Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CWMD Nuclear Forensics Quarterly Report

Analysis and evaluation of nuclear debris is a key component to identify forensic signatures in a post-detonation environment. Currently, methods exist and are practiced in obtaining signatures from post-detonation debris. However, efforts to reduce the timeline in obtaining signatures is continuous within nuclear forensics research and will be forwarded by this research. This education and research project will explore combined material chemistry and separations of radionuclides to provide actionable signatures in less time than standard methods. The research will use the phase distribution of radionuclides in debris to develop targeted and rapid dissolution methods. These dissolution methods will be coupled with microfluidics to achieve samples suitable for analysis within reduced timelines.

and nuclear chemistry↗

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS↗

The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions

Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Study of astronaut restraints and mobility aids in a weightless shirtsleeve environment

A study, established to produce needed information about manual performance limits in intravehicular weightlessness such as the motions induced by the astronaut's direct application of force against the body of the vehicle or an object to be moved, is presented. Using both conventional and water immersion techniques, it was possible to develop realistic time estimates for astronaut station-to-station translation in Skylab, to simulate and analyze specific Skylab tasks involving force application and motion dynamics, and to evaluate certain thresholds of force application in weightlessness. The study was divided into three tasks. The first related to locomotion and verification or modification of present Skylab translation timelines. In all cases, translation times were less than the Skylab timelines indicated. The second task studied mass handling and transfer. Specifically, this involved measurement of the astronaut's ability to relocate the Skylab food lockers to stowage levels of three different heights and his ability to transfer the M509 PSS bottles between the OWS and the recharge station. The third task helped define the physical limits of man's ability to perform Skylab translation tasks under weightless conditions.

Loats, H. L., Jr.↗

Geosynchronous platform definition study. Volume 7: Geosynchronous transporation requirements

The analyses and trade studies are presented which were conducted to define the interfaces between geosynchronous platforms and the space transportation system. Mission timelines are synthesized for both manned and unmanned placement and servicing operations. Physical, operational, and functional interfaces between platforms and the space shuttle and tug are derived from the timelines. Where interface incompatibilities exist, alternate approaches are evaluated and a preferred approach is defined. An evaluation of the adaptation of the solar electric propulsion (SEP) stage for geosynchronous operations is presented. A comparison of geosynchronous platform programs with and without the SEP stage in the transportation system is developed.

Myers, H. L.↗

Space processing applications payload equipment study. Volume 2D: SPA supplemental power and heat rejection kit

The design and application of a supplementary power and heat rejection kit for the Spacelab are discussed. Two subsystems of electric power and thermal control were analyzed to define the requirements for the power and heat rejection kit (PHRK). Twelve exemplary experiments were defined and power timelines were developed. From these timeline, the experiment requirements for sustained power, peak power, and energy were determined. The electrical power subsystem of the PHRK will consist of two fuel cells, oxygen and hydrogen reactant tank assemblies, water storage tanks, plumbing, cabling, and inverters to convert the nominal 28 volt dc fuel cell output to ac power.

Hammel, R. L.↗

Application of Shuttle EVA Systems to Payloads. Volume 2: Payload EVA Task Completion Plans

Candidate payload tasks for EVA application were identified and selected, based on an analysis of four representative space shuttle payloads, and typical EVA scenarios with supporting crew timelines and procedures were developed. The EVA preparations and post EVA operations, as well as the timelines emphasizing concurrent payload support functions, were also summarized.

Source record↗

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

Payload Operations Control Center (POCC)

The Spacelab payload operations control center (POCC) timeline analysis program which is used to provide POCC activity and resource information as a function of mission time is described. This program is fully automated and interactive, and is equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The POCC timeline analysis program is designed to operate on the VAX/VMS version V2.1 computer system.

Shipman, D. L.↗

Ambitious STS-7 mission to feature first landing at Kennedy

The STS-7 press briefing schedule, NASA select television schedule; launch preparations, countdown and liftoff; major countdown milestones; launch window; STS-7 flight sequence of events, landing timeline; STS-7 flight timeline; landing and post landing operations; flight objectives; Telesat's ANIK-C 2; PALAPA-B; STS-7 experiments; and spacecraft tracking and data network are presented.

Garrett, D.↗

Manned spaceflight activity planning with knowledge-based systems

An on-board expert system, capable of assisting with crew-activity planning and platform-status monitoring, could provide unprecedented autonomy to the crew of a permanently manned space station. To demonstrate this concept's feasibility, an existing knowledge-based system is adapted to support Space Shuttle crew-activity timeline planning. Proposed timeline changes are to be checked for compliance with crew capabilities and mission operating guidelines, so that a nonexpert can be guided through a successful plan modification. Early lessons that have been learned about the scope of the adaptation needed to achieve this objective are presented.

Mogilensky, J.↗

Orbital transfer vehicle concept definition and system analysis study. Volume 4, Appendix A: Space station accommodations. Revision 1

Orbit Transfer Vehicle (OTV) processing at the space station is divided into two major categories: OTV processing and assembly operations, and support operations. These categories are further subdivided into major functional areas to allow development of detailed OTV processing procedures and timelines. These procedures and timelines are used to derive the specific space station accommodations necessary to support OTV activities. The overall objective is to limit impact on OTV processing requirements on space station operations, involvement of crew, and associated crew training and skill requirements. The operational concept maximizes use of automated and robotic systems to perform all required OTV servicing and maintenance tasks. Only potentially critical activities would require direct crew involvement or supervision. EVA operations are considered to be strictly contingency back-up to failure of the automated and robotic systems, with the exception of the initial assembly of Space-Based OTV accommodations at the space station, which will require manned involvement.

Randall, Roger M.↗