Search NASA⌕ Search

SEARCH · Search NASA

Results for “communication delay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

121 records · Page 7

DARHT : Enduring Lessons from a Technical Project in a National Laboratory Context [Slides]

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility at Los Alamos National Laboratory (LANL) is the world’s first flash x-ray facility able to take multiple high-resolution radiographs of the interior features of fast-moving dense objects during a single experiment. DARHT’s radiography and complimentary diagnostics makes it an important diagnostic tool in support of the US Department of Energy’s (DOE)/National Nuclear Security Administration (NNSA)’s stewardship of the US nuclear deterrent. The project to construct DARHT ran from 1988 through 2003. Initial Operating Capability along a single axis began in 1999. A technical issue delayed Critical Decision 4 for the full dual-axis capability until 2008. DARHT was characterized by several directed changes resulting from an environmental impact study, changes to the global security context resulting from the end of underground nuclear testing, and rapid evolution of applicable technology. Conventional building and lab-space construction were part of the project, but the project was dominated by Special Facility Equipment that, together with the mission to support the nuclear weapons program, required the project to be completed by national laboratories. Although the project pre-dated implementation of DOE Order 413.3, several important lessons for national laboratory projects remain applicable today and will be discussed here, including projects appropriate for the national laboratory environment, scope stability, risk acceptance and mitigation, communication, and collaboration. Finally, considerations for DOE contractor project managers are offered based upon the DARHT experience.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SVM-Based Synchronized Fault Detection for 100% Renewable Microgrids

Traditional protection schemes face significant challenges when applied to microgrids with high penetrations of renewables with inverter-based resources (IBRs). The proliferation of advanced sensing and communication technologies has generated copious data, offering an opportunity to overcome these limitations using data-driven machine learning approaches. This work proposes a novel approach based on a support vector machine (SVM) for detecting faults within a 100% renewable microgrid. The approach encompasses a systematic offline training stage for the development of a linear SVM-based fault detection algorithm. This process covers offline data collection from the microgrid under study, the extraction of features such as positive- and negative-sequence components and the total harmonic distortion of the voltage and current measurements of the relays, and the design of the linear SVM-based classifier. During the online implementation, however, different classifiers can exhibit asynchronicity in detecting the fault inception at different subcycle-to-cycle period-level delays. To circumvent this asynchronicity issue, a separate algorithm is developed for each relay to estimate the fault inception time as close to the real fault time. The performance of the proposed SVM-based synchronized fault detection method is evaluated using online time-domain simulation studies on a microgrid test system. The results corroborate the reliability of the fault detection scheme when tested under various fault cases (fault types, locations, and impedances) and non-fault cases during both grid-tied and islanded operation modes.

100% microgrid↗

SVM-Based Synchronized Fault Detection for 100% Renewable Microgrids: Preprint

Traditional protection schemes face significant challenges when applied to microgrids with high penetrations of renewables with inverter-based resources (IBRs). The proliferation of advanced sensing and communication technologies has generated copious data, offering an opportunity to overcome these limitations using data-driven machine learning approaches. This work proposes a novel approach based on a support vector machine (SVM) for detecting faults within a 100% renewable microgrid. The approach encompasses a systematic offline training stage for the development of a linear SVM-based fault detection algorithm. This process covers offline data collection from the microgrid under study, the extraction of features such as positive- and negative-sequence components and the total harmonic distortion of the voltage and current measurements of the relays, and the design of the linear SVM-based classifier. During the online implementation, however, different classifiers can exhibit asynchronicity in detecting the fault inception at different subcycle-to-cycle period-level delays. To circumvent this asynchronicity issue, a separate algorithm is developed for each relay to estimate the fault inception time as close to the real fault time. The performance of the proposed SVM-based synchronized fault detection method is evaluated using online time-domain simulation studies on a microgrid test system. The results corroborate the reliability of the fault detection scheme when tested under various fault cases (fault types, locations, and impedances) and non-fault cases during both grid-tied and islanded operation modes.

100% microgrid↗

Teleoperation of Construction Robots Using Human Interaction: Case Study Examples: Preprint

The integration of advanced teleoperation methods in construction robotics has the potential to enhance productivity and safety in demanding environments. Among different methods, hand gestures have emerged as an intuitive approach, enabling seamless communication between human operators and robotic systems. This study demonstrates the use of hand gestures for controlling a model robotic excavator and a virtual robotic arm in construction applications. Two case study examples are presented. In the first case study, a series of hand gestures are performed to control a model robotic excavator's bucket and arm movements. The second case study focuses on using hand gestures to control a virtual robotic arm to perform a material handling task in a simulated environment. In both cases, the performed hand gestures are all successfully captured and interpreted by the gesture-based teleoperation method to conduct the corresponding tasks, which demonstrates the application of the gesture-based control method for various types of construction robots. Also, the limitations of the gesture-based teleoperation method (e.g., recognition delay, sensitivity to motion outliers) are discussed. Future work will focus on developing a digital twin system to support gesture-based teleoperation for a wider range of construction robots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Blockchain for Fault-Tolerant Grid Operations Version 2.0

This report explores the potential of distributed ledger technology (DLT) as a transformative tool to enhance fault-tolerant operations in electrical distribution systems. Leveraging DLT's core attributes, including an immutable decentralized ledger, distributed consensus mechanisms, and state replication capabilities, this study focuses on three critical use cases. A central aspect of this research centers on the utilization of a consensus-driven ledger, providing actors within the system, such as distributed resources, with access to a reliable data repository. This empowers these actors to collaborate effectively and make informed decisions, all securely recorded on the blockchain. The first use case concentrates on data configuration, utilizing mathematical criteria---particularly, the chi-squared test for gross error detection---to identify trustworthy sensors for advanced decision-making. Building upon this foundation of trust, the second use case, topology identification, accurately determines circuit breaker states, unveiling the distribution network's topology. Ultimately, the third use case leverages this trust to execute switching actions, reconfiguring feeders and restoring power to disconnected customers after fault events. The concept of trust serves as a cornerstone in this approach, marking a departure from traditional fault location, isolation, and service restoration (FLISR) methods. Additionally, the blockchain-based architecture introduces decentralization, empowering disconnected areas to make autonomous decisions, even when communication with a central control center is disrupted. The primary contributions of this report are twofold: (1) a novel approach for evaluating distribution system voltage areas while preserving data ownership and (2) the implementation of interactions between distribution network areas using the actor model. Unlike the previous sequential approach for evaluating the area connection voltages, which required a radial network topology, this study's area model reduction enables a more versatile approach. The area model reduction addresses issues of prolonged data waiting times and multiple points of failure within the previous approach. Notably, the presented evaluation for the reduced network model area connection reveals a significant increase in the differences in voltage magnitudes. Simulation and evaluation of area agents across four distinct cases elucidate the area-level interaction behavior during a fault event. Simulations demonstrate that the proposed distributed FLISR (DFLISR) approach can successfully restore service to an affected area. Varying message delays and message loss probabilities in each simulation case underscore their impacts on restoration times, ranging from 3 min and 32 s to 6 min and 19 s. In contrast, power is not restored in an area in one of our simulation cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inventory of Public Key Cryptography in US Electric Vehicle Charging

Electric vehicles (EVs) and charging infrastructure are networked systems, which employ high-level communications in support of charging and grid service decisions. Public key cryptography (PKC) underlies much of the security and privacy protections of the information exchange. We are entering a new epoch where quantum computing threats must be seriously considered. A sufficiently large quantum computer, so named Cryptographically Relevant Quantum Computer (QRQC), will be able to perform the mathematical operations to efficiently attack the underpinnings of traditional PKC, thus jeopardizing the digital foundations for trust, communications security, and data security. Estimates suggest a QRQC can break public key encryption and digital signatures in the manner of tens to hundreds of hours, compared to traditional computing that would demand more than 10 18 years in a brute force-style attack. A consensus belief of quantum theorists, quantum experimenters, and cryptographers suggest that the quantum threat will be likely realized in the next twenty years. To address the threat, post-quantum cryptography, which is cryptosystems that are designed to be secure against both traditional and quantum computing threats, must be adopted. Migration from traditional PKC to quantum-resilient cryptography is a global undertaking and likely represents the largest transition in computing history. The nascent state of EV public key infrastructure, combined with limited adoption of the vehicle secure charging features, presents an opportunity to establish a preference for quantum-resistant cryptography as a step on the migration path. Delays will stunt the efforts as rapidly accelerating EVs sales and huge infrastructure investments will create large growing bases of long-lived vehicles and infrastructure. Migration preparations can commence while NIST continues the process to standardize post-quantum cryptography (PQC), which are quantum-resilient algorithms designed to be secure against traditional and quantum computing threats. The first step in preparing EV charging is to identify the presence of traditional public key cryptography algorithms and applications. With this objective in mind, this report is intended to advise the vehicle manufacturers, charging station manufacturers, charging station operators, charge network providers and other EV charging stakeholders with information on traditional PKC application and the potential risks when PKC becomes insecure. This report, the first in a series of reports discussing the topics existing at the confluence of post-quantum cryptography adoption and EV charging, identifies traditional public key applications employed and identifies potential consequences of leaving EV charging infrastructure vulnerable to quantum computing. The focus remains squarely on the of EV charging and infrastructure with respect to PKC and is believed by the authors to complement the NIST SP 1800-38 Migration to Post-Quantum Cryptography. While the report is centered on infrastructure, there are implications to vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Decentralised Reinforcement Learning for Dynamic Cyberattack Response in Microgrid Networks

Microgrids rely on communication networks for reliable operation, which makes them inherently vulnerable to cyberattacks. Such attacks can destabilise system dynamics and drive states away from their nominal operating trajectories. Although several physics-informed and machine learning-based strategies have been developed to counter these threats, the rapidly evolving cyber landscape enables adversaries to bypass static defences or rules-based mitigation approaches. This paper proposes a dynamic, online-trained and fully decentralised reinforcement learning (RL)-based cyberattack response framework to protect microgrids from evolving cyberattacks. The proposed framework deploys multiple deep Q-networks (DQNs), each associated with a distributed energy resource (DER), to enable localised and adaptive attack mitigation. In this framework, each DQN processes local voltage and frequency measurements—combined with intrusion detection system (IDS) alerts—as observations and rewards to guide decision-making. Extensive simulation studies demonstrate the robustness of the proposed framework under diverse attack scenarios and varying IDS-induced detection delays. Comparative analysis highlights its superiority over existing static or preexisting rules-based mitigation approaches. Finally, we present an analysis that shows the framework's scalability to real-life microgrids with more interacting agents.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Provider Perspectives: Identification and Follow-up of Infants who Are Deaf or Hard of Hearing

Objective Without timely screening, diagnosis, and intervention, hearing loss can cause significant delays in a child's speech, language, social, and emotional development. In 2019, Texas had nearly twice the average rate of loss to follow-up (LFU) or loss to documentation (LTD; i.e., missing documentation of services received) among infants who did not pass their newborn hearing screening compared to the United States overall (51.1 vs. 27.5%). We aimed to identify factors contributing to LFU/LTD among infants who do not pass their newborn hearing screening in Texas. Study Design Data were collected through semistructured qualitative interviews with 56 providers along the hearing care continuum, including hospital newborn hearing screening program staff, audiologists, primary care physicians, and early intervention (EI) program staff located in three rural and urban public health regions in Texas. Following recording and transcription of the interviews, we used qualitative data analysis software to analyze themes using a conventional content analysis approach. Results Frequently cited barriers included problems with family access to care, difficulty contacting patients, problems with communication between providers and referrals, lack of knowledge among providers and parents, and problems using the online reporting system. Providers in rural areas more often mentioned problems with family access to care and contacting families compared to providers in urban areas. Conclusion These findings provide insight into strategies that public health professionals and health care providers can use to work together to help further increase the number of children identified early who may benefit from EI services. Key Points

Obstetrics & Gynecology↗

A Method of Estimating Sparse and Doubly-Dispersive Channels

The large delay and Doppler spreads of skywave high-frequency (HF) channels complicates channel acquisition, especially in low-SNR conditions. Using pilot-symbol assisted modulation, we develop a robust method to acquire channel information by first estimating the power-delay profile (PDP) of the channel, then applying that estimate to obtain the channel coefficients only where the PDP is nonzero. We find the presented approach to be robust at low-SNRs, making it suitable for spread-spectrum and underlay waveforms. We show that this two-stage channel acquisition procedure has three advantages: i),the channel is estimated with fewer terms, reducing complexity; ii), the MSE of the channel estimate is lower than assuming a fixed channel length; and iii), each propagation mode is reliably recovered in high-Doppler conditions. We conclude this paper by presenting results of the developed techniques as applied to a filter-bank multicarrier spread-spectrum (FBMC-SS) waveform.

42 ENGINEERING↗

A critical review of cyber-physical security for building automation systems

Modern Building Automation Systems (BASs), as the brain that enable the smartness of a smart building, often require increased connectivity both among system components as well as with outside entities, such as the cloud, to enable low-cost remote management, optimized automation via outsourced cloud analytics, and increased building-grid integrations. As smart buildings move towards open communication technologies, providing access to BASs through the building's intranet, or even remotely through the Internet, has become a common practice. However, increased connectivity and accessibility come with increased cyber security threats. BASs were historically developed as closed environments with limited cyber-security considerations. As a result, BASs in many buildings are vulnerable to cyber-attacks that may cause adverse consequences, such as occupant discomfort, excessive energy usage, and unexpected equipment downtime. Therefore, there is a strong need to advance the state-of-the-art in cyber-physical security for BASs and provide practical solutions for attack mitigation in buildings. However, an inclusive and systematic review of BAS vulnerabilities, potential cyber-attacks with impact assessment, detection & defense approaches, and cyber resilient control strategies is currently lacking in the literature. This review paper fills the gap by providing a comprehensive up-to-date review of cyber-physical security for BASs at three levels in commercial buildings: management level, automation level, and field level. The general BASs vulnerabilities and protocol-specific vulnerabilities for the four dominant BAS protocols (i.e., BACnet, KNX, LonWorks, and Modbus) are reviewed, followed by a discussion on four attack targets and seven potential attack scenarios. Furthermore, the impact of cyber-attacks on BASs is summarized as signal corruption, signal delaying, and signal blocking. The typical cyber-attack detection and defense approaches are identified at the three levels. Cyber resilient control strategies for BASs under attack are categorized into passive and active resilient control schemes. Open challenges and future opportunities are finally discussed.

97 MATHEMATICS AND COMPUTING↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗