Search NASA⌕ Search

SEARCH · Search NASA

Results for “distribution system operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Dual-season thermal energy storage-integrated heat pump system for load shifting: experiments, modeling and nationwide analysis

Here, this paper proposes and validates a dual-season thermal energy storage-integrated heat pump (TES-HP) system that shifts building electric load in both cooling and heating modes using a single phase-change TES. The design uses the TES as a heat sink for the condenser in summer and a heat source for the evaporator in winter, thereby reducing on-peak electric demand while ensuring compatible with existing air-distribution systems. A 14-kW TES-HP prototype with six operating modes and novel refrigerant charge management strategies was experimentally tested under varied conditions. Subsequently, data-driven polynomial performance curves were developed and validated against experiments, then coupled with a phase change material (PCM) model and a calibrated building model within a rule-based controller. Single-day case studies demonstrated effective on-peak demand reduction while maintaining thermal comfort. During cooling, hourly power was lowered by up to 1.5 kW; in heating, average hourly power decreased from over 3.5 kW to 1.8 kW, compared to an HP-only system, achieving 64.5 % load shifting, and the need for resistance heating was eliminated. Seasonal simulations showed typical on-peak electricity savings of 25–35 % in cooling and 40–65 % in heating, with the largest benefits on the hottest and coldest days. Extended response-surface analysis and nationwide mapping quantified load shifting as functions of ambient and TES temperatures, revealing a seasonal trade-off in TES phase-change temperature. These results demonstrate the TES-HP system as a practical and scalable solution for grid-interactive buildings that reduces on-peak demand and electricity use while maintaining thermal comfort and enhancing grid flexibility and reliability.

Grid-interactive buildings↗

Multi-Timescale Optimal Operation Framework for Integrated Economic and Reliability Analysis of Hybrid Power Plants

This paper introduces a hierarchical modeling framework for hybrid power plants (HPP) to facilitate the operation of HPP in power systems similar to conventional generators (Congens) in the integrated multi-timescale optimal operation framework. To consider the uncertainties of HPP renewable power in the day-ahead scheduling, distributionally robust optimization (DRO) is used. To ensure that the state-of-charge (SOC) of energy storage systems in HPPs aligns closely with the planned value for long-term reliability, real-time SOC management is incorporated. In addition, an adjustable real-time control is designed for the robust delivery of HPP real-time services. Case studies performed on a revised IEEE 39-bus system demonstrate the effectiveness of the proposed framework for HPP operation. Simulation results highlight that the proposed framework not only can help operators schedule HPP similar to Congens in varying weather conditions but can also maintain the frequency reliability of the system.

frequency stability↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Pricing Strategy of Electric Vehicle Aggregators Based on Locational Marginal Price to Minimize Photovoltaic (PV) Curtailment

The global climate crisis demands urgent action to mitigate global warming. Using renewable energy sources, such as solar and wind power, for electricity generation is crucial. This shift from centralized to distributed power systems, however, brings challenges, including voltage fluctuations and renewable energy curtailment. The rapid growth of the electric vehicle (EV) industry adds complexity, increasing overall electricity demand and straining the power supply during peak charging times. This paper proposes a scheduling strategy for EV aggregators to reduce renewable energy curtailment and stabilize grid operation by strategically scheduling EV charging. Using Multi -Agent Transport Simulation (MATSim), a traffic simulation tool, EV driving data in Denver, Colorado, USA, were modeled. The EV aggregator adjusts charging fees based on locational marginal prices, encouraging EVs to charge at different stations according to pricing. Simulations on an IEEE 33-bus system with distributed energy resources and EV charging stations validate the proposed algorithm, demonstrating its effectiveness in reducing curtailment by 12.55% and stabilizing grid operation.

33 ADVANCED PROPULSION SYSTEMS↗

Hydrogen Transportation and Distributed Energy Systems Seismic Risk Assessment for Cascadia Subduction Zone Airport Facilities

Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available.

08 HYDROGEN↗

​​Hydrogen Transportation and Distributed Energy Systems Seismic Risk Assessment for Cascadia Subduction Zone Airport Facilities​

Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available. To characterize the seismic hazard, we considered the initiating event frequency of a Cascadia Subduction Zone earthquake event based on data from the literature. Seismic stressors that translate to the site from an earthquake event are expressed as peak ground acceleration. Site disturbance is characterized as a function of soil conditions, represented by different shear wave velocity values, which affect how seismic waves propagate and impact structures. Pipe fragility curves as a function of seismic capacity were used to correlate ground acceleration and failure probability. These fragility characteristics were combined with site-specific soil conditions to calculate the probability of pipe rupture during a seismic event. It should be noted that multiple simultaneous failures due to an earthquake event as a common cause are not considered. Some epistemic uncertainties such as self-exciting shocks, aftershocks, and the time variant nature of the ground motion are not considered either.

08 HYDROGEN↗

Machine Learning-Assisted Distribution System Network Reconfiguration Problem

High penetration from volatile renewable energy resources in the grid and the varying nature of loads raise the need for frequent line switching to ensure the efficient operation of electrical distribution networks. Operators must ensure maximum load delivery, reduced losses, and the operation between voltage limits. However, computations to decide the optimal feeder configuration are often computationally expensive and intractable, making it unfavorable for real-time operations. This is mainly due to the existence of binary variables in the network reconfiguration optimization problem. To tackle this issue, we have devised an approach that leverages machine learning techniques to reshape distribution networks featuring multiple substations. This involves predicting the substation responsible for serving each part of the network. Hence, it leaves simple and more tractable Optimal Power Flow problems to be solved. This method can produce accurate results in a significantly faster time, as demonstrated using the IEEE 37-bus distribution feeder. Compared to the traditional optimization-based approaches, a feasible solution is achieved approximately ten times faster for all the tested scenarios.

deep neural networks↗

Optimization-Based Deconfliction of Distribution System Applications

Power distribution systems are transitioning towards a future with large numbers of controllable grid-edge devices and distributed generation, as well as more complex operational objectives. This evolution requires a new distribution management approach, and modular applications can play a significant role. Thus, new strategies to coordinate independent applications with diverging operational goals are necessary. In this paper, we propose a novel optimization-based deconflictor to facilitate coordination in future advanced distribution management systems.

application deconfliction, power system optimizati↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

D2NO: Efficient handling of heterogeneous input function spaces with distributed deep neural operators

Neural operators have been applied in various scientific fields, such as solving parametric partial differential equations, dynamical systems with control, and inverse problems. However, challenges arise when dealing with input functions that exhibit heterogeneous properties, requiring multiple sensors to handle functions with minimal regularity. To address this issue, discretization-invariant neural operators have been used, allowing the sampling of diverse input functions with different sensor locations. However, existing frameworks still require an equal number of sensors for all functions. We propose a novel distributed approach to further relax the discretization requirements and solve the heterogeneous dataset challenges. Our method involves partitioning the input function space and processing individual input functions using independent and separate neural networks. A centralized neural network is used to handle shared information across all output functions. This distributed methodology reduces the number of gradient descent back-propagation steps, improving efficiency while maintaining accuracy. Here, we demonstrate that the corresponding neural network is a universal approximator of continuous nonlinear operators and present three numerical examples to validate its performance.

97 MATHEMATICS AND COMPUTING↗

A sequential Attacker-Defender game for distribution systems resilience enhancement against extreme weather events

Improving distribution system resilience against frequent extreme weather events is important for reliable power system operations. Especially when dealing with events such as hurricanes that have short-term predictions, proactive pre-event preparedness plays a vital role in system resilience performance. In this paper, we propose a novel approach to construct pre-event resource allocation plans for system operators to cope with upcoming threats through a sequential attacker-defender game framework. The sequential attacker-defender game is designed to model the interaction between the extreme weather and the system operator. In each round of the game, the attacker and the defender sequentially update their current strategies by accounting for the opponent’s action set. The attacker model is formulated as a bi-level problem to identify the severe outage scenarios, and the defender model is formulated as a two-stage optimization problem to determine the allocation of restoration resources including mobile responsive resources and repair crews. Two scale-reduction strategies are proposed to ensure the scalability of the game scheme. Finally, case studies on the IEEE 33-bus and a 7149-node practical utility system validate the effectiveness of the proposed sequential game and the efficiency of the scale-reduction strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Distributionally Robust Optimization Framework for Stochastic Assessment of Power System Flexibility in Economic Dispatch

Given the complexity of power systems, particularly the high-dimensional variability of net loads, accurately depicting the entire operational range of net loads poses a challenge. To address this, recent methodologies have sought to gauge the maximum range of net load uncertainty across all buses. In this paper, we consider the stochastic nature of the net load and introduce a distributionally robust optimization framework that assesses system flexibility stochastically, accommodating a minimal extent of system violations. We verify the proposed method by solving the flexibility of the economic dispatch problem on four distinct IEEE standard test systems. Compared to traditional deterministic flexibility evaluations, our approach consistently yields less conservative flexibility outcomes.

distributionally robust optimization↗

Enabling DER visibility using a distributed dissemination network

The electrical grid is currently undergoing a series of rapid transformational changes that have resulted in the introduction of new actors and operational schemes that have fragmented the data and control planes. To help address the issue, this paper describes the implementation of a sensor-oriented, distributed data dissemination network that seeks to eliminate data silos. The implementation is based on the DGSS architecture previously described in [1]. The developed product seeks to facilitate the seamless integration of multi-operator, multi-origin, multi-domain sensor data by using a distributed systems approach. The proposed solution decouples the sensor’s data streams from the application-specific infrastructure and migrates them into a software-defined databus that can be configured to suit the end application’s demands. To further validate DGSS capabilities, a DER oriented use case has been developed.

Sensor Dissemination Networks, Enhanced DER visibi↗

Energy 101: Utilities [Slides]

The Energy 101: Utilities presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of utilities. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Novel Protection Scheme for Unbalanced Faults in Inverter Dominated Networks: A Computationally Efficient Algorithm for Entry-Level Relays

Microgrids are now a common practice in distribution systems to increase resilience and reliability. However, microgrid protection remains a critical challenge, considering its requirement to operate in both grid connected and islanded, and the variability in fault characteristics under each mode of operation. This paper presents unbalanced power (S unb ) based fault detection algorithm, which considers local voltage and current unbalances to determine faults in the system. S unb is a computationally efficient fault detection algorithm that is suitable for implementation in the programmable logic of entry level protective relays. In addition, the difference in current and voltage unbalance (D n ) is used to determine the fault type. The proposed method demonstrates high sensitivity and selectivity for line-to-ground (LG), line-to-line (LL), and double line-to-ground (LLG) faults, representing the most common faults in distribution systems. It also allows relay coordination with upstream and downstream protection devices in both island and grid connected operation, while preserving grading margins. The same pickup and time multiplier settings of a particular relay for both modes of operation eliminates the need for adaptive settings, which rely on communication networks. Validation was performed with a hardware-in-the-loop (HIL) setup using Typhoon HIL real time simulator interfaced with three entry-level, SEL 751 relays. Results confirmed the algorithm’s ability to discriminate fault conditions, and determine the fault type under both operating modes, maintain fast detection times, and ensure proper protection coordination.

fault classification↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Omega-Limit Sets and Input-To-State Stability in Power Grids with Switching Equilibria

This paper studies a power transmission system with both conventional generators (CGs) and distributed energy assets (DEAs) providing frequency control. We consider an operating condition with demand aggregating two dynamic components: one that switches between different values on a finite set, and one that varies smoothly over time. Such dynamic operating conditions may result from protection scheme activations, external cyber-attacks, or due to the integration of dynamic loads, such as data centers. Mathematically, the dynamics of the resulting system are captured by a system that switches between a finite number of vector fields - or modes -, with each mode having a distinct equilibrium point induced by the demand aggregation. To analyze the stability properties of the resulting switching system, we leverage tools from hybrid dynamic inclusions and the concept of ..omega.. -limit sets from sets. Specifically, we characterize a compact set that is semi-globally practically asymptotically stable under the assumption that the switching frequency and load variation rate are sufficiently slow. For arbitrarily fast variations of the load, we use a level-set argument with multiple Lyapunov functions to establish input-to-state stability of a larger set and with respect to the rate of change of the loads. The theoretical results are illustrated via numerical simulations on the IEEE 39-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗