Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Improved Modeling of Waste Isolation Pilot Plant Disposal Room Porosity

Disposal rooms at the Waste Isolation Pilot Plant (WIPP) contain waste and gas, and their porosity evolves over time. This report presents several improvements to the disposal room porosity model and presents new porosity predictions for use in future WIPP Performance Assessment activities. The improvements pertain to three sub-models: the geomechanical model, the waste compaction model, and the gas pressurization model. The impacts of each major improvement were quantified and the new porosity predictions were shown to be both mesh and domain size converged. Also, sensitivity studies on the disposal room horizon, clay seam friction coefficients, and homogenized waste representation were performed to support assumptions in the disposal room porosity model. To compare the legacy and new porosity predictions, the simulation results were plotted as a response surface, where gas pressure and time are inputs and porosity is the output. The new porosity response surface is insensitive to pressures beneath lithostatic pressure and highly sensitive to pressures above lithostatic pressure. The legacy porosity response surface, on the other hand, has moderate porosity gradients over all pressures. The new porosity response surface has a stronger scientific foundation than the legacy surface and may now be used for Compliance Decision Analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Baseline Monitoring Data for the Remote-Handled Low-Level Waste Disposal Facility at Idaho National Laboratory

The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose and Saturated Zone Flow and Transport Calculations for the Active Trenches of the Low-Level Burial Grounds, Hanford Site, Washington

The purpose of the fate and transport modeling described in this environmental calculation file (ECF) is to evaluate the impacts to groundwater associated with waste disposal operations at Mixed Waste Low-Level Burial Ground (LLBG) Trenches 31 and 34 to satisfy requirements in DOE O 435.1, Radioactive Waste Management. The model integrates the flow and transport in the vadose zone beneath the active trenches with the saturated zone downgradient of the trenches to predict the radionuclide concentration at the point of assessment (POA). DOE M 435.1-1, Radioactive Waste Management Manual, defines the POA as the point of highest projected dose or concentration beyond a 100 m (328 ft) buffer zone surrounding the disposed waste. The modeling is conducted in accordance with the DOE G 435.1, Implementation Guide for Use with DOE M 435.1-1, performance assessment (PA) guidelines. The modeling involves evaluation of the groundwater concentrations and radionuclide arrival times during the 1,000-year compliance and 10,000-year sensitivity-uncertainty periods per DOE O 435.1 and DOE M 435.1. This analysis does not consider radionuclide release during facility operations, only the post-closure impacts of the radionuclides to the environment. The evaluation of potential radiological dose to groundwater receptors caused by releases from a closed facility containing radioactive waste typically includes the following: (1) Release of radionuclides from that facility (2) Transport of those radionuclides through the environment, and (3) Exposure to humans to environmental concentration levels of those radionuclides The fate and transport three-dimensional (3D) model analysis involves the post-closure impacts to the environment of the technetium-99, iodone-129, and uranium (all isotopes in the waste). The residual inventory estimates include several radionuclides, but technetium-99 is typically responsible for almost all of the beta-gamma dose equivalent associated with groundwater (water resources) protection per 40 CFR 141, “National Primary Drinking Water Regulations” (e.g., see the results in WCH-520, Performance Assessment of Environmental Restoration Disposal Facility, Hanford Site, Washington; hereinafter referred to as the ERDF PA), and iodone-129 can also be a significant dose contributor for some waste (e.g., RPP-RPT-59958, Performance Assessment for the Integrated Disposal Facility, Hanford Site, Washington; hereinafter referred to as the IDF PA). Uranium does not typically factor significantly into the impacts to groundwater, even during the 10,000-year sensitivity-uncertainty period, but always remains of interest as a contaminant. This ECF does not address vadose and saturated zone modeling for Trench 94 of the 200 East Area LLBG. Current information confirms the validity of the low corrosion rate of the naval reactor plant carbon steel (HY-80), and the even lower corrosion rate of the nickel-iron-chromium alloy reactor vessel (Inconel Alloy 600) presented in DOE/EIS-0259, Final Environmental Impact Statement on the Disposal of Decommissioned, Defueled Cruiser, Ohio Class, and Los Angeles Class Naval Reactor Plants. Based on these low corrosion rates, the time to breach the reactor vessel to allow release of radionuclides from the activated metal of the reactor vessel internal structure is at least 10,000 years. This time to breach precludes the need to evaluate the vadose and saturated zone transport of contaminants released from the reactor compartment disposal packages in the 200 East Area LLBGs PA (CP-63826, Waste Release Model Package Report for the Active Trenches of the Low-Level Burial Grounds, Hanford Site, Washington).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Spike Testing of RPP-WTP LAW and HLW Glasses for Compliance with Land Disposal Restrictions, VSL-03R3760-1, Rev. 1

The United States Department of Energy’s (DOE’s) Hanford site is the current location of storage of about 50 million gallons of mixed waste. This waste is stored in underground tanks at the Hanford site and is both a listed and characteristic waste, as defined in 40 CFR Part 261, and a dangerous waste according to Chapter 173-303 of the Washington Administrative Code (WAC). The waste is also subject to the Land Disposal Restrictions (LDR) (40 CFR Part 268 and WAC 173-303-140). The River Protection Project - Waste Treatment Plant (RPP-WTP) will provide DOE with a means for treating this waste by vitrification (for subsequent disposal). The tank waste will be partitioned into low and high activity fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed of in an engineered facility on the Hanford site while the IHLW product will be directed to the national deep geological disposal facility for high level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Appendix H

This section provides supporting material for the development of DU-specific final inventory limits for the GW pathways for every generic waste form and SWF parent radionuclide requiring an inventory limit. The final inventory limits are based on nominal PA transport simulations using PORFLOW as reported in Chapter 5. The nominal PA settings represent the compliance case where some modeling parameter settings are defined based on conservative (pessimistically leaning) arguments. In the overall computational approach employed in this PA, a multitiered radionuclide screening process is adopted as discussed in Chapter 2, Section 2.3.7. In the multitiered process, the initial list of 1,252 parent radionuclides is shortened substantially using conservative, but simple, transport models, along with a reasonably low cutoff criterion of 0.1% SOF value. Multidimensional PORFLOW flow and transport modeling is employed for every parent radionuclide that failed the GW screening. The generic waste form limits represent Tier-3 analyses, while Tier-4 analyses are employed for SWF limits, where warranted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2022 Filter Test for TRU Waste Drum Prototype Unit

Continuing last year’s (fiscal year 2021) work, a prototype instrument and an NPI-6 Integrated Work Document (IWD) were developed to assess the functionality of filters on transuranic waste containers (commonly called 55 Gallon ring-top drums) without requiring the removal of the drum lid. The purpose of this work is to determine the air flow and pressure characteristics associated with filter clogging, filter pressure drop at a fixed flow rate, and leakage around the lid seal. The FY22 objectives included: (A) Development of prototype device, (B) Drafting an IWD document, (C) Defining a filter clogging parameter, (D) Assessing filter damage due to over-pressure events, and (E) A path forward to obtain approval of the system safety filters in compliance with P101-16 Industrial Ventilation – non HVACR (LANL 2022).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2019 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). This report summarizes the 2019 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (Mission Support and Test Services, LLC 2019, 2020a, 2020b). Direct radiation monitoring data indicate exposure levels at the Area 3 and Area 5 RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data at the Area 3 and Area 5 RWMSs show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS are below established investigation levels. Leachate samples collected from the leachate collection systems at the Area 5 mixed low-level waste disposal unit are below established contaminant regulatory limits. During 2019, precipitation at the Area 3 RWMS was 77 percent above average, and precipitation at the Area 5 RWMS was 69 percent above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter at the Area 5 RWMS dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring in the Area 3 and Area 5 RWMS soil covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 120 centimeters (3.9 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS during 2019. There was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. At the Area 3 RWMS, which received three times the natural precipitation, 57 percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter. All 2019 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs.

2019↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Chapter 5

This chapter presents selected GW flow and radionuclide contaminant transport results from PORFLOW for the VZ and aquifer zone for each type of DU (STs, ETs, LAWV, ILV, and NRCDAs). Results for the nominal PA compliance case and various sensitivity cases are given. Results for the VZ include water saturation spatial profiles and radionuclide flux-to-the-water- table time profiles. Aquifer zone results include maximum concentration spatial contours; radionuclide concentration time profiles at the 100-meter POA; and peak concentrations at the 100-meter POA and time of occurrence for each modeled radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Performance Report 2020 (Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1)

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in 2020, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗

2021 Annual Site Environmental Report

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. The results of PPPL’s 2021 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2021. PPPL’s on-site operations were significantly curtailed in 2021 due to the global coronavirus pandemic. PPPL has engaged in fusion energy research since 1951. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to developing the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2021. PPPL is engaged in a project to replace key NSTX-U components and systems to enable operation of this international fusion user facility. In 2021, PPPL’s radiological environmental monitoring program measured tritium in the air at the NSTX-U Stack and at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of an in-stack monitor located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2021, PPPL complied with permit limits for surface and sanitary discharges. PPPL was honored with awards for EPEAT-certified electronics purchasing and use of peracetic acid as an alternative water treatment chemical in its non-potable process water systems an NJDEP recycling award.

54 ENVIRONMENTAL SCIENCES↗

2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.

54 ENVIRONMENTAL SCIENCES↗

Full Scale HEPA Filter Encapsulation in Ultra-High-Performance Grout - Proof of Concept

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) currently being constructed to treat radioactive waste, includes vitrification facilities for both the high-level waste (HLW) and low activity waste (LAW) fractions. Operation of the WTP will produce contaminated high-efficiency particulate air filters (HEPA), as part of the solid secondary waste (SSW) stream. The HEPA filters receive off-gas from the vessel vent header and primary off-gas treatment system in LAW Facility and remove particulate contaminants including 99 Tc and 129 I salts. The current disposal method for HEPA filters is encapsulation in metal containers using cementitious material (CM) and disposal in the Integrated Disposal Facility (IDF). Results from the 2017 IDF Performance Assessment (PA) WRPS (2018) demonstrated that while compliance is maintained for the 1000 year compliance period mandated by DOE O 435.1 and its accompanying manual, release of constituents from the HEPA filters result in exceedance of the performance objective imposed as the groundwater regulatory limit at later times. For example, at about 1500 years post-closure, solid secondary waste (SSW), including HEPA filters is predicted to become a dominant contributor to 99 Tc release and over the 10,000-year sensitivity analysis period, SSW is the dominant contributor of 129 I release to the groundwater. The estimated release could potentially be reduced if the HEPA filters are not compacted and waste containers could be distributed throughout a large space, thereby diluting the contaminant release. Additionally, a better cementitious material could be used to encapsulate the HEPA filters. One alternative method for disposal of contaminated HEPA filters is encapsulation of the filters in ultra high-performance grout (UHPG). UHPG is a variation of ultra-high-performance concrete (UHPC) is commonly used in the prestressed concrete industry for large structural members. Recent studies of UHPG show it has excellent properties for containing radionuclides such as 99 Tc and 129 I Nichols and Kaplan (2021). This report presents the results of the first attempt to encapsulate a clean, full-size HEPA filter in UHPG and evaluate the effectiveness of the immobilization process and final waste form. A full-scale proof-of-concept simulated waste form was prepared by encapsulating a HEPA filter in a 110-gallon stainless steel (SS) drum using UHPG. A change from Type I/II PC to Type 1L PLC was made after American Rock Products informed the team that they would no longer be using Type I/II by the end of 2024 and the northwest was phasing out Type I/II PC overall. Type I/II PC used in previous studies of UHPG for encapsulation (Nichols and Kaplan 2021). After the UHPG was cured both the scaled mockup and the full-scale simulated waste forms were sectioned for visual examination. UHPG completely encapsulated the filters and bonded to the external surfaces of materials comprising the filters. No cracks were observed in the sectioned waste forms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Performance Report 2019: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in 2019, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗