Search NASA⌕ Search

SEARCH · Search NASA

Results for “departure scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The Carrier's Liability for Damage Caused by Delay in International Air Transport

Delay in the air transport occurs when passengers, baggage or cargo do not arrive at their destination at the time indicated in the contract of carriage. The causes of delay in the carriage of passengers are booking errors or double booking, delayed departure of aircraft, incorrect information regarding the time of departure, failure to land at the scheduled destination and changes in flight schedule or addition of extra landing stops. Delay in the carriage of baggage or cargo may have different causes: no reservation, lack of space, failure to load the baggage or cargo at the right place, or to deliver the covering documents at the right place. The Montreal Convention of 1999 Article 19 provides that 'The carrier is liable for damage occasioned by delay in the carriage by air of passengers, baggage or cargo. Nevertheless, the carder shall not be liable for damage occasioned by delay if it proves that it and its servants and agents took all measures that could reasonably be required to avoid the damage or that it was impossible for it or them to take such measures'. The Montreal Convention Article 22 provides liability limits of the carrier in case of delay for passengers and their baggage and for cargo. In the carriage of persons, the liability of the carrier for each passenger is limited to 4,150 SDR. In the carriage of baggage, the liability of the carrier is limited to 1,000 SDR for each passenger unless a special declaration as to the value of the baggage has been made. In the carriage of cargo, the liability of the carrier is limited to 17 SDR per kilogram unless a special declaration as to the value of the cargo has been made. The Montreal Convention Article 19 has shortcomings: it is silent on the duration of the liability for carriage,andit does not make any distinction between persons and good. It does not give any indication concerning the circumstances to be taken into account in cases of delay, and about the length of delay. In conclusion, it is desirable to define the period of carriage with accuracy, and to insert the word 'unreasonable' in Article 19.

Lee, Kang Bin↗

Strategic Surface Metering at Charlotte Douglas International Airport

NASA is conducting a field test of the Airspace Technology Demonstration2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system. The IADS system was deployed to Charlotte Douglas International Airport (CLT) in 2017 for a three-year field evaluation. The Phase 1 field evaluation included tactical surface metering, which manages departure excess taxi time by tactically assigning gate holds. Phase 2 built upon the lessons learned from Phase 1 to extend surface metering into the strategic metering timeframes. In this paper, we describe the strategic metering capabilities of the ATD-2 IADS system and the operational results from CLT.

Airspace Technology Demonstration 2↗

Vertiport Dynamic Density

Advanced Air Mobility (AAM) is envisioned to be another spoke in a region’s transportation system, supplementing ground-based travel with air-based travel. Eventually, air taxis will be pervasive, convenient, and affordable. As demand and operations tempo increase, congestion may arise. Several characteristics of AAM reduce the applicability of techniques used in today’s National Airspace System (NAS) to manage congestion. AAM will include both scheduled and non-scheduled, on-demand operations, challenging strategic deconfliction algorithms. Flights will be fairly short, traversing an urban area, not hundreds or thousands of miles, with corresponding low energy reserves, prohibiting excessive delays. Flight operators will need flexibility in operations, scheduling a flight only minutes before departure, or diverting to an alternate vertiport if it becomes advantageous, further adding to trajectory uncertainty that would challenge strategic deconfliction. Finally, operators will desire privacy to protect sensitive information or preserve competitive advantage, limiting early access to intent information. In this paper, we present an approach for managing congestion at vertiports by providing insight into the traffic situation to support operationally-advantageous and safe land or divert decisions. We propose a metric designed with usefulness and usability in AAM operations in mind. The metric uses the sociology concept of dynamic density (DD) that takes into consideration not only number of flights, but also the interaction of those flights with the vertiport’s limited resources, namely the landing pads and the parking spots. DD supports a Pilot in Command (PIC) with decisions about whether to proceed, expedite, delay, or divert; and supports air traffic control (ATC) and vertiport operators in airspace management and vertiport usage. We demonstrate the metric on a notional vertiport scenario. We also show that DD provides better insight into congestion and resulting flight delays than an aircraft count metric used in traditional air traffic management.

Lilly Spirkovska↗

Departure Trajectory Synthesis and the Intercept Problem

Two areas of the departure problem in air traffic control are discussed. The first topic is the generation of climb-out trajectories to a fix. The trajectories would be utilized by a scheduling algorithm to allocate runways, sequence the proposed departures, and assign a departure time. The second area is concerned with finding horizontal trajectories to merge aircraft from the TRACON to an open slot in the en-route environment. Solutions are presented for the intercept problem for two cases: (1) the aircraft is traveling at the speed of the aircraft in the jetway; (2) the merging aircraft has to accelerate to reach the speed of the aircraft in the en-route stream. An algorithm is given regarding the computation of a solution for the latter case. For the former, a set of equations is given that allows us to numerically solve for the coordinate where the merge will occur.

Bolender, Michael A.↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Ulysses mission design after Challenger

The delay of the Ulysses launch from May 1986 to October 1990, because of the Challenger disaster, has altered both the constraints under which the mission must be designed and the timing of several mission critical events. Safety and launch reliability concerns from the Shuttle have increased the effective launch window to durations greater than one hour. Fortuitously high declinations of the launch asymptote (DLA), of the order of the launch site latitude, ameliorate the impact of the new constraints on the launch window. Target overlays in the first hour of the launch window provide higher departure energies that improve mission performance and avoid a science schedule conflict at second opposition near the time of closest Jupiter approach. The mission design starts with the maximum earth departure energy that the upper stage can deliver within the launch constraints. The Jupiter arrival asymptotes are chosen from the optimal point of mission performance in the mission space defined in the Jupiter B-plane by contours mapped by the science and spacecraft constraints. More than half the orbital energy of the earth-to-Jupiter transfer orbit is lost in the Jupiter flyby, and the Jupiter gravitational assist rotates the orbit plane out of the ecliptic to an inclination of about 80 degrees.

Luthey, Joe L.↗

Predicting Airport Runway Configurations for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. It affects the efficiency of the National Airspace System (NAS) and both surface and airspace operations can benefit from better understanding future runway configurations. In this paper, we present a comprehensive implementation of predictive models for runway configuration estimation from large volumes of historical data. Specifically, operational data from two full years (2018 and 2019) is collected, analyzed, and fused together to build the data product used in this work. The data set differs from prior work in the field in terms of its scope, resolution, and variety of factors collected and considered. Meteorological data is collected from two different sources – current weather conditions from METAR (Meteorological Terminal Aviation Routine Weather Report) and forecast weather conditions from Localized Aviation MOS Program (LAMP). Operational data from the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) related to scheduled and actual number of arrivals and departures, average taxi times, etc. are collected. NASA’s Sherlock Data Warehouse is used to identify critical information such as go-arounds, and other events that might impact RCM decision-making. All data is collected and aggregated over 15-minute intervals throughout the two years. This provides a resolution like the timescales that might be necessary for runway configuration management decision-making. A variety of supervised learning algorithms are tested including Support Vector Machine, Random Forest, Gradient Boosting, etc. including tuning of the model hyperparameters. The modeling process is applied and presented on two representative U.S. airports – Charlotte Douglas International Airport (KCLT) and Denver International Airport (KDEN). The two airports present different levels of complexity in terms of the total number of configurations used and provide a balanced perspective on the generalizability of the developed approach to other airports in the NAS. Initial results are promising (F1 score of 0.91 at KCLT and 0.83 at KDEN) for data in the test set. The final paper will contain a comprehensive comparison between different models and model building strategies as well as further refined results. Most important predictors for each airport will be identified along with a discussion and recommendations on adapting the framework to other scenarios.

Tejas G Puranik↗

SARDA Surface Schedulers

Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

runways scheduling↗

Cis-Lunar Reusable In-Space Transportation Architecture for the Evolvable Mars Campaign

Human exploration missions to Mars or other destinations in the solar system require large quantities of propellant to enable the transportation of required elements from Earth's sphere of influence to Mars. Current and proposed launch vehicles are incapable of launching all of the requisite mass on a single vehicle; hence, multiple launches and in-space aggregation are required to perform a Mars mission. This study examines the potential of reusable chemical propulsion stages based in cis-lunar space to meet the transportation objectives of the Evolvable Mars Campaign and identifies cis-lunar propellant supply requirements. These stages could be supplied with fuel and oxidizer delivered to cis-lunar space, either launched from Earth or other inner solar system sources such as the Moon or near Earth asteroids. The effects of uncertainty in the model parameters are evaluated through sensitivity analysis of key parameters including the liquid propellant combination, inert mass fraction of the vehicle, change in velocity margin, and change in payload masses. The outcomes of this research include a description of the transportation elements, the architecture that they enable, and an option for a campaign that meets the objectives of the Evolvable Mars Campaign. This provides a more complete understanding of the propellant requirements, as a function of time, that must be delivered to cis-lunar space. Over the selected sensitivity ranges for the current payload and schedule requirements of the 2016 point of departure of the Evolvable Mars Campaign destination systems, the resulting propellant delivery quantities are between 34 and 61 tonnes per year of hydrogen and oxygen propellant, or between 53 and 76 tonnes per year of methane and oxygen propellant, or between 74 and 92 tonnes per year of hypergolic propellant. These estimates can guide future propellant manufacture and/or delivery architectural analysis.

McVay, Eric S.↗

Wheels-Off Time Uncertainty Impact on Benefits of Early Call for Release Scheduling

Arrival traffic scenarios with 808 flights from 173 airports to Houston George Bush International airport are simulated to determine if Call For Release flights can receive a benefit in terms of less delay over other flights by scheduling prior to gate pushback (look-ahead in time) as opposed to at gate pushback. Call for Release flights are departures that require approval from Air Route Traffic Control Center prior to release. Realism is brought to the study by including gate departure delay and taxi-out delay uncertainties for the 77 major U. S. airports. Gate departure delay uncertainty is assumed to increase as a function of look-ahead time. Results show that Call For Release flights from an airport within the freeze horizon (a region surrounding the arrival airport) can get an advantage over other flights to a capacity constrained airport by scheduling prior to gate pushback, provided the wheels-off time uncertainty with respect to schedule is controlled to a small value, such as within a three-minute window. Another finding of the study is that system delay, measured as the sum of arrival delays, is smaller when flights are scheduled in the order of arrival compared to in the order of departure. Because flights from airports within the freeze horizon are scheduled in the order of departure, an increase in the number of internal airports with a larger freeze horizon increases system delay. Delay in the given scenario was found to increase by 126% (from 13.8 hours to 31.2 hours) as freeze horizon was increased from 30-minutes to 2-hours in the baseline scenario.

wheels-off time uncertainty↗

Improving Departure Throughput by Dynamically Adjusting Inter-Arrival Spacing

LaGuardia Airport (LGA) in New York has many unique challenges that create excess taxi-out delays. The purpose of this paper is to investigate the potential benefit that could be gained by tactically adjusting the Terminal Sequencing and Spacing (TSS) schedule to precisely manage inter-arrival spacing to maximize the number of departures per arrival pair. Three strategies for dynamically adjusting arrival schedules are proposed in this paper: Delay Control, Delay and Advance, and No Slack Capacity. The benefits of these strategies were examined on actual traffic data at LGA. The results showed that by applying these strategies, a 10 to 60 increase in departures and a reduction in un-utilized departure capacity (gaps) could be achieved during the airports busiest six-hour period. Significant increases in departure throughput would improve air traffic operations by reducing departure delay time. Furthermore, the concept could be used to resolve temporal mismatches between departure capacity and demand which also cause excessive departure delays.

Yoo, Hyo-Sang↗

Exploring Management of Arrival Spacing Using Route Extensions with Terminal Spacing Tools

Airports with shared runway operations between arrivals and departures can experience severe departure gridlock and delays during a heavy arrival push due to insufficient gaps in the arrival stream for aircraft to depart. The problem is accentuated in situations when a large gap in the arrival spacing has to be created at the last minute due to wake vortex separation requirements. At LaGuardia airport, wake vortex separation problems arise when a heavy jet, such as a B757, departing on Runway 31 needs additional spacing between arrivals on Runway 22. A standard solution for controllers in many airports in situations such as this is to extend the downwind leg of arrival aircraft to create extra space between the arrivals. The question addressed in this paper is how such route extensions would work with terminal scheduling operations, namely (1) the automated Terminal Sequencing and Spacing (TSS) tools and (2) a new scheduling tool which increases the availability of gaps for departure aircraft (Departure Sensitive Arrival Spacing or DSAS). In a simulated LaGuardia airport (LGA) Terminal Radar Approach Control (TRACON) airspace, two new RNAV arrival routes were created along with extensions to these routes. The arrival route from the south had a downwind leg extension near the airport in the final sector. The arrival route from the north had an extension in a feeder sector further from the airport. An exploratory one-hour run with the route extensions was compared to an hour run without the extensions. Topics included in the paper are 1) how the route extensions were developed, 2) a procedure outlining how the aircraft could be scheduled to the extensions and who would do it, and 3) the results of the exploratory run compared to the original run without the extensions. The results indicated that the extended downwind leg route helped to create a B757 departure gap in the middle of a packed arrival stream, resulting in a reduction of 11 minutes in average wait time for the B757s, but at a cost of increased controller self-reported workload from low to moderate.

time based flow management↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

Analysis of Factors for Incorporating User Preferences in Air Traffic Management: A system Perspective

This paper presents an analysis of factors that impact user flight schedules during air traffic congestion. In pre-departure flight planning, users file one route per flight, which often leads to increased delays, inefficient airspace utilization, and exclusion of user flight preferences. In this paper, first the idea of filing alternate routes and providing priorities on each of those routes is introduced. Then, the impact of varying planning interval and system imposed departure delay increment is discussed. The metrics of total delay and equity are used for analyzing the impact of these factors on increased traffic and on different users. The results are shown for four cases, with and without the optional routes and priority assignments. Results demonstrate that adding priorities to optional routes further improves system performance compared to filing one route per flight and using first-come first-served scheme. It was also observed that a two-hour planning interval with a five-minute system imposed departure delay increment results in highest delay reduction. The trend holds for a scenario with increased traffic.

Sheth, Kapil S.↗

Optimizing Flight Departure Delay and Route Selection Under En Route Convective Weather

This paper presents a linear Integer Programming model for managing air traffic flow in the United States. The decision variables in the model are departure delays and predeparture reroutes of aircraft whose trajectories are predicted to cross weather-impacted regions of the National Airspace System. The model assigns delays to a set of flights while ensuring their trajectories are free of any conflicts with weather. In a deterministic setting, there is no airborne holding due to unexpected weather incursion in a flight s path. The model is applied to solve a large-scale traffic flow management problem with realistic weather data and flight schedules. Experimental results indicate that allowing rerouting can reduce departure delays by nearly 57%, but it is associated with an increase in total airborne time due to longer routes flown by aircraft. The computation times to solve this problem were significantly lower than those reported in the earlier studies.

Mukherjee, Avijit↗

Exploration of the Theoretical Physical Capacity of the John F. Kennedy International Airport Runway System

A design study was completed to explore the theoretical physical capacity (TPC) of the John F. Kennedy International Airport (KJFK) runway system for a northflow configuration assuming impedance-free (to throughput) air traffic control functionality. Individual runways were modeled using an agent-based, airspace simulation tool, the Airspace Concept Evaluation System (ACES), with all runways conducting both departures and arrivals on a first-come first-served (FCFS) scheduling basis. A realistic future flight schedule was expanded to 3.5 times the traffic level of a selected baseline day, September 26, 2006, to provide a steady overdemand state for KJFK runways. Rules constraining departure and arrival operations were defined to reflect physical limits beyond which safe operations could no longer be assumed. Safety buffers to account for all sources of operational variability were not included in the TPC estimate. Visual approaches were assumed for all arrivals to minimize inter-arrival spacing. Parallel runway operations were assumed to be independent based on lateral spacing distances. Resulting time intervals between successive airport operations were primarily constrained by same-runway and then by intersecting-runway spacing requirements. The resulting physical runway capacity approximates a theoretical limit that cannot be exceeded without modifying runway interaction assumptions. Comparison with current KJFK operational limits for a north-flow runway configuration indicates a substantial throughput gap of approximately 48%. This gap may be further analyzed to determine which part may be feasibly bridged through the deployment of advanced systems and procedures, and which part cannot, because it is either impossible or not cost-effective to control. Advanced systems for bridging the throughput gap may be conceptualized and simulated using this same experimental setup to estimate the level of gap closure achieved.

Neitzke, Kurt W.↗

Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

Traffic Management Initiative (TMI)↗

Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

Rodionova, O.↗