Search NASA⌕ Search

SEARCH · Search NASA

Results for “balance of system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within +/-0.05% the entire system has an accuracy of +/-0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within .+-.0.05%, the entire system has an accuracy of a .+-.0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

Recent Developments and Status of the Langley Single Vector Balance Calibration System (SVS)

The Langley Research Center (LaRC) Single Vector Balance Calibration System (SVS) was first introduced in 2000 by Peter Parker. The SVS combines the Design of Experiments (DOE) methodology with a novel load application system. Since that time three systems have been designed and developed with different load range capabilities (ranging from 2 pounds to 3,000 pounds). Approximately fifteen balances have been calibrated and their data compared to conventional techniques. This paper will present results of these comparisons, based on the mathematical models and accuracies, and discuss differences that were observed. In addition, changes in the implementation of the initial load schedules developed using DOE will be highlighted. One of the principles behind DOE is randomization. The initial loading schedules used to date have been randomized in the traditional DOE sense but not for repeat calibrations or experiments. Implementation of this randomization within blocks and its impact on data quality will be reviewed. Areas of potential future development will be presented which include changes in the centers to include loads with the force position system in the pure error estimates.

Jones, Shirley M.↗

Uncertainty Analysis of the Single-Vector Force Balance Calibration System

This paper presents an uncertainty analysis of the Single-Vector Force Balance Calibration System (SVS). This study is focused on the uncertainty involved in setting the independent variables during the calibration experiment. By knowing the uncertainty in the calibration system, the fundamental limits of the calibration accuracy of a particular balance can be determined. A brief description of the SVS mechanical system is provided. A mathematical model is developed to describe the mechanical system elements. A sensitivity analysis of these parameters is carried out through numerical simulations to assess the sensitivity of the total uncertainty to the elemental error sources. These sensitivity coefficients provide valuable information regarding the relative significance of the elemental sources of error. An example calculation of the total uncertainty for a specific balance is provided. Results from this uncertainty analysis are specific to the Single-Vector System, but the approach is broad in nature and therefore applicable to other measurement and calibration systems.

Parker, Peter A.↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Previous papers and presentations have focused on the development of the test method using a benchtop prototype. This presentation covers the early results of C-AST aging of static and dynamic specimens.

balance of systems↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. In this study, unused field-vintage specimens are examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for the C-AST chamber. The benchtop experiments were also used to develop the in-situ data acquisition of specimen current, voltage, and temperature. A significant increase in operating temperature (~100 degrees C from ~40 degrees C) and a different failure mode were observed promptly once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow for failure analysis, including the extraction of the internal convolute springs for morphological examination (optical and electron microscopy).

balance of systems↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include: offline-modules, -strings, -inverters; system shutdown; arc-faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector and discrete fuse components. Unused field-vintage specimens are presently being examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for C-AST. The benchtop experiments were also used to develop the in-situ data acquisition of specimen: current, voltage, and temperature. A significant increase in operating temperature, ~100 deg C from ~40 deg C, and a different failure mode was observed immediately once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure occurring in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow failure analysis, including the extraction of the internal convolute springs for morphological examination (optical- and electron-microscopy). Chemical composition analysis included: energy-dispersive X-ray spectroscopy, differential scanning calorimetry, and Fourier transform infrared spectroscopy.

balance of systems↗

Process-based balance of system cost modeling for offshore wind power plants in the United States

This paper describes the development of a process-based and open-source balance of system cost model that provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays caused by weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation. Installation times show reasonable agreement with real data. Project cost sensitivities are investigated to compute the system-level impact of different design choices. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. These values quantify the cost-benefit tradeoffs and show a net-cost savings of decreasing numbers of turbines, increased turbine spacing, and fewer turbine terminations. These results demonstrate that the balance of system model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing: Preprint

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include: offline-modules, -strings, -inverters; system shutdown; arc-faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Unused field-vintage specimens are presently being examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for the C-AST chamber. The benchtop experiments were also used to develop the in-situ data acquisition of specimen: current, voltage, and temperature. A significant increase in operating temperature, ~100 deg C from ~40 deg C, and a different failure mode was observed promptly once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow failure analysis, including the extraction of the internal convolute springs for morphological examination (optical- and electron-microscopy).

balance of systems↗

Single Event Transient Response of Vertical and Lateral Waveguide-Integrated Germanium Photodiodes

Pulsed-laser induced single event current measurements on two geometries of waveguide-integrated germanium photodiodes were conducted over a range of operating voltages to examine the impact of photodiode geometry on the transient response. Vertical PIN photodiodes exhibit transients with a duration that is relatively independent of the operating voltage while the transient duration in lateral PIN photodiodes depends on operating voltage. Furthermore, the experimental measurements facilitate identification of device dimensions that impact the transient response. In this work, these results can be used to identify potential radiation mitigation strategies for photodiodes operating in a radiation environment. Understanding the implications of design choices is critical for designing integrated photonic systems that balance system performance with tolerance for radiation degradation.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

High Speed Balancing Applied to the T700 Engine

The work performed under Contracts NAS3-23929 and NAS3-24633 is presented. MTI evaluated the feasibility of high-speed balancing for both the T700 power turbine rotor and the compressor rotor. Modifications were designed for the existing Corpus Christi Army Depot (CCAD) T53/T55 high-speed balancing system for balancing T700 power turbine rotors. Tests conducted under these contracts included a high-speed balancing evaluation for T700 power turbines in the Army/NASA drivetrain facility at MTI. The high-speed balancing tests demonstrated the reduction of vibration amplitudes at operating speed for both low-speed balanced and non-low-speed balanced T700 power turbines. In addition, vibration data from acceptance tests of T53, T55, and T700 engines were analyzed and a vibration diagnostic procedure developed.

Walton, J.↗

Vibration isolation

Viewgraphs on vibration isolation are presented. Techniques to control and isolate centrifuge disturbances were identified. Topics covered include: disturbance sources in the microgravity environment; microgravity assessment criteria; life sciences centrifuge; flight support equipment for launch; active vibration isolation system; active balancing system; and fuzzy logic control.

Bastin, Paul↗

Impact and Estimation of Balance Coordinate System Rotations and Translations in Wind-Tunnel Testing

Discrepancies between the model and balance coordinate systems lead to biases in the aerodynamic measurements during wind-tunnel testing. The reference coordinate system relative to the calibration coordinate system at which the forces and moments are resolved is crucial to the overall accuracy of force measurements. This paper discusses sources of discrepancies and estimates of coordinate system rotation and translation due to machining and assembly differences. A methodology for numerically estimating the coordinate system biases will be discussed and developed. Two case studies are presented using this methodology to estimate the model alignment. Examples span from angle measurement system shifts on the calibration system to discrepancies in actual wind-tunnel data. The results from these case-studies will help aerodynamic researchers and force balance engineers to better the understand and identify potential differences in calibration systems due to coordinate system rotation and translation.

Toro, Kenneth G.↗

Process-Based Balance-of-System Cost Modeling for Offshore Wind Power Plants in the United States: Preprint

This work describes the development of a process based and open source balance of system cost model which provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute the times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays due to weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation; installation times are shown to agree with real data with relative errors of less than 35\%. Case studies are presented to demonstrate the functionality of the model. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. This quantifies the cost benefit tradeoffs of decreasing number of turbines, increased turbine spacing, and fewer turbine terminations and shows a net cost savings. These results demonstrate that the BOS model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Battery model for electrical power system energy balance

A model to simulate nickel-cadmium battery performance and response in a spacecraft electrical power system energy balance calculation was developed. The voltage of the battery is given as a function of temperature, operating depth-of-charge (DOD), and battery state-of-charge. Also accounted for is charge inefficiency. A battery is modeled by analysis of the results of a multiparameter battery cycling test at various temperatures and DOD's.

Hafen, D. P.↗

Advanced Diagnosis and Accelerated Testing of Balance of System Components for Utility Scale PV Installations: October 1, 2022-September 30, 2024

A study of the durability of PV Balance of System components was performed. Specifically, wire cable jackets and cable connectors were examined within the direct current (DC) PV Power Transmission Chain (PTC). Degraded and failed samples have been obtained from utility PV installations to provide feedback on the degradation modes and the related damage-enabling considerations in today's PV systems. An industry interface group (including system owners, system inspectors, component manufacturers, and test labs) was used to help identify and obtain field-failed samples, for feedback (including samples and experimental design), and to facilitate the subsequent dissemination of the results of this study. Samples were empirically studied using accelerated stress testing with steady-state conditions (cable jackets) in addition to combined-accelerated stress testing (cable jackets, connectors and uncapped connectors). Steady-state accelerated testing has been performed using at least one applied stressor (e.g. UV light) to aid understanding of jacket durability relative to its application. Component- and material-focused failure analysis was conducted to develop an understanding and advise the PV industry. In-depth characterization will be applied selectively to field- and artificially aged-samples, to gain scientific understanding of the structural, chemical, electrical, mechanical, and thermal properties enabling degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scaling trends for balance-of-system costs at land-based wind power plants: Opportunities for innovations in foundation and erection

Wind power plant sizes, hub heights, and turbine ratings have increased since 2008 to optimize the cost and performance of wind power; however, the limits of these economies of scale remain unclear. Here, we explore how the costs incurred to install turbines at a wind power plant—the balance-of-system (BOS) costs—scale with turbine rating, hub height, and plant size. We also investigate how these changes in BOS costs influence the levelized cost of energy (LCOE). We show that increasing the plant size from 150 to 400 MW could reduce the BOS costs by 21%. We also show that if the foundation costs decreased by 50%, building a wind power plant with 5-MW turbines (having rotor diameters of 166 m and hub heights of 120 m) could decrease the LCOE by 5%. These results could help inform future BOS cost-reduction opportunities and thereby reduce future capital costs for land-based wind power.

17 WIND ENERGY↗