Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Passive retention/expulsion methods for subcritical storage of cryogens: Test plan, subscale dual-screen-liner retention/expulsion system

A test program is described to demonstrate liquid-free gas venting of a subcritically stored cryogen using a passive retention/expulsion system. The test plan is specifically aimed at verifying this capability for the dual-screen-liner concept, independent of gravity level and direction. In addition, the test is designed to yield operational characteristics data for the dual-screen-liner, including: tank filling, frequency and duration of venting, cryogen temperature and pressure histories, sensitivity of pressure relief control, and the ability of the passive device to provide communication between the vapor annulus and bulk regions. Normal l-g aircraft and drop tower tests using nitrogen as the test liquid are discussed.

Hise, R. E.↗

MCC/shuttle test plan. Volume 1: Philosophy and guidelines

The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

Source record↗

Test Plan for the Bearing Dust Cycle Test

The overall objective of these experiments is to test the dust-resistant seal on the high performance glove disconnect system (HPGD), to analyze the response of the bearing to lunar regolith simulant effects.

Gunderson, Katelyn↗

WEC-SIM Validation Testing Plan FY14 Q4.

The WEC-Sim project is currently on track, having met both the SNL and NREL FY14 Milestones, as shown in Table 1 and Table 2. This is also reflected in the Gantt chart uploaded to the WEC-Sim SharePoint site in the FY14 Q4 Deliverables folder. The work completed in FY14 includes code verification through code-to-code comparison (FY14 Q1 and Q2), preliminary code validation through comparison to experimental data (FY14 Q2 and Q3), presentation and publication of the WEC-Sim project at OMAE 2014 [1], [2], [3] and GMREC/METS 2014 [4] (FY14 Q3), WEC-Sim code development and public open-source release (FY14 Q3), and development of a preliminary WEC-Sim validation test plan (FY14 Q4). This report presents the preliminary Validation Testing Plan developed in FY14 Q4. The validation test effort started in FY14 Q4 and will go on through FY15. Thus far the team has developed a device selection method, selected a device, and placed a contract with the testing facility, established several collaborations including industry contacts, and have working ideas on the testing details such as scaling, device design, and test conditions.

47 OTHER INSTRUMENTATION↗

General test plan redundant sensor strapdown IMU evaluation program

The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

Hartwell, T.↗

Hill AFB Test Plan February-March 2018

This document will outline the test plans for the Hill AFB Mk 84 aging studies. The goal of the test series is to measure early case expansion velocities, sample the fragment field at various locations, and measure the overall shockwave and large fragment trajectories. This will be accomplished with 3 imaging systems as outlined in the sections below.

42 ENGINEERING↗

Startup Test Plan and Predictions for Highly Enriched Uranium to Low-Enriched Uranium Fuel Conversion at the University of Missouri Research Reactor

Nonpower reactors licensed by the U.S. Nuclear Regulatory Commission require a startup test plan as part of any facility modification to verify operability prior to resumption of operations. In order to support conversion of the University of Missouri Research Reactor from the use of highly enriched uranium to low-enriched uranium (LEU) fuel, a startup test plan has been devised to measure certain reactor physics parameters for the initial all-fresh LEU core licensing documentation that will be submitted. These parameters include the approach to critical, primary coolant void coefficient of reactivity, flux trap void coefficient of reactivity, determination of flux trap sample reactivity worth, radial and axial thermal neutron flux mapping, control blade worth calibration, primary and pool coolant temperature coefficient of reactivity, and flux mapping of experimental positions. Here, predictions for these parameters made using the Monte Carlo N-Particle Version 5 (MCNP5) radiation transport code are reported. These predictions will support the startup tests by providing a baseline set of expectations and additional insight into the performance of the LEU core.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Plan Proposal for an International Joint Project for Transient Testing of Fast Reactor Fuels

EXECUTIVE SUMMARY An international joint project for transient testing of fast reactor fuels is proposed. Input from several countries is provided regarding their advanced/fast reactor programs, and the objectives and methods are given based on both historical projects and modern tools and methods. The full package would include irradiation testing using TREAT, use of existing facilities for non destructive exams/evaluations (NDE) and post irradiation exams (PIE), and integration of current state-of-the-art modeling and simulation (M&S) tools to aid in both experiment design, and prediction of experimental results.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

Green, Lawrence L.↗

Test Planning Approach and Lessons

As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

Parkinson, Douglas A.↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗

Pyrotechnic hazards classification and evaluation program. Phase 2, segment 3: Test plan for determining hazards associated with pyrotechnic manufacturing processes

A comprehensive test plan for determining the hazards associated with pyrotechnic manufacturing processes is presented. The rationale for each test is based on a systematic analysis of historical accounts of accidents and a detailed study of the characteristics of each manufacturing process. The most hazardous manufacturing operations have been determined to be pressing, mixing, reaming, and filling. The hazard potential of a given situation is evaluated in terms of the probabilities of initiation, communication, and transition to detonation (ICT). The characteristics which affect the ICT probabilities include the ignition mechanisms which are present either in normal or abnormal operation, the condition and properties of the pyrotechnic material, and the configuration of the processing equipment. Analytic expressions are derived which describe the physical conditions of the system, thus permitting a variety of processes to be evaluated in terms of a small number of experiments.

Source record↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental Test Plan for PWR Sister Rods in the High Burnup Spent Fuel Data Project

The High Burnup Spent Fuel Data project pulled 25 sister rods (9 from the project assemblies and 16 from similar HBU assemblies) for characterization. The 25 sister rods are all high burnup and cover the range of modern domestic cladding alloys. The 25 sister rods were shipped to Oak Ridge National Laboratory (ORNL) in early 2016 for detailed non-destructive and destructive examination. Examinations are intended to provide baseline data on the initial physical state of the cladding and fuel prior to the loading, drying, and long-term dry storage process. Further examinations are focused on determining the effects of temperatures encountered during and following drying. Similar tests will be performed on rods taken from the project assemblies at the end of their long-term storage in a TN-32 dry storage cask (the cask rods ) to identify any significant changes in the fuel rods that may have occurred during the dry storage period. Additionally, some of the sister rods will be used for separate effects testing to expand the applicability of the project data to the fleet, and to address some of the data-related gaps associated with extended storage and subsequent transportation of high burnup fuel. A draft test plan is being developed that describes the experimental work to be conducted on the sister rods. This paper summarizes the draft test plan and necessary coordination activities for the multi-year experimental program to supply data relevant to the assessment of the safety of long-term storage followed by transportation of high burnup spent fuel.

dry storage↗

Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

Allan, R. D.↗