Contingency contractor optimization Phase 2, model description and formulation

The goal of Phase 2 the OSD ATL Contingency Contractor Optimization project is to create a prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. Additional features allow the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements and recommend where investments in manpower capabilities might minimize the overall total force costs in future operations.

Gearhart, Jared L.↗

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Contingency contractor optimization.

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗

Contingency Contractor Optimization Tool Prototype (Phase 3 Extension- Analyst Tutorial)

This tutorial walks the user through analysis examples using the Contingency Contractor Optimization Tool Prototype. The examples are designed to showcase key capabilities of the tool. The main goal of this tutorial is to provide examples of how to use the tool to perform analyses to those users acting in the analyst role. All examples and locations used in the prototype are fictional, but are intended to be realistic. Users reading this manual are expected to have a basic understanding and familiarity with the Contingency Contractor Optimization Tool Prototype. This tutorial includes scenarios for the occurrence of two wars, Prussia and New Granada.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Risk-Based Dynamic Contingency Analysis Applied to Puerto Rico Electric Infrastructure

The U.S. Department of Energy’s (DOE) Office of Electricity and Office of Energy Efficiency & Renewable Energy have funded DOE National Laboratories to perform modeling, analysis, and high-level design of resilience-enhancement options for the power grid of the Commonwealth of Puerto Rico. The Pacific Northwest National Laboratory (PNNL) is one of the national laboratories contributing to the DOE effort. Under this funding, PNNL completed Phase I of their analysis in 2018, which identified high-priority transmission enhancements derived from detailed dynamic cascading analysis of severe contingencies, including a hurricane scenario example. This report describes additional analysis completed under Phase II, which was performed over 2019. The PNNL team applied decades of experience making complex power systems more resilient, reliable, secure, flexible, affordable and sustainable, with partners in government and industry. In this report, PNNL presents the Phase II analysis, in which a risk-based dynamic contingency analysis approach to evaluate impact of several hurricane scenarios was developed. This approach was used to identify high-priority enhancements and test resilience mitigation actions, including the evaluation of high-solar scenarios developed as a result of the 2019 Puerto Rico Integrated Resource Plan (IRP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operations analysis (study 2.1). Contingency analysis

Future operational concepts for the space transportation system were studied in terms of space shuttle upper stage failure contingencies possible during deployment, retrieval, or space servicing of automated satellite programs. Problems anticipated during mission planning were isolated using a modified 'fault tree' technique, normally used in safety analyses. A comprehensive space servicing hazard analysis is presented which classifies possible failure modes under the catagories of catastrophic collision, failure to rendezvous and dock, servicing failure, and failure to undock. The failure contingencies defined are to be taken into account during design of the upper stage.

Source record↗

ATC contingency operations in the en-route flight regime

Air traffic control (ATC) operations were examined to learn what factors of controller performance should be given consideration in the design and development of future automation systems enhancing ATC. Contingencies were of two types: those constraining airspace usage or traffic flow (i.e., weather); and those related to system and equipment usage (i.e., radar/radio status). Examination of controller response to contingencies and workload pressures showed differing effects on controller allocations of effort among the three primary function of planning, monitoring, and informaton transfer. Automation advancements oriented towards aiding the controller in performing monitoring tasks may offer the most substantial safety benefit.

Lyman, E. G.↗

An assessment of nominal and contingency altitude reboost scenarios during Space Station assembly

The results of an analysis of several reboost scenarios for nominal and contingency SS operations during the Phase I assembly sequence are presented. Space Station program requirements on assembly and operational altitudes are outlined, and essential features of the SS reaction control system are described. A nominal reboost strategy designed to meet the current program requirements is presented. In addition, reboost strategies are developed for several contingency scenarios, including one missed STS mission, and an extended STS outage. It is shown that the time-averaged propellant 'cost' of maintaining altitude is greatest for equivalent continuous-thrusting altitude maintenance; it decreases with increasing reboost/rendezvous time interval to an asymptotic minimum value.

Bilardo, Vincent J., Jr.↗

Contingent plan structures for spacecraft

Most current AI planners build partially ordered plan structures which delay decisions on action ordering. Such structures cannot easily represent contingent actions. A representation which can is presented. The representation has some other useful features: it provides a good account of the causal structure of a plan, can be used to describe disjunctive actions, and it offers a planner the opportunity of even less commitment than the classical partial order on actions. The use of this representation is demonstrated in an on-board spacecraft activity sequencing problem. Contingent plan execution in a spacecraft context highlights the requirements for a fully disjunctive representation, since communication delays often prohibit extensive ground-based accounting for remotely sensed information and replanning on execution failure.

Drummond, M.↗

Real-time contingency handling in MAESTRO

A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

Britt, Daniel L.↗

The role of Environmental Health System air quality monitors in Space Station Contingency Operations

This paper describes the Space Station Freedom (SSF) Environmental Health System's air-quality monitoring strategy and instrumentation. A two-tier system has been developed, consisting of first-alert instruments that warn the crew of airborne contamination and a volatile organic analyzer that can identify volatile organic contaminants in near-real time. The strategy for air quality monitoring on SSF is designed to provide early detection so that the contamination can be confined to one module and so that crew health and safety can be protected throughout the contingency event. The use of air-quality monitors in fixed and portable modes will be presented as a means of following the progress of decontamination efforts and ensuring acceptable air quality in a module after an incident. The technology of each instrument will be reviewed briefly; the main focus of this paper, however, will be the use of air-quality monitors before, during, and after contingency incidents.

Limero, Thomas F.↗

Contingency maneuver strategies for the Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP)

The Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP) is a polar-orbiting spacecraft designed to measure total ozone levels in the Earth's atmosphere. The nominal mission orbit is a 955-kilometer circular Sun-synchronous orbit with an ascending node mean local crossing time (MLT) between 11:02 a.m. and 11:25 a.m. These two mean local ascending node times constitute the boundaries of the MLT box for this mission. The MLT boundaries were chosen to maintain the Sun-to-Earth-to-vehicle orbit-normal (SVN) angle within a preselected set of seasonally independent boundaries. Because the SVN angle is seasonally dependent, but the MLT is not, contingency options for correcting the MLT of orbital states that fall outside of the required MLT range become time dependent. This paper focuses on contingency orbit adjustment strategies developed at the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) during the mission planning phase of TOMS-EP. Time-dependent delta-V strategies are presented for correcting mission orbit states lying outside of the MLT range. Typically, passive control of the MLT drift rate can be used to restore the orbit state to the required MLT before a seasonal violation of SVN angle constraints can occur. Passive control of the MLT drift rate is obtained through adjustment of the semimajor axis and/or the inclination. The time between initial arrival on orbit at an 'out-of-the box' MLT state and violation of the SVN angle constraints is always less than or equal to 1 year. The choice of which parameter(s) to adjust is dictated by the duration of this time period, the desired mission lifetime, the delta-V cost, and operational constraints.

Kestler, James↗

Communications Contingency Plan: Planning for Crises and Controversy

Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

Treise, Deborah↗

Expected Utility Distributions for Flexible, Contingent Execution

This paper presents a method for using expected utility distributions in the execution of flexible, contingent plans. A utility distribution maps the possible start times of an action to the expected utility of the plan suffix starting with that action. The contingent plan encodes a tree of possible courses of action and includes flexible temporal constraints and resource constraints. When execution reaches a branch point, the eligible option with the highest expected utility at that point in time is selected. The utility distributions make this selection sensitive to the runtime context, yet still efficient. Our approach uses predictions of action duration uncertainty as well as expectations of resource usage and availability to determine when an action can execute and with what probability. Execution windows and probabilities inevitably change as execution proceeds, but such changes do not invalidate the cached utility distributions, thus, dynamic updating of utility information is minimized.

Bresina, John L.↗

Robustness via Run-Time Adaptation of Contingent Plans

In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

Bresina, John L.↗

CFD Simulations in Support of Shuttle Orbiter Contingency Abort Aerodynamic Database Enhancement

Modern Computational Fluid Dynamics (CFD) techniques were used to compute aerodynamic forces and moments of the Space Shuttle Orbiter in specific portions of contingency abort trajectory space. The trajectory space covers a Mach number range of 3.5-15, an angle-of-attack range of 20deg-60deg, an altitude range of 100-190 kft, and several different settings of the control surfaces (elevons, body flap, and speed brake). Presented here are details of the methodology and comparisons of computed aerodynamic coefficients against the values in the current Orbiter Operational Aerodynamic Data Book (OADB). While approximately 40 cases have been computed, only a sampling of the results is provided here. The computed results, in general, are in good agreement with the OADB data (i.e., within the uncertainty bands) for almost all the cases. However, in a limited number of high angle-of-attack cases (at Mach 15), there are significant differences between the computed results, especially the vehicle pitching moment, and the OADB data. A preliminary analysis of the data from the CFD simulations at Mach 15 shows that these differences can be attributed to real-gas/Mach number effects. The aerodynamic coefficients and detailed surface pressure distributions of the present simulations are being used by the Shuttle Program in the evaluation of the capabilities of the Orbiter in contingency abort scenarios.

Papadopoulos, Periklis E.↗

Implications of Contingency Planning Support for Weather and Icing Information

A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

Vigeant-Langlois, Laurence↗

Haughton-Mars Project (HMP)/NASA 2006 Lunar Medical Contingency Simulation: An Overview

Medical requirements are currently being developed for NASA's space exploration program. Lunar surface operations for crews returning to the moon will be performed on a daily basis to conduct scientific research and construct a lunar habitat. Inherent to aggressive surface activities is the potential risk of injury to crew members. To develop an evidence-base for handling medical contingencies on the lunar surface, a simulation project was conducted using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic. A review of the Apollo lunar surface activities and personal communications with Apollo lunar crew members provided a knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity. Objectives were established to 1) demonstrate stabilization, field extraction and transfer an injured crew member to the habitat and 2) evaluate audio, visual and biomedical communication capabilities with ground controllers at multiple mission control centers. The simulation project s objectives were achieved. Among these objectives were 1) extracting a crew member from a sloped terrain by a two-member team in a 1-g analog environment, 2) establishing real-time communication to multiple space centers, 3) providing biomedical data to flight controllers and crew members, and 4) establishing a medical diagnosis and treatment plan from a remote site. The simulation project provided evidence for the types of equipment and methods needed for planetary space exploration. During the project, the crew members were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges. These trials provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives of this project will be incorporated into the exploration medical requirements involving an incapacited astronaut on the lunar surface.