Search NASA⌕ Search

SEARCH · Search NASA

Results for “adaptive program execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Optimal dynamic remapping of data parallel computations

A large class of data parallel computations is characterized by a sequence of phases, with phase changes occurring unpredictably. Dynamic remapping of the workload to processors may be required to maintain good performance. The problem considered, for which the utility of remapping and the future behavior of the workload are uncertain, arises when phases exhibit stable execution requirements during a given phase, but requirements change radically between phases. For these situations, a workload assignment generated for one phase may hinder performance during the next phase. This problem is treated formally for a probabilistic model of computation with at most two phases. The authors address the fundamental problem of balancing the expected remapping performance gain against the delay cost, and they derive the optimal remapping decision policy. The promise of the approach is shown by application to multiprocessor implementations of an adaptive gridding fluid dynamics program and to a battlefield simulation program.

Nicol, David M.↗

Sorting on STAR

Timing comparisons are given for three sorting algorithms written for the CDC STAR computer. One algorithm is Hoare's (1962) Quicksort, which is the fastest or nearly the fastest sorting algorithm for most computers. A second algorithm is a vector version of Quicksort that takes advantage of the STAR's vector operations. The third algorithm is an adaptation of Batcher's (1968) sorting algorithm, which makes especially good use of vector operations but has a complexity of N(log N)-squared as compared with a complexity of N log N for the Quicksort algorithms. In spite of its worse complexity, Batcher's sorting algorithm is competitive with the serial version of Quicksort for vectors up to the largest that can be treated by STAR. Vector Quicksort outperforms the other two algorithms and is generally preferred. These results indicate that unusual instruction sets can introduce biases in program execution time that counter results predicted by worst-case asymptotic complexity analysis.

Stone, H. S.↗

Real-time control for manufacturing space shuttle main engines: Work in progress

During the manufacture of space-based assemblies such as Space Shuttle Main Engines, flexibility is required due to the high-cost and low-volume nature of the end products. Various systems have been developed pursuing the goal of adaptive, flexible manufacturing for several space applications, including an Advanced Robotic Welding System for the manufacture of complex components of the Space Shuttle Main Engines. The Advanced Robotic Welding System (AROWS) is an on-going joint effort, funded by NASA, between NASA/Marshall Space Flight Center, and two divisions of Rockwell International: Rocketdyne and the Science Center. AROWS includes two levels of flexible control of both motion and process parameters: Off-line programming using both geometric and weld-process data bases, and real-time control incorporating multiple sensors during weld execution. Both control systems were implemented using conventional hardware and software architectures. The feasibility of enhancing the real-time control system using the problem-solving architecture of Schemer is investigated and described.

Ruokangas, Corinne C.↗

Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy -Major Accomplishments and Lessons Learned

This presentation has shown the accomplishments of the PASS project over three decades and highlighted the lessons learned. Over the entire time, our goal has been to continuously improve our process, implement automation for both quality and increased productivity, and identify and remove all defects due to prior execution of a flawed process in addition to improving our processes following identification of significant process escapes. Morale and workforce instability have been issues, most significantly during 1993 to 1998 (period of consolidation in aerospace industry). The PASS project has also consulted with others, including the Software Engineering Institute, so as to be an early evaluator, adopter, and adapter of state-of-the-art software engineering innovations.

Orr, James K.↗

Maneuver Design and Calibration for the Genesis Spacecraft

Genesis is the fifth mission selected as part of NASA's Discovery Program. The objective of Genesis is to collect solar wind samples for a period of approximately two years while in a halo orbit about the Earth-Sun L I point. At the end of this period, the samples are to be returned to a specific recovery point on the Earth for subsequent analysis. This goal has never been attempted before and presents a formidable challenge in terms of mission design and operations, particularly planning and execution of propulsive maneuvers. To achieve a level of cost-effectiveness consistent with a Discovery-class mission, the Genesis spacecraft design was adapted to the maximum extent possible from designs used on earlier missions, such as Mars Global Surveyor (MGS) and Stardust, another sample collection mission. The spacecraft design for Genesis is shown. Spin stabilization was chosen for attitude control, in lieu of three-axis stabilization, with neither reaction wheels nor accelerometers included. This precludes closed-loop control of propulsive maneuvers and implies that any attitude changes, including spin changes and precessions, will behave like translational propulsive maneuvers and affect the spacecraft trajectory. Moreover, to minimize contamination risk to the samples collected, all thrusters were placed on the side opposite the sample collection canister. The orientation and characteristics of thrusters are indicated. For large maneuvers (>2.5 m/s), two 5 lbf thrusters will be used for delta v, with precession to the burn attitude, followed by spin-up from 1.6 to 10 rpm before the burn and spin down to 1.6 rpm afterwards, then precession back to the original spin attitude. For small maneuvers (<2.5 m/s), no spin change is needed and four 0.2 lbf thrusters are used for Av. Single or double 360 deg. precession changes are required whenever the desired delta v falls inside the two-way turn circle (about 0.4 m/s) based on the mass properties, spin rate and lever arm lengths based on thruster locations. In such instances, delta v resulting from spacecraft precession cannot be used effectively as a component of the desired delta v, and must therefore be removed by precessing at least one complete revolution around the turn circle. To eliminate cross-track execution errors, a second revolution in the opposite direction would also be performed. This paper will address the design of propulsive maneuvers in light of the aforementioned challenges and other constraints. Maneuver design will be performed jointly by the Navigation Team at JPL and the Spacecraft Team at LMA, based on the process indicated . Typical maneuver timelines will be presented which address considerations introduced by attitude changes. These include nutation, which is introduced by precessing or spinning down and must be given sufficient time to damp out prior to execution of subsequent events, as well as sun and earth pointing constraints, which must be considered to ensure sufficient spacecraft power and to minimize telecommunications interruptions, respectively. The paper will include a description of how individual propulsive maneuvers are resolved into components to account for delta v from translational burns and spacecraft attitude changes required to carry out such maneuvers. Contributions to maneuver delta v arising from attitude changes, based on mass properties for the period just after launch, are indicated. Similar curves will be presented spanning all mission phases from launch through return. A set of closed-form equations for resolving maneuver components, base on a specific delta v required for correction or deterministic changes to the spacecraft trajectory will be presented, as well. In addition to nominal maneuvers, special calibration maneuvers are planned to improve open-loop modeling of maneuvers and to reduce execution errors. Uncalibrated execution errors are indicated. Such errors could be reduced by 50% or more over the course of the mission. Special calibrations are of particular importance for the return leg of the mission, since the sample canister must be returned to a specific location within the Utah Test and Training Range (UTTR) for mid-air retrieval. An entry angle tolerance of no less than +/- 0.08 deg. is required to achieve this objective. Biasing of the final return maneuvers coupled with a specific maneuver mode to use a series of well-characterized spin changes to effect these maneuvers is part of the current Genesis baseline mission plan. Another important objective of calibrations is to better characterize precession maneuvers. Such maneuvers are part of most propulsive maneuvers, but are also required periodically to maintain sun-pointing for power or daily during solar-wind pointing during collection periods. Although relatively small, such maneuvers will have a significant cumulative impact on orbit determination, particularly in the halo portion of the mission. The current mission design also calls for three stationkeeping maneuvers during each halo orbit of approximately six months duration. These stationkeeping maneuvers may be sufficiently small that single or double 360 deg. precession changes may be required. Because there are no accelerometers on board the spacecraft, calibration can only be performed with the aid of ground-based radiometric tracking. To establish a high degree of accuracy in characterizing the magnitude of burns, the spacecraft spin axis should be along the line of sight to the Earth, providing Doppler measurements with <1 mm/sec accuracy in S-Band. Emission constraints allow such alignment only during certain portions of the mission when the Earth-spacecraft-sun geometry is favorable. The impact of precessions, or burns at times when geometry is not favorable, can be assessed by reconstruction of the spacecraft trajectory using tracking arcs of several days before and after the event.

Williams, Kenneth E.↗

Aspen-based performance and energy modeling frameworks

Now with the anticipation of exascale architectures, energy consumption is becoming one of the critical design parameters, especially in light of the energy budget of 20-30 Megawatts set by the U.S. Department of Energy. Understanding an application’s execution pattern and its energy footprint is critical to improving application operation on a diverse heterogeneous architecture. Applying application-specific performance optimization can consequently improve energy consumption. However, this approach is only applicable to current systems. As we enter a new era of exascale architectures that is projected to contain more complex memory hierarchies, increased levels of parallelism, heterogeneity in hardware, and complex programming models and techniques, energy and performance management is getting more cumbersome. We therefore propose techniques that predict the energy consumption beforehand or at runtime to enable proactive tuning. Such energy prediction approaches must be generic and adapt themselves at runtime to changing application and hardware configurations. Most existing energy estimation and prediction approaches are empirical in nature and thus tied to current systems. To overcome this limitation, we propose two energy estimation techniques: ACEE (Algorithmic and Categorical Energy Estimation), which uses a combination of analytical and empirical modeling techniques; and AEEM (Aspen’s Embedded Energy Estimation), a system-level analytical energy estimation technique. Both of these models incorporate the Aspen domain specific language for performance modeling. We present the methodologies of these two models and test their accuracy using five proxy applications. We also describe three use cases.

79 ASTRONOMY AND ASTROPHYSICS↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Two-Stage Adaptive Restoration Decision Support System for a Self-Healing Power Grid

Power outages cost American industries and businesses billions of dollars and jeopardize the lives of hospital patients. The losses can be greatly reduced with a fast, reliable, and flexible self-healing tool. This paper is aimed to tackle the challenging task of developing an adaptive restoration decision support system (RDSS). The proposed RDSS determines restoration actions both in planning and real-time phases and adapts to constantly changing system conditions. The comprehensive formulation encompasses practical constraints including ac power flow, dynamic reserve, and load modeling. Here, the combinatorial problem is decomposed into a two-stage formulation solved by an integer L-shaped algorithm. The two stages are then executed online in the RDSS framework employing a sliding window method. The IEEE 39-bus system has been studied under normal and contingency conditions to demonstrate the effectiveness and efficiency of the proposed online RDSS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lessons Learned from Ecosystem-Scale Experimental Field Studies (Workshop Report)

Efforts to understand and predict ecosystem responses to environmental change require long-term, large-scale, spatially representative experiments and observations that capture natural variability, test predictive models, and generate transferable knowledge. Such studies are indispensable for unraveling the complexities of terrestrial ecosystems and their responses to disturbances and evolving environmental conditions, while generating the data necessary for developing mechanistic models and predictive tools that inform decision-making processes. Having a rich history of designing and executing large-scale ecosystem experiments, the U.S. Department of Energy’s Environmental System Science program convened a workshop in January 2025 that brought together leaders in the field to distill critical lessons from decades of experience in large-scale experiments. The workshop aimed to (1) provide an ecosystem experiment primer for best practices, thus ensuring a high scientific return on investment for funding agencies, and (2) offer a robust framework for the design and management of future research initiatives. This report synthesizes insights and experiences from workshop participants and is structured to capture the entire research life cycle, from goal setting and design to operations, adaptive management, team dynamics, collaborations, and the often overlooked aspect of decommissioning. By synthesizing decision-making and lessons learned across diverse research approaches, the report aims to provide a template of essential factors to consider when designing successful long-term, large-scale ecosystem experiments.

54 ENVIRONMENTAL SCIENCES↗

Orion's Powered Flight Guidance Performance During Artemis I

Artemis is NASA’s campaign to explore the Moon and beyond. Artemis I, the un-crewed exo-LEO test flight, was completed in 2022. The Artemis I mission provided the means to prove-out both vehicle and systems as a pre-cursor to more advanced missions. The Orion capsule and service module had to be capable of accurately executing all major orbital burns and numerous correction burns to successfully execute the mission profile. In support of this needed translation maneuver capability, a powered flight guidance algorithm has been designed that provides a number of guided burn options depending on the burn objective. Some of these guidance options are based on classic orbit transfer problems, such as Lambert's time-of-flight problem. Some are based on proven NASA heritage manned space programs like Apollo and Shuttle. Some are new concepts that fill unique niche requirements. All of these options are integrated into an architecture based on a proven Shuttle heritage design, with a simple closed-loop guidance strategy, that provides both modularity, simplicity and adaptability to future, as yet to be defined, mission profiles. This paper will summarize the performance of Orion’s orbital powered flight guidance during the mission.

space guidance↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

Numerical Computation of a Continuous-thrust State Transition Matrix Incorporating Accurate Hardware and Ephemeris Models

A significant body of work exists showing that providing a nonlinear programming (NLP) solver with expressions for the problem constraint gradient substantially increases the speed of program execution and can also improve the robustness of convergence, especially for local optimizers. Calculation of these derivatives is often accomplished through the computation of spacecraft's state transition matrix (STM). If the two-body gravitational model is employed as is often done in the context of preliminary design, closed form expressions for these derivatives may be provided. If a high fidelity dynamics model, that might include perturbing forces such as the gravitational effect from multiple third bodies and solar radiation pressure is used then these STM's must be computed numerically. We present a method for the power hardward model and a full ephemeris model. An adaptive-step embedded eight order Dormand-Prince numerical integrator is discussed and a method for the computation of the time of flight derivatives in this framework is presented. The use of these numerically calculated derivatieves offer a substantial improvement over finite differencing in the context of a global optimizer. Specifically the inclusion of these STM's into the low thrust missiondesign tool chain in use at NASA Goddard Spaceflight Center allows for an increased preliminary mission design cadence.

Low Thrust↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Implementation of an Adaptive Controller System from Concept to Flight Test

The National Aeronautics and Space Administration (NASA) at the Dryden Flight Research Center (DFRC) has been conducting flight-test research using an F-15 aircraft (figure 1). This aircraft has been specially modified to interface a neural net (NN) controller as part of a single-string Airborne Research Test System (ARTS) computer with the existing quad-redundant flight control system (FCC) shown in figure 2. The NN commands are passed to FCC channels 2 and 4 and are cross channel data linked (CCDL) to the other computers as shown. Numerous types of fault-detection monitors exist in the FCC when the NN mode is engaged; these monitors would cause an automatic disengagement of the NN in the event of a triggering fault. Unfortunately, these monitors still may not prevent a possible NN hard-over command from coming through to the control laws. Therefore, an additional and unique safety monitor was designed for a single-string source that allows authority at maximum actuator rates but protects the pilot and structural loads against excessive g-limits in the case of a NN hard-over command input. This additional monitor resides in the FCCs and is executed before the control laws are computed. This presentation describes a "floating limiter" (FL) concept that was developed and successfully test-flown for this program (figure 3). The FL computes the rate of change of the NN commands that are input to the FCC from the ARTS. A window is created with upper and lower boundaries, which is constantly "floating" and trying to stay centered as the NN command rates are changing. The limiter works by only allowing the window to move at a much slower rate than those of the NN commands. Anywhere within the window, however, full rates are allowed. If a rate persists in one direction, it will eventually "hit" the boundary and be rate-limited to the floating limiter rate. When this happens, a persistent counter begins and after a limit is reached, a NN disengage command is generated. The tunable metrics for the FL are (1) window size, (2) drift rate, and (3) persistence counter. Ultimate range limits are also included in case the NN command should drift slowly to a limit value that would cause the FL to be defeated. The FL has proven to work as intended. Both high-g transients and excessive structural loads are controlled with NN hard-over commands. This presentation discusses the FL design features and presents test cases. Simulation runs are included to illustrate the dramatic improvement made to the control of NN hard-over effects. A mission control room display from a flight playback is presented to illustrate the neural net fault display representation. The FL is very adaptable to various requirements and is independent of flight condition. It should be considered as a cost-effective safety monitor to control single-string inputs in general.

Larson, Richard R.↗

Experiences with Testing the Largest Ground System NASA Has Ever Built

In the 1980s, the National Aeronautics and Space Administration (NASA) embarked upon a major Earth-focused program called Mission to Planet Earth. The Goddard Space Flight Center (GSFC) was selected to manage and develop a key component - the Earth Observing System (EOS). The EOS consisted of four major missions designed to monitor the Earth. The missions included 4 spacecraft. Terra (launched December 1999), Aqua (launched May 2002), ICESat (Ice, Cloud, and Land Elevation Satellite, launched January 2003), and Aura (scheduled for launch January 2004). The purpose of these missions was to provide support for NASA s long-term research effort for determining how human-induced and natural changes affect our global environment. The EOS Data and Information System (EOSDIS), a globally distributed, large-scale scientific system, was built to support EOS. Its primary function is to capture, collect, process, and distribute the most voluminous set of remotely sensed scientific data to date estimated to be 350 Gbytes per day. The EOSDIS is composed of a diverse set of elements with functional capabilities that require the implementation of a complex set of computers, high-speed networks, mission-unique equipment, and associated Information Technology (IT) software along with mission-specific software. All missions are constrained by schedule, budget, and staffing resources, and rigorous testing has been shown to be critical to the success of each mission. This paper addresses the challenges associated with the planning, test definition. resource scheduling, execution, and discrepancy reporting involved in the mission readiness testing of a ground system on the scale of EOSDIS. The size and complexity of the mission systems supporting the Aqua flight operations, for example, combined with the limited resources available, prompted the project to challenge the prevailing testing culture. The resulting success of the Aqua Mission Readiness Testing (MRT) program was due in no small measure to re-structuring the traditional programmatic and technical approach to a more efficient and robust program. Programmatically, it meant gaining the endorsement, commitment, and cooperation of the numerous subsystem element managers and other stakeholder organizations. Technically, it required an MRT program that was agile, could rapidly adapt to requirements changes, and was flexible in its overall approach. Furthermore, this paper addresses the following questions: 1. What are the key ingredients (e.g., test tools, organization) needed to conduct a successful MRT program? 2. What distinguishes EOS MRT from the traditional system testing approach? 3. Where should the focus of testing be since it is infeasible to test every element or subsystem? 4. How can MRT be applied effectively to other systems or missions? To provide answers to these questions, this paper relies heavily on real-life, hands-on experiences ("lessons learned") gained during mission readiness testing of the Terra ground system and, most recently, the Aqua and ICESat missions. Moreover, this paper explores how lessons learned were turned into lessons applied for the upcoming Aura mission. Although derived from the EOS missions, MRT techniques and strategies can be applied to enhance the testing of other missions.

Lehtonen, Ken↗

An investigation of transitional management problems for the NSTS at NASA, executive summary

A summary is given of the work of the University of Houston research team for the third quarter of effort in a yearly grant for the National Space Transportation System (NSTS). As such it serves as a resting place for the ideas and concepts developed this quarter with the collaboration of the Management Integration Offices of NASA. Another objective is the hope that the report will help to stimulate the healthy problem solving process already present at NASA. The main goal of the contractual work is to help NASA to find ways and means of moving into a truly operational era with the shuttle program. This work is a continuation of early work and the reader is encouraged to read the final reports of earlier years. Chapter One of the report is an introduction. Chapter Two deals with industrial adaptation and is in two parts: theory and application. In the theory section, impressions of the management system immediately after reflight are discussed. A key issue, in the author's opinion is the seeming lack of purpose of the program. The application section has six appendices: 1988 Demographic Survey, Field Notes of Interview with HL/P South Texas Nuclear Project, a comparison of the Agendas of the current manager with that of a previous manager, a note on compartmentalization to assist in manifesting, a study on launch prediction for STS-26, and a discussion of a statistical decision-making course for upper level managers. Chapter Three deals with theoretical results returned on flow shop scheduling which will be of use downstream. Chapter Four deals with a statistical model developed to predict the flight rate in future years and indicates the program will have trouble making its schedule. Chapter Five covers the constructural effort and shows the work to be on schedule.

Hunsucker, John↗