Search NASA⌕ Search

SEARCH · Search NASA

Results for “fleet scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Three dimensional inventories of aircraft emissions

Three dimensional inventories of fuel burned and emissions (NO(x), CO, and hydrocarbons) have been developed on a 1 deg latitude by 1 deg longitude by 1 km altitude grid for scheduled commercial air traffic (passenger jet, cargo, and turboprop aircraft) for 1990 and projected to the year 2015. Emission scenarios have also been calculated for projected fleets of Mach 2 and Mach 2.4 high speed civil transports. The methodology and results are discussed. These emission inventories are now in use in the assessment of aircraft emissions impact by NASA.

Baughcum, Steven L.↗

EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the first training in a four-part series and serves as an introductory training. This training covers fundamental topics such as EV and charging technology, utility basics, and financial considerations for EVs. Additionally, this session introduces the Federal Fleet ZEV Ready Center framework, a one-stop location for federal fleet electrification resources. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure. Visit the Federal Fleet ZEV Ready Center website to learn more about the ZEV Ready Center process. EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals will enable attendees to: Identify EV and EV charging technology fundamentals; Recognize EV market and GSA Schedule options; Identify utility basics, incentives, and rates as they relate to EV charging; and Identify methods to calculate life cycle costs for EVs and gasoline vehicles.

30 DIRECT ENERGY CONVERSION↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Methodology and Process for Condition Assessment at Existing Hydropower Plants

Hydropower Advancement Project was initiated by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with a standard methodology to identify the opportunities of performance improvement at existing hydropower facilities and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The concept of performance for the HAP focuses on water use efficiency how well a plant or individual unit converts potential energy to electrical energy over a long-term averaging period of a year or more. The performance improvement involves not only optimization of plant dispatch and scheduling but also enhancement of efficiency and availability through advanced technology and asset upgrades, and thus requires inspection and condition assessment for equipment, control system, and other generating assets. This paper discusses the standard methodology and process for condition assessment of approximately 50 nationwide facilities, including sampling techniques to ensure valid expansion of the 50 assessment results to the entire hydropower fleet. The application and refining process and the results from three demonstration assessments are also presented in this paper.

Zhang, Qin Fen↗

Comparative requirements, stakes and deployment for 2 ongoing major I and C modernization projects (NPIC2017 - 19956) - 293

Rolls-Royce Civil Nuclear I and C is deploying its safety and safety-related technologies in more than 80 plants, in particular in France, China and Finland. This paper gives an overview of the context (including regulatory requirements), stakes, objectives and progress as well as of the technology and technical solutions being deployed in two representative I and C modernization examples: - The modernization of 2 VVER plants in Loviisa (Finland); - Modernization of 20 PWR plants for EDF in France. While there are many similarities: a tight schedule, the cohabitation of new and old systems, mostly from third parties, both digital and analog, and some additional improvements and modifications, the context of these two projects is very different: - Fleet Vs 'isolated' plants approach; - Different types of reactors (PWR Vs VVER); - Involvement of a large utility and Integrator (EDF/Areva) Vs a smaller Utility (Fortum); - Specific safety requirements from well recognized safety authorities (French ASN and Finnish STUK); - Implementation of specific safety functions with the same Safety platform (Rolls-Royce Spinline{sup R}). From this comparison we will extract the main challenges faced, the solutions implemented and some key success factors for such I and C modernizations. In particular: the licensing, the importance of a proven and adaptable safety platform and the often overlooked aspects such as communication and joint working-organization with all the stakeholders: customer, supply chain and safety authorities. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging

This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedules, and more. Outcomes indicate that the existing charging network in New York City is not adequate even in the most optimistic scenario; 1,054 150-kW ports are required when 15% of drivers have access to overnight charging, whereas 367 150-kW ports are needed when 100% of drivers have access. Results also indicate that although charging is demanded in areas nearby high trip demand, fast charging ports are also demanded in areas near driver residences as a supplement for home charging in scenarios with limited overnight charging access. These findings motivate investment into both overnight charging and public fast charging to meet the charging demands of ride-hailing fleets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reliability-based optimum inspection and maintenance procedures

The development of reliability-based optimum inspection and maintenance schedules for engines needs an understanding of the fatigue behavior of the engines. Critical areas of the engine structure prone to fatigue damage are usually identified beforehand or after the fleet has been put into operation. In these areas, fatigue cracks initiate after several flight hours, and these cracks grow in length until failure takes place when these cracks attain the critical lengths. Crack initiation time and its growth rate are considered to be random variables. Usually, the inspection (fatigue) or test data from similar engines are used as prior distributions. The existing state-of-the-art is to ignore the different lengths of cracks obserbed at various inspections and to consider only the fact that a crack existed (or did not exist) at the time of inspection. In this paper, a procedure has been developed to obtain the probability of finding a crack of a given size at a certain time if the probability distributions for crack initiation and rates of growth are known. Application of the developed stochastic models to devise optimum procedures for inspection and maintenance are also discussed.

Nanagud, S.↗

The Summer of Hydrogen

Ground crew veterans at Kennedy Space Center still talk about what they call "the summer of hydrogen"-the long, frustrating months in 1990 when the shuttle fleet was grounded by an elusive hydrogen leak that foiled our efforts to fill the orbiter's external fuel tank. Columbia (STS-35) was on Launch Pad A for a scheduled May 30 launch when we discovered the hydrogen leak during - tanking. The external fuel tank is loaded through the orbiter. Liquid hydrogen flows through a 17-inch umbilical between the orbiter and the tank. During fueling, we purge the aft fuselage with gaseous nitrogen to reduce the risk of fire, and we have a leak-detection system in the mobile launch platform, which samples (via tygon tubing) the atmosphere in and around the vehicle, drawing it down to a mass spectrometer that analyzes its composition. When we progressed to the stage of tanking where liquid hydrogen flows through the vehicle, the concentration of hydrogen approached four percent-the limit above which it would be dangerously flammable. We had a leak. We did everything we could think of to find it, and the contractor who supplied the flight hardware was there every day, working alongside us. We did tanking tests, which involved instrumenting the suspected leak sources, and cryo-loaded the external tank to try to isolate precisely where the leak originated. We switched out umbilicals; we replaced the seals between the umbilical and the orbiter. We inspected the seals microscopically and found no flaws. We replaced the recirculation pumps, and we found and replaced a damaged teflon seal in a main propulsion system detent cover, which holds the prevalve-the main valve supplying hydrogen to Space Shuttle Main Engine 3 -in the open position. The seal passed leak tests at ambient temperature but leaked when cryogenic temperatures were applied. We added new leak sensors-up to twenty at a time and tried to be methodical in our placements to narrow down the possible sources of the problem. We even switched orbiters, sending Columbia back to the Vehicle Assembly Building and bringing out Atlantis, scheduled to fly as STS-38. Two shuttles on their mobile launchers passing in the night was a majestic sight, but not one you want to see if you're trying to get an orbiter launched. None of this told us where the leak was, or if we were dealing with more than one leak source.

Weber, Philip↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption (Research Performance Final Report)

This is the research performance final report for the project entitled: Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption This project was able to achieve the DOE’s goals of developing new modeling tools to understand MDHD vehicle operation and adoption. The first modeling tool is a fleet-level techno-economic analysis model capable of estimating energy use and associated environmental and cost impacts for electrified and conventional vehicles of any MDHD vocation, using real-world cost and operations data, including approaches to optimizing schedules for charging and/or vehicle dispatch. The second modeling tool is a system-level, bottom-up, agent-based adoption model capable of generating geographically-resolved estimates of market projections for MDHD vehicles and charging infrastructure. These tools will be developed and published to serve dual purposes as analysis tools for researchers, and decision-support tools for decision makers within the MDHD system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143

The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow for efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fleet-wide Electrification Impacts Assessment for the Valley Transportation Authority

This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.

33 ADVANCED PROPULSION SYSTEMS↗

Flight control electronics reliability/maintenance study

Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.

Dade, W. W.↗

Human Factors Research Considerations for Terminal Area Urban Air Mobility Operations

In this presentation, we discuss the human factors research challenges from introducing greater levels of automation in a future air transportation concept called Urban Air Mobility (UAM). UAM is an air transportation concept that aims to provide air transportation services to the daily commuter, as well as emergency response and package delivery. The principal innovation over current day large air transport system is the greater distribution of important safety functions to automated and human agents; these functions include air traffic management, traditionally an air traffic controller responsibility. A central aspect of UAM is the development of an automated air traffic manager, whose primary responsibility is to approve airspace access for vehicle operators. Vehicle operator roles may include onboard and remote pilots, as well as a human manager who will supervise an entire fleet. Alternatively, both fleet manager and vehicle operators can be merged into a single role – a feasible option if UAM aircraft are autonomous. In lieu of tower controllers, vertiport managers, with the assistance of automation, will manage arrival and departure schedules between vertiports, as well as supervise surface operations. Our approach here will be to introduce use cases currently being developed by NASA, and then provide preliminary definitions for each of the roles introduced above and how coordination between them can be configured to support the operations within the use cases described. Subsequently, we review the tools and interfaces being developed to support the various roles. To conclude, we present current human factors work related to defining the roles above and suggest future work to advance the UAM concept.

trial planning↗

Impact of the deployment schedule of fast breeding reactors in the frame of French act for nuclear materials and radioactive waste management

In the frame of the French Act of June 28, 2006 on 'a sustainable management of nuclear materials and radioactive waste' EDF R and D assesses various research scenarios of transition between the actual French fleet and a Generation IV fleet with a closed fuel cycle where plutonium is multi-recycled. The basic scenarios simulate a deployment of 60 GWe of Sodium-cooled Fast Reactors (SFRs) in two steps: one third from 2040 to 2050 and the rest from 2080 to 2100 (scenarios 2040). These research scenarios assume that SFR technology will be ready for industrial deployment in 2040. One of the many sensitivity analyses that EDF, as a nuclear power plant operator, must evaluate is the impact of a delay of SFR technology in terms of uranium consumptions, plutonium needs and fuel cycle utilities gauging. The sensitivity scenarios use the same assumptions as scenarios 2040 but they simulate a different transition phase: SFRs are deployed in one step between 2080 and 2110 (scenarios 2080). As the French Act states to conduct research on minor actinides (MA) management, we studied different options for 2040 and 2080 scenarios: no MA transmutation, americium transmutation in heterogeneous mode based on americium Bearing Blankets (AmBB) in SFRs and all MA transmutation in heterogeneous mode based on MA Bearing Blankets (MABB). Moreover, we studied multiple parameters that could impact the deployment of these reactors (SFR load factor, increase of the use of MOX in Light Water Reactors, increase of the cooling time in spent nuclear fuel storage...). Each scenario has been computed with the EDF R and D fuel cycle simulation code TIRELIRE-STRATEGIE and optimized to meet various fuel cycle constraints such as using the reprocessing facility with long period of constant capacity, keeping the temporary stored mass of plutonium and MA under imposed limits, recycling older assemblies first... These research scenarios show that the transition from the current PWR fleet to an equivalent fleet of Generation IV SFR can follow different courses. The design of SFR-V2B that we used in our studies needs a high inventory of plutonium resulting in tension on this resource. Several options can be used in order to loosen this tension: our results lead to favour the use of axial breeding blanket in SFR. Load factor of upcoming reactors has to be regarded with attention as it has a high impact on plutonium resource for a given production of electricity. The deployment of SFRs beginning in 2080 instead of 2040 following the scenarios we described creates higher tensions on reprocessing capacity, separated plutonium storage and spent fuel storage. In the frame of the French Act, we studied minor actinides transmutation. The flux of MA in all fuel cycle plants is really high, which will lead to decay heat, a and neutron emission related problems. In terms of reduction of MA inventories, the deployment of MA transmutation cycle must not delay the installation of SFRs. The plutonium production in MABB and AmBB does not allow reducing the use of axial breeding blankets. The impact of MA or Am transmutation over the high level waste disposal is more important if the SFRs are deployed later. Transmutation option (americium or all MA) does not have a significant impact on the number of canister produced nor on its long-term thermal properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tri-Level Scheduling Model Considering Residential Demand Flexibility of Aggregated HVACs and EVs Under Distribution LMP

Residential loads, especially heating, ventilation and air conditioners (HVACs) and electric vehicles (EVs), have great potentials to provide demand flexibility which is an attribute of grid-interactive efficient buildings (GEB). Under this new paradigm, first, EV and HVAC aggregator models are developed in this paper to represent the fleet of GEBs, in which the aggregated parameters are obtained based on a new approach of data generation and least squares parameter estimation (DG-LSPE), which can deal with heterogeneous HVACs. Then, a tri-level bidding and dispatching framework is established based on competitive distribution operation with distribution locational marginal price (DLMP). Furthermore, the first two levels form a bilevel model to optimize the aggregators’ payment and to represent the interdependency between load aggregators and the distribution system operator (DSO) using DLMP, and the third level is to dispatch the optimal load aggregation to all residents by the proposed priority list-based demand dispatching algorithm. Finally, case studies on a modified IEEE 33-Bus system illustrate three main technical reasons of payment reduction due to demand flexibility: load shift, DLMP step changes, and power losses. They can be used as general guidelines for better decision-making for future planning and operation of demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗