Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Delivering New Ultrasound System to International Space Station

Ultrasound has been used for medical purposes and experiments. The previous ultrasound, HDI 5000, was delivered to the ISS in 2001 and had expected its service life in February, 2012. Due to on-orbit ultrasound failure in February 2011, the delivery date of new ultrasound was moved to July 8, 2011, which is 7 months earlier than original delivery date. This report shows how the Ultrasound 2 team including myself worked to make new delivery date. Four-step approach, (1) understanding the project (literature search), (2) learning different documents, (3) performing certification tests and (4) participating crew trainings, were used to succeed my internship at NASA JSC. In addition, the participation in Summer Institution and other contributions are explained. i

Sugita, Yoshino↗

Optical Multi-Gas Monitor Technology Demonstration on the International Space Station

There are a variety of both portable and fixed gas monitors onboard the International Space Station (ISS). Devices range from rack-mounted mass spectrometers to hand-held electrochemical sensors. An optical Multi-Gas Monitor has been developed as an ISS Technology Demonstration to evaluate long-term continuous measurement of 4 gases. Based on tunable diode laser spectroscopy, this technology offers unprecedented selectivity, concentration range, precision, and calibration stability. The monitor utilizes the combination of high performance laser absorption spectroscopy with a rugged optical path length enhancement cell that is nearly impossible to misalign. The enhancement cell serves simultaneously as the measurement sampling cell for multiple laser channels operating within a common measurement volume. Four laser diode based detection channels allow quantitative determination of ISS cabin concentrations of water vapor (humidity), carbon dioxide, ammonia and oxygen. Each channel utilizes a separate vertical cavity surface emitting laser (VCSEL) at a different wavelength. In addition to measuring major air constituents in their relevant ranges, the multiple gas monitor provides real time quantitative gaseous ammonia measurements between 5 and 20,000 parts-per-million (ppm). A small ventilation fan draws air with no pumps or valves into the enclosure in which analysis occurs. Power draw is only about 3 W from USB sources when installed in Nanoracks or when connected to 28V source from any EXPRESS rack interface. Internal battery power can run the sensor for over 20 hours during portable operation. The sensor is controlled digitally with an FPGA/microcontroller architecture that stores data internally while displaying running average measurements on an LCD screen and interfacing with the rack or laptop via USB. Design, construction and certification of the Multi-Gas Monitor were a joint effort between Vista Photonics, Nanoracks and NASA-Johnson Space Center (JSC). Vista Photonics developed the core technology and built the sensor. Nanoracks designed, constructed the enclosure, interfaces, and battery power management circuitry, integrated all subsystems into the enclosure, and then managed the certification tests, documentation and manifesting. The unit was calibrated in the JSC Toxicology Laboratory. The Multi-Gas Monitor is manifested to fly as a technology demonstration to the ISS in November 2013 and will operate for at least 6 months with data sent to the ground for evaluation. The primary goal is to demonstrate long term interference free operation in the real spacecraft environment.

Pilgrim, Jeffrey S.↗

Bigelow Expandable Activity Module (BEAM) - ISS Inflatable Module Technology Demonstration

INNOVATION: BEAM is a pathway project demonstrating the design, fabrication, test, certification, integration, operation, on‐orbit performance, and disposal of the first ever man‐rated space inflatable structure. The groundwork laid through the BEAM project will support developing and launching a larger inflatable space structure with even greater mass per volume (M/V) advantages need for longer space missions. OVERVIEW: Inflatable structures have been shown to have much lower mass per volume ratios (M/V) when compared with conventional space structures. BEAM is an expandable structure, launched in a packed state, and then expanded once on orbit. It is a temporary experimental module to be used for gathering structural, thermal, and radiation data while on orbit. BEAM will be launched on Space X‐8, be extracted from the dragon trunk, and will attach to ISS at Node 3‐ Aft. BEAM performance will be monitored over a two‐year period and then BEAM will be jettison using the SSRMS.

Dasgupta, Rajib↗

Flight test investigation of certification issues pertaining to general-aviation-type aircraft with natural laminar flow

Development of Natural Laminar Flow (NLF) technology for application to general aviation-type aircraft has raised some question as to the adequacy of FAR Part 23 for certification of aircraft with significant NLF. A series of flight tests were conducted with a modified Cessna T210R to allow quantitative comparison of the aircraft's ability to meet certification requirements with significant NLF and with boundary layer transition fixed near the leading edge. There were no significant differences between the two conditions except an increasing in drag, which resulted in longer takeoff distances and reduced climb performance.

Doty, Wayne A.↗

A flight test investigation of certification requirements for laminar-flow general aviation airplanes

A modified T210R general aviation aircraft incorporating natural laminar flow (NLF) technology has been subjected to flight tests in order to evaluate its stability and control characteristics. Attention is given to this aircraft's ability to meet certification requirements with significant NLF, as well as with the boundary-layer transition fixed near the leading edge. It is established that the large regions of NLF achieved yielded a significant cruise performance enhancement; loss of laminar flow did not result in significant changes in the stability and control characteristics of the aircraft. FAR Part 23 certification requirements were met.

Manuel, Gregory S.↗

Atomic oxygen interaction with spacecraft materials: Relationship between orbital and ground-based testing for materials certification

The effects of atomic oxygen on boron nitride (BN), silicon nitride (Si3N4), Intelsat 6 solar cell interconnects, organic polymers, and MoS2 and WS2 dry lubricant, were studied in Low Earth Orbit (LEO) flight experiments and in a ground based simulation facility. Both the inflight and ground based experiments employed in situ electrical resistance measurements to detect penetration of atomic oxygen through materials and Electron Spectroscopy for Chemical Analysis (ESCA) analysis to measure chemical composition changes. Results are given. The ground based results on the materials studied to date show good qualitative correlation with the LEO flight results, thus validating the simulation fidelity of the ground based facility in terms of reproducing LEO flight results. In addition it was demonstrated that ground based simulation is capable of performing more detailed experiments than orbital exposures can presently perform. This allows the development of a fundamental understanding of the mechanisms involved in the LEO environment degradation of materials.

Cross, Jon B.↗

Re-Certification and Equivalency Test Results for IM7/8552-1 Following Extended Freezer Storage

In 2015, the Composites for Exploration Upper Stage (CEUS) Project established an equivalency test program to reduce the scope of laminate coupon tests within the project. The material selected was IM7/8552-1, a variant of the IM7/8552 prepreg used to populate a National Center for Advanced Materials Performance (NCAMP) database. The CEUS successor program, Composites Technology for Exploration (CTE), kicked off in 2017 with the remaining CEUS prepreg planned for use. The IM7/8552-1 prepreg was recertified through an in-house defined set of pass/fail criteria then evaluated for equivalency to the NCAMP database. Over the course of recertification and equivalency panel fabrication, the time of freezer storage ranged from 19-23 months. Panels for recertification and equivalency tests were fiber placed at NASA Marshall Space Flight Center (MSFC) and NASA Langley Research Center (LARC).

equivalency↗

A radiant heating test facility for space shuttle orbiter thermal protection system certification

A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orbiter. This facility simulates surface thermal gradients, onorbit cold-soak temperatures down to 200 K, entry heating temperatures to 1710 K in an oxidizing environment, and the dynamic entry pressure environment. The capabilities of the facility and the development of new test equipment are presented.

Sherborne, W. D.↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history has demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Vacuum Chamber↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history as demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Thermal↗

System reliability and risk assessment task goals and status

The major focus for continued development of the Numerical Evaluation of Stochastic Structures Under Stress (NESSUS) codes is in support of system testing and certification of advanced propulsion systems. Propulsion system testing has evolved over the years from tests designed to show success, to tests designed to reveal reliability issues before service use. Such test conditions as performance envelope corners, high rotor imbalance, power dwells, and overspeed tests are designed to shake out problems that can be associated with low and high cycle fatigue, creep, and stress rupture, bearing durability, and the like. Subsystem testing supports system certification by standing as an early evaluation of the same durability and reliability concerns as for the entire system. The NESSUS software system is being further developed to support the definition of rigorous subsystem and system test definition and reliability certification. The principal technical issues are outlined which are related to system reliability, including key technology issues such as failure mode synergism, sequential failure mechanisms, and fault tree definition.

Cruse, T. A.↗

Development and Certification of Station Development Test Objective (SDTO) Experiment # 15012-U, "Near RealTime Water Quality Monitoring Demonstration for ISS Biocides Using Colorimetric Solid Phase Extraction (CSPE)"

Scientists and engineers from the Wyle Integrated Science and Engineering Group are working with researchers at the University of Utah and Iowa State University to develop and certify an experimental water quality monitoring kit based on Colorimetric Solid Phase Extraction (CSPE). The kit will be launched as a Station Development Test Objective (SDTO) experiment and evaluated on the International Space Station (ISS) to determine the acceptability of CSPE technology for routine inflight water quality monitoring. Iodine and silver, the biocides used in the US and Russian on-orbit water systems, will serve as test analytes for the technology evaluation. This manuscript provides an overview of the CSPE SDTO experiment and details the development and certification of the experimental water quality monitoring kit. Initial results from reagent and standard solution stability testing and environmental testing performed on the kit hardware are also reported.

Gazda, Daniel B.↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

Manufacture and evaluation of Li/BCX DD cells

This project is divided into four main tasks: cell manufacture, acceptance, and lot certification of cells, performance testing of cells, and abuse testing of cells. Lithium/bromine chloride in thionyl chloride (Li/BCX) 149 DD cells (PN 3B2085-XA) were built according to the provisions of Electrochem Industries Quality Plan 17096. Acceptance and lot certification testing was performed according to NASA JSC Document EP5-83-025, Revision B. Acceptance testing included open circuit and load voltage check, visual examination, size and weight measurements, and high temperature exposure. Lot certification tests were performed for capacity performance and for performance under conditions of thermal and electrical abuse. These tests included 149 C exposure, capacity discharge, fuse check, high temperature exposure, high rate discharge, short circuit, vibration, and overdischarge testing. A quantity of 200 cells was delivered to Johnson Space Center for life test evaluation. A parametric evaluation of the capacity discharge of Li/BCX DD cells was performed over a variety of temperatures and discharge rates. This testing served to map the performance capability of the cell. Tests were also performed over a variety of electrical and thermal abuse conditions. Abuse tests included short circuit, charging, overdischarge, high temperature exposure, shock, and vibration.

Meyer, S.↗