Search NASA⌕ Search

SEARCH · Search NASA

Results for “critical design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The RadarSAT-MAMM automated mission planner

The RadarSAT Modified Antarctic Mapping Mission (MAMM) ran from September to November 2000. It consisted of over 2400 synthetic aperture radar (SAR) data takes over Antarctica that had to satisfy coverage and other scientific criteria while obeying tight resource and operational constraints. Developing these plans is a time and knowledge intensive effort. It required over a work-year to manually develop a comparable plan for AMM-1, the precursor mission to MAMM. This paper describes the automated mission planning system for MAMM, which dramatically reduced mission-planning costs to just a few workweeks, and enabled rapid generation of 'what-if' scenarios for evaluating mission-design trades. This latter capability informed several critical design decisions and was instrumental in accurately costing the mission.

RadarSAT Modified Antarctic Mapping Mission (MAMM)↗

NASA Ares I Launch Vehicle Roll and Reaction Control Systems Design Status

This paper provides an update of design status following the preliminary design review of NASA s Ares I first stage roll and upper stage reaction control systems. The Ares I launch vehicle has been chosen to return humans to the moon, mars, and beyond. It consists of a first stage five segment solid rocket booster and an upper stage liquid bi-propellant J-2X engine. Similar to many launch vehicles, the Ares I has reaction control systems used to provide the vehicle with three degrees of freedom stabilization during the mission. During launch, the first stage roll control system will provide the Ares I with the ability to counteract induced roll torque. After first stage booster separation, the upper stage reaction control system will provide the upper stage element with three degrees of freedom control as needed. Trade studies and design assessments conducted on the roll and reaction control systems include: propellant selection, thruster arrangement, pressurization system configuration, and system component trades. Since successful completion of the preliminary design review, work has progressed towards the critical design review with accomplishments made in the following areas: pressurant / propellant tank, thruster assembly, and other component configurations, as well as thruster module design, and waterhammer mitigation approach. Also, results from early development testing are discussed along with plans for upcoming system testing. This paper concludes by summarizing the process of down selecting to the current baseline configuration for the Ares I roll and reaction control systems.

Butt, Adam↗

The OSIRIS-REx Asteroid Sample Return Mission Operations Design

OSIRIS-REx is an acronym that captures the scientific objectives: Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer. OSIRIS-REx will thoroughly characterize near-Earth asteroid Bennu (Previously known as 1019551999 RQ36). The OSIRIS-REx Asteroid Sample Return Mission delivers its science using five instruments and radio science along with the Touch-And-Go Sample Acquisition Mechanism (TAGSAM). All of the instruments and data analysis techniques have direct heritage from flown planetary missions. The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the mission's science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the Sample Return Capsule (SRC) lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis. Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together spacecraft, instrument and operations scenarios. Asteroid Touch and Go (TAG) has various options varying from ground only to fully automated (natural feature tracking). Spacecraft constraints such as thermo and high gain antenna pointing impact the timeline. The mission is sensitive to navigation errors, so a late command update has been implemented. The project implemented lessons learned from other "small body" missions. The key lesson learned was 'expect the unexpected' and implement planning tools early in the lifecycle. This paper summarizes the ground and spacecraft design as presented at OSIRIS-REx Critical Design Review(CDR) held April 2014.

mission operations↗

Development of a High Performance, Low Profile Translation Table with Wire Feedthrough for a Deep Space CubeSat

NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.

Few, Alex↗

Development of a High Performance, Low-Profile Translation Table with Wire Feedthrough

NEAScout, a 6U cubesat, will use an 85 sq m solar sail to travel to a near-earth asteroid for observation. Over the course of the 3-year mission, a combination of reaction wheels, cold gas reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was addressed and a new subsystem was introduced to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space-about 17 mm of the vehicle's assembly height-and was required to generate +/-10 cm by +/-5 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the design downselect process and breadboarding for designing low-profile translation stages with feedthrough capabilities.

Few, Alex↗

Development of a High-Performance, Low-Profile Translation Table with Wire Feedthrough for a Deep Space CubeSat

NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.

Few, Alex↗

CLARREO Pathfinder: Mission Overview and Current Status

The Climate Absolute Radiance and Refractivity Observatory (CLARREO) Pathfinder (CPF) mission consists of a high accuracy reflected solar spectrometer that will take measurements from the International Space Station for one year starting in 2023. CPF will demonstrate that its novel on-orbit absolute calibration approaches are capable of achieving 0.3% (1-sigma) radiometric uncertainty. Additionally, using its two-axis pointing gimbal which enables nearly-concurrent measurements matching look angles with other orbiting sensors, CPF will demonstrate a novel inter-calibration approach by inter-calibrating CERES and VIIRS. CPF is currently in its Final Design and Fabrication Stage and recently passed its Critical Design Review.

Yolanda Shea↗

CLARREO Pathfinder: Mission Status and Current Status

The Climate Absolute Radiance and Refractivity Observatory (CLARREO) Pathfinder (CPF) mission consists of a high accuracy reflected solar spectrometer that will take measurements from the International Space Station for one year starting in 2023. CPF will demonstrate that its novel on-orbit absolute calibration approaches are capable of achieving 0.3% (1-sigma) radiometric uncertainty. Additionally, using its two-axis pointing gimbal which enables nearly-concurrent measurements matching look angles with other orbiting sensors, CPF will demonstrate a novel inter-calibration approach by inter-calibrating CERES and VIIRS. CPF is currently in its Final Design and Fabrication Stage and recently passed its Critical Design Review.

Yolanda Shea↗

Clarreo Pathfinder: Mission Overview and Current Status

The Climate Absolute Radiance and Refractivity Observatory (CLARREO) Pathfinder (CPF) mission consists of a high accuracy reflected solar spectrometer that will take measurements from the International Space Station for one year starting in 2023. CPF will demonstrate that its novel on-orbit absolute calibration approaches are capable of achieving 0.3% (1-sigma) radiometric uncertainty. Additionally, using its two-axis pointing gimbal which enables nearly-concurrent measurements matching look angles with other orbiting sensors, CPF will demonstrate a novel inter-calibration approach by inter-calibrating CERES and VIIRS. CPF is currently in its Final Design and Fabrication Stage and recently passed its Critical Design Review.

accuracy↗

NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

Allowable response delay for large aircraft

The degree of permissible time delay in an airliner flight control system is presently sought by means of a pilot-in-the-loop moving base flight simulator, assuming the characteristics of an advanced L-1011 aircraft variant. Test pilots and engineers from the U.S. Navy, the airliner manufacturer, and NASA Langley were used in a task which encompassed approach and landing after recovery from offsets in localizer and glide slope, during calm, turbulent, and cross-wind conditions. The data obtained in the course of 279 runs included statistics on pilot workload and performance as well as pilot opinion. Preliminary results indicate that requirements for a 0.1-sec maximum delay in aircraft response are excessively conservative for large aircraft, where an offset landing maneuver is the critical design task. Lateral axis delays appear to be more critical than longitudinal ones.

Meyer, R. T.↗

Cryogenic propellant management: Integration of design, performance and operational requirements

The integration of the design features of the Shuttle elements into a cryogenic propellant management system is described. The implementation and verification of the design/operational changes resulting from design deficiencies and/or element incompatibilities encountered subsequent to the critical design reviews are emphasized. Major topics include: subsystem designs to provide liquid oxygen (LO2) tank pressure stabilization, LO2 facility vent for ice prevention, liquid hydrogen (LH2) feedline high point bleed, pogo suppression on the Space Shuttle Main Engine (SSME), LO2 low level cutoff, Orbiter/engine propellant dump, and LO2 main feedline helium injection for geyser prevention.

Worlund, A. L.↗

Probabilistic Study of Fluid Structure Interaction

A combustor liner was computationally simulated and probabilistically evaluated in view of the several uncertainties in the aerodynamic, structural, material and thermal variables that govern the combustor liner. The interconnection between the computational fluid dynamics code and the finite element structural analysis codes was necessary to couple the thermal profiles with structural design. The stresses and their variations were evaluated at critical points on the liner. Cumulative distribution functions and sensitivity factors were computed for stress responses due to the aerodynamic, mechanical and thermal random variables. It was observed that the inlet and exit temperatures have a lot of influence on the hoop stress. For prescribed values of inlet and exit temperatures, the Reynolds number of the flow, coefficient of thermal expansion, gas emissivity and absorptivity and thermal conductivity of the material have about the same impact on the hoop stress. These results can be used to quickly identify the most critical design variables in order to optimize the design and make it cost effective.

Gorla, Rama S. R.↗

ARES I Upper Stage Subsystems Design and Development

From 2005 through early 2011, NASA conducted concept definition, design, and development of the Ares I launch vehicle. The Ares I was conceived to serve as a crew launch vehicle for beyond-low-Earth-orbit human space exploration missions as part of the Constellation Program Architecture. The vehicle was configured with a single shuttle-derived solid rocket booster first stage and a new liquid oxygen/liquid hydrogen upper stage, propelled by a single, newly developed J-2X engine. The Orion Crew Exploration Vehicle was to be mated to the forward end of the Ares I upper stage through an interface with fairings and a payload adapter. The vehicle design passed a Preliminary Design Review in August 2008, and was nearing the Critical Design Review when efforts were concluded as a result of the Constellation Program s cancellation. At NASA Glenn Research Center, four subsystems were developed for the Ares I upper stage. These were thrust vector control (TVC) for the J-2X, electrical power system (EPS), purge and hazardous gas (P&HG), and development flight instrumentation (DFI). The teams working each of these subsystems achieved 80 percent or greater design completion and extensive development testing. These efforts were extremely successful representing state-of-the-art technology and hardware advances necessary to achieve Ares I reliability, safety, availability, and performance requirements. This paper documents the designs, development test activity, and results.

Frate, David T.↗

Instrumented Architectural Simulation System

Simulation of systems at an architectural level can offer an effective way to study critical design choices if (1) the performance of the simulator is adequate to examine designs executing significant code bodies, not just toy problems or small application fragements, (2) the details of the simulation include the critical details of the design, (3) the view of the design presented by the simulator instrumentation leads to useful insights on the problems with the design, and (4) there is enough flexibility in the simulation system so that the asking of unplanned questions is not suppressed by the weight of the mechanics involved in making changes either in the design or its measurement. A simulation system with these goals is described together with the approach to its implementation. Its application to the study of a particular class of multiprocessor hardware system architectures is illustrated.

COMPUTERIZED SIMULATION↗

Design and construction of a prototype ACTS propagation terminal

The launch schedule for the Advanced Communication Technology Satellite (ACTS) spacecraft did not leave sufficient time for completion of the prototype ACTS Propagation Terminals (APT) prior to initiation of the APT production phase. In fact, the approach used was to construct and test all subassemblies of the terminal with special emphasis on the technically challenging portions. These include the RF front end that uses a state-of-the-art down converter which integrates a low noise amplifier, mixer, post amplifier, filter, and local oscillator port frequency doubler into a single small package. In addition, a new digital receiver that uses the latest DSP technology was developed. Both of these subassemblies were thoroughly tested. The highest risk technology in the APT program was the digital receiver. Several candidate algorithms and DSP chips were investigated early on, primarily under JPL sponsorship. A receiver was constructed based on Texas Instruments chip. The final prototype digital receiver was one based on an Analog Devices chip. The design and test results are documented in a report prepared for this grant. A Primary Design Review (PDR) was conducted 30 May 1991, and a Critical Design Review was held 7 Jul. 1992. Final complete documentation of the APT's will appear in the form of three reports: a hardware description report, a report on the data collection code (ACTS VIEW), and a report on the preprocessing code.

Stutzman, Warren↗