Search NASA⌕ Search

SEARCH · Search NASA

Results for “comprehensive site planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Status Update for the Canister Deposition Field Demonstration

This report updates the high-level test plan for evaluating surface deposition on three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUTECH Horizontal Modular Storage (NUHOMS) Advanced Horizontal Storage Modules (AHSMs) from Orano (formerly Transnuclear Inc.) and provides a description of the surface characterization activities that have been conducted to date. The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or requirements. The goal of the testing is to collect highly defensible and detailed dust deposition measurements from the surface of dry storage canisters in a marine coastal environment to guide chloride-induced stress corrosion crack (CISCC) research. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the decay heat and thermal hydraulic environment. Test and heater design is supported by detailed computational fluid dynamics modeling. Instrumentation throughout the canister, storage module, and environment will provide extensive information about thermal-hydraulic behavior. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer a high-fidelity quantification of the conditions experienced in a harsh yet realistic environment. Functional testing of the finalized heater assemblies and test apparatus is set to begin in December 2022. The proposed delivery of the canisters to the host test site is June/July 2023, which is well ahead of when the AHSM installations would be completed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Ecological connectivity and in-kind mitigation in a regulatory decision framework: A case study with an amphibian habitat specialist

Ecological connectivity is critical to the survival and long-term viability of populations but is often overlooked in regulatory frameworks. We integrated landscape-level processes into a mitigation strategy for impacts to aquatic resources on the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) in eastern Tennessee. Wetlands on the ORR, which contain significant breeding populations of the imperiled four-toed salamander (Hemidactylium scutatum) and tubercled rein orchid (Platanthera flava var. herbiola), will be impacted by construction of an environmental waste disposal facility under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Here, we used a modified Kepner-Tregoe decision analysis to select general mitigation options that balanced regulatory requirements and interest group perspectives. We emphasized habitat connectivity through models that prioritized an area's importance to natural area connectivity (centrality) and maintenance of population structure for an affected habitat specialist (four-toed salamanders). We also emphasized in-kind mitigation through the preservation and enhancement of ecologically similar resources and the translocation and establishment of a new subpopulation of four-toed salamanders elsewhere on the ORR. We ultimately released over 500 juvenile salamanders that originated from the impacted site into the chosen mitigation wetlands. By doing so under the constraints of a time-sensitive CERCLA remediation effort and exceeding its substantive requirements, this work underscores feasibility. Ecological connectivity and the conservation of species that are not afforded explicit regulatory processes can be effectively and efficiently integrated into environmental decision-making and land use planning.

54 ENVIRONMENTAL SCIENCES↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feasibility of Ocean-Based Renewable Energy in the Gulf of Mexico

This paper summarizes a comprehensive feasibility assessment of six offshore renewable energy sources in the Gulf of Mexico (GOM) to potentially provide utility-scale electricity from the Outer Continental Shelf (federal waters) and state waters to land-based grids. Overall, the primary objective is to inform future energy planning. The authors evaluated offshore wind, wave energy, tidal energy, ocean-based solar photovoltaics (PV), ocean current, and ocean thermal energy conversion. Of these energy resources, offshore wind was the most viable option and was the focus of the second part of the study. The technical challenges of developing offshore wind in the GOM are discussed including hurricane design for turbines and substructures, as well as turbine solutions to overcome lower wind regimes. In addition, advantages to offshore wind development in the GOM are described including proximity to oil and gas supply chains. Economic analysis using established cost models at the National Renewable Energy Laboratory identified hypothetical project locations where net value of offshore wind was the highest, and the levelized cost of energy (LCOE) was calculated for three sites: Port Isabel, Port Arthur, and Pensacola. Offshore wind LCOE in the GOM was found to be higher than those in sites along the north and mid-Atlantic coasts, but decreasing cost trajectories indicate the possibility of economic viability for locations in Texas and west Louisiana after 2030. The extrapolated 2030 LCOE values range from 73 dollars per MWh (Site 1, Port Isabel) and 79 dollars per MWh (Site 3, Port Arthur) to 91 dollars per MWh (Site 5, Pensacola).

16 TIDAL AND WAVE POWER↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2023 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

58 GEOSCIENCES↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2024 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

15 GEOTHERMAL ENERGY↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Next Generation System Analysis Model: Recently Added Features and Future Plans

To better enable informed decision-making regarding the back-end of the nuclear fuel cycle, the Integrated Waste Management System (IWMS) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste (HLW).With these tools, IWMS architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool expressly designed to be capable of modeling features within various IWMS architectures. NGSAM imports data from Oak Ridge National Laboratory (ORNL)’s unified database (e.g., historic assembly information, thermal profiles for assembly heat, and at-reactor dry storage loadings) to ensure that each simulation initializes with a realistic representation of the state of commercial SNF in the U.S. Recent major enhancements implemented into NGSAM in the period since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort car acquisition and buffer car acquisition • The addition of heavy haul truck (HHT) and barge routes for some sites, as well as support for user-defined inter-modal routes • Updates to the logic that checks the transportation cask thermal limit maps prior to package transport • An allocation method that predicts when reactor sites would pack assemblies from their spent fuel pools for dry storage, and prioritizes shipments directly from the pools of those reactor sites in the preceding periods (before the predicted loadings to dry storage), thus reducing the number of casks loaded into dry storage at reactor sites • The addition of “reactor site family” operational limits to restrict the number of loads of SNF taken from the pool and from dry storage at a given reactor site each year • Added support for multiple canister loading map options and packages with multiple compatible transportation overpacks • Updates to the handling of non-commercial SNF, including a new database that contains data to support the updates • Updates to allow analysis of hypothetical scenarios which include repackaging at reactor sites, e.g., for possible comparative analysis with other scenarios • Implementation of additional output reports, or modification of existing ones • The ability to generate and implement user edits via the NGSAM website • The ability to model loading SNF from pool storage at an interim storage facility (ISF) into dry storage at the ISF • The ability to model consolidating SNF from different existing storage containers at a DOE site into the same DOE standard canister • The ability to model transferring SNF casks from one transportation mode to another, e.g., from HHT to rail, referred to as transloading. These new features have improved NGSAM capabilities and users’ experience with the model. Preliminary NGSAM requirements for modeling advanced reactor fuels, reprocessing, treatment, and conditioning were considered, and this paper describes them at a high level. Other nuclear fuel cycle system analysis tools developed under sponsorship of DOE-NE, like the VISION code developed at Idaho National Laboratory, might be better suited for initial high-level analysis of those technologies and advanced fuel cycles. As technologies are developed and system concepts evolve, NGSAM could provide value by providing more detailed modeling of transport, storage, and disposal of spent fuel and wastes from advanced reactors and advanced fuel cycles at the fuel element and waste container level.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Algal Biomass Production via Open Pond Algae Farm Cultivation: 2020 State of Technology and Future Research

The annual State of Technology (SOT) assessment is an essential activity for platform research conducted under the Bioenergy Technologies Office. It allows for the impact of research progress to be quantified in terms of economic improvements in the overall biofuel production process for a particular biomass processing pathway, whether based on terrestrial or algal biomass feedstocks. As such, initial benchmarks can be established for currently demonstrated performance, and progress can be tracked towards out-year goals to ultimately demonstrate economically viable biofuel technologies. NREL's algae state of technology benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL's "combined algae processing" (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) consortium efforts, driven by data furnished by Arizona State University (ASU) at the Arizona Center for Algae Technology and Innovation (AzCATI) testbed site. The CAP model is based on experimental efforts conducted under NREL research and development projects. This report focuses on front-end algal biomass production, documenting the pertinent algal biomass cultivation parameters that were input to the NREL open pond algae farm model based on the latest DISCOVR cultivation performance data. Relative to prior 2019 benchmarks, the 2020 algae farm SOT achieved further reductions in modeled minimum biomass selling price of approximately $70/ton (roughly 10%), primarily attributable to a 16% demonstrated improvement in annual average cultivation productivity rates.

09 BIOMASS FUELS↗

Quantifying the Effect of Economic Development Zones on Electrical Load Growth in Kentucky [Slides]

The Kentucky Energy and Environment Cabinet has recently undertaken a comprehensive effort to map and catalog potential economic development sites across the state. The purpose of this technical assistance is to quantify the potential impact of developing designated sites on Kentucky's electricity load growth, providing insights at both state and county level considering the next 10 years. This analysis should explicitly incorporate and address key project uncertainties by developing various load growth scenarios that account for development scale, site specificity, and sector variability. The need for a site-specific analysis comes from the understanding that conventional econometric (top-down) load forecasting models cannot sufficiently isolate or predict the discrete load increases resulting from the development of these unique and targeted economic sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Siting Analysis of a Solar-Nuclear-Desalination Integrated Energy System

Nuclear power is typically deployed as a baseload generator. Increased penetration of variable renewables motivates combining nuclear and renewable technologies into Integrated Energy Systems (IES) to improve dispatchability, component synergies and, through cogeneration, address multiple markets. However, combining multiple energy resources heavily depends on the proper selection of each system’s location and design limitations. In this paper, co-siting options for IES that couple nuclear and concentrating solar power (CSP) with thermal desalination are investigated. A comprehensive siting analysis is performed that utilizes global information survey data to determine possible co-siting options for nuclear and solar thermal generation in the United States. Viable co-siting options are distributed across the Southwestern U.S., with the greatest concentration of siting options in the southern Great Plains, although siting with higher solar direct normal irradiance is possible in other states such as Arizona and New Mexico. Brackish water desalination is also attractive across the southwest U.S. due to high water stress, but for brackish water desalination reverse osmosis (an electricity driven process) is most cost- and energy-efficient, which does not require co-siting with the thermal generator. The most attractive state for nuclear and thermal desalination (which is more attractive when using seawater) is Texas, although other areas may become attractive as water stress increases over the coming decades. Co-siting of all CSP and thermal desalination is challenging as attractive CSP sites are not coastal.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydropower Evaluation Framework for Wildfire Resilient Microgrids

This paper presents a framework for characterizing hydropower plants based on plant and site attributes, assessing their feasibility to function within microgrids during periods of wildfire-induced outages. A set of nine metrics is developed to assign scores to hydropower plants, considering their suitability for forming wildfire-resilient microgrids, their capability to operate within such microgrids, and their simulated performance during wildfire events. A comprehensive database is constructed, comparing hydropower plants according to their suitability and capability metrics. To evaluate the performance score of a specific hydropower plant, namely the Hills Creek plant situated in a wildfire-prone region of Oregon, a case study is conducted, simulating a wildfire scenario. The results of steady-state and dynamic simulations demonstrate that the Hills Creek hydropower plant can effectively provide crucial microgrid services and power nearby communities during a prolonged wildfire-related outages.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Algal Biomass Conversion to Fuels via Combined Algae Processing (CAP): 2020 State of Technology and Future Research

The annual State of Technology (SOT) assessment is an essential activity for platform research conducted under the Bioenergy Technologies Office. It allows for the impact of research progress to be quantified in terms of economic improvements in the overall biofuel production process for a particular biomass processing pathway, whether based on terrestrial or algal biomass feedstocks. As such, initial benchmarks can be established for currently demonstrated performance, and progress can be tracked towards out-year goals to ultimately demonstrate economically viable biofuel technologies. NREL's algae state of technology benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL's "combined algae processing" (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under the Development of Integrated Screening, Cultivar Optimization, and Verification Research consortium (DISCOVR) efforts, driven by data furnished by Arizona State University (ASU) at the Arizona Center for Algae Technology and Innovation (AzCATI) testbed site. The CAP model is based on experimental efforts conducted under NREL research and development projects. This report focuses on back-end conversion of algal biomass through the CAP pathway, highlighting the 2020 updates to minimum fuel selling price (MFSP). Notably, this analysis marks the first time that polyurethane (PU) is included as a value-added coproduct in the SOT case. Relative to prior 2019 benchmarks, the 2020 CAP SOT achieved further MFSP reductions of over $4/gallon gasoline equivalent, reflective of (a) the inclusion of PU co-production, (b) reduced SOT biomass production costs, and (c) higher pretreatment sugar yield data.

09 BIOMASS FUELS↗

Y-12 Nuclear Criticality Safety Program Health Model: Development, Use and Benefits

The Y-12 National Security Complex (Y-12) operates seven diverse enriched uranium processing facilities and maintains a comprehensive nuclear criticality safety (NCS) program. Given the magnitude of the hazard, the NCS program receives significant oversight. Describing the scope and health of the Y-12 NCS program to sometimes non-expert stakeholders with limited time had historically focused on recent events and “hot topics” which did not always convey sufficient context (i.e., how to differentiate between an individual performance issue and a systemic concern). Y-12 created the NCS Program Health (NCSPH) Model to provide a complete and holistic framework to quantify and communicate NCS program health. The model is constructed in a tiered fashion with the top tier broken into three (3) Tier 2 elements, fourteen (14) Tier 3 elements, and 104 Tier 4 and 5 elements. This granularity ensures every feature of the NCS Program is accounted for and stakeholders can see how these features support the collective whole. The model is used as the framework for NCS communications including program plans, reports, health surveys, and meeting agendas. The model has substantially improved stakeholder appreciation for the entirety of the NCS program and how events and assessment results factor into an overarching conclusion on NCS program health. While some details are Y-12 specific, the NCSPH model can easily be tailored for any other site with an NCS program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗