated primarily by subject matter experts, limiting their use and the benefits of such teams. Providing additional information about the ongoing mission to the operator can lead to increased usability and allow for operation by non-experts. Linguistic analysis of the context of verbal communication provides insight into the intended meaning of commonly heard phrases such as "What's it doing now?" Analyzing the semantic sphere surrounding these common phrases enables the prediction of the operator's intent and allows the interface to supply the operator's desired information.

Meszaros, Erica L.↗

Addressing Human Error in International Space Station Flight Control Teams: Advances in Ground Training for Science Operators

In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork.Academic research in teamwork has resulted in the identification of many factors which make cross-functional teaming difficult, including leadership, trust building, and communication challenges. These factors, especially when combined with the challenging environmental factors flight control teams must contend with daily, make the goal of minimizing operator errors in payload operations challenging to achieve. To address such teamwork errors, trainers at the POIC have drawn best practices from high reliability industries such as commercial aviation, healthcare, and nuclear power plants, as well as from our sister ISS control center in Houston, Texas, to develop and institute a new training program focused specifically on teamwork skills.This training program, called the Team Skills Curriculum, is based on the concept of Crew Resource Management (CRM) which was developed by NASA in the 1970s for the commercial aviation industry in response to a series of aviation disasters resulting from ineffective teamwork. CRM was later tailored by the Johnson Space Center (JSC) for use in astronaut and flight control training. The result, called Space Flight Resource Management (SFRM) was formally introduced into manned spaceflight training in the late 90s. SFRM has evolved over the years, but the focus has remained on helping operators develop the skills needed to work as part of an effective team. Using these concepts as well as the latest research in cross-functional teaming and data on specific errors occurring at the POIC, trainers in the integrated flight control training branch created a custom training program for both new and certified payload operations specialists.

Harris, Samantha S.↗