Search NASA⌕ Search

SEARCH · Search NASA

Results for “Venting valve”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Regenerative Fuel Cell Test Rig at Glenn Research Center

The regenerative fuel cell development effort at Glenn Research Center (GRC) involves the integration of a dedicated fuel cell and electrolyzer into an energy storage system test rig. The test rig consists of a fuel cell stack, an electrolysis stack, cooling pumps, a water transfer pump, gas recirculation pumps, phase separators, storage tanks for oxygen (O2) and hydrogen (H2), heat exchangers, isolation valves, pressure regulators, interconnecting tubing, nitrogen purge provisions, and instrumentation for control and monitoring purposes. The regenerative fuel cell (RFC) thus formed is a completely closed system which is capable of autonomous cyclic operation. The test rig provides direct current (DC) load and DC power supply to simulate power consumption and solar power input. In addition, chillers are used as the heat sink to dissipate the waste heat from the electrochemical stack operation. Various vents and nitrogen (N2) sources are included in case inert purging is necessary to safe the RFC test rig.

Chang, Bei-Jiann↗

Reduction of liquid hydrogen boiloff: Optimal reliquefaction system design and cost study

The refrigeration cycles investigated are referred to as Joule-Thomson cycles because they depend on the J-T effect to produce the low temperatures. Two basic competitive refrigeration cycles were evaluated. The first vents a portion of cold H2 gas to achieve the required precooling; the second uses LN2 for precooling. Both open loop and closed loop cycles were evaluated as well as combinations of venting to supplement the LN2 precooling. All cycles use a H2 compressor to achieve the desired high pressure (1325 psig). The heat compression was removed by cooling water. The high pressure H2 gas was cooled in counter flow heat exchangers by flowing cold H2 to the compressor. Further cooling was achieved for cycles using LN2 by passing H2 vapors through a LN2 heat exchanger. Finally, the high pressure H2 gas was expanded through a J-T valve where a portion of H2 was liquefied. The low pressure H2 gas flow back through the heat exchangers to the compressor is that portion not liquefied and makes up hydrogen gas from the dewar.

Source record↗

Analyzing the Use of Gaseous Helium as a Pressurant with Cryogenic Propellants with Thermodynamic Venting System Modelling and Test Data

Cryogens are viable candidate propellants for NASA's Lunar and Mars exploration programs. To provide adequate mass flow to the system's engines and/or to prevent feed system cavitation, gaseous helium (GHe) is frequently considered as a pressurant. During low gravity operations, a Thermodynamic Venting System (TVS) is designed to maintain tank pressure during low gravity operations without propellant resettling. Therefore, a series of tests were conducted in the Multi-purpose Hydrogen Test Bed (MHTB) of Marshall Space Flight Center (MSFC) in order to evaluate the effects of GHe pressurant on pressure control performance of a TVS with liquid hydrogen (LH2) and nitrogen (LN2) as the test liquids. The TVS used in these test series consists of a recirculation pump, Joule-Thomson (J-T) expansion valve, and a parallel flow concentric tube heat exchanger combined with a longitudinal spray bar. Using a small amount of liquid extracted from the tank recirculation line, passing it through the J-T valve, and then through the heat exchanger, thermal energy is extracted from the bulk liquid and ullage thereby enabling pressure control. The LH2/GHe tests were performed at fill levels of 90%, 50%, and 25% and LN2/GHe tests were conducted at fill levels of 50% and 25%. Moreover, each test was conducted with a specified tank ullage pressure control band. A one-dimensional TVS performance program was used to analyze and correlate the test data. Predictions and comparisons with test data of ullage pressure and temperature and bulk liquid saturation pressure and temperature with test data are presented.

Hedayat, A.↗

Deep-Sea Hydrothermal-Vent Sampler

An apparatus is being developed for sampling water for signs of microbial life in an ocean hydrothermal vent at a depth of as much as 6.5 km. Heretofore, evidence of microbial life in deep-sea hydrothermal vents has been elusive and difficult to validate. Because of the extreme conditions in these environments (high pressures and temperatures often in excess of 300 C), deep-sea hydrothermal- vent samplers must be robust. Because of the presumed low density of biomass of these environments, samplers must be capable of collecting water samples of significant volume. It is also essential to prevent contamination of samples by microbes entrained from surrounding waters. Prior to the development of the present apparatus, no sampling device was capable of satisfying these requirements. The apparatus (see figure) includes an intake equipped with a temperature probe, plus several other temperature probes located away from the intake. The readings from the temperature probes are utilized in conjunction with readings from flowmeters to determine the position of the intake relative to the hydrothermal plume and, thereby, to position the intake to sample directly from the plume. Because it is necessary to collect large samples of water in order to obtain sufficient microbial biomass but it is not practical to retain all the water from the samples, four filter arrays are used to concentrate the microbial biomass (which is assumed to consist of particles larger than 0.2 m) into smaller volumes. The apparatus can collect multiple samples per dive and is designed to process a total volume of 10 L of vent fluid, of which most passes through the filters, leaving a total possibly-microbe-containing sample volume of 200 mL remaining in filters. A rigid titanium nose at the intake is used for cooling the sample water before it enters a flexible inlet hose connected to a pump. As the water passes through the titanium nose, it must be cooled to a temperature that is above a mineral-precipitation temperature of 100 C but below the upper working temperature (230 C) of switching valves and tubes in the apparatus. The sample water then passes into a manifold tube, from whence the switching valves can direct the water through either a bypass tube or any one of the filter arrays, without contamination from a previous sample. Each filter array consists of series of filters having pore sizes decreasing in the direction of flow: 90-, 60-, 15-, and 7-micron prefilters and a large-surface-area 0.2-micron collection filter. All the filter taps are located between the intake and the bypass tube so that each time the bypass tube is used, the entire manifold tube is flushed as well.

Behar, Alberto E.↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vesse l relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Precision measurement of the magnetic field in run 1 of the g-2 experiment

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Natural and Induced Environment around the International Space Station (ISS) as Observed during On-Orbit Operations of the Robotic External Leak Locator (RELL)

Final Document is attached. The Robotic External Leak Locator (RELL) was deployed to the International Space Station (ISS) with the goal of detecting and locating on-orbit leaks around the ISS. Three activities to investigate and corroborate the background natural and induced environment of ISS were performed with RELL as part of the on-orbit validation and demonstration conducted in November – December 2016. The first demonstration activity pointed RELL directly in the ram and wake directions for one orbit each. The ram facing measurements showed high partial pressure for mass-to-charge ratio 16, corresponding to atomic oxygen (AO), as well as the presence of mass-to-charge ratio 17. RELL™s view in the wake-facing direction included more ISS structure and several Environmental Control and Life Support System (ECLSS) on-orbit vents were detected, including the Carbon Dioxide Removal Assembly (CDRA), Russian segment ECLSS, and Sabatier vents. The second demonstration activity pointed RELL at three faces of the P1 Truss segment. Effluents from ECLSS and European Space Agency (ESA) Columbus module on-orbit vents were detected by RELL. The partial pressures of mass-to-charge ratios 17 and 18 remained consistent with the first on-orbit activity of characterizing the natural environment. The third demonstration activity involved RELL scanning an Active Thermal Control System (ATCS) radiator. Three locations along the radiator were scanned and the angular position of RELL with respect to the radiator was varied. Mass-to-charge ratios 16 and 17 both had upward shifts in partial pressure when pointing toward the Radiator Beam Valve Modules (RBVMs), likely corresponding to a known, small ammonia leak.

International Space Station↗

Natural and Induced Environment Around the International Space Station (ISS) as Observed During On-Orbit Operations of the Robotic External Leak Locator (RELL)

The Robotic External Leak Locator (RELL) was deployed to the International Space Station (ISS) with the goal of detecting and locating on-orbit leaks around the ISS. Three activities to characterize the background natural and induced environment of ISS were performed with RELL as part of the on-orbit validation and demonstration conducted in November and December 2016. The first demonstration activity pointed RELL directly in the ram (+X) and wake (-X) directions for one orbit each. The ram facing measurements showed high partial pressure for mass-to-charge ratio 16, corresponding to atomic oxygen (AO), as well as the presence of mass-to-charge ratio 17. RELL's view in the wake-facing direction included more ISS structure and several Environmental Control and Life Support System (ECLSS) on-orbit vents were detected, including the Carbon Dioxide Removal Assembly (CDRA), Russian segment ECLSS, and Sabatier vents. The second demonstration activity pointed RELL at three faces of the P1 Truss segment. Effluents from ECLSS and European Space Agency (ESA) Columbus module on-orbit vents were detected by RELL. The partial pressures of mass-to-charge ratios 17 and 18 remained consistent with the first on-orbit activity of characterizing the natural environment. The third demonstration activity involved RELL scanning an Active Thermal Control System (ATCS) radiator. Three locations along the radiator were scanned and the angular position of RELL with respect to the radiator was varied. Mass-to-charge ratios 16 and 17 both had upward shifts in partial pressure when pointing toward the Radiator Beam Valve Modules (RBVMs), likely corresponding to a known, small ammonia leak.

Fox, Katie L.↗

Dew Point Simulation and Analysis of the Heat Melt Compactor Gas Effluent

The effluent gases and water vapor of the Trash Compaction and Processing System (TCPS) can be vented through the Vacuum Exhaust System (VES) if requirements are met. One of the constraints in this venting scenario is the dew point of the exhaust gases disposed into the VES must be less than 15.5 °C. With simulations using Aspen Plus and the effluent gas sample results of the Heat Melt Compactor (HMC), flash calculations were conducted in the modeling study to calculate the feed temperature and dew point at fixed pressures. Saturated vapor curves were produced and provided a preliminary result on optimal feed conditions that satisfy the dew point and vapor-phase only requirements after flashing across the throttle valve towards the VES.

trash↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

43 PARTICLE ACCELERATORS↗

DESIGN ISSUES AND QUALIFICATION OF HYDROFORMED DOUBLE WALLED EXPANSION JOINTS IN VACUUM SERVICE

The Vacuum Auxiliary System for ITER is devoted to pumping out, venting, and purging the vacuum volumes of the tokamak. Over 5000 clients including the cryostat and vacuum vessel, at 8500 m3 and 1400 m3 respectively, are serviced by approximately 150 pumping stations through 6 km of pipework. The piping and functions provided to the clients include component operation, routing of potentially tritiated gases, and timely leak localization. Expansion joints are used to reduce loadings on pumps and piping stresses but also to qualify in-line components having low allowable design loads. The ITER project utilizes vacuum valves that are not designed to withstand typical piping system loadings and require detailed design and evaluation. Loading scenarios prescribed by governing system specifications must be considered. To maintain allowable design loads for components and to keep piping stresses below code requirements, double walled hydroformed expansion joints have been employed in the design. These are not standard items and require custom fabrication. Installation space constraints and adjacent pipe support attachment location availability at ITER limit standard expansion joint installation guidelines provided by the Expasion Joint Manufacturers Association (EJMA). Careful consideration must be given to the analysis model to ensure proper function and life expectancy of the component. These considerations include accurate accounting of thrust forces, thermal movements, seismic accelerations, equipment and building differential displacements. In addition to displacements, the process internal, external, and interspace pressures affect the qualification and selection of the double walled expansion joints. The calculation results shall confirm that deflections, forces, and moments are reasonable for the size and type required for the system’s demands as evaluated against the manufacturer’s design.

Clark, Forrest [ORNL] (ORCID:0009000678106843)↗

Oil-And-Gas-Fire Snubber

Flame diverted and extinguished without explosives. Oil-and-gas-fire snubber consists of pipe with two exit branches and large selector valve, positioned over well, on path of escaping fuel. Flame moved to one side; then flow of fuel moved to other side, away from flame. Two versions of snubber have different uses. First used only to extinguish fire. Exit branch only long enough to keep fuel away to prevent reignition. Second needed if well not capped after fire at well extinguished and oil and gas remained present in problem quantities. Exit branch long enough to extend to oil-storage tank, and gas separated from oil and vented or burned at convenient location.

Weinstein, Leonard M.↗

Regenerable non-venting cooler for protective suit

A life support back pack 14 for use during extravehicular activity in space incorporates a cooling apparatus 20 comprised of five panels 22 each of which include in layered fashion a LCG coolant heat exchange coil 32, a heat distribution plate 42, and a heat dissipation module 50A or 50B having an outer radiator surface 52. Each module 50A houses a first phase change material 55A, for example hexadecane paraffin, and each module 50B houses a second phase change material 55B, for example tetradecane paraffin, which has a phase change temperature which is less than the phase change temperature of the first phase change material 55A. The cooling apparatus 20 is equipped with a coolant heat exchange circuit provided with mode selection valves 84 and 86 which are operated by a controller 88 to selectively direct the LCG coolant to be cooled through the cooling apparatus in one of three operating modes.

Roebelen, Jr., George J.↗

Benchmark study of the DTU OWC chamber with both two-way and one-way absorption

This paper reports on a benchmark study based on small-scale (1:50) measurements of a single, oscillating water column chamber mounted sideways in a long flume. The geometry of the OWC chamber is extracted from a barge-like, attenuator-type floating concept “KNSwing” with 40 chambers targeted for deployment in the Danish part of the North Sea. In addition to traditional two-way energy extraction we also consider one-way energy extraction with passive venting and compare chamber response, pressures and total absorbed energy between the two methods. A blind study was established for the numerical modeling, with participants applying several implementations of weakly nonlinear potential flow theory and commercial Navier–Stokes solvers (CFD). Both compressible and incompressible models were used for the air phase. Potential flow calculations predict more energy absorption near the chamber resonance for one-way absorption than for two-way absorption, but the opposite is found from the experimental measurements. This outcome is mainly attributed to energy losses in the experimental passive valve system, but this conclusion must be confirmed by better experimental measurements. Modeling the one-way valve in CFD proved to be very challenging and only one team was able to provide results which were generally closer to the experiments. The study illustrates the challenges associated with both numerical and experimental analysis of OWC chambers. Air compressibility effects were not found to be important at this scale, even with the large volume of additional air used for the one-way case.

16 TIDAL AND WAVE POWER↗

Submerged AUV Charging Station

Autonomous Underwater Vehicles (AUVs) are becoming increasingly important for military surveillance and mine detection. Most AUVs are battery powered and have limited lifetimes of a few days to a few weeks. This greatly limits the distance that AUVs can travel underwater. Using a series of submerged AUV charging stations, AUVs could travel a limited distance to the next charging station, recharge its batteries, and continue to the next charging station, thus traveling great distances in a relatively short time, similar to the Old West “Pony Express.” One solution is to use temperature differences at various depths in the ocean to produce electricity, which is then stored in a submerged battery. It is preferred to have the upper buoy submerged a reasonable distance below the surface, so as not to be seen from above and not to be inadvertently destroyed by storms or ocean going vessels. In a previous invention, a phase change material (PCM) is melted (expanded) at warm temperatures, for example, 15 °C, and frozen (contracted) at cooler temperatures, for example, 8 °C. Tubes containing the PCM, which could be paraffin such as pentadecane, would be inserted into a container filled with hydraulic oil. When the PCM is melted (expanded), it pushes the oil out into a container that is pressurized to about 3,000 psi (approx equals 20.7 MPa). When a valve is opened, the high-pressure oil passes through a hydraulic motor, which turns a generator and charges a battery. The low-pressure oil is finally reabsorbed into the PCM canister when the PCM tubes are frozen (contracted). Some of the electricity produced could be used to control an external bladder or a motor to the tether line, such that depth cycling is continued for a very long period of time. Alternatively, after the electricity is generated by the hydraulic motor, the exiting low-pressure oil from the hydraulic motor could be vented directly to an external bladder on the AUV, such that filling of the bladder causes the AUV to rise, and emptying of the bladder allows the AUV to descend. This type of direct buoyancy control is much more energy efficient than using electrical pumps in that the inefficiencies of converting thermal energy to electrical energy to mechanical energy is avoided. AUV charging stations have been developed that use electricity produced by waves on floating buoys and that use electricity from solar photovoltaics on floating buoys. This is the first device that has absolutely no floating or visible parts, and is thus impervious to storms, inadvertent ocean vessel collisions, or enemy sabotage.

Jones, Jack A.↗

Thermal Vacuum Chamber Repressurization with Instrument Purging

At the end of James Webb Space Telescope (JWST) OTIS (Optical Telescope Element-OTE-Integrated Science Instrument Module-ISIM) cryogenic vacuum testing in NASA Johnson Space Centers (JSCs) thermal vacuum (TV) Chamber A, contamination control (CC) engineers are mooting the idea that chamber particulate material stirred up by the repressurization process may be kept from falling into the ISIM interior to some degree by activating instrument purge flows over some initial period before opening the chamber valves. This memo describes development of a series of models designed to describe this process. These are strung together in tandem to estimate overpressure evolution from which net outflow velocity behavior may be obtained. Creeping flow assumptions are then used to determine the maximum particle size that may be kept suspended above the ISIM aperture, keeping smaller particles from settling within the instrument module.

Venting↗

Thermal Vacuum Chamber Repressurization with Instrument Purging

At the end of James Webb Space Telescope (JWST) OTIS (Optical Telescope Element-OTE-Integrated Science Instrument Module-ISIM) cryogenic vacuum testing in NASA Johnson Space Centers (JSCs) thermal vacuum (TV) Chamber A, contamination control (CC) engineers are mooting the idea that chamber particulate material stirred up by the repressurization process may be kept from falling into the ISIM interior to some degree by activating instrument purge flows over some initial period before opening the chamber valves. This memo describes development of a series of models designed to describe this process. These are strung together in tandem to estimate overpressure evolution from which net outflow velocity behavior may be obtained. Creeping flow assumptions are then used to determine the maximum particle size that may be kept suspended above the ISIM aperture, keeping smaller particles from settling within the instrument module.

Repressurization↗

Testing of a Spray-bar Thermodynamic Vent System in Liquid Nitrogen

To support development of a microgravity pressure control capability for liquid oxygen, thermodynamic vent system (TVS) testing was conducted at Marshall Space Flight Center (MSFC) using liquid nitrogen (LN2) as a LOX simulant. The spray bar TVS hardware used was originally designed by the Boeing Company for testing in liquid hydrogen (LH2). With this concept, a small portion of the tank fluid is passed through a Joule-Thomson (J-T) device, and then through a longitudinal spray bar mixed-heat exchanger in order to cool the bulk fluid. To accommodate the larger mass flow rates associated with LN2, the TVS hardware was modified by replacing the recirculation pump with an LN2 compatible pump and replacing the J-T valve. The primary advantage of the spray-bar configuration is that tank pressure control can be achieved independent of liquid and vapor location, enhancing the applicability of ground test data to microgravity conditions. Performance testing revealed that the spray-bar TVS was effective in controlling tank pressure within a 6.89 kPa band for fill levels of 90%, 50%, and 25%. Tests were also conducted with gaseous helium (GHe) in the ullage. The TVS operated nominally with GHe in the ullage, with performance similar to the tests with gaseous nitrogen (GN2). Testing demonstrated that the spray-bar TVS design was flexible enough for use in two different propellants with minimal hardware modifications.

Flachbart, R. H.↗