Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight subsystem designs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Custom Unit Pump Design and Testing for the EVA PLSS

This paper describes the effort by the Texas Engineering Experiment Station (TEES) and Honeywell for NASA to design and test a pre-flight prototype pump for use in the Extra-vehicular activity (EVA) portable life support subsystem (PLSS). Major design decisions were driven by the need to reduce the pump s mass, power, and volume compared to the existing PLSS pump. In addition, the pump must accommodate a much wider range of abnormal conditions than the existing pump, including vapor/gas bubbles and increased pressure drop when employed to cool two suits simultaneously. A positive displacement, external gear type pump was selected because it offers the most compact and highest efficiency solution over the required range of flow rates and pressure drops. An additional benefit of selecting a gear pump design is that it is self priming and capable of ingesting non-condensable gas without becoming air locked. The chosen pump design consists of a 28 V DC, brushless, sealless, permanent magnet motor driven, external gear pump that utilizes a Honeywell development that eliminates the need for magnetic coupling. Although the planned flight unit will use a sensorless motor with custom designed controller, the pre-flight prototype to be provided for this project incorporates Hall effect sensors, allowing an interface with a readily available commercial motor controller. This design approach reduced the cost of this project and gives NASA more flexibility in future PLSS laboratory testing. The pump design was based on existing Honeywell designs, but incorporated features specifically for the PLSS application, including all of the key features of the flight pump. Testing at TEES verified that the pump meets the design requirements for range of flow rates, pressure drop, power consumption, working fluid temperature, operating time, gas ingestion , and restart capability under both ambient and vacuum conditions. The pump operated between 40 and 240 lbm/hr flowrate, 35 to 100 F pump temperature range, and 5 to 10 psid pressure rise. Power consumption of the pump controller at the nominal operating point in both ambient and vacuum conditions was 9.5 W, which was less than the 12 W predicted. Gas ingestion capabilities were tested by injecting 100 cc of air into the fluid line; the pump operated normally throughout this test. The test results contained a number of anomalies, specifically power increases and a few flow stoppages, that prompted TEES and Honeywell to disassemble and inspect the pump. Inspection indicated contamination in the pump and fit issues may have played roles in the observed anomalies. Testing following reassembly indicated that the performance of the pump 1) matched both the predicted performance values, 2) the performance values measured prior to disassembly, and 3) was free of the anomalies noted in the pre-disassembly testing.

Schuller, Michael↗

Custom Unit Pump Development for the EVA PLSS

This paper describes the effort by the Texas Engineering Experiment Station (TEES) and Honeywell for NASA to design and test a pre-flight prototype pump for use in the Extra-vehicular activity (EVA) portable life support subsystem (PLSS). Major design decisions were driven by the need to reduce the pump s mass, power, and volume compared to the existing PLSS pump. In addition, the pump must accommodate a much wider range of abnormal conditions than the existing pump, including vapor/gas bubbles and increased pressure drop when employed to cool two suits simultaneously. A positive displacement, external gear type pump was selected because it offers the most compact and highest efficiency solution over the required range of flow rates and pressure drops. An additional benefit of selecting a gear pump design is that it is self priming and capable of ingesting non-condensable gas without becoming air locked. The chosen pump design consists of a 28 V DC, brushless, seal-less, permanent magnet motor driven, external gear pump that utilizes a Honeywell development that eliminates the need for magnetic coupling. The pump design was based on existing Honeywell designs, but incorporated features specifically for the PLSS application, including all of the key features of the flight pump. Testing at TEES verified that the pump meets the design requirements for range of flow rates, pressure drop, power consumption, working fluid temperature, operating time, gas ingestion, and restart capability under both ambient and vacuum conditions. The pump operated at 40 to 240 lbm/hr flow rate, 35 to 100 oF pump temperature, and 5 to 10 psid pressure rise. Power consumption of the pump controller at the nominal operating point in both ambient and vacuum conditions was 9.5 W, which was less than the 12 W predicted. Gas ingestion capabilities were tested by injecting 100 cc of air into the fluid line; the pump operated normally throughout this test.

Schuller, Michael↗

The Gas-Grain Simulation Facility (GGSF) for Space Station Freedom - Design concept

The GGSF is specifically designed to accommodate micro-g experiments that investigate long-term effects and interactions between submicron to centimeter size particles. The paper introduces the science disciplines and the type of experiments that are currently envisioned for the GGSF. The broad range of science and technology requirements are discussed, and the Space Station Freedom (SSF) accommodations, and available utilities are reviewed. Based on the requirements and the available accommodations, a facility conceptual design is outlined. The required subsystems are listed, and the rationale and considerations that lead to the selected approach, delineated. The present GGSF concept is that of a modular facility system comprising a flight rack and an array of fully compatible and interchangeable subsystems that are designed to meet a diverse set of science requirements. The modularity allows for future upgrade of various subsystems as technology evolves and for introduction of new modules to accommodate new or different experiments. These features are essential for a facility that is expected to be in service on board the SSF for 10 years or more.

Gat, N.↗

The Low Temperature Microgravity Physics Facility (LTMPF)

We will describe the LTMPF, its objectives, its science requirements, and provide a brief description of the science investigations. The current status of the project and the facility design including results on the performance of flight-like subsystems will also be presented.

dewar helium International Space Station↗

Analysis of Data in Accordance with Space Flight Mission Environmental Requirements

The Environmental Assurance Program sets forth standards to ensure that all flight hardware is compatible with the environments that will be encountered during a spacecraft mission. It outlines the design, test and analysis, and risk control standards for the mission and certifies that it will survive in any external or self-induced environments that the spacecraft may experience. The Environmental Requirements Document (ERD) is the most important document in the Environmental Assurance Program, providing the design and test requirements for the project's flight system, subsystems, assemblies, and instruments. This summer's project was to assist Environmental Requirements Engineers (ERE's) in completing the Environmental Assurance Program Summary Report for both the Juno Project and Mars Science Laboratory (MSL) Project. The Summary Report is a document summarizing the environmental tests and analyses of each spacecraft at both the assembly and system level. It compiles a source of all relevant information such as waivers and Problem/Failure Reports (PFRs) into a single report for easy reference of how well the spacecraft met the requirements of the project.

Jupiter properties↗

The Ejectable Data Recorder: A Lean, Risk-Informed Approach for Hardware Development

NASA is developing the Orion spacecraft to transport crew from the Earth to the Moon as part of the Artemis series of missions. To provide a crew escape capability from pre-launch through ascent, the Orion vehicle is equipped with a Launch Abort System (LAS), built by Lockheed Martin, which pulls the capsule away from the launch vehicle in the event of an abort scenario. The Ascent Abort 2 (AA-2) test flight occurred on July 2, 2019,and tested a production version of the LAS to ensure that it can operate as intended, and to collect a large data set from hundreds of sensors on the vehicle to support Orion flight certification. In the original AA-2 architecture, a single-string set of communications antennas on the LAS would downlink all of the in-flight test data to ground stations. However, that communications architecture was predicted to have data dropouts during abort and jettison of the LAS, and would not support data transmission at all after LAS jettison. As a result, a comprehensive trade study was completed, yielding the addition of antennas on the crew module (CM), a buffer/rebroadcast capability for key portions of the flight, and an ejectable data recorder (EDR) subsystem. This EDR subsystem would serve as a backup to the radio frequency (RF) communications system, and would be non-flight critical, providing a unique capability that enabled management to take a different approach with the hardware and software development. The Crew Module and Separation Ring were developed as “Class 1”Flight Hardware, albeit with some tailoring approaches to enable efficiencies. The Class 1 designation requires full rigor for flight hardware and software, documenting everything that happens to a piece of hardware from procurement through disposal, requiring a full spectrum of acceptance tests, and the highest rigor of quality assurance processes. At the other end of the spectrum, Class 3hardware is controlled, but not intended for flight, and leaves the level of rigor up to the project manager. This classification is often used for research and development projects. Similarly,Class-1E has been recently defined at NASA for ISS payloads and technology development projects that are not flight critical and do not need the full rigor of Class 1 to be successful. The EDR subsystem was challenged at commencement to adopt a skunkworks and agile-like approach to hardware development, allowing for a different risk posture than the rest of the AA-2 hardware. After initially pursuing Class 1 processes, the EDR subsystem design evolved to incorporating numerous commercial components, leading to re-designation as a Class-1E subsystem. The resulting EDR subsystem was fully successful in meeting all flight system requirements, and achieved 100% retrieval of flight test data. This paper will discuss the risk posture of the EDR subsystem and the subsequent tailoring that was enacted as part of its Class-1E status.

EDR↗

Voyager flight project: DSN Telecommunications Compatibility Test Program

The Voyager Flight Project - DSN Telecommunications Compatibility Test Program consisted of three phases: Subsystem Design, System Design, and System Verification Tests. Subsystem Design Tests were performed during mid 1976. System Design Tests were performed during late 1976 and early 1977. System Verification Tests were performed during the spring and summer of 1977. This article describes the System Design Tests and test results that provided the basis for establishment of telecommunications design between the DSN and the Voyager Flight Project.

Bryan, A. I.↗

Ice pack heat sink subsystem - Phase 1, Volume 1

The design, development, fabrication, and test at one-g of a functional laboratory model (non-flight) ice pack heat sink subsystem to be used eventually for astronaut cooling during manned space missions are discussed. In normal use, excess heat in the liquid cooling garment (LCG) coolant is transferred to a reusable/regenerable ice pack heat sink. For emergency operation, or for extension of extravehicular activity mission time after all the ice has melted, water from the ice pack is boiled to vacuum, thereby continuing to remove heat from the LCG coolant. This subsystem incorporates a quick connect/disconnect thermal interface between the ice pack heat sink and the subsystem heat exchanger.

Roebelen, G. J., Jr.↗

NASA's Low-Cost Optical Terminal (LCOT) Free-Space Optical Subsystem (FSOS): Concept, Design, Build, & Test

We present the status of ongoing work at NASA’s Goddard Space Flight Center (GSFC) to build a prototype, low-cost-of-production, flexibly-configured ground terminal for space optical communication. For laser telecommunication to be cost effective for future missions, a wide-spread global network of operationally responsive optical terminals should be established. There has been a decades-old need for a single modular open systems approach (MOSA) ground terminal architecture capable of supporting multiple space missions ranging from LEO to Lunar distances with 2-way laser communications. At the heart of LCOT’s design concept is the Free-Space Optical Subsystem (FSOS). The major subassemblies of LCOT/FSOS that address most optical common configurations are : (1) Single 700mm F/12 Nasmyth folded Rx R-C Telescope, (2) Four independent 150mm diameter high-power all-reflective Tx beam directors (XOA), (3) Non-coherent direct detection Rx bench on starboard side of telescope (SOB), and (4) Coherent (possibly Quantum) optical communications bench on port side (POB). The Low-Cost Optical Terminal (LCOT) research and development (R&D) prototype is designed to be a generalized system that can be quickly field-reconfigured to support a wide variety of laser communications missions past, present, & future.

COTS↗

The Influence of Material Characterization on Thermal Loads Development and Flight Vehicle Design

The thermal management team faces a significant challenge to meet the aggressive thermal loading associated with hypersonic flight. Design strategies require the involvement of many engineering disciplines, as each must design their respective subsystem and then interface with all remaining subsystems to successfully close the vehicle design space. High fidelity thermal solid models will capture the variation in material properties and the effects of chemical reactions associated with hypersonic flight. Selection of the best materials for the mission will be based upon computational fluid dynamics and thermal modeling results. To enhance the probability for success, it is recommended that frequent communication occur between the thermal modeler and the materials scientist regarding design strategies and modeling assumptions. Early in the design process, lower fidelity modeling will be used to narrow the trade space. As promising designs are found, greater fidelity in the modeling process will be required to address more of the flowfield challenges and the material performance under the prescribed flight profile. The end goal is to select the most technically sound and physically advantageous material for the mission while avoiding overdesigning the vehicle due to modeling or material uncertainties. This presentation seeks to give an overview of the key thermal parameters that are affected through materials engineering, the interactions between a thermal engineer and other disciplines, and an example of the thermal design process, the X-43.

hypersonic↗

Spectro-Photometer for the History of the Universe, Epoch of Reionization, and Ices Explorer, One Quarter Scale Prototype Thermal Testing

The Spectro-Photometer for the History of the Universe, Epoch of Reionization, and Ices Explorer (SPHEREx) instrument has been proposed as NASA Small Explorer (SMEX) and Medium Explorer (MIDEX) missions designed to perform an all-sky near-infrared survey. The primary science objective of the SPHEREx instrument is the mapping and cataloging of data on galaxy red shifts and absorption spectra. The SPHEREx instrument utilizes a linear variable band pass filter to provide discrete spectral coverage of the 0.75 to 5.0 μm range. The nominal on-orbit mission lifetime for the instrument is two years with continuous primary science imaging. The SPHEREx instrument will be placed in a near-circular LEO sun-synchronous terminator orbit with a mean altitude of 600 km, and solar beta angles ranging from 59° to 90°. A passive V-groove radiator cooling system was selected for the SPHEREx instrument. This design was chosen for its simplicity and lack of vibration. It includes five radiator stages with the coldest two stages providing temperatures below 80K and 55K for the 2.5μm and 5.3μm detectors respectively. A one quarter scale thermal prototype was constructed to characterize the performance of the SPHEREx thermal control subsystem. This prototype was directly derived and scaled from the current flight design, and accurately replicates all heat flow paths at scale. The prototype was tested in two bounding hot flight-like environments in the Cryogenic Systems Engineering, Advanced Thermal Technology Lab at NASA’s Jet Propulsion Laboratory. Following testing, a previously developed one quarter scale thermal model was correlated to the two conditions seen in test. The resultant correlated model is able to predict the prototype test temperatures to within 1K for all critical radiator stages. An overview of the thermal control design approach, the test configuration, and test and correlation results are presented.

Bolton, Douglas A.↗

NASA's LCOT (Low-Cost Optical Terminal) FSOS (Free-Space Optical Subsystem): Concept, Design, Build, & Test

We present the status of ongoing work at NASA’s Goddard Space Flight Center (GSFC) to build a prototype, low-cost-of-production, flexibly-configured ground terminal for space optical communication. For laser telecommunication to be cost effective for future missions, a wide-spread global network of operationally responsive optical terminals should be established. There has been a decades-old need for a single modular open systems approach (MOSA) ground terminal architecture capable of supporting multiple space missions ranging from LEO to Lunar distances with 2-way laser communications. At the heart of LCOT’s design concept is the Free-Space Optical Subsytem (FSOS). The major subassemblies of LCOT/FSOS that address most optical comms configurations are : (1) Single 700mm F/12 Nasmyth folded Rx R-C Telescope, (2) Four independent 150mm diameter high-power all-reflective Tx beam directors (XOA), (3) Non-coherent direct detection Rx bench on starboard side of telescope (SOB), and (4) Coherent (possibly Quantum) optical communications bench on port side (POB). The Low-Cost Optical Terminal (LCOT) research and development (R&D) prototype is designed to be a generalized system that can be quickly field-reconfigured to support a wide variety of laser communications missions past, present, & future.

COTS↗

Deep-Space Optical Terminals (DOT)

A conceptual design study titled Deep-Space Optical Terminals was recently completed for an optical communication technology demonstration from Mars in the 2018 time frame. We report on engineering trades for the entire system, and for individual subsystems including the flight terminal, the ground receiver and the ground transmitter. A point design is described to meet the requirement for greater than 0.25 Gb/s downlink from the nearest distance to Mars of 0.42 AU with a maximum mass and power allocation of 40 kg and 110 W. Furthermore, the concept design addresses link closure at the farthest Mars range of 2.7 AU. Maximum uplink data-rate of 0.3 Mb/s and ranging with 30 cm precision are also addressed.

optical communications↗

Integration and flight demonstration of a high-capacity monogroove heat-pipe radiator

The cancellation of the TDRS-B satellite as the payload for the eighth Space Shuttle mission provided a unique opportunity to demonstrate on-orbit operation of the high-capacity monogroove heat pipe used in the space constructible radiator subsystem. In less than 4 months, a flight experiment was conceived, designed, fabricated, tested, integrated with a payload carrier, installed in the Orbiter Challenger payload bay, and successfully operated in flight. Still color photographs and direct crew visual observation of color changes in a pattern of temperature-sensitive liquid-crystal tapes provided the temperature data necessary to verify successful on-orbit startup and orbital transient response of the heat pipe when subjected to a heat load from its attached electrical heaters. This successful on-orbit demonstration verified analytical design tools and provided confidence in the use of high-capacity heat pipes for future space applications. The flight experiment hardware and the integration and test activities that led to the flight are described, and the actual flight results are compared to analytical performance predictions.

Rankin, J. G.↗

Characterization of Volatiles Loss from Soil Samples at Lunar Environments

Resource Prospector Integrated Thermal Vacuum Test Program A series of ground based dirty thermal vacuum tests are being conducted to better understand the subsurface sampling operations for RP Volatiles loss during sampling operations Hardware performance Sample removal and transfer Concept of operationsInstrumentation5 test campaigns over 5 years have been conducted with RP hardware with advancing hardware designs and additional RP subsystems Volatiles sampling 4 years Using flight-forward regolith sampling hardware, empirically determine volatile retention at lunar-relevant conditions Use data to improve theoretical predictions Determine driving variables for retention Bound water loss potential to define measurement uncertainties. The main goal of this talk is to introduce you to our approach to characterizing volatiles loss for RP. Introduce the facility and its capabilities Overview of the RP hardware used in integrated testing (most recent iteration) Summarize the test variables used thus farReview a sample of the results.

In Situ Resource Utilization↗

Multidisciplinary Optimization of a Transonic Truss Braced Wing Aircraft with Hybrid-Electric Propulsion

Next generation aircraft concepts have subsystems that are increasingly inter-connected. This necessitates advanced design tools using gradient based optimization to properly account for strong subsystem coupling in these aircraft. Additionally, these design tools require accurate modeling capability to support the increased interest in electrified propulsion. Design studies for these aircraft must consider the trade-offs between electric propulsion and turbojet engines at all points in the flight envelope to determine the optimal balance between propulsion options. This paper describes the development of an electric propulsion subsystem model designed to work within Aviary - an open source aircraft design tool. We will demonstrate the electric propulsion model operating with Aviary by showing results from an optimized Transonic Truss-Braced Wing (TTBW) concept using assisted electric propulsion during climb. First, we present results with and without electrification to show the overall system impacts of hybrid electric propulsion during climb. We also present two distinct battery models compatible with this optimization framework, and compare results using both. Next, we ran the same problem using a slightly different cell type, and demonstrate a considerable change in the result. Finally, we vary the cell energy density of the batteries, and provide an illustrative trend for the system-level impact for improving cell technology.

optimization↗