Estimating the Performance and Economic Value of Multiple Concentrating Solar Power Technologies in a Production Cost Model

Concentrating solar power with thermal energy storage (CSP-TES) is a unique source of renewable energy in that the solar thermal energy can be dispatched similarly to conventional thermal generation. However, CSP-TES plants are energy-limited, meaning that their response might be restricted by solar availability. Therefore, the use of this limited solar energy must be optimally scheduled toprovide the greatest value to the system. The timing of CSP-TES dispatch depends on a variety of factors, including electricity demand patterns, the penetration of variable generation sources, and the configuration of the CSP-TES plant itself. We use an established CSP-TES modeling framework in a commercially available production cost model to compare the dispatch and value of two CSP-TEStechnologies (molten salt towers and parabolic troughs) in a Colorado test system. In addition, we consider a range of configuration parameters, such as the solar multiple and thermal energy storage limit, to evaluate how the operational and capacity value varies with plant configuration.

14 SOLAR ENERGY↗

A Modified Maximum Entropy Inverse Reinforcement Learning Approach for Microgrid Energy Scheduling

Increasing popularity of integrating distributed energy resources (DERs) into the power system brings a challenge to optimize the microgrid dispatch policy. The reinforcement learning methods suffer from a long-time problem with the theoretical assumption of the objective/reward function for the microgrid system. Although the traditional inverse reinforcement learning (IRL) approaches can solve this problem to some extent, they encounter a limitation of complex computations for state visitation frequency in the large and continuous state space. To alleviate this limitation, we propose a modified maximum entropy IRL (MMIRL) method to extract the reward function from the expert demonstrations for solving the microgrid energy scheduling problem. The proposed MMIRL algorithm is promising in recovering the reward function and learning the dispatch policy compared to conventional approaches. Case studies are performed in an energy arbitrage problem and a microgrid system with DERs. Results substantiate that the proposed MMIRL approach can learn the dispatch policy with more than 99% efficiency and outperforms other comparative methods.

artificial intelligence, reinforcement learning, m↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

FESTIV (Flexible Energy Scheduling Tool for Integrating Variable generation) [SWR-14-11]

Flexible Energy Scheduling Tool for Integrating Variable generation (FESTIV) is a tool that simulates the realistic representation of steady-state power system operations and scheduling performed by an independent system operator, regional transmission organization, or a vertically integrated regulated utility. The tool integrates security-constrained unit commitment (SCUC), security-constrained economic dispatch (SCED), and automatic generation control (AGC) into one model. These are the three modes of power system scheduling that are used to meet the changing net demand. Each of these submodels have different time characteristics and are used to meet the changing demand at different time resolutions and horizons. This allows multiple timescales to be studied where FESTIV accounts for intertemporal coupling between each submodel and the submodels themselves. It does this while having different objectives between the submodels; commitment of resources, dispatch and reserve commitment, and finally control.

Ela, Erik↗

An Improved Genetic Algorithm approach to the Unit Commitment/Economic Dispatch problem

The deployment of new technologies, the importance of accurately modeling the dynamics of the generating units and the introduction of new policies are making the solution of the Unit Commitment/Economic Dispatch problem more and more complicated.In the present scenario, traditionally followed scheduling criteria might not lead to the optimal fleet configuration any more. In addition, most of the widely used techniques have limited capabilities at modeling the nonlinear dynamics of committed power plants. When realistic power systems comprising of several tens of generating units are modeled, the resulting optimization problem turns to be computationally intensive for the current computing capabilities. In this paper, an improved version of a GA-based optimization algorithm is presented. A detailed methodology aimed at obtaining a more efficient version of the GA, and a more detailed and accurate description of the flexible operation flexibility of the power plants is described.

genetic algorithm↗

Adaptive cold-load pickup considerations in 2-stage microgrid unit commitment for enhancing microgrid resilience

In an extended main grid outage spanning multiple days, load shedding serves as a critical mechanism for islanded microgrids to maintain essential power and energy reserves that are indispensable for fulfilling reliability and resiliency mandates. However, using load shedding for such purposes leads to increasing occurrence of cold load pickup (CLPU) events. Here, this study presents an innovative adaptive CLPU model that introduces a method for determining and incorporating parameters related to CLPU power and energy requirements into a two-stage microgrid unit commitment (MGUC) algorithm. In contrast to the traditional fixed-CLPU-curve approach, this model calculates CLPU duration, power, and energy demands by considering outage durations and ambient temperature variations within the MGUC process. By integrating the adaptive CLPU model into the MGUC problem formulation, it allows for the optimal allocation of energy resources throughout the entire scheduling horizon to fulfill the CLPU requirements when scheduling multiple CLPU events. The performance of the enhanced MGUC algorithm considering CLPU needs is assessed using actual load and photovoltaic (PV) data. Simulation results demonstrate significant improvements in dispatch optimality evaluated by the amount of load served, customer comfort, energy storage operation, and adherence to energy schedules. These enhancements collectively contribute to reliable and resilient microgrid operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic scheduling of generating units with weekly energy storage: A hybrid decomposition approach

We propose a solution method for the large-scale stochastic unit commitment (SUC) problem with weekly-dispatched energy storage and significant weather-dependent stochastic generating capacity. Weekly storage facilities that mostly charge during weekends and discharge during weekdays require a weekly scheduling of generating units, which result in a large-scale optimization problem. This SUC problem is formulated as a two-stage stochastic model and we use the conditional value-at-risk as a risk measure. Using a Benders framework, the proposed solution method decomposes the problem into a mixed-integer linear master problem and linear and continuous subproblems. The master problem corresponds to the first-stage decisions throughout the week and includes all the commitment (binary) variables and their corresponding constraints. The subproblems correspond to the actual dispatch of the generating units on a weekly basis. Based on the success of column-and-constraint generation algorithms to solve robust optimization problems, we improve the low communication between the master problem and the subproblems in the standard Benders decomposition by adding primal variables and constraints from the subproblems to the master problem, which provides a better approximation of the recourse function. Furthermore, our computational experiments demonstrate the effectiveness of the proposed decomposition method using an instance of the South Carolina synthetic system with 90 generating units under 40 scenarios.

25 ENERGY STORAGE↗

Optimal scheduling and its Lyapunov stability for advanced load-following energy plants with CO 2 capture

In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capture and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.

01 COAL, LIGNITE, AND PEAT↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor↗

Improving Wind Farm Dispatchability Using Model Predictive Control for Optimal Operation of Grid-Scale Energy Storage

This paper demonstrates the use of model-based predictive control for energy storage systems to improve the dispatchability of wind power plants. Large-scale wind penetration increases the variability of power flow on the grid, thus increasing reserve requirements. Large energy storage systems collocated with wind farms can improve dispatchability of the wind plant by storing energy during generation over-the-schedule and sourcing energy during generation under-the-schedule, essentially providing on-site reserves. Model predictive control (MPC) provides a natural framework for this application. By utilizing an accurate energy storage system model, control actions can be planned in the context of system power and state-of-charge limitations. MPC also enables the inclusion of predicted wind farm performance over a near-term horizon that allows control actions to be planned in anticipation of fast changes, such as wind ramps. This paper demonstrates that model-based predictive control can improve system performance compared with a standard non-predictive, non-model-based control approach. It is also demonstrated that secondary objectives, such as reducing the rate of change of the wind plant output (i.e., ramps), can be considered and successfully implemented within the MPC framework. Specifically, it is shown that scheduling error can be reduced by 81%, reserve requirements can be improved by up to 37%, and the number of ramp events can be reduced by 74%.

Halamay, Douglas↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Combined Repair Crew Dispatch Problem for Resilient Electric and Natural Gas System Considering Reconfiguration and DG Islanding

Resilience is an overarching concept that requires combined efforts from interdependent critical infrastructures to achieve. As the interdependence between the power system and the natural gas system grows, the roles of coordination in post-disaster repair will be unneglectable to improve the resilience of the two systems. In this paper, a combined repair crew dispatch problem for the interdependent power and natural gas systems is proposed. The repair schedule of the two systems is coordinated and co-optimized. Both power system topology reconfiguration and intentional DG islanding are modeled as operational measures to further improve the resilience of the interdependent systems. Case studies validate the effectiveness of the proposed method in reducing load shedding and repair duration, and prove that the interdependence has a significant impact on the repair sequence and crew coordination.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Two-stage minimax stochastic unit commitment

The study proposes a stochastic optimisation approach based on discrete scenarios and the minimax criterion to deal with demand uncertainty in the two-stage unit commitment problem. To avoid making an over-conservative decision, the approach is designed to assign a probability-based weight to each demand scenario and provide a unit commitment schedule that minimises the maximum possible-weighted generation cost. Unit commitment is determined in the first stage and the economic dispatch under the scenario that corresponds to the maximum possible-weighted generation cost is determined in the second stage. The problem is formulated as a type of min-max-min mixed integer programming model. By introducing an auxiliary variable, the model is further transformed into a minimisation problem. A Benders decomposition algorithm is developed to solve the problem. The Benders master problem determines the unit commitment decision, while the Benders subproblem determines the dispatch decision. Multiple Benders feasibility cuts are constructed when the Benders subproblem is infeasible. Valid inequalities are derived to improve the lower bound provided by the Benders master problem. Numerical results show the performance of the algorithm.

Che, Ping↗

Investigation of Stochastic Unit Commitment to Enable Advanced Flexibility Measures for High Shares of Solar PV

As the share of solar photovoltaics (PV) in the power system increases, there is a growing need for flexibility from multiple, possibly interdependent sources to adjust to PV's variability, uncertainty, and diurnal dependence. This paper investigates how stochastic unit commitment leveraging probabilistic solar forecasts can support other flexibility measures under high solar shares. We consider two flexibility measures relevant to day-ahead scheduling: battery energy time-shifting and solar ancillary service provision. Unit commitment and economic dispatch simulations are conducted on a realistic test system based on Texas using day-ahead solar trajectories. The benefits of the two flexibility measures are pronounced when the instantaneous solar share is high, offering cost savings of 10%-20% in the spring. For a Texas-sized system, this translates to hundreds of millions of dollars in cost savings once the installed PV capacity enables instantaneous solar shares regularly exceeding 40%. Using probabilistic forecasts also greatly increases the reliability of upward reserve provision from solar PV, reducing unserved reserves by 50%-100%. Both day-ahead forecast resolution and errors can impact system reliability at high solar shares, but the stochastic formulation has significant value, mitigating reliability impacts on over-forecast days.

ancillary services↗