Search NASA⌕ Search

SEARCH · Search NASA

Results for “compliance monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

Hanford Site Mule Deer Monitoring Report for Fiscal Years 2024 and 2026

The U.S. Department of Energy, Hanford Field Office (HFO) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with environmental laws, regulations, and policies governing Department of Energy activities. The vision for the HFOmanaged portion of the Hanford Site, hereby referred to as Central Hanford, focuses not only on the cleanup of nuclear facilities and waste sites but on the protection and restoration of the Hanford Site lands. As the HFO moves toward accomplishing this vision, understanding of the ecological resources present and the need for conservation and/or protection of those resources will be critical for making informed decisions for responsible site stewardship. Ecological monitoring data provides baseline information about the plants, animals, and habitats under HFO stewardship at Central Hanford required for decision-making under the National Environmental Policy Act of 1969 (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act of 1980.

54 ENVIRONMENTAL SCIENCES↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Permitting and Compliance Cost Reduction Strategies for the MHK Industry: Lessons Learned from Other Industries

The marine and hydrokinetic (MHK) industry plays a vital role in the U.S. clean energy strategy by providing a renewable, domestic energy source that may offset the need for traditional energy sources. The first MHK deployments in the U.S. have incurred very high permitting costs and long timelines for deploying projects, which increases project risk and discourages investment. A key challenge to advancing an economically competitive U.S. MHK industry is reducing the time and cost required for environmental permitting and compliance with government regulations. Other industries such as offshore oil and gas, offshore wind energy, subsea power and data cables, onshore wind energy, and solar energy facilities have all developed more robust permitting and compliance pathways that provide lessons for the MHK industry in the U.S. and may help inform the global consenting process. Based on in-depth review and research into each of the other industries, we describe the environmental permitting pathways, the main environmental concerns and types of monitoring typically associated with them, and factors that appear to have eased environmental permitting and compliance issues.

other industries↗

Enhanced Design of Radiation Tolerant High-Temperature Structural Health Monitoring Sensors

Acoustic emission sensors are vital in the nuclear industry for real-time structural health monitoring and early detection of material degradation. By capturing high-frequency stress waves emitted from defects like cracks, corrosion, or fatigue, acoustic emission sensors enable non-invasive monitoring of critical components such as reactor vessels, piping, and containment structures. This technology supports predictive maintenance, enhances safety, and ensures regulatory compliance by providing early warnings of potential failures. It is also instrumental in research, particularly in material testing reactors, where it is used to monitor the behavior of fuels and materials under irradiation, by allowing the detection of cracking or other acoustic signals in real time. This enables the evaluation of performance and accident behavior of advanced fuel concepts.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Evolution of storage monitoring – update in response to commercial and regulatory drivers

Carbon Capture and Storage (CCS) is in transition from first-of-a kind projects and research-orientated pilots to commercially-motivated applications. Monitoring results from many newly developed and planned large scale commercial projects are limited; however, it is worthwhile to assess their evolution and consider new strategies as part of an effort to assess and document best practices. Commercial monitoring is targeted to activities that comply with regulatory drivers and de-risk investments. Commercial monitoring also supports accounting that storage has occurred and is tied to project financing. It deals with long time frames and large volumes injected into multiple wells and multiple projects in favorable areas. We see developing trends toward reproducible workflows that systematically reduce risks and clarify expectations for oversight and long-term surveillance. Monitoring techniques showing increasing trends include injection zone pressure as a history-matching and compliance tool. To reduce cost and environmental impact of time-lapse seismic data collection, deploying new approaches and tools, such as use of fibre and installed sources are increasingly applied. Concern over the risk of induced seismicity by regulatory bodies and the general public has increased, which has also resulted in increased monitoring. Some techniques used in the early research phases have been sidelined or used only in restricted applications. For example, geochemical analyses in the injection zone as well as the environment are now being deployed less than it was in research-oriented programs, except in the US where it is required by the permitting process. Expectations of frequent area-wide near surface monitoring have also decreased.

25 ENERGY STORAGE↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impurity gas monitoring using ultrasonic sensing and neural networks: forward and inverse problems

Ultrasonic sensing is a non-invasive technique for monitoring impurity gas composition in various industrial applications where safety and regulatory compliance are crucial. In this study, ultrasonic sensing and neural networks were used to analyze impurity gases (i.e., air and argon) in helium. An experimental platform was established to acquire ultrasonic data. In the forward problem, an artificial neural network (ANN) model was used to forecast the response and time-of-flight (TOF) based on the excitation, and argon and air concentrations. The inverse problem was solved using a convolutional neural network (CNN) to predict the argon and air concentrations given the ultrasonic response and excitation. The results showed that the ANN accurately predicted the ultrasonic response and the change in TOF with concentration. As the air concentration was increased from 0 to 9.8%, the TOF sensitivity to detect argon decreased by 39.8% and 16.1% from ANN and sound speed theory, respectively. The CNN demonstrated high accuracy in predicting concentrations for inputs in the testing dataset. The application of the trained CNN indicated that it over-predicts air concentration while under-predicting the argon concentration. To improve accuracy, the predicted air and argon concentrations should be corrected by -0.992% and 1.027% bias, respectively.

47 OTHER INSTRUMENTATION↗

Passenger Boarding Station and Curbfront Configuration Concepts for On-Demand Services with Small Automated Vehicles

This paper explores the various configurations of off-line stations and vehicle berthing that have been found to be fundamentally important parameters in the analysis of system performance, operations, and capacity. The proposed automated transit network system concept, which provides a direct ride between a passenger's origin and destination station, is applicable to both fixed guideway automated transit and to systems with self-driving vehicles. Addressed at a conceptual level is the vehicle/station interface in terms of Americans with Disability Act compliance and station capacity concerns. The concept of open-edge platforms monitored by advanced sensing technology combined with artificial intelligence-powered perception for the purpose of protecting passengers from entering the active vehicle lanes is also discussed. Finally, the paper draws initial conclusions on how these station configurations, operational complexities, and associated costs can be better understood through appropriate research and development.

ADVANCED PROPULSION SYSTEMS↗

Passenger Boarding Station and Curbfront Configuration Concepts for On-Demand Services with Small Automated Vehicles: Preprint

This paper explores the various configurations of off-line stations and vehicle berthing that have been found to be fundamentally important parameters in the analysis of system performance, operations, and capacity. The proposed Automated Transit Network system concept, which provides a direct ride between a passenger's origin and destination station, is applicable to both fixed guideway automated transit and to systems with self-driving vehicles. Addressed at a conceptual level are the vehicle/station interface in terms of Americans with Disability Act compliance and station capacity concerns. The concept of open-edge platforms monitored by advanced sensing technology combined with artificial intelligence-powered perception for the purpose of protecting passengers from entering the active vehicle lanes is also discussed. Finally, the paper draws initial conclusions on how these station configurations, operational complexities, and associated costs can be better understood through appropriate research and development.

ADVANCED PROPULSION SYSTEMS↗

Continuous Water Quality Sensing for FGD Wastewater

The coal fired plant power industry requires new solutions for on-line monitoring of flue gas desulfurization (FGD) wastewaters for regulated trace metals to reduce recurring operating and off-site laboratory analysis costs and provide a high level of confidence of compliance with state and federal discharge guidelines. The University of Alabama at Birmingham (UAB) developed an integrated water sensor package for continuous water quality monitoring of flue gas desulfurization (FGD) wastewaters for concentration measurements of Selenium (Se). UAB utilized a diverse team of University Professors/Staff Members/Student(s) (Engineering and Innovative Technology Development Group), a University Affiliated Research Institution from the local area (Southern Research), and a cost sharing Industry Partner (Metrohm). The team developed and validated a proprietary wet chemistry batch process for water sample preparation; and implemented this process as a fully automated on-line monitor prototype system. This prototype system’s performance was evaluated in both the laboratory and during in-field deployment to a coal fired power plant. In both environments it was found that the prototype system was unable to recreate the batch process’s success at preparing FGD water samples for total Se measurements with a commercial-off-the-shelf (COTS) cyclic anodic stripping voltammetry (CSV) system. Through this experience, UAB has provided insight into a number of specific areas where improvements can be made with respect to the COTS systems used in this project to yield a more complete and competitive industry solution for on-line monitoring of total Se in industrial wastewater.

01 COAL, LIGNITE, AND PEAT↗

2022 Site Environmental Report: Idaho National Laboratory

The INL Site’s operations, as well as the ongoing cleanup mission involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for U.S. Department of Energy, Idaho Operations Office (DOE-ID) in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” The purpose of the report is to provide the following: (1) Present the INL Site, mission, and programs, (2) Report compliance status with applicable federal, state, and local regulations, (3) Describe the INL Site environmental programs and activities, (4) Summarize results of environmental monitoring, (5) Discuss potential radiation doses to the public residing in the vicinity of the INL Site, (6) Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park, (7) Describe quality assurance methods used to ensure confidence in monitoring data, and (8) Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

54 ENVIRONMENTAL SCIENCES↗

Quantifying CO 2 Plume Stabilization at Carbon Storage Projects, North Dakota, USA

This study presents an approach for quantifying when injected carbon dioxide (CO 2 ) stabilizes pursuant to carbon capture and storage (CCS) project permitting and site closure requirements. The distribution of mobile-phase CO 2 (CO 2 plume) will evolve within the storage reservoir during and after injection through both physical and chemical trapping mechanisms. CCS policies generally agree that the CO 2 plume’s migratory behavior in post-injection should demonstrate nonendangerment to the environment but do not provide specific guidance on how to meet the definition of plume stabilization, generating some uncertainty for operators. Plume stability herein means the CO 2 plume 1) changes size minimally and predictably in the storage reservoir such that it will not cross key boundaries identified in the permit and 2) does not pose a threat to human health, underground sources of drinking water (USDWs), and the environment because of lateral migration to areas where leakage pathways may exist. Published literature on plume metrics was reviewed to determine which metric(s) may be most appropriate for determining CO 2 plume stability. A technical approach that defines plume stabilization by estimating the rate of change in the geographic footprint of the CO 2 plume with respect to time was developed and illustrated using a case study from North Dakota, USA, as a proposed solution for CCS operators to apply at the project permitting stage. Any prospective CCS operator may benefit from using the same approach to inform the selection of pore space lease and monitoring areas and develop post-injection site care plans.

03 NATURAL GAS↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2021 (Final Report)

The U.S. Department of Energy requires that all its site facilities develop an annual site environmental report to comply with DOE Order 231.1B Chg 1 and DOE Order 458.1 Admin Chg 4. This report provides a synopsis of calendar year 2021 information related to environmental management performance and compliance efforts at the Pacific Northwest National Laboratory. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2019 (Final Report)

The PNNL Annual Site Environmental Report is prepared to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL Richland Campus or PNNL Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL Richland Campus in Richland, Washington, and at the PNNL Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification.

54 ENVIRONMENTAL SCIENCES↗

Multidecadal Biological Monitoring and Abatement Program assessing human impacts on aquatic ecosystems within the Oak Ridge Reservation in eastern Tennessee, USA

Human activities can be powerful drivers of ecosystem change within catchments. While most long-term catchment studies have been conducted at pristine sites, such studies are less common from sites more impacted by human activity. The Oak Ridge National Laboratory's Biological Monitoring and Abatement Program (BMAP) was developed in the mid-1980s to (1) assess compliance with environmental regulations, (2) identify causes of adverse ecological impacts, (3) provide data for human and ecological risk assessments, and (4) evaluate the effectiveness of remedial actions taken to mitigate the impacts of contaminants in soils, groundwater, and surface water by documenting ecological recovery on the Oak Ridge Reservation (ORR), a federally owned 33,476-acre site in eastern Tennessee, USA, managed by the U.S. Department of Energy. The ORR is composed of multiple watersheds containing many small to mid-size streams. BMAP uses an integrated approach for determining stream health; its databases include long-term seasonal records of contaminant concentrations in water and biota, data from aquatic toxicity testing, and surveys of macroinvertebrate and fish assemblages from impacted and reference streams. These long-term data provide valuable records of degradation and recovery in catchment ecosystems. Our objective in this work is to describe our study system and data series in order to increase awareness of the availability of these long-term data to the catchment science community.

54 ENVIRONMENTAL SCIENCES↗

2019 Site Environmental Report (Volume 1)

Brookhaven National Laboratory (BNL) is managed on behalf of the Department of Energy (DOE) by Brookhaven Science Associates (BSA), a partnership between the Research Foundation for the State University of New York on behalf of Stony Brook University and Battelle. For over 70 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory’s Environmental, Safety, Security, and Health (ESSH) Policy reflects the commitment of BNL’s management to fully integrate environmental stewardship into all facets of its mission and operations. BNL prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1B, Environment, Safety, and Health Reporting. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all its environmental history since the Laboratory’s inception in 1947. Volume II of the SER, the Groundwater Status Report, is also prepared annually to report on the status of groundwater protection and restoration efforts. Volume II includes detailed technical summaries of groundwater data and treatment system operations and is intended for regulators and other technically oriented stakeholders. A summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume.

54 ENVIRONMENTAL SCIENCES↗

2022 Site Environmental Report (SER)

Brookhaven National Laboratory (BNL) is managed on behalf of the Department of Energy (DOE) by Brookhaven Science Associates (BSA), a partnership between Stony Brook University and Battelle, and six core universities: Columbia, Cornell, Harvard, Massachusetts Institute of Technology, Princeton, and Yale. For over 75 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research operations with sensitivity to environmental issues and community concerns. The Laboratory’s Environmental, Safety, Security, and Health (ESSH) Policy reflects the commitment of BNL’s management to fully integrate environmental stewardship into all facets of its mission and operations. BNL prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1B, Environment, Safety, and Health Reporting. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all its environmental history since the Laboratory’s inception in 1947. Volume II of the SER, the Groundwater Status Report, is also prepared annually to report on the status of groundwater protection and restoration efforts. Volume II includes detailed technical summaries of groundwater data and treatment system operations and is intended for regulators and other technically oriented stakeholders. A summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume.

54 ENVIRONMENTAL SCIENCES↗