Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission System Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Impact Analysis of Data Integrity Attacks on FACTS-based Wide-Area Voltage Control System

Energy management system (EMS) consists of several wide-area control applications that serve as a backbone for security, stability, and reliability of the power system. Wide-area voltage control system (WAVCS), one of the critical wide-area applications, operates in coordination with local Flexible AC Transmission System (FACTS) devices to provide voltage security and optimal management of active and reactive power resources. Since the WAVCS relies on wide-area communication and data sharing devices, possible cybersecurity vulnerabilities have to be addressed to ensure the closed-loop operation of WAVCS. In this paper, we present a methodology for performing an impact analysis of cyber-attacks in WAVCS cybersecurity. In particular, different types of data integrity attacks, such as malicious tripping, fault replay, and signal altering attacks, are considered, and detailed impact analysis is conducted in a testbed environment using the Kundur's four machine two-area system. For performing an impact analysis, the transient voltage stability of the sensitive bus voltage is studied, followed by the quantitative assessment and severity ranking using the voltage profile index. Our experimental evaluation reveals that the data integrity attacks on control signals exhibit a higher attack severity than on the measurement signals. Further, the severity of these attacks varies with nature (static or dynamic), location, and types of attacks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field operations with cesium clocks in HF navigation systems

Networks of HF phase comparison marine navigation stations employing cesium clocks are discussed. The largest permanent network is in the Gulf of Mexico where some fourteen base stations are continuously active and others are activated as needed. These HF phase comparison systems, which operate on a single transmission path, require a clock on the mobile unit as well. Inventory consists of upwards of 70 clocks from two different manufacturers. The maintenance of this network as an operating system requires a coordinated effort involving clock preparation, clock environment control, station performance monitoring and field service.

Christy, E. H.↗

The Fiber Optic System for the Advanced Topographic Laser Altimeter System (ATLAS) Instrument

The Advanced Topographic Laser Altimeter System (ATLAS) Instrument has been in integration and testing over the past 18 months in preparation for the Ice, Cloud and Land Elevation Satellite - 2 (ICESat-2) Mission, scheduled to launch in 2017. ICESat-2 is the follow on to ICESat which launched in 2003 and operated until 2009. ATLAS will measure the elevation of ice sheets, glaciers and sea ice or the "cryosphere" (as well as terrain) to provide data for assessing the earth's global climate changes. Where ICESat's instrument, the Geo-Science Laser Altimeter (GLAS) used a single beam measured with a 70 m spot on the ground and a distance between spots of 170 m, ATLAS will measure a spot size of 10 m with a spacing of 70 cm using six beams to measure terrain height changes as small as 4 mm. The ATLAS pulsed transmission system consists of two lasers operating at 532 nm with transmitter optics for beam steering, a diffractive optical element that splits the signal into 6 separate beams, receivers for start pulse detection and a wavelength tracking system. The optical receiver telescope system consists of optics that focus all six beams into optical fibers that feed a filter system that transmits the signal via fiber assemblies to the detectors. Also included on the instrument is a system that calibrates the alignment of the transmitted pulses to the receiver optics for precise signal capture. The larger electro optical subsystems for transmission, calibration, and signal receive, stay aligned and transmitting sufficiently due to the optical fiber system that links them together. The robust design of the fiber optic system, consisting of a variety of multi fiber arrays and simplex assemblies with multiple fiber core sizes and types, will enable the system to maintain consistent critical alignments for the entire life of the mission. Some of the development approaches used to meet the challenging optical system requirements for ATLAS are discussed here.

global climate changes↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gas dispersion measurements using a mobile Raman lidar system

The exploitation of natural gas resources to supply energy demands has resulted in the need to engineer pipelines and plants capable of handling extremely high pressures and throughputs. Consequently, more attention has been directed to evaluating the consequences of releases of material whether accidental or deliberate in nature. An important aspect of assessing the consequences of a release is an understanding of how gas disperses in the atmosphere over a wide range of release and atmospheric conditions. The most cost effective way of providing such information is through the development and use of reliable theoretical prediction methods. The need for some form of remote sensing device was identified. The various possibilities studied led to the conclusion that LIDAR (Light Detection And Ranging) offered the most suitable method. The system designed and built is described, and its recent use in monitoring operational ventings from a high pressure transmission system is discussed.

Houston, J. D.↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A real time programmable data compression system for video data.

Description of the implementation of a data compression system for the real-time operational transmission (through microwave links) of ATS satellite pictures between the command and data acquisition station and a central location for computer processing. The system features the use of general-purpose minicomputers for encoding and decoding; this makes it possible to vary the employed data compression technique and to make simultaneous statistical calculations on the data. Data compression and expansion is accomplished in a manner that does not lower data quality.

Kutz, R. L.↗

A General State Estimation Formulation for Three-Phase Unbalanced Power Systems

Almost all of the three-phase state estimation algorithms assume existence of a reference bus whose phase angles are perfectly balanced. This assumption is quite realistic for transmission systems, and also for most distribution systems that are connected to a strong transmission system where transmission side can modeled by a balanced reference bus. However, for distribution systems having high penetration of renewable sources or for microgrids operating in islanded mode, the assumption of a balanced reference bus will not be realistic. While there are recent publications focusing on this problem, formulation of the three-phase unbalanced state estimation problem with proper treatment of the reference bus remains unaddressed. In this paper, a new formulation will be described where an accurate state estimation solution can be obtained for any unbalanced threephase system irrespective of its operating conditions (balanced or highly unbalanced), configuration (isolated microgrid, connected to transmission system, etc.) and whether or not it contains any synchronous generators. Validation of the proposed formulation will be carried out via simulations.

State Estimation, Distribution System, Unbalanced ↗

Cyber risk assessment and investment optimization using game theory and ML-based anomaly detection and mitigation for wide-area control in smart grids

The electric power grid is increasingly becoming susceptible to cyber attacks that exploit vulnerabilities in the smart grid control, information, and physical layers. Successful cyber attacks can have catastrophic impacts on the social and economic well-being of any nation all over the globe. It has, thus, become imperative to secure the smart grid against such adversarial actions to ensure stable, secure, and reliable operation of the grid. The existing research and industry practices prove to be inadequate in terms of providing pragmatic and effective defense methodologies and measures for long-term cybersecurity planning and real-time cybersecurity for grid operation. For example, existing works lack models that incorporate uncertain behavior of cyber-attackers and pragmatic defense measures for cyber risk assessment and cybersecurity investment optimization which often provide unreliable and strictly qualitative solutions to these problems. At the same time, with the growing number of cyber incidents in the grid, there still exists a need to develop attack-resilient algorithms for wide-area monitoring, protection, and control (WAMPAC) applications like the wide-area voltage control systems (WAVCS) for Flexible AC Transmissions Systems (FACTS) that lack in scalable and feasible solutions from the cybersecurity perspective. This dissertation proposes novel models and methodologies for: (1) Cybersecurity planning, and (2) Cybersecurity for system operation. The cybersecurity planning is achieved through cyber risk assessment and cybersecurity resource investment optimization for long-term cybersecurity of the grid using game theory and attack-defense trees. Cybersecurity for system operation consists of development of cyber anomaly detection and mitigation algorithms for flexible AC transmission system (FACTS) controller-based wide-area voltage control systems (WAVCS) using machine learning (ML), and software defined networking-based moving target defense network routing for achieving real-time cyber-physical security for grid operations. This is followed by hardware-in-the-loop (HIL) implementation and evaluation of these attack prevention, detection, and mitigation algorithms and methodologies showcasing their feasibility in a close to real-world environment. For cybersecurity planning, a novel approach involving a combination of game theory and attack defense trees (ADT) for optimal cybersecurity resource allocation in the smart grid is proposed. This methodology involves modeling of the cyber-physical smart grid substations as ADTs, defining attacker costs, defense costs, and attack probabilities for attack access points. Using game theoretical formulation, optimal defense strategies for the defender of the system to invest cybersecurity resources in the grid are obtained. Additionally, a game-theoretic framework is developed for quantitative cyber-physical risk assessment of the grid under a dynamically changing cyber threat space and uncertain behavior of cyber attackers which is further used to optimize investments in the smart grid's cybersecurity resources. The attacker, defender, and the smart grid system are modeled while incorporating attacker-stochasticity and federal guidelines for smart grid cybersecurity. This allows quantification of threat, vulnerabilities, and attack impact of the grid for quantitative risk assessment. The defender's budget to invest in the security resources in the grid is optimized based on the strategies leading to minimum system risk. The evaluation of the proposed solutions highlight the feasibility for practical implementation of these methodologies and algorithms in the smart grid, while taking the federal requirements and guidelines for smart grid security into consideration. For achieving cybersecurity for system operation, attack prevention, detection, and mitigation algorithms and methodologies are developed specifically for FACTS-based WAVCS. Anomaly detection and mitigation in the WAVCS are achieved using algorithms based on machine learning which involves offline training and testing of ML models with CPS datasets incorporating physics-based features that allow accurate distinction between system faults and cyber attacks. For attack prevention, a methodology based on software defined network (SDN)-based moving target defense (MTD) network routing is proposed that enables prevention of Denial of Service (DoS) type attacks on the smart grid communication system. Subsequently, these methodologies and algorithms are implemented and evaluated on an HIL testbed that allows for real-time attack prevention, detection, and mitigation of emulated cyber attacks on the WAVCS in a close to real-world environment. The results show highly accurate and efficient performance of the implemented algorithms and methodologies with the smart grid system operating within the NERC's system operation limits even in the presence of DoS and data integrity cyber attacks. This work opens up future research opportunities in other directions such as (1) Expanding cybersecurity planning methodologies to real-time cyber contingency analysis with different game formulations; and (2) Applying the cybersecurity for system operation algorithms to broader categories of wide-area control applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Antenna system providing a spherical radiation pattern

An antenna system provides a substantially spherical radiation pattern about a structure located above ground level, by locating the individual radiation pattern of each of a plurality of individual antennae, each positioned to have a radiation pattern covering only a portion of the desired sphere, and then applying all antenna signals, during either transmission or reception time intervals, through space-diversity and/or time-diversity apparatus, to cause the patterns of all of the antennae to combine into the desired substantially-spherical pattern. The antennae may have substantially hemispherical patterns, with each antenna of a pair thereof being directed in a direction generally opposite to the other antenna of that pair. Time domain multiple access (TDMA) operation of a master system station, with transmission in different time slots for different portions of the coverage sphere, and selection of the strongest received signal from among all of the plurality N of signals simultaneously received by the plurality N of antennae, can provide the desired spherical radiation pattern in both the transmission and reception modes of operation.

Sickles, II, Louis↗

Noncontact Monitoring of Overhead Transmission Lines Using Space Potential Phasor Measurements

Power system reliability requirements necessitate the development of measurement systems to monitor the operational state of critical transmission lines. Here in this article, a novel noncontact method for monitoring overhead transmission lines is proposed. The method is based on measuring the amplitude and relative phase of the transmission line's space potential at two or more strategically located points in space along with the use of passive phase shifters to enhance the sensitivity of the measurements. Applications of voltage unbalance and conductor sag measurements are demonstrated along with the results of conductor sag measurements on an operating 230-kV transmission line. It is shown that using enhanced relative phase measurements can significantly improve the sensitivity of the measurements.

47 OTHER INSTRUMENTATION↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation: Preprint

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

The assembly of large structures in space

Techniques developed for orbital assembly of the support structure for a 1000 meter diameter microwave power transmission system antenna are described. The operation is performed in two phases using the shuttle remote manipulator system in low earth orbit, and a mobile assembler in geosynchronous orbit.

Smith, G. W.↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗