Search NASA⌕ Search

SEARCH · Search NASA

Results for “dynamic PRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Predictive Modeling to Assess and Address Challenges and Limitations Associated with Clinical Care and Decision Support in Deep Space

Probabilistic risk assessment (PRA) is a method for assessing and integrating the risk of failure in a multivariate system. While it is often applied by engineers designing complex machines, it could also be applied to humans to assess the probability of a health “failure” treating diseases as the multiple “variables” and the human as the “complex machine.” The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) was developed to apply PRA to assess medical risk for exploration spaceflight and inform the design of medical systems for space flight. The NASA engineering community utilizes event-driven and fault tree probabilistic techniques to classify risk in the space flight environment by leveraging the inherent knowledge of complex space flight system design and testing to quantify risk. However, in harmonizing the risk of human space flight, answering the question of “How do we balance astronaut health, performance and resource risks with other engineering risks on exploration space missions?” remains a profoundly challenging and largely qualitative practice. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is one aspect of the Human Research Program’s efforts to represent space fight human health and performance risks quantitatively.

L Mcintyre↗

Pruning of Discrete Dynamic Event Trees Using Density Peaks and Dynamic Time Warping

Discrete Dynamic Event Trees (DDETs) are used in probabilistic risk assessment (PRA) to determine the risk associated with complex systems, such as nuclear power plants, where accident scenarios need to be realistically modeled. One of the most challenging aspects of the DDET method is that a large number of branches are produced for each initiating event. This can result in data that is difficult to organize and time consuming to analyze. As the number of uncertain parameters increases, so does the complexity of the event tree. An event tree often has nodes that do not contribute to the overall results and predictive capabilities; therefore, we suggest a pre-pruning algorithm that can work to remove these nodes, and consequently, reduce the complexity of the tree. Sandia National Laboratories (SNL) is currently working on a two year dynamic cyber-risk informed project to assess cyber failure in a nuclear power plant. This will be achieved by coupling SNL's dynamic scheduler known as Analysis of Dynamic Accident Progression Trees (ADAPT) with MELCOR, a reactor accident simulator, and a System for Circuit Evaluation and Prediction of Transient Radiation Effects (SCEPTRE), a cyber Emulytics code. This paper will discuss the preliminary results of a feasibility study for using density peaks (DP) clustering with dynamic time warping (DTW) to prune branches that are formed from large DDETs, like the ones that will be produced throughout SNL's project. Papers from the project that are submitted to this conference discuss the following: - The MELCOR model for a Pressurized Water Reactor that uses a digital instrumentation and control system. - Proposed generic cyber exploits for the above reactor. - Modifications to ADAPT to extend the framework for multiple simulators, incorporate importance measures into DDET analysis, as well as sort and reduce DDETs based on inputs to or outputs from the tree. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of an Integrated Mechanistic Source Term Assessment Capability for Lead- and Sodium-Cooled Fast Reactors

The scope of this project entails development of mechanistic source term assessment capabilities to inform and guide plant design activities and to support license applications. The main objective of this project is to couple NL’s SAS4A safety analysis code with the FAI’s FATE facility modeling code for mechanistic source term assessments in liquid-metal-cooled fast reactors. The end product is a coupled SAS4A-FATE code system for integrated mechanistic source term assessments and Level-2 PRA as the precursor for off-site dispersion analyses (Level-3 PRA). The SAS4A code is used to model system transients with fuel failures and its results are linked to the FATE code to predict radionuclide transport through the reactor vessel cover gas and containment system. The integrated code package offers a state-of-the-art radionuclide tracking capability for a spectrum of accident scenarios consistent with the plant dynamic response including the reactivity feedback to support Probabilistic Risk Assessments (PRA).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analyzing simulation-based PRA data through traditional and topological clustering: A BWR station blackout case study

Here, dynamic probabilistic risk assessment (DPRA) methodologies couple system simulator codes (e.g., RELAP and MELCOR) with simulation controller codes (e.g., RAVEN and ADAPT). Whereas system simulator codes model system dynamics deterministically, simulation controller codes introduce both deterministic (e.g., system control logic and operating procedures) and stochastic (e.g., component failures and parameter uncertainties) elements into the simulation. Typically, a DPRA is performed by sampling values of a set of parameters and simulating the system behavior for that specific set of parameter values. For complex systems, a major challenge in using DPRA methodologies is to analyze the large number of scenarios generated, where clustering techniques are typically employed to better organize and interpret the data. In this paper, we focus on the analysis of two nuclear simulation datasets that are part of the risk-informed safety margin characterization (RISMC) boiling water reactor (BWR) station blackout (SBO) case study. We provide the domain experts a software tool that encodes traditional and topological clustering techniques within an interactive analysis and visualization environment, for understanding the structures of such high-dimensional nuclear simulation datasets. We demonstrate through our case study that both types of clustering techniques complement each other for enhanced structural understanding of the data.

97 MATHEMATICS AND COMPUTING↗

NNL.Fe.qSNAP-ZBL.2024.1: A Fe Spectral Neighbor Analysis Potential for Radiation Damage Simulations

The NNL.Fe.qSNAP-ZBL.2024.1 machine-learned potential (MLP) has been generated to support the development of an elemental body-centered cubic (BCC) Fe athermal recombination corrected neutron damage model and simulations of primary recoil atom (PRA) cascades in BCC Fe. This MLP is a quadratic spectral neighbor analysis potential (qSNAP) hybridized with the universal Ziegler-Beirsack-Littmark (ZBL) potential at short-range and is named according to Naval Nuclear Laboratory MLP naming conventions (NNL.material-system.MLP-type.year.version). Training set calculations for Fe are presented along with the subsequent MLP fitting procedure. A key criterion of the fitting procedure is that ZBL describes the short-range interaction with minimal impact on the MLP. The MLP is compared to density functional theory (DFT) predicted properties relevant to radiation damage simulation, including threshold displacement energies, for validation. The NNL.Fe.qSNAP-ZBL.2024.1 potential is considered suitable for molecular dynamics (MD) simulations of radiation defects up to 800 K and PRA cascades in BCC Fe up to around 10 keV. The potential can additionally be used on a limited basis for recoils of 10–20 keV, within which range the emergence of structures outside the training set in cascade simulations may cause system instabilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Planetary radio astronomy receiver

The planetary radio astronomy (PRA) experiment on the Voyager spacecraft will measure the amplitude, spectrum, time variations, and polarization of radio emissions over a frequency range of 1.2 kHz to 40.5 MHz with the aid of the PRA receiver (PRAR) and two 10-m orthogonal monopoles. Sensitivity and dynamic range will allow observation of a wide range of Jovian emissions from near earth to encounter. This paper describes the system elements, including the preamp/attenuator/calibrator, the LF polarization discriminator, the four LF-IF amplifier stages, the HF polarization discriminator, the translation LO, the log-IF and detector, the frequency synthesizer, the data processor, control system, power supply, and antennas.

Lang, G. J.↗

Proof-of-Concept Demonstrations for Computation-Based Human Reliability Analysis. Modeling Operator Performance During Flooding Scenarios

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program has the overall objective to help sustain the existing commercial nuclear power plants (NPPs). To accomplish this program objective, there are multiple LWRS “pathways,” or research and development (R&D) focus areas. One LWRS focus area is called the Risk-Informed Safety Margin and Characterization (RISMC) pathway. Initial efforts under this pathway to combine probabilistic and plant multi-physics models to quantify safety margins and support business decisions also included HRA, but in a somewhat simplified manner. HRA experts at Idaho National Laboratory (INL) have been collaborating with other experts to develop a computational HRA approach, called the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER), for inclusion into the RISMC framework. The basic premise of this research is to leverage applicable computational techniques, namely simulation and modeling, to develop and then, using RAVEN as a controller, seamlessly integrate virtual operator models (HUNTER) with 1) the dynamic computational MOOSE runtime environment that includes a full-scope plant model, and 2) the RISMC framework PRA models already in use. The HUNTER computational HRA approach is a hybrid approach that leverages past work from cognitive psychology, human performance modeling, and HRA, but it is also a significant departure from existing static and even dynamic HRA methods. This report is divided into five chapters that cover the development of an external flooding event test case and associated statistical modeling considerations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States' human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After over 40 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent and how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort.

Bigler, Mark↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States's human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After nearly 50 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either of the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return to the home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent as to how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort. Key Words: PRA, space launches, human space program, ascent abort, spacecraft, launch vehicles

Bigler, Mark↗

Reliability and Probabilistic Risk Assessment - How They Play Together

PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will perform its intended function(s) for a specified mission profile. In general, the reliability metric can be calculated through the analyses using reliability demonstration and reliability prediction methodologies. Reliability analysis is very critical for understanding component failure mechanisms and in identifying reliability critical design and process drivers. The following sections discuss the PRA process and reliability engineering in detail and provide an application where reliability analysis and PRA were jointly used in a complementary manner to support a Space Shuttle flight risk assessment.

Safie, Fayssal M.↗

A Reliable Earth Return System for Safe Recovery of Mars Samples

The objective of a Mars sample return mission is to bring selected Mars surface materials to Earth. Numerous approaches for the Earth-return segment have been analyzed including propulsive or aerocapture return to low-Earth orbit followed by Space Shuttle rendezvous and direct entry. Of these approaches, ballistic entry of a small capsule terminating in a ground landing has been shown to be the lowest risk strategy. Over the past two years, significant work has been performed towards development of a robust direct entry vehicle for Mars sample return. In June 1999, the NASA Planetary Protection Officer provided initial guidance to the former Mars Sample Return Project. The sample return phase of the mission was assigned a restricted Earth return planetary protection classification. The draft mission requirement states that the total mean probability of release of unsterilized Mars material into the Earth;s biosphere must be less than 1.0E-06 (1 in a million). This strict requirement drives the approach and design of the Earth return system. To meet this requirement, selection of the Earth return strategy and development of the Earth return system must be guided by risk, not performance, based decisions. An initial Probabilistic Risk Assessment (PRA) was performed to address the direct entry Earth return system containment assurance reliability and to identify high-risk elements of this system. The results of this PRA identified risk elements that include thermal protection system performance during entry, spin-eject orientation and aerodynamic stability during entry, structural integrity under atmospheric deceleration and impact loads, and tracking/recovery of this system. This initial probabilistic risk quantification demonstrates that, with the proper development program, a prototypical direct entry design can satisfy the containment assurance reliability requirement. Through the current Mars Sample Return Advanced Technology Development effort, an extensive design, analysis, and test program is presently proceeding with the aim of reducing the containment assurance risk of this system. This technology development effort, guided by a continuing PRA, focuses on key risk areas of a direct entry Earth return system including: the thermal protection system, impact dynamics, structural performance, aerodynamic stability, and ground recovery. This development program will culminate in a system validation flight test, 1-2 years prior to launch of the flight system. This flight test would include the launch, entry, and recovery of a full-scale Earth return system, as a scientific validation of the key risk elements to verify nominal design performance. The results of the initial PRA suggested several dominant failure sequences that can be validated in a flight test. These include: demonstrating the thermal protection system reliability and performance during entry, demonstrating the spin-eject orientation and aero-dynamic stability during entry, demonstrating the structural integrity under atmospheric deceleration and impact loads, and demonstrating tracking and recovery of the Earth return system. This single test will directly address over 50% of the total containment assurance risk elements. This presentation will begin by presenting the relative risk of various Earth return strategies. The results of the initial probabilistic risk assessment will be presented followed by a discussion of the development accomplishments and plans for demonstration of a highly reliable direct entry Earth return system.

Braun, R.↗

Extension of the ADAPT Framework for Multiple Simulators

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One limitation of the DDET driver codes developed to date (namely ADAPT, ADS, and MCDET ) is that the tree is driven by a single simulator. The goal of this work is a general multi-simulator driver. This limits the parameter space that may be explored in a single DDET to that which may be covered by a single simulator. In this work, the Analysis of Dynamic Accident Progression Trees (ADAPT) code is extended to support multiple arbitrary simulators. This capability will increase the depth and breadth of phenomena that may be analyzed in a single DDET. For example, a large-scale system code may pass the analysis to a more detailed code if certain conditions are met, in order to capture relevant phenomena that would be lost if only the system code were to be used. In addition, the time required to cover a given uncertainty space may be reduced by dynamically identifying and running only the situations that are appropriate given the plant conditions in each simulator. The use of multiple simulators is expected to further reduce subjectivity in PRA by enabling high fidelity modeling of reality. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

A Simulation-Based Dynamic Approach for External Flooding Analysis in Nuclear Power Plants

All nuclear power plants must consider and evaluate external flooding risks such as local intense precipitation, dam failure, and coastal flooding due to storm surge or tsunami. While these events could challenge off-site power and other plant structure integrity, threaten plant safety systems and components, and limit plant access, they are more than often qualitatively regarded as risk insignificant and screened out from detailed evaluation and quantification. The recent lessons learned from the Fukushima seismic/tsunami initiated nuclear accident (2011), the Fort Calhoun (2011), Vermont Yankee (2013), Arkansas Nuclear One (2013), and St. Luice (2014) flooding events showed otherwise. However, developing an external flood model with traditional event tree/fault tree approach as in a static probabilistic risk assessment (PRA) model could be difficult to accurately represent plant system and component behavior and reliability of manual actions during an ever-progressing flood event. The plant response to external flood may be highly spatial- and time- dependent and subject to the hydrological and hydraulic characteristics of the flood event. Such unique challenges prompt the investigation of using the simulation-based dynamic analysis approaches for external flood risk assessment. Simulation methods can better illustrate the performance of structures, systems, and components during an external flooding event. A general framework to perform a simulation-based dynamic flooding analysis is presented in this paper with the sub-tasks of flood hazard analysis, flood fragility analysis, plant response modeling, safety margin analysis or PRA quantification. A new type of State PRA modeling technique is introduced to incorporate time-related interactions such as those from 3D simulations into a traditional PRA model.

99 GENERAL AND MISCELLANEOUS↗

ADAPT (Analysis of Dynamic Accident Progression Trees) Beta Version 0.9

The purpose of the ADAPT code is to generate Dynamic Event Trees (DET) using a user specified simulator. ADAPT can utilize any simulation tool which meets a minimal set of requirements. ADAPT is based on the concept of DET which use explicit modeling of the deterministic dynamic processes that take place during a nuclear reactor plant system evolution along with stochastic modeling. When DET are used to model different aspects of Probabilistic Risk Assessment (PRA), all accident progression scenarios starting from an initiating event are considered simultaneously. The DET branching occurs at user specified times and/or when an action is required by the system and/or the operator. These outcomes then decide how the dynamic system variables will evolve in time for each DET branch. Since two different outcomes at a DET branching may lead to completely different paths for system evolution, the next branching for these paths may occur not only at different times, but can be based on different branching criteria. The computational infrastructure allows for flexibility in ADAPT to link with different system simulation codes, parallel processing of the scenarios under consideration, on-line scenario management (initiation as well as termination) and user friendly graphical capabilities. The ADAPT system is designed for a distributed computing environment; the scheduler can track multiple concurrent branches simultaneously. The scheduler is modularized so that the DET branching strategy can be modified (e.g. biasing towards the worse case scenario/event). Independent database systems store data from the simulation tasks and the DET structure so that the event tree can be constructed and analyzed later. ADAPT is provided with a user-friendly client which can easily sort through and display the results of an experiment, precluding the need for the user to manually inspect individual simulator runs.

Kunsman, David↗

ADAPT

The purpose of the ADAPT code is to generate Dynamic Event Trees (DET) using a user specified set of simulators. ADAPT can utilize any simulation tool which meets a minimal set of requirements. ADAPT is based on the concept of DET which uses explicit modeling of the deterministic dynamic processes that take place during a nuclear reactor plant system (or other complex system) evolution along with stochastic modeling. When DET are used to model various aspects of Probabilistic Risk Assessment (PRA), all accident progression scenarios starting from an initiating event are considered simultaneously. The DET branching occurs at user specified times and/or when an action is required by the system and/or the operator. These outcomes then decide how the dynamic system variables will evolve in time for each DET branch. Since two different outcomes at a DET branching may lead to completely different paths for system evolution, the next branching for these paths may occur not only at separate times, but can be based on different branching criteria. The computational infrastructure allows for flexibility in ADAPT to link with different system simulation codes, parallel processing of the scenarios under consideration, on-line scenario management (initiation as well as termination), analysis of results, and user friendly graphical capabilities. The ADAPT system is designed for a distributed computing environment; the scheduler can track multiple concurrent branches simultaneously. The scheduler is modularized so that the DET branching strategy can be modified (e.g. biasing towards the worst-case scenario/event). Independent database systems store data from the simulation tasks and the DET structure so that the event tree can be constructed and analyzed later. ADAPT is provided with a user-friendly client which can easily sort through and display the results of an experiment, precluding the need for the user to manually inspect individual simulator runs.

Reynolds, John↗

Proof-of-Concept for a Long-Term Health Metric to Quantify End of Mission Health Status in Astronauts

NASA has long used Probabilistic Risk Assessment (PRA) when high-stakes decisions need to be made about complex systems. For spaceflight medical risk, the Human Research Program’s Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is a significant step towards robustly quantifying the risk to crew health during exploration missions. However, there remains a significant gap in the ability to comprehensively characterize and assess risk across the disparate functionalities and capabilities which comprise the entire Crew Health and Performance (CHP) system. To fill this gap, the Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA) project aims to perform risk characterization for the CHP system by assessing performance risk in addition to medical risk. This effort also includes quantifying Long-Term Health (LTH) risk in addition to in-mission risk outcomes within the CHP-PRA results. LTH risk encompasses the timeframe from immediately post-flight, through the rest of an astronaut’s career, through retirement, and until death. A proof-of-concept LTH risk metric is based on medical condition end-state, as defined by the Evidence Library, capturing the spaceflight specific medical impacts persisting into post-flight[1]. Condition outcomes in the Evidence Library progress through three Clinical Phases (CP): the diagnostic phase (CP1), the treatment/convalescent phase (CP2), and the end-state phase (CP3) which represents the detrimental effects of the condition after the crew member has recovered to the maximal extent. Each CP has an associated Task Impairment (TI), defined as the degree of crew incapacity due to experiencing the condition, and is quantified with a 0-1 range. Conditions with an associated CP3 (e.g. Sepsis, Traumatic Hypovolemic Shock, Sudden Cardiac Arrest, etc.) typically have serious consequences that can cause an astronaut to be fully or partially debilitated throughout the remainder of the mission. Consequently, the Cumulative CP3 TI End-of-Mission Health Status Metric is developed by CHP-PRA to quantify the cumulative effects of all conditions which progressed to the CP3 state throughout the entirety of the mission. Hence, this End-of-Mission Health Status Metric attempts to serve as an indicator of an astronaut’s health state at the time of landing. The severity of the lingering effects of in-mission medical events are dependent on mission activities and the level of available in-mission medical care. This allows the associated cumulative TI metric to be used in comparison with the crew’s end of mission health status for different levels of in-mission resources. This presentation provides the strategy for using CP3 as an LTH metric component, as well as a proof-of-concept demonstration of LTH risk characterization using this component.

long term health↗

Investigating Risks Due to Artemis EVA Tempo Via Probabilistic Risk Assessment

Spaceflight operations pose unique challenges to crew health, safety, and resource management. As space agencies and private companies continue to push the boundaries of human exploration, it is essential to understand the risks associated with Extravehicular Activities (EVAs) and develop strategies to mitigate them. The tempo at which EVAs are conducted – the total number and frequency of these activities – can have a profound impact on medical risks, resource consumption, and overall mission success. Probabilistic risk assessment (PRA) provides a powerful framework for evaluating complex systems and identifying potential hazards. Our work employs the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) [1] to simulate mission events, occurrence and treatment of medical conditions, and track the utilization of resources. Coupled with the Evidence Library [2], a medical evidence base for exploration-class missions developed by the Exploration Medical Capability within NASA’s Human Research Program, we can estimate these risks with increased fidelity and optimize medical kit contents to meet specific mission requirements. This presentation provides a detailed examination of how EVA tempo influences medical risk estimates for a lunar surface design reference mission. A comprehensive analysis is conducted to assess the additional mass and volume burden imposed on medical kits required to maintain adequate levels of risk mitigation. Furthermore, we estimate the distribution of the number of successful EVAs completed based on the level of task impairment imposed by medical events and flight rules related to specific medical events, such as decompression sickness.

Modeling↗