Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Costs and benefits of composite material applications to a civil STOL aircraft

Costs and benefits of advanced composite primary airframe structure were studied to determine cost-effective applications to a civil STOL aircraft designed for introduction in the early 1980 time period. Applications were assessed by comparing costs and weights with a baseline metal aircraft which served as a basis of comparison throughout the study. Costs as well as weights were estimated from specific designs of principal airframe components, thus establishing a cost-data base for the study. Cost effectiveness was judged by an analysis that compared direct operating costs and return on investment of the composite and baseline aircraft. A systems operations analysis was performed to judge effects of the smaller, lighter composite aircraft. It was determined that broad applications of advanced composites to the airframe considered could be cost-effective, but this advantage is strongly influenced by structural configuration and several key cost categories.

Logan, T. R.↗

Development of a solar-powered residential air conditioner: Economic analysis

The results of investigations aimed at the development of cost models to be used in the economic assessment of Rankine-powered air conditioning systems for residential application are summarized. The rationale used in the development of the cost model was to: (1) collect cost data on complete systems and on the major equipment used in these systems; (2) reduce these data and establish relationships between cost and other engineering parameters such as weight, size, power level, etc; and (3) derive simple correlations from which cost-to-the-user can be calculated from performance requirements. The equipment considered in the survey included heat exchangers, fans, motors, and turbocompressors. This kind of hardware represents more than 2/3 of the total cost of conventional air conditioners.

Source record↗

Advanced Fuel Cycle Cost Basis Report: Module D1-7 Contact-Handled Pelletized Pressurized Heavy Water (PHWR) UOX Fuel Fabrication (Rev.1)

In addition to literature-based pressurized heavy-water reactor (PHWR) fuel price information in the 2017 AFC-CBR, the what-it-takes (WIT) unit cost data in this update is informed by new analysis and escalation of the 1978 PHWR-UOX fuel life cycle cost (LCC) data from ORNL reports prepared for the 1977–1980 Nonproliferation Alternative Systems Assessment Program (NASAP). (These reports are referenced and summarized in detail in Module D1-PR.) The PHWR fuel fabrication LCC data in these reports is scaled from a bottom-up cost estimate for a reference technology pressurized-water reactor (PWR)—uranium oxide (UOX) fuel fabrication plant by using algorithms that consider the manufacturing process complexity, fuel design complexity, plant floor space requirements, and the radiation and health, safety, and environmental (HS&E) regulatory environment of PHWR-UOX fuel production vis-à-vis light-water reactor (LWR)-UOX production (PWR fuel in this case). The module name has been changed from “Canadian Deuterium Uranium (CANDU)” to the more generic PHWR fuel fabrication in recognition that not all power reactors that might use this fuel type are considered. Unfortunately, the detailed algorithms and their design bases were not archived at the end of the NASAP effort of the commercial CANDU concept specifically developed in the middle of the last century by Atomic Energy of Canada Limited (AECL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A system for processing Landsat and other georeferenced data for resource management applications

The NASA Earth Resources Laboratory has developed a transferrable system for processing Landsat and disparate data with capabilities for digital data classification, georeferencing, overlaying, and data base management. This system is known as the Earth Resources Data Analysis System. The versatility of the system has been demonstrated with applications in several disciplines. A description is given of a low-cost data system concept that is suitable for transfer to one's available in-house minicomputer or to a low-cost computer purchased for this purpose. Software packages are described that process Landsat data to produce surface cover classifications and that geographically reference the data to the UTM projection. Programs are also described that incorporate several sets of Landsat derived information, topographic information, soils information, rainfall information, etc., into a data base. Selected application algorithms are discussed and sample products are presented. The types of computers on which the low-cost data system concept has been implemented are identified, typical implementation costs are given, and the source where the software may be obtained is identified.

Whitley, S. L.↗

Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

Rosenberg, Leigh↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SMART Task 6: Evaluation of the Costs of Geologic CO2 Storage for the Illinois Basin Decatur Project Site Using the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model

This is a presentation featuring an analysis related to SMART Task 6 in which CO2 storage costs are presented. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. TALES calculates the revenues, costs, and financial performance of candidate CO2 saline storage project based on site-specific activity costs and financial parameters. TALES is being integrated as a module pertaining to storage cost as part of the broader SMART Visualization and Decision Support Platform (SVDSP). In this study, the TALES model was applied using real activity cost data associated with the development and operations at the Illinois Basin Decatur Project (IBDP) CO2 storage project site. Scenario analysis was implemented in which crucial operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics like first-year breakeven price of CO2 ($/tonne) and net present value (NPV) are presented in similar fashion to how they will appear in the SVDSP.

Vikara, Derek↗

Jobs and Economic Development Impact (JEDI) User Reference Guide: Fast Pyrolysis Biorefinery Model

This guide -- the JEDI Fast Pyrolysis Biorefinery Model User Reference Guide -- was developed to assist users in operating and understanding the JEDI Fast Pyrolysis Biorefinery Model. The guide provides information on the model's underlying methodology, as well as the parameters and data sources used to develop the cost data utilized in the model. This guide also provides basic instruction on model add-in features and a discussion of how the results should be interpreted. Based on project-specific inputs from the user, the JEDI Fast Pyrolysis Biorefinery Model estimates local (e.g., county- or state-level) job creation, earnings, and output from total economic activity for a given fast pyrolysis biorefinery. These estimates include the direct, indirect and induced economic impacts to the local economy associated with the construction and operation phases of biorefinery projects.Local revenue and supply chain impacts as well as induced impacts are estimated using economic multipliers derived from the IMPLAN software program. By determining the local economic impacts and job creation for a proposed biorefinery, the JEDI Fast Pyrolysis Biorefinery Model can be used to field questions about the added value biorefineries might bring to a local community.

09 BIOMASS FUELS↗

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

Cost and Performance Baseline for Fossil Energy Plants - Volume 2: Coal to Synthetic Natural Gas and Ammonia [Slides]

Presentation of Volume 2: This report establishes performance and cost data for coal fueled plants producing synthetic natural gas and ammonia. The plants are based on a dry-feed entrained-flow gasifier and include cases using bituminous, sub-bituminous, and lignite coals. All configurations were studied with and without carbon sequestration. The analyses were performed on a consistent technical and economic basis that accurately reflects current market conditions for plants starting operation in 2012. This is believed to provide the most comprehensive set of cost and performance data available in the public literature to date. The cost and performance data were compiled from published reports, information obtained from vendor quotes and users of the technology, and data from designing and building projects.

01 COAL, LIGNITE, AND PEAT↗

Cost and Performance Baseline for Fossil Energy Plants - Volume 2: Coal to Synthetic Natural Gas and Ammonia

This report establishes performance and cost data for coal fueled plants producing synthetic natural gas and ammonia. The plants are based on a dry-feed entrained-flow gasifier and include cases using bituminous, sub-bituminous, and lignite coals. All configurations were studied with and without carbon sequestration. The analyses were performed on a consistent technical and economic basis that accurately reflects current market conditions for plants starting operation in 2012. This is believed to provide the most comprehensive set of cost and performance data available in the public literature to date. The cost and performance data were compiled from published reports, information obtained from vendor quotes and users of the technology, and data from designing and building projects.

01 COAL, LIGNITE, AND PEAT↗

Advanced Fuel Cycle Cost Basis Report: Module D1-2 LWR Pelletized MOX Fuel Fabrication

Nature of this 2021 Module update from previous AFC-CBRs: Use of U,Pu MOX life cycle cost data from late 1970s Non-proliferation Assessment Systems Analysis Program (NASAP). This archived data has been updated in 2018-2019 to reflect today’s regulatory and economic conditions and is presented in 2017. For the lower unit cost MOX fabrication case the PuO 2 from the reprocessed LWR SNF is assumed to be fabricated immediately after aqueous PUREX reprocessing, thus minimizing the time for undesirable actinide radioisotopes, from the standpoint of radiation safety, to build in. Fabricated MOX utilizing separated and multi-year stored Pu from aqueously reprocessed SNF has also been added to this Module as a second LWR MOX fabrication variant, requiring additional and more costly glovebox design and operations to protect personnel. This new NASAP-informed data augments historical data and unit cost projections appearing in the 2009 (Shropshire et al 2009), 2012 (Dixon et al 2012), and 2017 Dixon et al 2017) AFC-CBRs. The “What-it-takes” 2017 unit fabrication cost values based on the updated NASAP studies are escalated to 2020$ for this 2021 Update Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

I'll take that to go: Big data bags and minimal identifiers for exchange of large, complex datasets

Big data workflows often require the assembly and exchange of complex, multi-element datasets. For example, in biomedical applications, the input to an analytic pipeline can be a dataset consisting thousands of images and genome sequences assembled from diverse repositories, requiring a description of the contents of the dataset in a concise and unambiguous form. Typical approaches to creating datasets for big data workflows assume that all data reside in a single location, requiring costly data marshaling and permitting errors of omission and commission because dataset members are not explicitly specified. We address these issues by proposing simple methods and tools for assembling, sharing, and analyzing large and complex datasets that scientists can easily integrate into their daily workflows. These tools combine a simple and robust method for describing data collections (BDBags), data descriptions (Research Objects), and simple persistent identifiers (Minids) to create a powerful ecosystem of tools and services for big data analysis and sharing. We present these tools and use biomedical case studies to illustrate their use for the rapid assembly, sharing, and analysis of large datasets.

Chard, Kyle↗