Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trajectory analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Extensions of the space trajectories error analysis programs

A generalized covariance analysis technique which permits the study of the sensitivity of linear estimation algorithms to errors in a priori statistics has been developed and programed. Several sample cases are presented to illustrate the use of this technique. Modifications to the Simulated Trajectories Error Analysis Program (STEAP) to enable targeting a multiprobe mission of the Planetary Explorer type are discussed. The logic for the mini-probe targeting is presented. Finally, the initial phases of the conversion of the Viking mission Lander Trajectory Reconstruction (LTR) program for use on Venus missions is discussed. An integrator instability problem is discussed and a solution proposed.

Adams, G. L.↗

Space Trajectories Error Analysis (STEAP) Programs. Volume 1: Analytic manual, update

Manual revisions are presented for the modified and expanded STEAP series. The STEAP 2 is composed of three independent but related programs: NOMAL for the generation of n-body nominal trajectories performing a number of deterministic guidance events; ERRAN for the linear error analysis and generalized covariance analysis along specific targeted trajectories; and SIMUL for testing the mathematical models used in the navigation and guidance process. The analytic manual provides general problem description, formulation, and solution and the detailed analysis of subroutines. The programmers' manual gives descriptions of the overall structure of the programs as well as the computational flow and analysis of the individual subroutines. The user's manual provides information on the input and output quantities of the programs. These are updates to N69-36472 and N69-36473.

Source record↗

Simulated trajectories error analysis program, version 2. Volume 2: Programmer's manual

A series of three computer programs for the mathematical analysis of navigation and guidance of lunar and interplanetary trajectories was developed. All three programs require the integration of n-body trajectories for both interplanetary and lunar missions. The virutal mass technique is used in all three programs. The user's manual contains the information necessary to operate the programs. The input and output quantities of the programs are described. Sample cases are given and discussed.

Vogt, E. D.↗

Recent refinements and increased capabilities in balloon vertical performance analysis

The NASA Thermal Trajectory analysis model for predicting the vertical performance of balloons is described in terms of two critical refinements and recent results. The model employs heat-balance equations and a vertical equation of motion, and revised methods are employed to predict maximum balloon volume, balloon shape, and the continuous computation of gas loss. Also incorporated are modeling techniques for assessing the solar radiation input that can affect the load tapes, and autoballast control algorithms are employed. The model permits the evaluation of the presence of cap layers as well as the effects of small leaks and programmed venting. The revised model is shown to give good predictions of balloon performance during flight in terms of altitude changes, descent rates, gas-mass flow, and leak potential. The model is found to be more versatile due to autoballasting and leak analysis, and good prediction are possible for the float phase and descent of current balloon shapes.

Conrad, G. R.↗

Cassini 1997 VVEJGA Trajectory Launch/Arrival Space Analysis

The baseline trajectory for the Cassini mission to Saturn is an Oct. 1997 VVEJGA (Venus-Venus-Earth-Jupiter-Gravity-Assist) trajectory. The current choice for an arrival date, June 25, 2004, provides a rare Phoebe flyby opportunity. The goal of this analysis is to determine the optimal feasible trajectory for any launch/arrival date combination.

Cassini↗

Engine Damage to a NASA DC-8-72 Airplane From a High-Altitude Encounter With a Diffuse Volcanic Ash Cloud

The National Aeronautics and Space Administration (NASA) DC-8 airborne sciences research airplane inadvertently flew through a diffuse volcanic ash cloud of the Mt. Hekla volcano in February 2000 during a flight from Edwards Air Force Base (Edwards, California) to Kiruna, Sweden. Although the ash plume was not visible to the flight crew, sensitive research experiments and instruments detected it. In-flight performance checks and postflight visual inspections revealed no damage to the airplane or engine first-stage fan blades; subsequent detailed examination of the engines revealed clogged turbine cooling air passages. The engines were removed and overhauled. This paper presents volcanic ash plume analysis, trajectory from satellites, analysis of ash particles collected in cabin air heat exchanger filters and removed from the engines, and data from onboard instruments and engine conditions.

Grindle, Thomas J.↗

The Multi-GNSS Space Service Volume (SSV): USA ICG Support and Space User Applications

This introductory presentation discusses US contributions to the United Nations International Committee on Global Navigation Satellite Systems publication "The Interoperable Global Navigation Satellite Systems Space Service Volume", ST/SPACE/75, published November 2018. It covers US space user initiatives, lunar trajectory analysis results as performed for inclusion in the ST/SPACE/75 publication, and lunar trajectory analysis results post-publication.

Satellite navigation systems↗

Comparison of ER-2 Aircraft and POAM-III, MLS, and SAGE-II Satellite Measurements During SOLVE Using Traditional Correlative Analysis and Trajectory Hunting Technique

We compared the version 5 Microwave Limb Sounder (MLS) aboard the Upper Atmosphere Research Satellite (UARS), version 3 Polar Ozone and Aerosol Measurement-III (POAM-111) aboard the French satellite SPOT-IV, version 6.0 Stratospheric Aerosol and Gas Experiment 11 (SAGE-II) aboard the Earth Radiation Budget Satellite, and NASA ER-2 aircraft measurements made in the northern hemisphere in January-February 2000 during the SAGE III Ozone Loss and Validation Experiment (SOLVE). This study addresses one of the key scientific objectives of the SOLVE campaign, namely, to validate multi-platform satellite measurements made in the polar stratosphere during winter. This intercomparison was performed using a traditional correlative analysis (TCA) and a trajectory hunting technique (THT). Launching backward and forward trajectories from the points of measurement, the THT identifies air parcels sampled at least twice within a prescribed match criterion during the course of 5 days. We found that the ozone measurements made by these four instruments agree most of the time within 110% in the stratosphere up to 1400 K (approximately 35 km). The water vapor measurements from POAM-III and the ER-2 Harvard Lyman-alpha hygrometer and JPL laser hygrometer agree to within 10.5 ppmv (or about +/-10%) in the lower stratosphere above 380 K. The MLS and ER-2 ClO measurements agree within their error bars for the TCA. The MLS and ER-2 nitric acid measurements near 17-20 km altitude agree within their uncertainties most of the time with a hint of a positive offset by MLS according to the TCA. We also applied the AER box model constrained by the ER-2 measurements for analysis of the ClO and HN03 measurements using the THT. We found that: (1) the model values of ClO are smaller by about 0.3-0.4 (0.2) ppbv below (above) 400 K than those by MLS and (2) the HN03 comparison shows a positive offset of MLS values by approximately 1 and 1-2 ppbv below 400 K and near 450 K, respectively. It is hard to quantify the HN03 offset in the 400-440 K range because of the high sensitivity of nitric acid to the PSC schemes. Our study shows that, with some limitations (like HN03 comparison under PSC conditions), the THT is a more powerful tool for validation studies than the TCA, making conclusions of the comparison statistically more robust.

Danilin, M. Y.↗

Flight test trajectory control analysis

Recent extensions to optimal control theory applied to meaningful linear models with sufficiently flexible software tools provide powerful techniques for designing flight test trajectory controllers (FTTCs). This report describes the principal steps for systematic development of flight trajectory controllers, which can be summarized as planning, modeling, designing, and validating a trajectory controller. The techniques have been kept as general as possible and should apply to a wide range of problems where quantities must be computed and displayed to a pilot to improve pilot effectiveness and to reduce workload and fatigue. To illustrate the approach, a detailed trajectory guidance law is developed and demonstrated for the F-15 aircraft flying the zoom-and-pushover maneuver.

Walker, R.↗

Lunar Prospector Mission Design

The National Aeronautics and Space Administration (NASA) has selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and will be launched in September 1997. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. The mission design of Lunar Prospector is characterized by a direct minimum energy transfer trajectory to the moon with an injection into a circular 100 km altitude polar mapping orbit. The mission design will incorporate the optimization of the reference trajectory for a new launch vehicle. An extended mission includes a periselene altitude approaching 10 km. As part of the navigation, a new lunar potential model will be used that incorporates data from the recent Clementine mission. This paper provides understanding of the design of the Lunar Prospector mission and the optimization process of the nominal trajectory, orbit determination, launch windows, and lunar orbit targets, and discusses the feasibility of meeting the mission goals.

Folta, David↗

Weight Assessment for Fuselage Shielding on Aircraft With Open-Rotor Engines and Composite Blade Loss

The Federal Aviation Administration (FAA) has been engaged in discussions with airframe and engine manufacturers concerning regulations that would apply to new technology fuel efficient "openrotor" engines. Existing regulations for the engines and airframe did not envision features of these engines that include eliminating the fan blade containment systems and including two rows of counter-rotating blades. Damage to the airframe from a failed blade could potentially be catastrophic. Therefore the feasibility of using aircraft fuselage shielding was investigated. In order to establish the feasibility of this shielding, a study was conducted to provide an estimate for the fuselage shielding weight required to provide protection from an open-rotor blade loss. This estimate was generated using a two-step procedure. First, a trajectory analysis was performed to determine the blade orientation and velocity at the point of impact with the fuselage. The trajectory analysis also showed that a blade dispersion angle of 3deg bounded the probable dispersion pattern and so was used for the weight estimate. Next, a finite element impact analysis was performed to determine the required shielding thickness to prevent fuselage penetration. The impact analysis was conducted using an FAA-provided composite blade geometry. The fuselage geometry was based on a medium-sized passenger composite airframe. In the analysis, both the blade and fuselage were assumed to be constructed from a T700S/PR520 triaxially-braided composite architecture. Sufficient test data on T700S/PR520 is available to enable reliable analysis, and also demonstrate its good impact resistance properties. This system was also used in modeling the surrogate blade. The estimated additional weight required for fuselage shielding for a wing- mounted counterrotating open-rotor blade is 236 lb per aircraft. This estimate is based on the shielding material serving the dual use of shielding and fuselage structure. If the shielding material is not used for dual purpose, and is only used for shielding, then the additional weight per aircraft is estimated to be 428 lb. This weight estimate is based upon a number of assumptions that would need to be revised when applying this concept to an actual airplane design. For example, the weight savings that will result when there is no fan blade containment system, manufacturing limitations which may increase the weight where variable thicknesses was assumed, engine placement on the wing versus aft fuselage, etc.

aircraft safety↗

DAVINCI: Venus Atmospheric Model Comparisons

The Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging(DAVINCI) mission aims to answer long-standing questions regarding Venus’ origin using Zephyr, an atmospheric descent probe. Zephyr will be the first probe to take high-resolution aerial photographs of a mountainous tesserae surface as it descends over the Alpha Regio highlands region, which has the oldest surfaces of Venus. The Zephyr’s descent trajectory that determines the touchdown in the Alpha Regio, which is crucial for the DAVINCI mission, depends on Venus’ atmospheric properties and winds. Unfortunately, the atmospheric data for Venus from previous missions is sparse. Therefore, it is essential to consider various atmospheric models and scenarios from past flight data to predict Zephyr’s flight performance, specifically landing ellipse. To this end, this work compares three atmospheric models: the Venus Global Reference Atmospheric Model (Venus-GRAM), the Venus Climate Database(VCD), and an empirical wind model developed by Ralph Lorenz for the DAVINCI trajectory simulation and modeling. This paper compares the mean and variations of different atmospheric properties and winds from these atmospheric models. In addition, this work combines the atmospheric properties and the wind variability from the Venus-GRAM with the winds from the Lorenz-based model to have more stressing Venus wind dispersions that allow for more conservative trajectory analysis. Furthermore, this work relies on the DAVINCI landing ellipse size as a metric to measure how robust the trajectory analysis will be to the change in the atmospheric properties and winds of the Venus atmosphere.

Pardha Sai Chadalavada↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗