Search NASA⌕ Search

SEARCH · Search NASA

Results for “geothermal technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

121 records · Page 7

Intersections of Disadvantaged Communities and Renewable Energy Potential: Data Set and Analysis to Inform Equitable Investment Prioritization in the United States

Renewable energy development can bolster local economies through job creation, local tax revenues, and reduced energy costs; however, communities most in need of economic development and employment opportunities often see lower levels of renewable energy deployment. We sought to identify areas where disadvantaged community indicators and high generation potential from cost-effective renewable energy opportunities intersect and deployment could lead to economic development and job creation. This presentation will highlight several of our findings. This research and the associated county-level data set are intended to inform national- and state-level energy-related assistance programs, economic development efforts, and infrastructure programs seeking to prioritize investments in disadvantaged communities.

community energy planning↗

Technical Geothermal Roadmap for Indonesia

The technical geothermal roadmapping exercise described by this report is part of the NZW Collaborative Work Program with the Government of Indonesia. Indonesia currently has the second largest installed geothermal power generation capacity in the world and has abundant undeveloped resources that allow for continued expansion of its geothermal resource development, which can serve to contribute to the country’s goal of achieving net zero emissions for power generation by 2060. The DOE GeoVision study (2019) highlighted the importance of technical improvements as the key for accelerating the development of geothermal resources in the United States by reducing the costs and risks to make geothermal more competitive, and this also applies to Indonesia. The main objective of the roadmap is to identify and discuss key technical challenges and discuss how implementation of geothermal technology advances could reduce the risks, costs, and time associated with geothermal exploration and development activities and expand the potential resource base to include unconventional resource types, thus accelerating geothermal deployment in Indonesia.

15 GEOTHERMAL ENERGY↗

Wyandotte Neighborhood Stabilization Program: Retrofit of Two Homes

The Wyandotte NSP2 project aims to build 20 new houses and retrofit 20 existing houses in Wyandotte, MI. This report will detail the retrofit of 2 existing houses in the program. Wyandotte is part of a Michigan State Housing Development Authority-led consortium that is funded by HUD under the NSP2 program. The City of Wyandotte has also been awarded DOE EE&CBG funds that are being used to develop a district GSHP system to service the project. This draft report examines the energy efficiency recommendations for retrofit construction at these homes. The report will be of interest to anyone planning an affordable, high performance retrofit of an existing home in a Cold Climate zone. Information from this report will also be useful to retrofit or weatherization program staff as some of the proposed retrofit solutions will apply to a wide range of projects. Preliminary results from the first complete house suggest that the technology package employed (which includes spray foam insulation and insulating sheathing) does meet the specific whole house water, air, and thermal control requirements, as well as, the project's affordability goals. Monitoring of the GSHP system has been recommended and analysis of this information is not yet available.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Geothermal Hydraulic Stimulation: Overview of Methods and Best Practices

This paper outlines important information related to the hydraulic stimulation of geothermal wells and considerations for regulators responsible for evaluating applications to conduct these operations. Hydraulic stimulation applied to geothermal wells is an evolving technology that is different from the hydraulic fracturing process widely used to complete unconventional oil and gas wells. Important differences relate to operating pressures, variations in rock and fracture processes, and characteristics and disposal of hydraulic fracture fluids. Hydraulic stimulation is not widely used in the geothermal industry; however, future development of enhanced geothermal systems (EGS) will require hydraulic stimulation in order to enhance and create fracture permeability to allow wells to deliver sufficient heat and fluid to power plants. Gigawatts of EGS potential have been identified (U.S. Department of Energy 2019), so it is expected that the use of hydraulic stimulation of geothermal wells will be more common in the future. At present, there are no formal regulations guiding drilling programs or sundry notices that propose hydraulic stimulation of geothermal wells. On federal lands, important constraints and oversight are embedded in the process for obtaining Geothermal Drilling Permits outlined in the Code of Federal Regulations (43 CFR Section 3262.11); in Geothermal Resource Order 2 (GRO 2) guidance for assessment and mitigation of impacts of geothermal operations as well as construction and testing of geothermal wells; and in a Bureau of Land Management (BLM) Induced Seismicity Instruction Memorandum (BLM 2018). Additionally, local knowledge from BLM field offices and expertise of BLM engineers, or that of state regulators for operations on private and state lands, will be applied to fully assess operator applications to conduct geothermal hydraulic stimulation activities. Significant research effort has been directed toward EGS, so geothermal hydraulic stimulation techniques, impacts, and results are evolving and becoming better understood, including adaptation of decades of oil and gas industry experience with hydraulic fracturing of unconventional reservoirs. Recent EGS activities in the United States provide details about hydraulic stimulation with respect to oversight, stimulation design, execution, and results. Based on experience to date, the important issues to address when hydraulically stimulating a geothermal well include the following: 1. Wellbore construction and integrity must be appropriate to protect groundwater and manage stimulation pressures. 2. Understanding of lithology, faults, fractures, and subsurface stress state is necessary to design stimulation plans and predict results. 3. Seismic monitoring allows for observation and mitigation of induced seismicity.

geothermal↗

Boston Architectural College Urban Sustainability Initiative

The Boston Architectural College's Urban Sustainability initiative is a demonstration project as defined by the National Energy Technology Laboratory. BAC's proposed project with the U.S. Department of Energy - NETL, is a large part of that overall initiative. The BAC's Urban Sustainability Initiative is a multi-part project with several important goals and objectives that will have a significant impact on the surrounding neighborhood including: energy conservation, reduction of storm water runoff, generation of power through alternative energy sources, elimination/reduction of BAC carbon footprint, and to create a vehicle for ongoing public outreach and education. Education and outreach opportunities will serve to add to the already comprehensive Sustainability Design courses offered at BAC relative to energy savings, performance and conservation in building design. At the finish of these essential capital projects there will be technical materials created for the education of the design, sustainability, engineering, community development and historic preservation communities, to inform a new generation of environmentally-minded designers and practitioners, the city of Boston and the general public. The purpose of the initiative, through our green renovations program, is to develop our green alley projects and energy saving renovations to the BAC physical plant, to serve as a working model for energy efficient design in enclosed 19th century and 20th century urban sites and as an educational laboratory for teaching ecological and sustainable technologies to students and the public while creating jobs. The scope of our project as it relates to the BAC and the U.S. Department of Energy- NETL combined efforts includes: Task I of the project is Phase II (Green Alley). Task I encompasses various renovation activities that will demonstrate the effectiveness of permeable paving and ground water recharge systems. It will aid in the reduction of storm water runoff into the Charles River Basin in one of its most significantly polluted sections and, will provide a green renovation mechanism for the redirected storm water of a public alley way. This activity is designed to improve the quality of water recharging the ground water and protecting the vulnerable wood pilings under many of the historic masonry buildings in Boston's Back Bay. Sustainable design research and system monitoring opportunities will also be incorporated, providing ongoing tools for public outreach and education through innovative signage and "virtual tour" technology. The monitoring will include a "building performance dash board" that reflects real time operating conditions and improvements in environmental and economic performance to be prominently displayed on the face of our 320 Newbury Street building (approximately 1.5 million people walk by annually). The project site and demonstration area is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task II of the project is Geothermal Solution. This task involves the installation of approximately seven Geothermal wells which will tap into the earth's constant underground temperatures to provide air-conditioning and heating for BAC facilities. The environmentally friendly geothermal system uses no fossil fuel, produces no emissions and runs silently, providing a sustainable model for commercial and residential buildings throughout Boston. Ultimately the combination of this project and other projects will assist in making the BAC "carbon-neutral", and could generate enough additional energy to provide free power to the Engine 33 and Ladder 15 Firehouse located at 941 Boylston Street. The project is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task III of the project is the Sustainability Design Curriculum at the BAC. The BAC is the nation’s largest independent, multi-disciplinary college of spatial design, and a leader in sustainable design education. The Sustainabiltiy Design program, in particular, focuses on energy efficiency,energy performance, energy modeling, energy and air quality principles, green building, renewable energy alternatives and much more. Additionally, the Urban Sustainability Initiative has an objective of providing courses relative to the BAC's demonstration project with DOE, the project’s period of performance activities, subsequent performance data and anticipated sustainability teaching tools. In keeping with BAC's practice based curriculum, students have been involved in the discussion and planning of this project since its inception and sustainability issues have become a part of other programs throughout the college as well. Students will continue to benefit from this hands-on learning opportunity. The project is located at 320 Newbury Street Boston, MA 02115. Task IV of the project is Program Management and Reporting. This task will involve BAC's oversight and general management of the entire project including subcontract administration, contracts administration, technical and financial reporting, design and renovation assistance, other deliverables in accordance with the Federal Assistance reporting Checklist and other contractual obligations and provisions.

15 GEOTHERMAL ENERGY↗

The Newberry Deep Drilling Project (NDDP) workshop

The important scientific questions that will form the basis of a full proposal to drill a deep well to the ductile–brittle transition zone (T>400 °C) at Newberry Volcano, central Oregon state, USA, were discussed during an International Continental Drilling Program (ICDP) sponsored workshop held at the Oregon State University-Cascades campus in Bend, Oregon, from 10 to 13 September 2017. Newberry Volcano is one of the largest geothermal heat reservoirs in the USA and has been extensively studied for the last 40 years. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 340–374 °C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The workshop concluded by setting ambitious goals for the NDDP: (1) test the enhanced geothermal system (EGS) above the critical point of water, (2) collect samples of rocks within the brittle–ductile transition, (3) investigate volcanic hazards, (4) study magmatic geomechanics, (5) calibrate geophysical imaging techniques, and (6) test technology for drilling, well completion, and geophysical monitoring in a very high-temperature environment. Based on these recommendations, a full drilling proposal was submitted in January 2018 to the ICDP for deepening an existing well. The next steps will be to continue building a team with project, technology, and investment partners to make the NDDP a reality.

58 GEOSCIENCES↗

Controlling Subsurface Fractures and Fluid Flow: A Basic Research Agenda

From beneath the surface of the earth, we currently obtain about 80-percent of the energy our nation consumes each year. In the future we have the potential to generate billions of watts of electrical power from clean, green, geothermal energy sources. Our planet’s subsurface can also serve as a reservoir for storing energy produced from intermittent sources such as wind and solar, and it could provide safe, long-term storage of excess carbon dioxide, energy waste products and other hazardous materials. However, it is impossible to underestimate the complexities of the subsurface world. These complexities challenge our ability to acquire the scientific knowledge needed for the efficient and safe exploitation of its resources. To more effectively harness subsurface resources while mitigating the impacts of developing and using these resources, the U.S. Department of Energy established SubTER – the Subsurface Technology and Engineering RD&D Crosscut team. This DOE multi-office team engaged scientists and engineers from the national laboratories to assess and make recommendations for improving energy-related subsurface engineering. The SubTER team produced a plan with the overall objective of “adaptive control of subsurface fractures and fluid flow.”This plan revolved around four core technological pillars—Intelligent Wellbore Systems that sustain the integrity of the wellbore environment; Subsurface Stress and Induced Seismicity programs that guide and optimize sustainable energy strategies while reducing the risks associated with subsurface injections; Permeability Manipulation studies that improve methods of enhancing, impeding and eliminating fluid flow; and New Subsurface Signals that transform our ability to see into and characterize subsurface systems. The SubTER team developed an extensive R&D plan for advancing technologies within these four core pillars and also identified several areas where new technologies would require additional basic research. In response, the Office of Science, through its Office of Basic Energy Science (BES), convened a roundtable consisting of 15 national lab, university and industry geoscience experts to brainstorm basic research areas that underpin the SubTER goals but are currently underrepresented in the BES research portfolio. Held in Germantown, Maryland on May 22, 2015, the round-table participants developed a basic research agenda that is detailed in this report. Highlights include the following: -A grand challenge calling for advanced imaging of stress and geological processes to help understand how stresses and chemical substances are distributed in the subsurface—knowledge that is critical to all aspects of subsurface engineering; -A priority research direction aimed at achieving control of fluid flow through fractured media; -A priority research direction aimed at better understanding how mechanical and geochemical perturbations to subsurface rock systems are coupled through fluid and mineral interactions; -A priority research direction aimed at studying the structure, permeability, reactivity and other properties of nanoporous rocks, like shale, which have become critical energy materials and exhibit important hallmarks of mesoscale materials; -A cross-cutting theme that would accelerate development of advanced computational methods to describe heterogeneous time-dependent geologic systems that could, among other potential benefits, provide new and vastly improved models of hydraulic fracturing and its environmental impacts; -A cross-cutting theme that would lead to the creation of “geo-architected materials” with controlled repeatable heterogeneity and structure that can be tested under a variety of thermal, hydraulic, chemical and mechanical conditions relevant to subsurface systems; -A cross-cutting theme calling for new laboratory studies on both natural and geo-architected subsurface materials that deploy advanced high-resolution 3D imaging and chemical analysis methods to determine the ;rates and mechanisms of fluid-rock processes, and to test predictive models of such phenomena. Many of the key energy challenges of the future demand a greater understanding of the subsurface world in all of its complexity. This greater under- standing will improve the ability to control and manipulate the subsurface world in ways that will benefit both the economy and the environment. This report provides specific basic research pathways to address some of the most fundamental issues of energy-related subsurface engineering.

15 GEOTHERMAL ENERGY↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

Energy Transitions Initiative Partnership Project: ETIPP Technical Assistance Informational Webinar

This webinar is for prospective applicants (i.e., remote, island, and islanded communities) interested in applying to the U.S. Department of Energy's Energy Transitions Initiative Partnership Program (ETIPP) in spring of 2022. This webinar provides an overview of ETIPP and technical assistance, introduces the ETIPP regional partners, summarizes two ongoing ETIPP projects, discusses the 2022 application process, and closes with a question-and-answer session. This webinar is hosted by the National Renewable Energy Laboratory, which is part of the ETIPP partner network.

Alaska Center for Energy and Power↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

Geothermal Exploration Case Studies on OpenEI (Presentation)

The U.S. Geological Survey (USGS) resource assessment (Williams et al., 2008) outlined a mean 30 GWe of undiscovered hydrothermal resource in the western United States. One goal of the U.S. Department of Energy's (DOE) Geothermal Technology Office (GTO) is to accelerate the development of this undiscovered resource. DOE has focused efforts on helping industry identify hidden geothermal resources to increase geothermal capacity in the near term. Increased exploration activity will produce more prospects, more discoveries, and more readily developable resources. Detailed exploration case studies akin to those found in oil and gas (e.g. Beaumont and Foster, 1990-1992) will give developers central location for information gives models for identifying new geothermal areas, and guide efficient exploration and development of these areas. To support this effort, the National Renewable Energy Laboratory (NREL) has been working with GTO to develop a template for geothermal case studies on the Geothermal Gateway on OpenEI. In 2012, the template was developed and tested with two case studies: Raft River Geothermal Area (http://en.openei.org/wiki/Raft_River_Geothermal_Area) and Coso Geothermal Area (http://en.openei.org/wiki/Coso_Geothermal_Area). In 2013, ten additional case studies were completed, and Semantic MediaWiki features were developed to allow for more data and the direct citations of these data. These case studies are now in the process of external peer review. In 2014, NREL is working with universities and industry partners to populate additional case studies on OpenEI. The goal is to provide a large enough data set to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

15 GEOTHERMAL ENERGY↗

Development of New g-function Data for Simulating a Novel Shallow Bore Ground Heat Exchanger

Geothermal heat pump (GHP), which is also referred as ground source heat pump, is the most energy-efficient technology for space heating and cooling. However, the application of GHP is hindered by its high initial cost, of which approximately 30% is for the ground heat exchanger (GHE). In recent years, researchers have developed different types of shallow bore ground heat exchangers (SBGHE) intending to reduce the cost of drilling. The ability to predict the thermal response of an SBGHE is critical for sizing SBGHE. While g-functions have been commonly used for predicting the thermal response of conventional vertical bore ground heat exchangers (VBGHE), they cannot be directly used for predicting the performance of SBGHE because they did not account for the impacts of the seasonal variation of the soil temperature along with the depth of an SBGHE. In addition, an SBGHE has a larger thermal mass within the borehole than the VBGHE due to the larger borehole diameter of SBGHE. This study develops new g-function data pairs for a new design of SBGHE, which is named Underground Thermal Battery (UTB). Impacts of the seasonal variation of soil temperature on the thermal response of UTB were accounted for by superposing a time-dependent soil temperature onto the g-functions calculated with a numerical model that assumes constant undisturbed soil temperature. The TOUGH program was used to predict the thermal response of several configurations involving multiple UTBs. The results indicate that the proposed methodology is appropriate to generate g-functions for the UTB, and the g-function value of UTB is much lower than that of VBGHE in the time range of 15 min to 1 year due to the large thermal mass and convection heat transfer within the UTB.

Shi, Liang↗

Exploration Drilling and Technology Demonstration At Fort Bliss

The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before the well was cased.

15 GEOTHERMAL ENERGY↗