Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Regional Modeling and Simulation for Vertiport Location Assessment

There is increasing interest in the Urban Air Mobility concept and the realization of electric Vertical Take-Off and Landing (e-VTOL) vehicles flying in the National Airspace System. NASA, FAA, and the industry are investigating various aspects of this new mode of transportation for cargo and humans. There are significant challenges in making this mode a reality, including feasibility, safety, infrastructure, traffic management, public acceptance, and scalability. From the infrastructure perspective, one of the aspects that needs to be addressed is the location of vertiports (named similar to heliports, for vertical take-off and landing vehicles). There is significant on-going research for selecting location of vertiports. However, the locations are largely based on demand models. Also, these efforts are focused in specific local regions, San Francisco/Bay Area, Chicago, Tampa, etc. This talk presents an approach to determine the location of vertiports in regional areas (across the United States), incorporating the desire to have certain attributes closer to or further from the location using a regional modeling tool. The feasibility of flying e-VTOL vehicles between various vertiport locations is also presented using a mobility operations simulation tool.

Air Mobility↗

JTEC Panel report on microelectromechanical systems in Japan

This report summarizes recent activities in the development of microelectromechanical systems (MEMS) in Japan. For the purposes of this study, 'MEMS' means batch-fabricated miniature devices that convert physical parameters to or from electrical signals and that depend on mechanical structures or parameters in important ways for their operation. The report covers advanced materials and process technology; sensors and sensing microstructures; microactuators and actuation mechanisms; sensor-circuit integration and system partitioning; advanced packaging, microassembly, and testing technologies; and MEMS design techniques, applications, and infrastructure. The panel found that Japanese industry is emphasizing approaches to MEMS that are similar to those taken by U.S. industry (i.e., approaches based on silicon integrated-circuit technology); these efforts are comparable in their level of development to those in the United States. However, the ten-year, $250 million, MITI-sponsored program in micromachines emphasizes the miniaturization of more traditional (nonlithographic) machining processes, an area in which there is no comparable U.S. effort. Packaging technology and applications for batch-fabricated MEMS devices is considered a major challenge in both countries. The panel concluded that these and other issues will require global leadership and international cooperation to realize the benefits of MEMS in a timely way.

Wise, Kensall D.↗

NASA's Kilopower Reactor Development and the Path to Higher Power Missions

The development of NASAs Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

Kilopower↗

NASA's Kilopower Reactor Development and the Path to Higher Power Missions

The development of NASA's Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

Kilopower↗

Systems Engineering of Electric and Hybrid Vehicles

Technical paper notes systems engineering principles applied to development of electric and hybrid vehicles such that system performance requirements support overall program goal of reduced petroleum consumption. Paper discusses iterative design approach dictated by systems analyses. In addition to obvious peformance parameters of range, acceleration rate, and energy consumption, systems engineering also considers such major factors as cost, safety, reliability, comfort, necessary supporting infrastructure, and availability of materials.

Kurtz, D. W.↗

NASA Propulsion Engineering Research Center, volume 1

Over the past year, the Propulsion Engineering Research Center at The Pennsylvania State University continued its progress toward meeting the goals of NASA's University Space Engineering Research Centers (USERC) program. The USERC program was initiated in 1988 by the Office of Aeronautics and Space Technology to provide an invigorating force to drive technology advancements in the U.S. space industry. The Propulsion Center's role in this effort is to provide a fundamental basis from which the technology advances in propulsion can be derived. To fulfill this role, an integrated program was developed that focuses research efforts on key technical areas, provides students with a broad education in traditional propulsion-related science and engineering disciplines, and provides minority and other under-represented students with opportunities to take their first step toward professional careers in propulsion engineering. The program is made efficient by incorporating government propulsion laboratories and the U.S. propulsion industry into the program through extensive interactions and research involvement. The Center is comprised of faculty, professional staff, and graduate and undergraduate students working on a broad spectrum of research issues related to propulsion. The Center's research focus encompasses both current and advanced propulsion concepts for space transportation, with a research emphasis on liquid propellant rocket engines. The liquid rocket engine research includes programs in combustion and turbomachinery. Other space transportation modes that are being addressed include anti-matter, electric, nuclear, and solid propellant propulsion. Outside funding supports a significant fraction of Center research, with the major portion of the basic USERC grant being used for graduate student support and recruitment. The remainder of the USERC funds are used to support programs to increase minority student enrollment in engineering, to maintain Center infrastructure, and to develop research capability in key new areas. Significant research programs in propulsion systems for air and land transportation complement the space propulsion focus. The primary mission of the Center is student education. The student program emphasizes formal class work and research in classical engineering and science disciplines with applications to propulsion.

Source record↗

A High-Energy Technology Demonstration Platfom: The First Step in a Stepping Stones Approach to Energy-Rich Space Infrastructures

The sun provides an abundant source of energy in space, which can be used to power exploration vehicles and infrastructures that support exploration. A first step in developing and demonstrating the necessary technologies to support solar-powered exploration could be a 100-kWe-class solar-powered platform in Earth orbit. This platform would utilize advanced technologies in solar power collection and generation, power management and distribution, thermal management, and electric propulsion. It would also provide a power-rich free-flying platform to demonstrate in space a portfolio of technology flight experiments. This paper presents a preliminary design concept for a 100-kWe solar-powered satellite with the capability to use high-powered electric propulsion, and to flight-demonstrate a variety of payload experiments.

Carrington, Connie↗

Noise Exposure Maps of Urban Air Mobility

A noise exposure map is “a scaled geographic depiction of an airport, its noise exposure contours, noise-sensitive facilities, and land uses in the airport surrounding area” developed in accordance with the FAA’s 14 Code of Federal Regulation Part 150. This paper is the first to explore the applicability of airport noise exposure maps to Urban Air Mobility (UAM). The FAA’s airport noise compatibility planning program is first described. Then the applicability of the noise exposure map to Urban Air Mobility (UAM) is explored. Finally, new airspace infrastructure, including vertiport locations and UAM routes from NASA’s UAM engineering simulations, and local noise-sensitive facility locations and land use information were collected and processed to develop the noise exposure maps of UAM near the Dallas-Fort Worth area. The DNL noise contours resulting from a six-passenger electric quadrotor prototype vehicle are predicted using NASA’s AIRNOISEUAM software. The noise exposure maps of UAM are generated automatically using Python’s data analysis and visualization libraries. The results have applications for UAM’s noise compatibility planning, noise-reducing route planning, and vertiport location selection

Urban Air Mobility↗

Noise Exposure Map of Urban Air Mobility

A noise exposure map is “a scaled geographic depiction of an airport, its noise exposure contours, noise-sensitive facilities, and land uses in the airport surrounding area” developed in accordance with the FAA’s 14 Code of Federal Regulation Part 150. This paper is the first to explore the applicability of airport noise exposure maps to Urban Air Mobility (UAM). The FAA’s airport noise compatibility planning program is first described. Then the applicability of the noise exposure map to Urban Air Mobility (UAM) is explored. Finally, new airspace infrastructure, including vertiport locations and UAM routes from NASA’s UAM engineering simulations, and local noise-sensitive facility locations and land use information were collected and processed to develop the noise exposure maps of UAM near the Dallas-Fort Worth area. The DNL noise contours resulting from a six-passenger electric quadrotor prototype vehicle are predicted using NASA’s AIRNOISEUAM software. The noise exposure maps of UAM are generated automatically using Python’s data analysis and visualization libraries. The results have applications for UAM’s noise compatibility planning, noise-reducing route planning, and vertiport location selection. (To hear the voice please utilize the video uploaded to the record)

Urban Air Mobility↗

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Deployable solar array tower laser beamed power 3G↗

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Lunar Relay↗

Project RAMA: Reconstructing Asteroids Into Mechanical Automata

Many interesting ideas have been conceived for building space-based infrastructure in cislunar space. From O'Neill's space colonies, to solar power satellite farms, and even prospecting retrieved near earth asteroids. In all the scenarios, one thing remained fixed - the need for space resources at the outpost. To satisfy this need, O'Neill suggested an electromagnetic railgun to deliver resources from the lunar surface, while NASA's Asteroid Redirect Mission called for a solar electric tug to deliver asteroid materials from interplanetary space. At Made In Space, we propose an entirely new concept. One which is scalable, cost effective, and ensures that the abundant material wealth of the inner solar system becomes readily available to humankind in a nearly automated fashion. We propose the RAMA architecture, which turns asteroids into self-contained spacecraft capable of moving themselves back to cislunar space. The RAMA architecture is just as capable of transporting conventional-sized asteroids on the 10-meter length scale as transporting asteroids 100 meters or larger, making it the most versatile asteroid retrieval architecture in terms of retrieved-mass capability. This report describes the results of the Phase I study funded by the NASA NIAC program for Made In Space to establish the concept feasibility of using space manufacturing to convert asteroids into autonomous, mechanical spacecraft. Project RAMA, Reconstituting Asteroids into Mechanical Automata, is designed to leverage the future advances of additive manufacturing (AM), in-situ resource utilization (ISRU) and in-situ manufacturing (ISM) to realize enormous efficiencies in repeated asteroid redirect missions. A team of engineers at Made In Space performed the study work with consultation from the asteroid mining industry, academia, and NASA. Previous studies for asteroid retrieval have been constrained to studying only asteroids that are both large enough to be discovered, and small enough to be captured and transported using Earth-launched propulsion technology. Project RAMA is not forced into this constraint. The mission concept studied involved transporting a much larger approximately 50-meter asteroid to cislunar space. Demonstration of transport of a 50-meter-class asteroid has several ground-breaking advantages. First, the returned material is of an industrial, rather than just scientific, quantity (greater than 10,000 tonnes versus approximately10s of tonnes). Second, the "useless" material in the asteroid is gathered and expended as part of the asteroid's propulsion system, allowing the returned asteroid to be considerably "purer" than a conventional asteroid retrieval mission. Third, the infrastructure used to convert and return the asteroid is reusable, and capable of continually returning asteroids to cislunar space.

asteroids↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented for each primary mission capability. These profiles are the basis for propellant loads, numbers of vehicles/stages and launches for each mission capability. Data includes the number of launches required for each mission utilizing current expendable launch vehicle systems, and concluding remarks include ideas for reducing the number of launches through incorporation of heavy-lift launch vehicles, solar electric propulsion, and other transportation support concepts.

Smitherman, David↗

Thermionic technology infrastructure for space power

An assessment is made of the potential effectiveness, designs, and technological difficulties involved in the construction of space nuclear reactors coupled to thermionic energy converters (TEC). The TECs can be positioned either inside or outside of the reactor core. The out-of-core design lowers the reactor shielding requirements, as well as removing the need for mechanically pumped coolant for the reactor. R&D is still needed for the heat pipes for the reactor and the collectors, electrical insulation, and to reduce the potential losses in the interelectrode space. A cylindrical converter for the out-of-core configuration consists of a tungsten emitter heated by a tungsten-lithium heat pipe. The collector is a layer of tungsten oxide deposited on a Nb-1%Zr alloy, and has been tested at emitter temperatures of 1300-1850 K and a collector temperature range of 700-850 K. A design of a superheated thermionic converter is described, noting that a prototype has been operated at 1730 K for 12,000 hr.

Huffman, F.↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing‐site selection and infrastructure development which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo predeploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth‐Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20. PEVs would contain closed loop guidance and provide life support and consumables for two crew for 2 weeks plus reserves. The PEV has a cabin that uses the exploration atmosphere of 8.2 psi with 34% oxygen, enabling use of suit ports for rapid EVA with minimal oxygen prebreathe as well as dust control by keeping the suits outside the pressurized volume. When equipped with outriggers and control moment gyros, the PEV enables EVA tasks of up to 8 pounds of force application without the need to anchor. Tasks with higher force requirements can be performed with PEV propulsion providing the necessary thrust to react forces. Exploration of Phobos builds heavily from the developments of the cis‐lunar proving ground, and significantly reduces Mars surface risk by facilitating the development and testing of habitats, MAVs, and pressurized rover cabins that are all Mars surface forward. A robotic precursor mission to Phobos and Deimos is also under consideration and would need to launch in 2022 to support a 2031 human Phobos mission.

Gernhardt, Michael L.↗

The Behavior of High-Velocity Dust Generated by Lander Plumes in the Lunar Environment

Lunar lander plumes are known to accelerate fine dust to speeds exceeding 2 km/s, and the resultant ejecta may remain in lunar orbit for extended periods of time. Such ejecta could become hazardous to objects in lunar orbit as well as systems on the surface. In order to understand the impact on orbiting lunar infrastructure such as Gateway, as well as assets on the lunar surface, here we consider the dynamics of the resultant high-velocity plume ejecta. Initial conditions were set by the expected near-term lunar activity and the known cone of accelerated dust generated by previous lunar landings. The effects of regular 3-body gravitation, solar radiation pressure, and electric field are included in the model. It is found that although the majority of sub-μm dust is carried away by solar wind and electric fields, about ~10% of the dust between 1.7 km/s and 2.3 km/s reimpacts the surface, much of it near the landing site. The hazard posed by that debris is a function of lander mass and distance from the landing site. The Gateway, when orbiting in the nominal NRHO at the time of a landing, is not expected to be significantly affected by the dust. However, other spacecraft in less elliptic orbits may be at greater risk.

Ejecta↗

Advanced Concepts Research for Flywheel Technology Applications

The Missile Defense Agency (MDA) (formerly the Ballistic Missile Defense Organization) is embarking on a program to employ the use of High Altitude Airships (HAAs) for surveillance of coastal areas as a part of homeland defense. It is envisioned that these HAAs will fly at 70,000 feet continuously for at least a year, therefore requiring a regenerative electric power system. As part of a program to entice the MDA to utilize the NASA GRC expertise in electric power and propulsion as a means of risk reduction, an internal study program was performed to examine possible configurations that may be employed on a HAA to meet a theoretical surveillance need. This entailed the development of a set of program requirements which were flowed down to system and subsystem level requirements as well as the identification of environmental and infrastructure constraints. Such infrastructure constraints include the ability to construct a reasonably sized HAA within existing airship hangers, as the size of such vehicles could reach in excess of 600 ft. The issues regarding environments at this altitude are similar to those that would be imposed on satellite in Low Earth Orbit. Additionally, operational constraints, due to high winds at certain times of the year were also examined to determine options that could be examined to allow year round coverage of the US coast.

Keith, Theo G., Jr.↗

NASA Lunar Exploration – Gateway’s Power and Propulsion Element Communications Links

As a key part of NASA’s Artemis program to return to the moon, the Lunar Gateway will provide a platform for staging lunar missions, for gaining experience in operations beyond earth orbit, and for creating sustainable infrastructure. Of specific interest, the Lunar Gateway will provide communications support to landers, orbiters, and surface systems, including in the South Polar Region where direct line of sight (LOS) to Earth is limited or non-existent. A foundational segment of the Gateway is the Power and Propulsion Element (PPE), which will carry: solar arrays to provide power to the Gateway; electric propulsion to maintain the Gateway in its operational orbit; and communication links between the Earth and Gateway, the Moon and Gateway, and relays from the Moon to the Earth. PPE Communication Links include an X-band link to Earth for Command, Ranging, and Telemetry (CR&T), which also carries low to medium rate data; a Ka-band Direct to Earth(DTE) link for high rate data transmissions; and a Ka-band Lunar link for high data rate connections to lunar systems. This paper describes the PPE communication links from a technical perspective. Other Gateway links supported by other modules are outside the scope of this paper.

ARTEMIS↗