Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployables”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Seismoacoustic Signatures Observed During a Long-Term Deployment of Infrasound Sensors at the Nevada National Security Site

Earthquakes have repeatedly been shown to produce inaudible acoustic signals (<20 Hz), otherwise known as infrasound. These signals can propagate hundreds to thousands of kilometers and still be detected by ground-based infrasound arrays depending on the source strength, distance between source and receiver, and atmospheric conditions. Another type of signal arrival at infrasound arrays is the seismic induced motion of the sensor itself, or ground-motion-induced sensor noise. Measured acoustic and seismic waves produced by earthquakes can provide insight into properties of the earthquake such as magnitude, depth, and focal mechanism, as well as information about the local lithology and atmospheric conditions. Large earthquakes that produce strong acoustic signals detected at distances greater than 100 km are the most commonly studied; however, more recent studies have found that smaller magnitude earthquakes ($M$ w <2.0) can be detected at short ranges. In that vein, this study will investigate the ability for a long-term deployment of infrasound sensors (deployed as part of the Source Physics Experiments [SPE] from 2014 to 2020) to detect both seismic and infrasonic signals from earthquakes at local ranges (<50 km). Methods used include a combination of spectral analysis and automated array processing, supported by U.S. Geological Survey earthquake bulletins. Further, this investigation revealed no clear acoustic detections for short range earthquakes. However, secondary infrasound from an $M$ w 7.1 earthquake over 200 km away was detected. Important insights were also made regarding the performance of the SPE networks including detections of other acoustic sources such as bolides and rocket launches. Finally, evaluation of the infrasound arrays is performed to provide insight into optimal deployments for targeting earthquake infrasound.

58 GEOSCIENCES↗

Rapid and Temporary Deployment of Fiber-Optic Arrays to Measure Surface Chemical Explosion Series with Distributed Acoustic Sensing

Rapid and temporary distributed acoustic sensing (DAS) deployments are crucial for accurately capturing the seismic wavefield following major events, such as earthquakes, or in anticipation of known events of interest, such as chemical explosions. We provide an overview of two DAS campaigns conducted in May and October 2024 to record the seismoacoustic waves generated by two series of surface chemical explosions in New Mexico, United States, involving 1- and 10-ton trinitrotoluene-equivalent charges. In both campaigns, we deployed approximately 2 km of fiber-optic cables in a dry riverbed, about 12 km east of the explosion sites. For the October campaign, seven geophones and two anemometers were collocated with the fiber. We describe the field deployments and present preliminary results from the recorded signals. Specifically, we cross analyze the data recorded in May and October, validate the DAS data with geophone measurements, and highlight the benefits of burying fibers to reduce wind noise and improve signal-to-noise ratios. This study demonstrates the potential of DAS to record the seismoacoustic waves generated by surface chemical explosions of varying sizes at distances of approximately 10 km from the source.

58 GEOSCIENCES↗

EPICS Deployment at Fermilab

Fermilab has traditionally not been an EPICS house, as such expertise in EPICS is limited and scattered. However, PIP-II will be using EPICS for its control system. Furthermore, when PIP-II is operating, it must to interface with the existing, though modernized (see ACORN) legacy control system. We have developed and deployed a software pipeline that addresses these needs and presents to developers a tested and robust software framework, including template IOCs from which new developers can quickly gain experience. In this presentation, we will discuss the motivation for this work, the implementation of a continuous integration/continuous deployment pipeline, testing, template IOCs, and the deployment of user applications. We will also discuss how this is used with the current PIP-II teststand and lessons learned.

43 PARTICLE ACCELERATORS↗

Modeling Photovoltaics Innovation and Deployment Dynamics

PV’s historically rapid cost reduction is exceptional among technologies. Further cost reductions could play a major role in increasing deployment in the future. To enable such cost reductions, new modeling frameworks are needed to understand the determinants of innovation in PV. In this project, we study the mechanisms driving PV module and system cost reductions, delving deeply into the specific technological innovations that have occurred in the past and the policies that encouraged them, and also opportunities for future cost reduction and widespread deployment. The project contributes new fundamental insight on the determinants of technological innovation by developing novel methods and insights that are generalizable and can therefore be applied to other technologies. The results will allow policy makers, engineers, and other stakeholders to better prioritize their efforts and investments in the future. The project is organized around four journal articles as described below. The first article [1] identifies ‘low-level’ (e.g. conversion efficiency improvement) and ‘high- level’ (e.g. R&D efforts) mechanisms of cost reduction in PV systems (Tasks 1-4). This work builds on a previous DOE grant, where we developed a framework for technological innovation leading to PV module cost reduction [2]. We advance a method to disentangle the contributions of physical (‘hardware’) and non-physical (‘soft technology’) changes. Our results uncover reasons behind the relatively slow evolution of soft technology and can inform new innovation approaches to these technologies. The second article [3] identifies specific engineering or institutional innovations that enabled the low-level mechanisms of cost reduction in PV module and balance-of-systems (BOS) (Tasks 5, 9, 10). We identify 85 innovations and connect them to the cost variables they affected. By developing an innovations typology, this study shows the differences between the types of innovations affecting PV modules and BOS components. Finally, by analyzing the industry origins of innovations, this study also finds that PV was well-positioned within an ecosystem of continuously advancing technologies. The third article [4] studies prospective cost reduction opportunities (Task 10). We explore how design approaches that emphasize standardization and automation, such as plug-and-play PV systems, can create cost reduction opportunities by reducing interactions and speeding up activities with high process costs. We show that this can lead to cost reduction in cost components with the most untapped opportunity for improvement such as installation labor, overhead, electrical BOS, and customer acquisition. The fourth article [5] analyzes how various policies supporting PV deployment and R&D contributed to PV’s cost improvement by enabling high-level mechanisms, specific innovations, and ultimately low-level mechanisms of cost reduction (Tasks 8, 13, 14). We investigate examples from different countries and connect these policies to quantifiable cost change mechanisms. Our study sheds light on the roles that different nations played over time, through a diverse set of policy approaches.

14 SOLAR ENERGY↗

Storage Futures Study: The Four Phases of Storage Deployment: A Framework for the Expanding Role of Storage in the U.S. Power System

This report is one in a series of NREL’s Storage Futures Study (SFS) publications. The SFS is a multiyear research project that explores the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS is designed to examine the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data will be published as a series of publications. The table on the next page lists the planned publications and specific research topics they will examine under the SFS. This report, the first in the SFS series, explores the roles and opportunities for new, cost-competitive stationary energy storage with a conceptual framework based on four phases of current and potential future storage deployment, and presents a value proposition for energy storage that could result in substantial new cost-effective deployments. This conceptual framework provides a broader context for consideration of the later reports in the series, including the detailed results of the modeling and analysis of power system evolution scenarios and their operational implications

25 ENERGY STORAGE↗

FTS3: Data Movement Service in containers deployed in OKD [Slides]

The File Transfer Service (FTS3) is a data movement service developed at CERN which is used to distribute the majority of the Large Hadron Collider's data across the Worldwide LHC Computing Grid (WLCG) infrastructure. At Fermilab, we have deployed a couple of FTS3 instances for Intensity Frontier experiments (e.g. DUNE) to transfer data in America and Europe, using a container-based strategy. During this talk, we are going to present the two different configurations currently running at Fermilab, comparing and contrasting a Docker-based OKD deployment against a traditional RPM-based deployment and giving an overview of the possible issues encountered. In addition, we discuss our method of certificate management and maintenance utilizing Kubernetes cronjobs.

97 MATHEMATICS AND COMPUTING↗

Less-Than-Lethal Quick Deploy Inflatable Hall/Door Barrier: VISTA Feasibility Study

Physical protection of public buildings has long been a concern of police and security services where a balance of facility security and personnel safety is vital. Due to the nature of public spaces, the use of permanently installed and deploy-on-demand physical barrier systems must be safe for the legitimate occupants and visitors of that space. Such systems must seek to mitigate the personal and organizational consequences of unintentionally seriously injuring or killing an innocent bystander by slamming a heavy, rigid, and quick-deploying barrier into place. Consideration and implementation of less-than-lethal technologies is necessary to reduce risk to visitors and building personnel. One potential barrier solution is a fast-acting, high-strength, composite airbag barrier system for doorways and hallways to quickly deploy a less-than-lethal barrier at entry points as well as isolate intruders who have already gained access. This system is envisioned to be stored within an architecturally attractive selectively frangible shell that could be permanently installed at a facility or installed in remote or temporary locations as dictated by risk. The system would be designed to be activated remotely (hardwired or wireless) from a Central Alarm Station (CAS) or other secure location.

42 ENGINEERING↗

CORAL-2 EAS-3 Deployment (Level-2 Milestone 7907)

This report documents the delivery and installation of rzVernal, a CORAL-2 El Capitan early delivery system deployed on the LLNL Restricted Zone network. Early ASC program users have run codes on the machine in support of application porting for the final El Capitan system which will be deployed at LLNL in CY2023. In addition to the RZ resource, rzVernal, two similar machines, Tioga and Tenaya, have been deployed on the LLNL SRD and Collaboration Zone networks in support of application readiness for the El Capitan platform.

97 MATHEMATICS AND COMPUTING↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Waste Attributes of SMRs Scheduled for Near-Term Deployment

The purpose of this study is to evaluate the nuclear waste attributes of Small Modular Reactors (SMRs) scheduled for deployment within this decade using available data and established nuclear waste metrics, with the results compared to a reference large Pressurized Water Reactor (PWR). The current fleet of commercial nuclear reactors in the U.S. is composed of 92 large Light Water Reactors (LWR) with an average electricity generating capacity of over 1,000 MWe each. These large LWRs built on-site in massive construction projects have been the mainstay of the industry for the last 50 years. However, new construction soon is expected to include several designs of smaller reactors primarily fabricated in factories and installed in the field in modules. Some of these SMRs will also be LWRs, while some will use other coolants such as liquid metals, molten salts or gases, and different types of fuels. The technologies and economics of SMRs have been the focus of many studies, but there has been only minimal information published on the amount of nuclear waste different types of SMRs are expected to generate and no reports focused on near-term-deployable designs. In this study, the nuclear waste attributes of three small reactors scheduled for near-term-deployment, VOYGR TM (from NuScale Power), Natrium TM ab (from TerraPower), and Xe-100 (from X-energy), were assessed by comparing nuclear waste metrics with those of a reference large Pressurized Water Reactor (PWR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

VOLTTRON Modular Framework: Enabling flexible and scalable deployment solutions

VOLTTRON ™ is an open-source platform for distributed sensing and control. The platform provides services for collecting and storing data from buildings and devices and provides an environment for developing applications which interact with that data. The platform allows developers to build out their use cases by utilizing these frameworks and integrating new capabilities. To simplify the deployment of systems built on VOLTTRON, a new way of organizing the codebase is being explored. This document details these efforts through a new code repository layout for the VOLTTRON platform and services, and how this new layout provides targeted deployments using standard python deployment packages (wheels). In addition, this paper will discuss the development of third-party agents and how they can be integrated within the VOLTTRON ecosystem. Finally, we will discuss core platform development and direction for the modularized version of VOLTTRON.

47 OTHER INSTRUMENTATION↗

Standard Operating Procedure for Optimal Deployment of Meteorological Instrumentation Within the Solar Radiation Research Laboratory (BMS and RMS SOP)

The objective of the National Renewable Energy Laboratory's (NREL's) Solar Radiation Research Laboratory (SRRL) is to collect and use high-quality solar radiation data sets for research leading to the widespread adoption of solar technologies. To appropriately populate and track the diverse array of instruments at the NREL-SRRL, NREL has established a Standard Operating Procedure (SOP) for optimal instrument deployment within the SRRL for both the Baseline Measurement System (BMS) and the Research Measurement System (RMS). Using best practices methodologies, the NREL-SRRL maintains a varied and extensive array of solar monitoring equipment to test, evaluate, and characterize the solar sensors used by federal and international agencies as well as the solar industry to determine the solar resource. The SOP provides the industry with guidance for solar resource assessment and is used for procedures in the long-term continuous monitoring of legacy instruments alongside state-of-the-art instruments. Based on the SOP, instruments are annually evaluated for continued deployment. Instruments that do not meet the SOP criteria are decommissioned, and new instruments that meet the criteria are deployed. Streamlining and optimizing the use of this facility ensures that the lab continues to be a world-leading solar calibration and measurement facility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lidar Buoy Data Dictionary: For the 2020 – 2021 California Deployments

Pacific Northwest National Laboratory (PNNL) manages two AXYS WindSentinel™ buoys (Buoys #120 and #130) on behalf of the U.S. Department of Energy (DOE) that collect a comprehensive set of meteorological and oceanographic (metocean) data to support resource characterization for wind energy offshore. The buoys have been deployed off the California coast in partnership with the Bureau of Ocean Energy Management (BOEM) from September 2020 through October 2021. One buoy was deployed within the Morro Bay Call Area offshore central California; the other buoy was deployed within the Humboldt Call Area off the coast of northern California. The measurements from the buoys are used to characterize the metocean conditions near potential locations for offshore wind lease areas and are uploaded to DOE’s Data Archive and Portal (DAP). Plots are updated on the DAP webpage to visualize the recent metocean measurements. This document serves as a data dictionary – or reference guide – for understanding and interpreting the data available from the buoys. This document includes: (1) specifications for the buoy instrumentation (Section 2.0) (2) description of each plot and definition of measured parameters (Section 3.0) (3) description of data files and naming convention (Appendix A) (4) reference guide of measurements and variables (Appendix B).

17 WIND ENERGY↗

Connected Loads – Grid Connected Appliances: Deployment IoT Solution for Fault Detection and Diagnostics

As one of the most energy-intensive end-uses in the commercial buildings sector, supermarkets consume around 50 kWh/ft 2 ( or 537.6 kWh/m 2 ) of electricity annually, or more than 2 million kWh of electricity per year for a typical store. The biggest consumer of energy in a supermarket is its refrigeration system, which accounts for 40–60% of its total electricity usage and is equivalent to about 2–3% of the total energy consumed by commercial buildings in United States, or around 0.5 quadrillion Btu (or 0.53 quadrillion KJ). Also, the supermarket refrigeration system is one of the biggest consumers of refrigerants. Current supermarket refrigeration systems rely on high global warming potential hydrofluorocarbon refrigerants. Reducing refrigerant usage or using environment friendly alternatives can result in significant climate benefits. Transcritical CO2 refrigeration systems have attracted more attention in recent years because of their zero-carbon emission advantages compared with traditional refrigerants. These systems are widely used in commercial buildings such as supermarkets. The refrigeration system can also be adapted to handle flexible building loads and be integrated into grid response transactive control to balance the supply and demand of the electric grid. Even minor improvements in the efficiency and operational reliability of supermarket refrigeration systems can create significant value in terms of saving energy, improving food quality, protecting the environment, reducing carbon footprint, and enhancing electric grid resilience. For decarbonization, the new administration has set a target to reduce greenhouse gas emissions by 50– 52% by 2030 and targeting a carbon-neutral economy by 2050. For electrification, the goal is to achieve 100% clean electricity by 2035. Such decarbonization and electrification in the building sector require that energy consumption in buildings be reduced significantly. Therefore, the building sector must continuously adopt new technologies to achieve its energy and carbon emission goals. One of the most fundamental technologies is the Internet of Things (IoT). IoT has proven to be an effective solution for the building domain, including building information/energy modeling, smart buildings, etc. Although much progress has been made in the development of IoT-based building energy systems, there is still a lack of reliable, scalable, and affordable IoT-based automated fault and degradation diagnostics (AFDDs) solutions. Such solutions would enable deployment of advanced algorithms into real systems to archive the projected energy benefits. This study reviews existing IoT solutions developed for building energy– related application and developed a simple but effective AFDD IoT deployment solution, including developing a suitable IoT architecture and conducting easy and scalable deployment by leveraging a common cloud-based IoT service.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Enhancements and Deployment of the TDAQ System for the Mu2e Experiment

The Real Time Processing Systems Division at Fermilab has deployed new features to the Off-The-Shelf Data Acquisition framework (otsdaq) for the Mu2e experiment. The Mu2e experiment will search for the coherent neutrino-less conversion of a muon into an electron in the field of an aluminum nucleus with a sensitivity improvement of 10,000 times over existing limits. Such a charged lepton flavor-violating reaction probes new physics at a scale unavailable at present or planned high-energy colliders. The Mu2e Trigger and Data Acquisition (TDAQ) system uses otsdaq as its online Data Acquisition System (DAQ) framework. otsdaq integrates the artdaq and art frameworks for event transfer, filtering, and processing. otsdaq is a web-based DAQ software suite focusing on flexibility and scalability and provides a multi-user interface accessible through a web browser. artdaq handles the entire data stream, which is read over the peripheral component interconnect express (PCIe) bus to a software filter algorithm that selects events combined with the data flux coming from a cosmic-ray veto (CRV) system. Detector front-ends are configured through the PCIe bus by customized otsdaq plugins. The otsdaq slow controls infrastructure has been further developed using the experimental physics and industrial control system (EPICS) open-source platform for monitoring, controlling, alarming, and archiving. The detector control system (DCS) for Mu2e has been integrated into otsdaq. The production TDAQ and DCS system has been deployed at the experimental hall and is being debugged and optimized for experiment operations. We report on the feature enhancements and deployment of otsdaq for Mu2e.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Standard Operating Procedure for Optimal Deployment of Meteorological Instrumentation Within the Solar Radiation Research Laboratory: 2024 Edition

The objective of the National Renewable Energy Laboratory's (NREL's) Solar Radiation Research Laboratory (SRRL) is to collect and use high-quality solar radiation data sets for research leading to the widespread adoption of solar technologies. To appropriately populate and track the diverse array of instruments at the NREL-SRRL, NREL has established a Standard Operating Procedure (SOP) for optimal instrument deployment within the SRRL for both the Baseline Measurement System (BMS) and the Research Measurement System (RMS). Using best practices methodologies, the NREL-SRRL maintains a varied and extensive array of solar monitoring equipment to test, evaluate, and characterize the solar sensors used by federal and international agencies as well as the solar industry to determine the solar resource. The SOP provides the industry with guidance for solar resource assessment and is used for procedures in the long-term continuous monitoring of legacy instruments alongside state-of-the-art instruments. Based on the SOP, instruments are annually evaluated for continued deployment. Instruments that do not meet the SOP criteria are decommissioned, and new instruments that meet the criteria are deployed. Streamlining and optimizing the use of this facility ensures that the lab continues to be a world-leading solar calibration and measurement facility. This 2024 edition includes updates to the appendices to reflect the instrument changes from one year to another.

14 SOLAR ENERGY↗

Malcolm Deployment Guide for Solar Power Generation Plants

This guide provides detailed instructions for deploying Malcolm in Solar Power Generation systems. It covers the deployment process, from understanding the network architecture of these systems to configuring network switches and Switched Port Analyzer (SPAN) ports or mirror ports or TAPs. The guide also includes best practices for deploying Hedgehog sensors, another critical component in these systems. Following this guide, users can enhance network visibility, improve their system’s security, and effectively troubleshoot common issues.

14 SOLAR ENERGY↗