Search NASA⌕ Search

SEARCH · Search NASA

Results for “V&V”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Ares V: A National Launch Asset for the 21st Century

NASA is designing the Ares V as the cargo launch vehicle to carry NASA's exploration plans into the 21st century. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study, NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V also represents a national asset offering opportunities for new science, national security, and commercial missions of unmatched size and scope. Using the dual-launch Earth Orbit Rendezvous approach, the Ares I and Ares V together will be able to inject roughly 57percent more mass to the Moon than the Apollo-era Saturn V. Ares V alone will be able to send nearly 414,000 pounds into low Earth orbit (LEO) or more than 138,000 pounds directly to the Moon, compared with 262,000 pounds and 99,000 pounds, respectively for the Saturn V. Significant progress has been made on the Ares V to support a planned fiscal 2011 authority-to-proceed (ATP) milestone. This paper discusses recent progress on the Ares V and planned future activities.

Sumrall, Phil↗

Geological Map of the Fredegonade (V-57) Quadrangle, Venus: Status Report

The Fredegonde quadrangle (V-57; 50-75degS, 60-120degE, Fig. 1) corresponds to the northeastern edge of Lada Terra and covers a broad area of the topographic province of midlands (0-2 km above MPR [1,2]). This province is most abundant on Venus and displays a wide variety of units and structures [3-11]. The sequence of events that formed the characteristic features of the midlands is crucially important in understanding of the timing and modes of evolution of this topographic province. Topographically, the Fredegonde quadrangle is within a transition zone between the elevated portion of Lada Terra to the west (Quetzalpetlatl-Boala Coronae rise, approx.3.5 km) and the lowland of Aino Planitia to the north and northeast (approx.-0.5 km). This transition is one of the key features of the V-57 quadrangle. In this respect the quadrangle resembles the region of V-4 quadrangle [12] that shows transition between the midlands and the lowlands of Atalanta Planitia. One of the main goals of our mapping within the V-57 quadrangle is comparison of this region with the other transitional topographic zones such as quadrangles V-4 and V-3 [13]. The most prominent features in the V-57 quadrangle are linear deformational zones of grooves and large coronae. The zones characterize the central and NW portions of the map area and represent broad (up to 100s of km wide) ridges that are 100s of m high. Morphologically and topographically, these zones are almost identical to the groove belt/corona complexes at the western edge of Atalanta Planitia [12]. Within the Fredegonde area, however, the zones are oriented at high angles to the general trend of elongated Aino Planitia, whereas within the V-4 quadrangle they are parallel to the edge of Atalanta Planitia. Relatively small (100s of km across, 100s of m deep) equidimensional basins occur between the corona-groove-chains in the area of V-57 quadrangle. These basins are similar to those that populate the area of the V-3 quadrangle [13]. Broad regional plains cover the surface of the basins in both regions. In contrast to Fredegonde, the area of the V-3 quadrangle displays a greater diversity of units and features [13]. Here we describe units that make up the surface within the V-57 quadrangle and present a summary of our geological map that shows the areal distribution of the major groups of units.

Ivanov, M. A.↗

Experimental Constraints on the Partitioning and Valence of V and Cr in Garnet and Coexisting Glass

A series of experiments with garnet and coexisting melt have been carried out across a range of oxygen fugacities (near hematite-magnetite (HM) to below the iron-wustite (IW) buffers) at 1.7 GPa to study the partitioning and valence of Cr and V in both phases. Experiments were carried out in a non end loaded piston cylinder apparatus, and the run products were analyzed with electron microprobe and xray absorption near edge structure (XANES) analysis at beamline 13-ID at the Advanced Photon Source of Argonne National Lab. The valence of vanadium and chromium were determined using the position and intensity of the Ka pre-edge peaks, calibrated on a series of Cr and Vbearing standard glasses. This technique has been applied to V and Cr in glasses and V in spinels previously, and in these isotropic phases there are no orientational effects on the XANES spectra (Righter et al., 2006, Amer. Mineral. 91, 1643-1656). We also now demonstrate this to be true for V and Cr in garnet. Also, previous work has shown that V has a higher valence in the glass (or melt) than in the coexisting spinel. This is also true for V in garnet-glass pairs in this study. Vanadium valence in garnets varies from 2.7 below the IW buffer to 3.7 near HM, and for coexisting glass it varies from 3.2 to 4.3. Vanadium valence measured in some natural garnets from mantle localities indicates V in the more reduced range at 2.5. Comparisons will be made between fO2 estimated from V valence and other methods for garnet-bearing mantle samples. In contrast, Cr valence measured in garnet and coexisting glass for all experimental and natural samples is 2.9- 3.0, suggesting that the valence of Cr does not vary within either phase across a large fO2 range. These results demonstrate that while V varies from 2+ to 3+ to 4+ in garnet-melt systems, Cr does not, and this will ultimately affect the partitioning behavior of these two elements in natural systems. Garnet/melt D(Cr) are between 12 and 17 across this range of fO2, whereas D(V) has the highest partition coefficient approx.3, near the IW buffer where the valence of V is almost entirely 3+.

Righter, K.↗

Ares V: Shifting the Payload Design Paradigm

NASA's Ares V heavy-lift cargo launch vehicle is being designed send more crew and cargo to more places on the lunar surface than the 1960s-era Apollo program and provide ongoing support to a permanent lunar outpost. In addition to that role, however, its unmatched mass and volume capability represent a global asset for exploration, science, and commerce. The Ares V also is an enabler of a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately 5 times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are 3 to 5 times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Excursion Modules or approximately 5 equivalent Hubble Space Telescopes. This mass and volume capability to Low Earth Orbit enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based power and mining, Earth asteroid defense, propellant depots, etc. The Ares V team is engaging the potential payload community now, 2-3 years before System Requirements Review, in order to better understand the potential limitations and or additional requirements that could be added to the Ares V from the mission planning community. If a viable mission is determined and added to the Ares V as a design case, tradeoffs will be conducted to determine if other mission design requirements can be included in the system. Multiple shroud options for the Ares V have been analyzed to identify their impact on performance. Ares V is in a conceptual design stage prior to a formal design phase. The initial concept for the cargo launch vehicle (CaLV) that would later be dubbed "Ares V" was produced by the Exploration Systems Architecture Study in 2005. Since then, it has evolved through hundreds of concepts. The current point-of-departure (POD) concept was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. This paper will discuss the Ares V design evolution, the most recent point-of-departure concept, and its capabilities to support future science missions.

Summrall, Phil↗

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA’s Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA’s Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V’s desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V’s assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Gerek Whitman↗

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA's Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA's Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V's desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V's assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Whitman, Gerek↗

Ares V: New Opportunities for Scientific Payloads

What if scientists and payload planners had access to three to five times the volume and five to nine times the mass provided by today's launch vehicles? This simple question can lead to numerous exciting possibilities, all involving NASA's new Ares V cargo launch vehicle now on the drawing board. Multiple scientific fields and payload designers have that opportunity with the Ares V cargo launch vehicle, being developed at NASA as the heavy-lift component of the U.S. Space Exploration Policy. When the Ares V begins flying late next decade, its capabilities will significantly exceed the 1960s-era Saturn V or the current Space Shuttle, while it benefits from their engineering, manufacturing, and infrastructure heritage. It will send more crew and cargo to more places on the lunar surface than Apollo and provide ongoing support to a permanent lunar outpost. Moreover, it will restore a strategic heavy-lift U.S. asset, which can support human and robotic exploration and scientific ventures for decades to come. Assessment of astronomy payload requirements since Spring 2008 has indicated that Ares V has the potential to support a range of payloads and missions. Some of these missions were impossible in the absence of Ares V's capabilities. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. A 2008 study by a National Research Council (NRC) panel, as well as analyses presented by astronomers and planetary scientists at two weekend conferences in 2008, support the position that Ares V has benefit to a broad range of planetary and astronomy missions. This early dialogue with Ares V engineers is permitting the greatest opportunity for payload/transportation/mission synergy and the least financial impact to Ares V development. In addition, independent analyses suggest that Ares V has the opportunity to enable more cost-effective mission design.

Creech, Steve↗

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John↗

Ares V: Progress Toward Unprecedented Heavy Lift

Ares V represents the vehicle that will again make possible human exploration beyond low Earth orbit. The Ares V is part of NASA s Constellation Program architecture developed to support the International Space Station (ISS), establish a permanent human presence on the Moon, and explore it to an extent far greater than was possible with the Apollo Program. Ares V will carry the lunar lander to orbit where it will join the Orion crew spacecraft, launched by the smaller Ares I launch vehicle. Then the Ares V upper stage will send the Orion and lander to the Moon. Ares V is also intended to launch automated cargo landers to the Moon. The Ares vehicles are designed to employ the proven technologies and experience from the Space Shuttle, Delta IV, and earlier U.S. programs, as well as sharing common components where feasible. The Ares V is in an early stage of concept development. However, commonality allows it to benefit from development work already under way on the Ares I, including the first stage booster, and upper stage, J-2X upper stage engine. This paper will discuss progress to date on the Ares V and its potential for freeing payload designers from current mass and volume constraints. Progress includes development progress on Ares I elements that will be shared by the two launch vehicles. The Ares I first stage recently completed a successful test firing of Development Motor 1 (DM-1). The J-2X engine is proceeding with manufacturing of components for the first development engines that will be used for testing. Several component-level tests have been completed or are under way that will help verify designs and confirm solutions to design challenges. The Ares V Earth departure stage will benefit from the Ares I upper stage development, including design, manufacturing, and materials testing. NASA is also working with government and industry to collect data on flights and testing of the operational RS-68 engine and potential upgrades. The Ares V team continues to evaluate technical options, vehicle configurations, and operations concepts for the Ares V. The team recently completed a Fall Face-to-Face meeting that served as a stepping-stone to the Systems Requirements Review (SRR). This four-day meeting served as an information exchange for the various teams at several NASA field centers and supporting contractors.

Sumrall, Phil↗

Statistics of Delta v magnitude for a trajectory correction maneuver containing deterministic and random components

A number of interplanetary missions now being planned involve placing deterministic maneuvers along the flight path to alter the trajectory. Lee and Boain (1973) examined the statistics of trajectory correction maneuver (TCM) magnitude with no deterministic ('bias') component. The Delta v vector magnitude statistics were generated for several values of random Delta v standard deviations using expansions in terms of infinite hypergeometric series. The present investigation uses a different technique (Monte Carlo simulation) to generate Delta v magnitude statistics for a wider selection of random Delta v standard deviations and also extends the analysis to the case of nonzero deterministic Delta v's. These Delta v magnitude statistics are plotted parametrically. The plots are useful in assisting the analyst in quickly answering questions about the statistics of Delta v magnitude for single TCM's consisting of both a deterministic and a random component. The plots provide quick insight into the nature of the Delta v magnitude distribution for the TCM.

Bollman, W. E.↗

Optimizing IV and V for Mature Organizations

NASA is intending for its future software development agencies to have at least a Level 3 rating in the Carnegie Mellon University Capability Maturity Model (CMM). The CMM has built-in Verification and Validation (V&V) processes that support higher software quality. Independent Verification and Validation (IV&V) of software developed by mature agencies can be therefore more effective than for software developed by less mature organizations. How is Independent V&V different with respect to the maturity of an organization? Knowing a priori the maturity of an organization's processes, how can IV&V planners better identify areas of need choose IV&V activities, etc? The objective of this research is to provide a complementary set of guidelines and criteria to assist the planning of IV&V activities on a project using a priori knowledge of the measurable levels of maturity of the organization developing the software.

Fuhman, Christopher↗

Update on the Ares V to Support Heavy Lift for U.S. Space Exploration Policy

The focus of design efforts in the near future will be on the primary Lunar mission. We are currently just beginning to integrate the design functions from the various centers for this mission. We appreciate all thoughts and ideas for different ways to use the Ares V platform. The Ares V can support an order of magnitude more science instrumentation for outer planetary exploration missions. It can also reach outer planets such as Neptune and other high energy insertion destinations. Current Ares V Point-of-Departure (51.00.48) exceeds Saturn mass capability by approx.40%. Ares V Lunar Capabilities Concept Review analysis focused on meeting lunar requirements and developing margin. Ares V is sensitive to Loiter, Attitude, Power, and Altitude requirements in addition to payload performance. LCCR-approved 51.00.48 POD 5.5-segment steel case booster/6 engine core) Ares V can meet current Human Lunar Return requirements with approx.6 mT of Margin. LCCR-approved 51.00.47 option maintained (5 segment HTPB composite case booster/6 engine core) can meet HLR requirement with more than 9 mT Margin. Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, scientific and commercial development needs.

Creech, Steve↗

Ares V: Shifting the Payload Design Paradigm

NASA is designing the Ares V heavy-lift cargo launch vehicle to send more crew and cargo to more places on the lunar surface than the 1960s-era Saturn V and to provide ongoing support for a permanent lunar outpost. This uncrewed cargo vehicle is designed to operate together with the Ares I crew vehicle (Figure 1). In addition to this role, however, its unmatched mass and volume capability represent a national asset for exploration, science, and commerce. The Ares V also enables or significantly enhances a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are three to five times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Modules or approximately five equivalent Hubble Space Telescopes. This mass and volume capability to low-Earth orbit (LEO) enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based solar power and mining, Earth asteroid defense, propellant depots, etc. In addition, payload designers may also have the option of simplifying their designs or employing Ares V s payload as dumb mass to reduce technical and operational risk. The Ares V team is engaging the potential payload community now, two to three years before System Requirements Review (SRR), in order to better understand the additional requirements from the payload community that could be accommodated in the Ares V design in its conceptual phase. This paper will discuss the Ares V reference mission and capability, as well as its potential to perform other missions in the future.

Sumrall, Phil↗

Analysis of Phoenix Anomalies and IV & V Findings Applied to the GRAIL Mission

NASA IV&V was established in 1993 to improve safety and cost-effectiveness of mission critical software. Since its inception the tools and strategies employed by IV&V have evolved. This paper examines how lessons learned from the Phoenix project were developed and applied to the GRAIL project. Shortly after selection, the GRAIL project initiated a review of the issues documented by IV&V for Phoenix. The motivation was twofold: the learn as much as possible about the types of issues that arose from the flight software product line slated for use on GRAIL, and to identify opportunities for improving the effectiveness of IV&V on GRAIL. The IV&V Facility provided a database dump containing 893 issues. These were categorized into 16 bins, and then analyzed according to whether the project responded by changing the affected artifacts or using as-is. The results of this analysis were compared to a similar assessment of post-launch anomalies documented by the project. Results of the analysis were discussed with the IV&V team assigned to GRAIL. These discussions led to changes in the way both the project and IV&V approached the IV&V task, and improved the efficiency of the activity.

Larson, Steve↗

Phase V of the single-breath washout test

A downward-deflecting phase V is often seen following the terminal rise (phase IV) in single-breath washout tests. To investigate the nature of phase V, experiments using simultaneous washouts of N2 and tracer boluses of Ar were performed on eight normal nonsmoking subjects aged 27-41 who exhibited a phase V. Phase V is found to occur in all subjects at expiratory flow rates between 0.1 and 2.0 l/sec shortly after expiration became flow limited. Volumes of both phases IV and V increase with increasing flow rate. The difference between the exhaled volumes at which flow became limited and phase V appeared is shown to be approximately equal to the anatomic dead space. Results support a model of lung emptying in a gravitational field in which flow limitation occurs first in the lower lung regions and then progresses toward the upper regions, causing phase IV. A decrease in the amount of flow from the upper relative to the lower regions after all regions have become flow limited then causes phase V.

Nichol, G. M.↗

Observation of Vibrational Relaxation Dynamics in X(sup 3)Sigma(sup -)(sub g) Oxygen Following Stimulated Raman Excitation to the v=1 Level: Implications for the RELIEF Flow Tagging Technique

The vibrational relaxation of ground-state molecular oxygen (O2, X(sup 3)Sigma(sup -)(sub g)) has been observed, following stimulated Raman excitation to the first excited vibrational level (v=1). Time delayed laser-induced fluorescence probing of the ro-vibrational population distribution was used to examine the temporal relaxation behavior. In the presence of water vapor, the relaxation process is rapid, and is dominated by near-resonant vibrational energy exchange between the v=1 level of O2 and the n2 bending mode of H2O. In the absence of H2O, reequilibration proceeds via homogeneous vibrational energy transfer, in which a collision between two v=1 O2 molecules leaves one molecule in the v=2 state and the other in the v=0 state. Subsequent collisions between molecules in v=1 and v>1 result in continued transfer of population up the vibrational ladder. The implications of these results for the RELIEF flow tagging technique are discussed.

Diskin, Glenn S.↗

Robust Requirements Tracing via Internet Search Technology: Improving an IV and V Technique

There are three major objectives to this phase of the work. (1) Improvement of Information Retrieval (IR) methods for Independent Verification and Validation (IV&V) requirements tracing. Information Retrieval methods are typically developed for very large (order of millions - tens of millions and more documents) document collections and therefore, most successfully used methods somewhat sacrifice precision and recall in order to achieve efficiency. At the same time typical IR systems treat all user queries as independent of each other and assume that relevance of documents to queries is subjective for each user. The IV&V requirements tracing problem has a much smaller data set to operate on, even for large software development projects; the set of queries is predetermined by the high-level specification document and individual requirements considered as query input to IR methods are not necessarily independent from each other. Namely, knowledge about the links for one requirement may be helpful in determining the links of another requirement. Finally, while the final decision on the exact form of the traceability matrix still belongs to the IV&V analyst, his/her decisions are much less arbitrary than those of an Internet search engine user. All this suggests that the information available to us in the framework of the IV&V tracing problem can be successfully leveraged to enhance standard IR techniques, which in turn would lead to increased recall and precision. We developed several new methods during Phase II; (2) IV&V requirements tracing IR toolkit. Based on the methods developed in Phase I and their improvements developed in Phase II, we built a toolkit of IR methods for IV&V requirements tracing. The toolkit has been integrated, at the data level, with SAIC's SuperTracePlus (STP) tool; (3) Toolkit testing. We tested the methods included in the IV&V requirements tracing IR toolkit on a number of projects.

Hayes, Jane↗

Ares V Overview and Status

As part of NASA s Constellation Program to resume exploration beyond low Earth orbit (LEO), the Ares V heavy-lift cargo launch vehicle as currently conceived will be able to send more crew and cargo to more places on the Moon than the Apollo Program Saturn V. (Figure 1) It also has unprecedented cargo mass and volume capabilities that will be a national asset for science, commerce, and national defense applications. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. The Columbia space shuttle accident, the resulting investigation, the Vision for Space Exploration, and the Exploration Systems Architecture Study (ESAS) broadly shaped the Constellation architecture. Out of those events and initiatives emerged an architecture intended to replace the space shuttle, complete the International Space Station (ISS), resume a much more ambitious plan to explore the moon as a stepping stone to other destinations in the solar system. The Ares I was NASA s main priority because of the goal to retire the Shuttle. Ares V remains in a concept development phase, evolving through hundreds of configurations. The current reference design was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review (LCCR/MCR) in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. In 2009, the Ares V team was heavily involved in supporting the Review of U.S. Human Space Flight Plans Committee. Several alternative designs for Ares V have been supplied to the committee. This paper will discuss the origins of the Ares V design, the evolution to the current reference configuration, and the options provided to the review committee.

Creech, Steve↗