Search NASA⌕ Search

SEARCH · Search NASA

Results for “backfilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model. Zion Station Restoration Project

ZionSolutions is in the process of decommissioning the Zion Nuclear Power Station (ZNPS). After decommissioning is completed, the site will contain two reactor Containment Buildings, the Fuel Handling Building and Transfer Canals, Auxiliary Building, Turbine Building, Crib House/Forebay, and a Waste Water Treatment Facility that have been demolished to a depth of 3 feet below grade. Additional below ground structures remaining will include the Main Steam Tunnels and large diameter intake and discharge pipes. These additional structures are not included in the modeling described in this report, but the inventory remaining (expected to be very low) will be included with one of the structures that are modeled as designated in the Zion Station Restoration Project (ZSRP) License Termination Plan (LTP). The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Construction and Social Experiences in Residential Remediation Sites - 13423

Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

54 ENVIRONMENTAL SCIENCES↗

Technical Design and Optimization of a HLW-Repository in the Gorleben Salt Dome including Detailed Design of the Sealing System - 13305

The preliminary safety analysis for a HLW repository at Gorleben, the potential repository site in Germany, takes into account an updated set of data on the amounts and types of expected heat generating waste, the documented results of the exploration of the Gorleben salt dome, and the 'Safety Requirements Governing the Final Disposal of Heat-Generating Radioactive Waste' as at 30 September 2010. A repository design was developed for two emplacement concepts (drift disposal and borehole disposal) mainly influenced by the thermal impact of the heat-generating waste on the host rock and taking into account mining constrains. According to the objective to create the conditions for a safe containment of the waste containers in the host rock, a closure concept consisting of backfilling and sealing measures was developed. The repository was designed in such a way that retrievability requirements can be met for all waste containers within the operating phase of the repository. In addition, it could be shown that sufficient measures for ensuring subcriticality are provided both during the operational and the post-closure phases of the repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

German research and development for high level waste in light of the new site selection process - 15516

The German government decided 50 years ago, that radioactive waste is to be disposed of in Deep Geologic Repositories, preferably in a salt rock formation. Soon after, in 1967, research in the Asse salt mine was initiated. Since then substantial progress has been achieved in the development of the radioactive waste disposal programme in Germany. For a geologic repository for High Level Waste in salt a reference concept has been developed, which represented the radioactive waste management processes from transport of High Level Waste and Spent Nuclear Fuel to an interim storage site, waste conditioning and repackaging for disposal, to emplacement of the waste packages. The feasibility of the reference concept has been proven by demonstration tests for all relevant equipment: a pilot conditioning plant has been built as well as the main equipment for the entire transport chain including the shaft transport and emplacement technologies for heavy loads fulfilling strict requirements for nuclear and mining safety. Also the backfilling technology has been optimised for the purposes of a repository for radioactive waste. Finally, tests have been performed to verify thermo-mechanical models for the host rock. The demonstration tests have been performed to an extent which even would allow immediate licensing of the repository and the employed equipment. The Research and Development work was completed by further optimisation of the reference concept. Construction and operation of deep geologic repositories for low and intermediate level radioactive wastes in Germany benefited from the above mentioned but also stimulated the knowledge and experience build-up for the repositories for High Level Waste. Despite the well progressed work for a deep geologic repository in salt R and D work in Germany for already a long time also considered other host rock formations. While work for crystalline rock mainly consisted of relatively small contributions to international research projects due to the limited occurrence of suitable sites in Germany, projects and developments for repositories in clay formations have had an increasing contribution to the overall Research and Development work for radioactive waste repositories in Germany. In July 2013 a new site selection act was put into force, which set the initiating conditions for the German programme on radioactive waste management. Principally, a process was initiated to search for a site for a deep geologic repository for High Level Waste independent from earlier decisions. This means that a site shall be determined without predetermination by earlier decisions. Nevertheless, to enable a sound decision for a site selection it is necessary to be able draw back on the knowledge and experience from earlier activities. Otherwise, tedious learning processes would have to be experienced again. Since efforts to open up a site selection process again grew since the late 1990's projects had been implemented timely to capture existing knowledge. The paper at hand describes the achievements of R and D activities in Germany, the change of radioactive waste management policy and the endeavours to maintain the achievements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Retrieval project Asse II - Lessons Learned in Radiological Protection - 18263

From 1967 to 1978 in total 125,787 drums and packages with low- and intermediate level waste were emplaced in the Asse II mine. The disposal operation ended in 1978 due to a revision of the Atomic Energy Act. For the disposal of radioactive waste, a plan approval procedure would have been mandatory due to the Atomic Energy Act, but the mining law was the legal basis for operating the Asse II mine, further on. A concept for a closure of the mine was not existing at that time. On January 1, 2009, the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz BfS) became the new license-holder and operator of the Asse II mine under the Atomic Energy Act. The Act on the Organizational Restructuring in the Field of Disposal in Germany became effective on July 30, 2016. The act provides that a federally owned company, the Bundesgesellschaft fuer Endlagerung (BGE mbH, Federal Company for Radioactive Waste Disposal) is formed to carry out the operative tasks of searching for a High Level Waste (HLW) repository, the construction and operation of repositories (Konrad, Morsleben) and of the Asse II mine. Since April 25, 2017 BGE is in charge of the operative tasks that have so far been carried out by BfS. Up to now, the long-term safety of the Asse II mine has not been demonstrated in the case that all the waste will remain inside the mine. Further problems arise from a lack of host rock stability, the incomplete backfilling of the mining areas that have not been used for the emplacement of radioactive waste, and a continuous brine inflow into the mine of approx.12 m{sup 3} per day. For these reasons, according to chap. 57b of the Atomic Energy Act, the Asse II mine is to be closed without delay after retrieving the emplaced nuclear waste. Besides the recent organizational changes in Germany and the special problems giving rise to retrieve the waste, in this paper the operational experiences since 2009 on the way from mining law to atomic law will be described. This applies to the radiation protection regime, the release and clearance procedure, and some measures to boost efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generic HLW Repository In Bedded Salt In Germany: Emplacement Technologies and Repository Designs - 18288

In Germany, a new site selection act for a repository for HLW and SNF entered into force in July 2013 and was amended in spring 2017 [1]. It stipulates that the safety of repository systems for heat-generating radioactive waste and spent nuclear fuel in different host rock formations be compared. This requires that generic repository concepts and adequate safety- and safety demonstration concepts for all potential host rock formations in Germany (salt, clay and crystalline rock) exist. For several decades, development of disposal concepts and safety analyses for a repository in a salt dome was prioritized while repository concepts for clay and crystalline rock have been taken into account for two decades only. So far, bedded salt formations have not been the subject of comparative investigations. Thus, in summer 2015, the Federal Ministry for Economic Affairs and Energy (BMWi) launched the R and D project KOSINA to develop repository designs and carry out safety analyses for different emplacement alternatives in a generic bedded salt formation and a generic salt pillow. KOSINA is an acronym for 'Concept development for a generic repository for heat-generating waste in bedded salt formations in Germany as well as development and testing of a safety and demonstration concept'. Together with its partners BGR, GRS, and IfG, DBE Technology GmbH has successfully carried out an almost three years lasting scientific programme, which will be concluded in April 2018. The core areas of the programme are the development of generic geologic models, including derivation of model parameters, the development of a safety and safety demonstration concept, the development of technical repository designs for four different emplacement alternatives, the analysis of geomechanical integrity, the evaluation of operational safety as well as the analysis of radiological consequences. An interim report, which compiles the basic data of the waste inventory, the repository design requirements, the data basis for geologic model developments, and the outline of a safety and safety demonstration concept, was already published in February 2016. The main achievements of the R and D project KOSINA are the development of four different repository designs, two per each generic geologic model (flat-bedded salt, salt pillow) based on thermomechanical calculations. This includes the implementation of a safety concept that provides containment of the radioactive materials with regard to the technical designs of waste packages, transport and emplacement technologies, and backfilling and sealing concepts. Furthermore, the integrity of the geologic barriers could be demonstrated for all four repository designs, and the long-term predictions showed no radiological releases during the demonstration period of one million years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural Attenuation Progress, Plume Movement, and Source Reduction for the SRS CMP Pits VOC Plume - 18384

Monitoring the effectiveness of natural attenuation for remediating the Savannah River Site (SRS) Chemical, Metals, and Pesticides (CMP) Pits plume fringe has focused intensive sampling of shallow groundwater for different reaches of Pen Branch from 2005 to 2017. Volatile organic compounds (VOCs) were analyzed for the critical hyporheic zone beneath Pen Branch and adjacent floodplain. These sampling efforts assisted larger-scale compliance monitoring in accordance with US Environmental Protection Agency (EPA) guidelines. When applicable, EPA has found natural attenuation to be an acceptable mode of achieving regulatory compliance. While natural attenuation can include any ecosystem function that reduces contaminant loads, it is focused on microbial biochemical pathways. The study plume originated from CMP Pits, a waste disposal area in operation from 1971 to 1979, when the pits were closed and backfilled. In 1984, excavations of source material and contaminated soils were removed up to a depth of 7.6 m below the trenches. However, monitoring well data indicated that perchloroethylene (PCE) and trichloroethylene (TCE) had seeped beneath the vadose zone and formed groundwater plumes reaching the Pen Branch valley below. Although 'hot spots' of TCE were found within the Pen Branch floodplain, it was unknown just how the flow pattern was entering Pen Branch and to what degree natural attenuation was reducing the contaminant load. For this reason, our stations were located along the Pen Branch reach bordering the modelled plume fringe. In general, VOCs were highest at station piezometer holes in the middle study zone. Moderate VOC levels were detected at upstream stations and lowest VOC levels were found at downstream stations. Electrical resistance heating (ERH) with soil vapor extraction (SVE) conducted by Savannah River Nuclear Solutions (SRNS) from 2008 to 2009 at the filled CMP Pits helped to remove contaminants trapped in clay horizons beneath the CMP Pits and to reduce overall new plume concentrations. Collectively PCE, TCE, and their degradation products displayed a favorable yearly trend of contaminant natural attenuation. Additionally, phytoremediation actions by native bamboo, Arundinaria gigantea, added to VOC removal from wetlands soils. Total VOC concentrations at some stations declined by >25% and concentrations of vinyl chloride (VC), a nearly-final stage degradation product increased from 0.0 ppb to >20 ppb. Temporal patterns displayed a continued reduction of VOCs, while spatial patterns indicated a possible slow progression of the plume downstream along Pen Branch. Conclusions about plume export into surface waters must address the seasonal and geological complexities of this system. Hydrological patterns are complex and plumes do not directly outcrop into Pen Branch surface waters, but emerge into the stream through pathways in the porous hyporheic zone. For this reason, continued sampling must identify critical depths and downstream locations where plume flows may be more intense. During drought periods with no surface flow in Pen Branch, subsurface plume flows may be flowing downslope in the hyporheic zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concept for Operation of the Belgian Geological Disposal Facility for Category B and C Wastes - 19247

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF) in poorly indurated clays as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). In the absence of a policy decision, the proposed Belgian reference option for disposal of such waste is a GDF in poorly indurated clays, located at a depth of between 200 m and 600 m. Within the framework of the first Safety and Feasibility Case (SFC-1) undertaken by ONDRAF/NIRAS, the organization is updating its former GDF layout, which dates back from 2003. The SFC-1 GDF concept is characterized by a central zone in which shafts, joined by a central connecting gallery, provide two surface connections. On opposing sides of the central gallery, four (two on each side) access galleries branch off to connect the disposal areas for B- and C-waste, respectively. Disposal dead end galleries, 400 m long, branch off perpendicular to the access galleries. Both waste areas will be operated during two separate time frames. The current underground layout has been significantly modified from the previous 2003 layout. The modifications are largely based on several R and D studies with regard to the future operations of the GDF carried out by BGE Technology GmbH in support to ONDRAF/NIRAS. This paper focuses on major operational processes such as waste transport and emplacement. In addition, the current conceptual design of the backfilling and closure concept is presented. Optimization studies on the further development of the operational process are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New Architectures for Designed Catalysts: Selective Oxidation using AgAu Nanoparticles on Colloid-Templated Silica

A highly modular synthesis of designed catalysts with controlled bimetallic nanoparticle size and composition and a well-defined structural hierarchy is shown. Exemplary catalysts—bimetallic dilute Ag-in-Au nanoparticles partially embedded in a porous SiO 2 matrix (SiO 2 –Ag x Au y )—were synthesized by the decoration of polymeric colloids with the bimetallic nanoparticles followed by assembly into a colloidal crystal backfilled with the matrix precursor and subsequent removal of the polymeric template. This work reports that these new catalyst architectures are significantly better than nanoporous dilute AgAu alloy catalysts (nanoporous Ag 3 Au 97 ) while retaining a clear predictive relationship between their surface reactivity with that of single-crystal Au surfaces. This paves the way for broadening the range of new catalyst architectures required for translating the designed principles developed under controlled conditions to designed catalysts under operating conditions for highly selective coupling of alcohols to form esters. Excellent catalytic performance of the porous SiO 2 –Ag x Au y structure for selective oxidation of both methanol and ethanol to produce esters with high conversion efficiency, selectivity, and stability was demonstrated, illustrating the ability to translate design principles developed for support-free materials to the colloid-templated structures. The synthetic methodology reported is customizable for the design of a wide range of robust catalytic systems inspired by design principles derived from model studies. Fine control over the composition, morphology, size, distribution, and availability of the supported nanoparticles was discussed.

36 MATERIALS SCIENCE↗

Priority-BF: A Task Manager for Priority-Based Scheduling

The increasing demand for computational resources, particularly in High-Performance Computing environments, necessitates to rethink how we handle job scheduling strategies. This work addresses the challenge of managing concurrent jobs with differing priorities on overloaded parallel systems, where strict QoS constraints are often difficult for users to define. Our solution relies on a qualitative description of priorities and pulls from two key approaches: the Easy-BF algorithm and the Conservative Backfilling algorithms. This solution improves the response time for high-priority jobs by 50% without affecting the overall system utilization. We show its applicability in several critical scenarios such as High-Performance Computing (HPC) resource management and in-situ computing.

Gainaru, Ana [ORNL]↗

Strategies for obtaining long constant-pressure test times in shock tubes

Several techniques have been developed for obtaining long, constant-pressure test times in reflected shock wave experiments in a shock tube, including the use of driver inserts, driver gas tailoring, helium gas diaphragm interfaces, driver extensions, and staged driver gas filling. Here, we detail these techniques, including discussion on the most recent strategy, staged driver gas filling. Experiments indicate that this staged filling strategy increases available test time by roughly 20 % relative to single-stage filling of tailored driver gas mixtures, while simultaneously reducing the helium required per shock by up to 85 %. This filling scheme involves firstly mixing a tailored helium–nitrogen mixture in the driver section as in conventional driver filling and, secondly, backfilling a low-speed-of-sound gas such as nitrogen or carbon dioxide from a port close to the end cap of the driver section. Using this staged driver gas filling, in addition to the other techniques listed above, post-reflected shock test times of up to 0.102 s (102 ms) at 524 K and 1.6 atm have been obtained. Spectroscopically based temperature measurements in non-reactive mixtures have confirmed that temperature and pressure conditions remain constant throughout the length of these long test duration trials. Finally, these strategies have been used to measure low-temperature n-heptane ignition delay times.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Infiltration studies of additive manufacture of WC with Co using binder jetting and pressureless melt method

Additive manufacturing (AM) of tungsten carbide-cobalt (WC-Co) is explored starting with WC preforms shaped with binder jet additive manufacturing (BJAM) followed by melt infiltration of Co. The research objective is to demonstrate the ability to net-shape WC-Co composites through BJAM of a WC preform followed by backfilling with cobalt via pressureless infiltration. This method also has the potential to minimize shrinkage and grain growth compared to other AM techniques. The effects of sintering, Co content, and infiltration time on the net shaping and properties of processed composites are shown. The best shaped material had an average grain size of 5.1 μm, 32 vol.% Co, density of 98.54% theoretical, fracture toughness of 23.2 MPa m 1/2 , and hardness of 9.0 GPa. Data presented illustrates that the proposed approach results in favorable ceramic-metal (cermet) properties and is viable for fabricating cermets of other material combinations. Furthermore successful AM of cermets provides complex geometries, high throughout, and low costs.

36 MATERIALS SCIENCE↗

Stability of plutonium oxide nanoparticles in the presence of montmorillonite and implications for colloid facilitated transport

The physical and chemical stability of PuO 2 nanoparticles (intrinsic colloids) in groundwater will control their transport and may affect the performance of high-level radioactive waste repositories. In this study, we examined the chemical stability of two types of PuO 2 nanoparticles at both 25 and 80 °C. The “alkaline” PuO 2 nanoparticles were prepared by neutralizing an acidic Pu(IV) solution with dilute NaOH to pH ~9.5. The “acidic” PuO 2 nanoparticles were precipitated from 0.1 M nitric acid by heating a Pu(IV) solution at 60–80 °C for 30 min. The chemical stability of these PuO 2 nanoparticles was tested in the presence of montmorillonite, a common mineral in the environment and potentially relevant backfill material in some nuclear waste repository designs. The “alkaline” PuO 2 nanoparticles were found to be unstable over a timescale of months at both 25 and 80 °C, with elevated temperature enhancing their dissolution rates and sorption to montmorillonite. PuO 2 nanoparticle dissolution rates decreased with increasing Pu concentration, consistent with solution saturation. The “acidic” PuO 2 nanoparticles appeared to remain stable for much longer than the “alkaline” PuO2 nanoparticles. The “alkaline” PuO 2 nanoparticle dissolution rate constants were as high as 10 -11.9±0.4 mol m -2 s -1 and 10 -11.2±0.2 mol m -2 s -1 at 25 and 80 °C, respectively, while the “acidic” PuO 2 nanoparticle dissolution rate at 80 °C was 10 -13.5 mol m -2 s -1 . Based on transmission electron microscopy, the “alkaline” and “acidic” PuO 2 nanoparticles were of similar size (2.5–4.5 and 2–3 nm nanoparticles, respectively). However, the “acidic” PuO 2 nanoparticles formed more ordered nanoparticle aggregates. Our results suggest that the specific conditions experienced during PuO 2 nanoparticle formation could significantly affect the stability of PuO 2 in the presence of competing sorption processes and, in turn, the relative importance of intrinsic versus pseudocolloid transport in the environment.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Leaching behaviour of low Ca:Si ratio CaO–SiO{sub 2}–H{sub 2}O systems

A dynamic leaching study of the dissolution of low calcium to silicon ratio (C/S) calcium–silicate–hydrate (C–S–H) systems with initial C/S ranging from 0.2 to 0.6 has been undertaken. Dissolution was studied in demineralised water at 25 °C to a degree of leaching of 2.5 m{sup 3} kg{sup −1}. These C–S–H gels show remarkably similar behaviour during early leaching stages, giving an equilibrated pH of ~ 9.9 and a solution phase C/S of ~ 0.29. Over longer times, C–S–H gels with C/S > 0.29 evolve, on leaching, towards a congruent dissolution point with a solid C/S close to 0.84 (consistent with tobermorite) and pH ~ 10.8. C–S–H gels with C/S < 0.29 become increasingly silica-rich on leaching but maintain an alkaline pH > 9.5 down to at least C/S = 0.07 (the lowest ratio reached). For C/S < 0.7, chemical modelling and X-ray diffraction data support an explanation of the incongruent dissolution behaviour of the low C/S C–S–H gels based on the congruent dissolution of distinct amorphous silica and tobermorite-like C–S–H phases. Above C/S of 0.7, the dissolution data are well described by an ideal solid solution model for the C–S–H phases. These results are of relevance to the consideration of the disposal of silica-rich vitrified intermediate-level radioactive wastes in cement-based concepts for geological disposal, where maintenance of alkaline pH values forms a key component of the chemical barrier to radionuclide migration. The implications are that the long-term pH buffering capacity provided by cementitious backfill materials would not be significantly affected by interactions with silica-rich wasteforms, which may lower the net C/S ratio of C–S–H phases, due to the natural tendency of these systems to restore congruent dissolution at pH 10.8.

36 MATERIALS SCIENCE↗