At least 127 records · Page 7

Cybersecurity Considerations for Grid-Connected Batteries with Hardware Demonstrations

The share of renewable and distributed energy resources (DERs), like wind turbines, solar photovoltaics and grid-connected batteries, interconnected to the electric grid is rapidly increasing due to reduced costs, rising efficiency, and regulatory requirements aimed at incentivizing a lower-carbon electricity system. These distributed energy resources differ from traditional generation in many ways including the use of many smaller devices connected primarily (but not exclusively) to the distribution network, rather than few larger devices connected to the transmission network. DERs being installed today often include modern communication hardware like cellular modems and WiFi connectivity and, in addition, the inverters used to connect these resources to the grid are gaining increasingly complex capabilities, like providing voltage and frequency support or supporting microgrids. To perform these new functions safely, communications to the device and more complex controls are required. The distributed nature of DER devices combined with their network connectivity and complex controls interfaces present a larger potential attack surface for adversaries looking to create instability in power systems. To address this area of concern, the steps of a cyberattack on DERs have been studied, including the security of industrial protocols, the misuse of the DER interface, and the physical impacts. These different steps have not previously been tied together in practice and not specifically studied for grid-connected storage devices. In this work, we focus on grid-connected batteries. We explore the potential impacts of a cyberattack on a battery to power system stability, to the battery hardware, and on economics for various stakeholders. We then use real hardware to demonstrate end-to-end attack paths exist when security features are disabled or misconfigured. Our experimental focus is on control interface security and protocol security, with the initial assumption that an adversary has gained access to the network to which the device is connected. We provide real examples of the effectiveness of certain defenses. This work can be used to help utilities and other grid-connected battery owners and operators evaluate the severity of different threats and the effectiveness of defense strategies so they can effectively deploy and protect grid-connected storage devices.

25 ENERGY STORAGE↗

A Real-Time ANPC Inverter Digital Twin with Integrated Design-For-Trust

The demand for renewable energy has increased over the last few years, and so has the demand for greater expectations within the energy market. This increasing trend has been accompanied by more significant usage of internet-connected devices (IoT), leading to critical electrical infrastructure being connected to the internet. Implementing internet connectivity with such devices and systems provides benefits such as improving the system's performance, facilitating irregularity and anomaly mitigation, and providing additional situational awareness for enhanced decision-making. However, enhancing the connected system with IoT introduces a drawback – a greater vulnerability to cyber-attacks. Cyber-attacks targeting critical infrastructure in the electrical sector have occurred in the United States and Ukraine. These cyber-attacks highlight and expose vulnerabilities that a system inherits when connecting to the internet. These attacks left thousands of customers without electricity for hours until operators could regain control of the electric utility grid. Therefore, to address the vulnerabilities of an internet-connected power electronic device, this work focused on the hardware layer of the system. Implementing a cyber-control system inside the hardware layer can significantly reduce the possibility of an attacker patching malicious controller firmware into a photovoltaic grid-connected inverter, thus mitigating the likelihood that the inverter becomes inactive a cyber-attack scenario. With this mitigation technique, if a cyberattack is successful and an attacker gains control of the network, a cyber-defense technique is in place to mitigate the impact of the cyber-attack. This additional protection layer was developed based on an innovative concept known as Digital Twin (DT). A DT, in this case, replicates an Active-Neutral Point Clamped (ANPC) inverter and was designed using a hardware language known as VHDL (Very High-Speed Integrated Circuit Hardware Description Language) and applied to Field-Programmable-GateArray (FPGA). The DT is embedded within the FPGA and contained in a controller board, the UCB (Unified Controller Board), developed by the University of Arkansas electrical engineering team. This UCB also contains two Digital Signal Processors (DSPs) responsible for generating associated signals to control an authentic physical inverter. These DSP signals are received and processed by the FPGA that implements the DT of an ANPC; in other words, it simulates in realtime the expected output of an actual ANPC inverter using the signals from the DSP. When a new firmware is ready to be patched, the DT provides output signals simulating behavior that a real ANPC inverter would generate with the new firmware. The new firmware is tested to check if it meets all the operational requirements established using a Design-For-Trust technique (DFTr). If the new firmware fails in at least one of the DFT tests, it is considered malicious and must be rejected. This work is divided into sections, such as Background, which explains the pieces that were used and the strategy behind this work; Process and Procedure, which explains the methodology that was adopted to prove the reliability and effectiveness of this work; Results and Discussion, where the simulations and results are described and explained; followed by Conclusion and Future work section, which concludes this work and adds possible future projects to continue this work further.

do Amaral Custodio, Paulo Vitor↗

Grid-Connected Modular Soft-Switching Solid State Transformers (M-S4T)

The objective of this project is to develop and verify the concept of a flexible and modular soft-switching solid-state transformer (M-S4T) for direct grid-connected applications. The ability to directly connect power electronics converters to the medium voltage grid (4 kV – 13 kV), and to potentially replace the passive and bulky, but ubiquitous 60 hertz service transformer in the 25 kVA to 100 kVA range, with a more flexible and controllable device, has been regarded as the ‘holy grail’ in grid control. However, this has proven to be extremely difficult. This project has developed the solutions to several key challenges of the direct grid-connected power electronics and realized a 7.2 kV M-S4T prototype. First, a protection method to protect the M-S4T from the high voltages (110 kV for the 13 kV system) that occur on the grid due to transients and lightning strikes have been developed and experimentally verified. Second, the realization and the operation of the M-S4T based on high-voltage SiC devices (>3.3 kV) and a medium-frequency medium-voltage low-leakage transformer in a single-stage solid-state transformer with zero-voltage switching, low dv/dt, and low electromagnetic interference has been successfully demonstrated up to 7.5 kV peak. Third, an oil-cooling system and stable communication and distributed control system for converter module voltage sharing have been developed and experimentally verified. The developed M-S4T has realized a modular universal high-performance power conversion system. This conversion system is scalable to different voltage and power levels and adaptable to four-quadrant bidirectional operation. Moreover, the use of passive cooling techniques meets the equipment life requirements, and the lightning protection scheme fulfills the basic insulation level specifications for direct grid connection. Such power conversion system opens up near-term opportunities, including energy storage, solar PV, or electric vehicle charging with significant cost and footprint savings. In the longer term, the possibility of replacing the utility distribution transformer with an M-S4T will be transformative for future distribution grids with a compact footprint and full controllability to enable high renewable energy and storage penetration. In addition to the main project, this report expands on the Plus-Up projected including as part of the main award. This project developed and demonstrated the technology for autonomous collaborative inverters that can be connected in an ad hoc manner to the grid. The aim of the project was to: (1) evaluate the existing techniques for grid-connected inverters and find their limitations; (2) develop detailed requirements for grid-connected inverters in the modern grid with millions of active nodes; (3) design a unified control strategy that brings more autonomy and intelligence to grid-connected inverters, and addresses parts of the issues with the existing techniques. The proposed technique, called UniCon, enables inverters to 1) connect/disconnect to/from the grid in an ad hoc manner; (2) work based on local sensing. Slow communication could be used for a more optimized behavior; (3) work automatically in both grid-forming/grid-following mode; (4) handle large disturbances, e.g., big load step and fault, in an oscillation-free manner; (5) work collaboratively with other inverters in steady-state and during transients. UniCon can be implemented in the middle-level control; hence it is agnostic to the vendor and to the implementation of the inner voltage/current and protection loops. Furthermore, a new synchronization scheme, based on deep learning, was developed that can extract the grid voltage phase and amplitude in a stable manner. The method is cheap to implement can improve the dynamic performance of the grid-connected inverters during fast transients, e.g., fault. The proposed control scheme was validated by (1) MATLAB/Simulink; (2) hardware-in-the-loop results, and; (3) experimental results using three inverters that form a microgrid in a down-scaled feeder. Lastly, both the M-S4T and UniCon have achieved promising tangible paths to markets. In the case of the M-S4T, the underlying technology — the Soft Switching Solid State Transformer (S4T) developed at the Georgia Tech Center for Distributed Energy (GT-CDE) has been licensed by GridBlock from the Georgia Tech Research Corporation, and GridBlock has been working with manufacturing partner Jabil (one of the largest US-based contract manufacturers) and system integrator Power Secure (largest deployer of microgrids in the US with 4.7 GW under management), to meet the strong initial demand. Similarly, GridBlock has an exclusive license to the UniCon technology, developed under this award by GT-CDE. The UniCon provides an intermediate control layer that enables the implementation of the higher-level ‘transactive’ control commands for the system. The architecture of the system - slow communications with the cloud for system optimization and setpoints, and the use of locally measured quantities for real-time control, provide a very robust and secure way of implementing a real-time must-run grid that is also secure and stable. This is a brand-new functionality that is critical for the future grid and key to GridBlock’s business model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Modeling of Three-Phase Grid-Supporting Inverters for Dynamic Studies

Grid technologies connected by power electronic converter (PEC) interfaces continually implement grid support functions mandated by grid codes and standards. The transition to converter-based generation demands precise PEC models to assess system dynamics, which have been previously overlooked in conventional power systems. This study proposes a hybrid method for analyzing grid-connected three-phase PEC dynamics with the IEEE standard 1547-2018 Volt-VAr mode that combines physics and data-driven techniques. The physics model reflects the PEC’s internal behavior, whereas the data-driven modeling technique evaluates the grid-supporting capabilities of the smart PEC. The system identification approach is used to generate dynamic PEC models based on changing grid voltage and measured current injected into the grid by the PEC. In the Volt-VAr support mode, a detailed topological model including switches is utilized to compare the goodness-of-fit of the extracted hybrid dynamic model. The results demonstrate that the hybrid PEC model in the Volt-VAr mode accurately matches the dynamics with the topological model.

Subedi, Sunil↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Transformer Magnetizing Reactance Using Describing Function in Direct Power Control of Back-to-Back Modular Multilevel Converter with Advanced Grid Support

This paper presents a Port Controlled Hamiltonian based direct power control architecture for a back-to-back modular multilevel converter system connecting two ac sources at different frequencies. The system features advanced grid support functionalities based on IEEE 1547-2018, implemented on the inverter side. The rectifier side controller ensures reference following for active and/or reactive powers and maintains the commanded dc bus voltage. The inverter side controller ensures power command following for active and reactive powers.The proposed control architecture is designed to suppress second harmonic oscillations in powers during unbalanced grid voltage sags by dynamically adjusting the currents on each ac side. This also ensures effective elimination of any second harmonic oscillations in the equivalent dc bus voltage. Validation is performed on an OPAL-RT real-time platform with case studies on unbalanced and balanced sags, demonstrating the controller's effectiveness during real time implementation. A reduced-scale laboratory prototype further verifies these case studies, with experimental results for balanced sags due to grid simulator limitations. The results confirm the robustness and efficiency of the proposed control strategy in ensuring stable and reliable operation under various grid conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Application and Controls Development for Medium-Voltage SiC-Based Grid Interconnects

This paper studies, the grid-interconnection requirements of directly connected medium-voltage (MV) Silicon Carbide-based (SiC-based) converters and details the necessary control implementations. These power electronic converters follow the interconnection standard IEEE 1547-2018, but can also have additional controls supported by the microgrid standards in IEEE 2030.7, which is demonstrated in this work. Additionally, this paper defines the grid applications realized by these directly connected medium-voltage power electronic converters at the distribution scale and demonstrates results. The controls for the studied grid applications are then developed and implemented on the controller. The paper also includes details of the control algorithm development and validations of the control algorithm through hardware-in-the-loop results.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Modified Andronov-Hopf Oscillator-Based Grid-Forming Converter with Emulated Virtual Cable for Enhanced Power Sharing Performance

Nonlinear oscillator-based grid-forming converters offer superior dynamic and steady-state performance, making them an attractive solution for interconnecting renewable resources. This paper proposes a novel modified Andronov-Hopf oscillator to enhance the operating spectrum and facilitate the integration of renewable energy sources. An inner loop controller based on the Lyapunov energy function is implemented to achieve robust stability and performance, while a virtual cable emulation strategy enables seamless parallel operation. Comprehensive modeling and simulation studies validate the effectiveness of the proposed system, demonstrating its capabilities in addressing diverse operating scenarios, including grid faults, renewable energy fluctuations, and parallel operation. The proposed solution exhibits fast transient response, robust stability, and flexible operation, making it a valuable contribution to the field of renewable energy integration. The results of this study can be used to inform the design and implementation of next-generation grid-forming converters, enabling a more sustainable and reliable energy future. Additionally, the proposed system's ability to operate in both grid-connected and islanded modes makes it an ideal candidate for remote and off-grid renewable energy applications. The proposed solution's scalability and modularity also make it suitable for large-scale renewable energy integration. The proposed system is verified through MATLAB/Simulink and PLECS simulations, demonstrating its effectiveness in ensuring robust and efficient operation.

Andronov-Hopf Oscillator (AHO)↗

LA100 Equity Strategies. Chapter 12: Distribution Grid Upgrades for Equitable Resilience and Solar, Storage, and Electric Vehicle Access

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. As Los Angeles transitions toward clean energy, existing distribution grid infrastructure will need to be updated and expanded to support reliable service during routine operations, enable interconnection with distributed energy resources and electrified loads, and provide access to energy-related services during disasters. This chapter focuses on equity in distribution grid upgrades, reliability, and resilience in Los Angeles. Specifically, NREL performed grid upgrade and resilience analyses using a detailed model of the distribution grid and income-differentiated household load profiles, electric vehicle (EV) adoption patterns, distributed solar adoption, and grid reliability to explore two key questions to inform how the City of Los Angeles can ensure a resilient and reliable distribution grid for all communities during the clean energy transition: Where can distribution system upgrades can be prioritized to enable equitable access to, and adoption of, clean energy technologies and how can Los Angeles provide equitable, resilient access to electricity-related services (e.g., health care, food) during disaster events like earthquakes and flooding? The electric distribution system is the "last mile" of the grid, linking the multistate bulk power system with customers; new loads, including EVs; and distributed energy resources, such as customer and community solar and storage. This analysis focuses on the 4.8-kilovolt (kV) system, including service transformers that represent the utility-side of the grid connection for most residential customers. Chapter 17 looks at the customer-side of the grid connection with a focus on electric panel upgrade needs. The transition toward clean energy can put additional stress on the distribution system from distributed energy resources and electrification - especially EVs and increased use of electricity for heating, cooling, cooking, and hot water. This stress, measured here as the number of equipment overloads and voltage violations, correlates strongly to grid reliability and therefore is used as a proxy for understanding additional upgrades needed and to help ensure equitable access to electrification and distributed energy resources. NREL also conducted community resilience analysis to examine customer-level access to both electricity and a larger range of services, such as hospitals and grocery stores during a disaster. This analysis explicitly considers equity to understand differences in current resilience and resilience strategies to effectively improve critical services access for all Angelenos. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

14 SOLAR ENERGY↗

Topology-Agnostic, Scalable, Self-Healing, and Cost-Aware Protection of Microgrids

Most microgrid protection schemes found in published literature suffer from a lack of generality in that they work well for the assumed topology, including type and placement of sources. Other generic protection schemes tend to be too complicated, too expensive, or both. To overcome these draw- backs, a topology-agnostic, scalable, and cost-aware protection based on fundamental principles that work in the presence of high penetration of inverter-based resources (IBRs) is developed and tested in this paper. Here, the protection system also implements stable automatic reconfiguration of the healthy sections of the system after clearance of fault, thus increasing resilience by self- healing. To achieve this ambitious goal, stable inverter models are developed that operate in unbalanced networks in grid-connected and islanded modes, even with 100% IBRs, share power without conflicting controls, and can ride through faults while limiting fault currents. The scheme is tested for primary and backup protection and reconfiguration on the IEEE 123-node feeder in grid-connected and islanded modes with 15 IBRs connected to the system.

42 ENGINEERING↗

Leveraging National Laboratory Assets to Address Stability Challenges due to Declining Grid Inertia Using Geographically Distributed Electrical–Thermal Co-Emulation

Due to increased penetration of low-inertia resources into the electric grid, challenges are increasing for maintaining wide-area system stability. Grid stability assessment requires a faithful representation of the multiple-physics interaction at the system level, and timescales of interaction varying in orders of magnitude, from microseconds to seconds to several minutes. Along with the simulation-based techniques, hardware-in-the-loop (HIL), controller HIL, and power HIL techniques have been developed to better understand the emergent behavior of the system with emerging technologies. US National Laboratories have played a vital role in research and development to understand the behavior of individual technologies and devices integrated to the electric grid. Each national laboratory forwards a technological and strategic initiative tied core and enabling capabilities. Due to strategic, efficiency, and economic reasons, not all the labs have assets to conduct research on all technologies concomitantly, so it becomes crucial to integrate the labs across geographies to understand the interplay of different technologies together at the system level. This approach avoids duplication of the assets at different lab facilities and helps understand the integrated system behavior of various technologies representative of actual grid conditions by connecting multiple national labs. This article talks about techniques of connecting three national laboratories to enable co-emulation of electrical–mechanical–thermal characteristics of devices and systems. Such an approach can be used to understand the dynamic and transient interaction of multi-physics in a system level, at-scale emulation using real-time simulation tools and techniques.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connectivity, Centrality, and Bottleneckedness: On Graph Theoretic Methods for Power Systems

This report provides an introduction to selected graph theoretic topics with pertinence to the structural analysis of electric power grid and communication systems. We focus on methodologies for defining, scoring, and identifying connectivity, spectral, and bottleneckeness properties in graphs, as well as vertex and edge importance measures such as centrality. We apply these measures to power systems and communications graph data, discuss and visualize the results, and comment on computational aspects of these methods. We show that graph theoretic methods can provide useful insights into grid and communication network structure, leading to tools and methods that could be used by electric utility engineers to improve key grid and communication network characteristics, such as resilience and scalability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Controller Requirements for Managing Community Microgrids

Microgrid control systems are central to the functioning of a microgrid. They are responsible for managing distributed energy resources (DER) in both grid-connected and islanded modes of operation. Although microgrids are being developed and deployed by many utilities, several questions are being raised about the control system that manages them. This document provides the detailed list of requirements for a feeder-level microgrid controller to manage various islanded and grid-connected use cases. Functionally, the use cases include control scenarios that require the controller to maintain energy balance, prevent constraint violations, manage switching equipment, manage grid-forming (GFM) and grid-following (GFL) DER, manage critical/non-critical loads, and coordinate with peer systems to operate joined island areas. In addition to detailed requirements, the document includes interface and performance metrics for functional evaluation. These requirements can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; requirements also apply to third-party managed microgrid controllers that coordinate with the utility- and customer-owned equipment. The document can also be used by technology developers and project developers in industry to specify desired control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multiscale Electrothermal Design of a Modular Multilevel Converter for Medium-Voltage Grid-Tied Applications

As a key feature of modular multilevel converters (MMCs), a large number of semiconductor devices are employed in the converter and distributed over a stack of submodules. Each submodule has a strict temperature limit that imposes constraints on the operating range of the converter. Different loading conditions/losses in the submodules lead to unavoidable temperature variations inside the MMC, which consequently affect the system-level performance and reliability. This paper is focused on the electrothermal analysis and design of a medium-voltage silicon carbide (SiC)-based MMC system, from submodule power semiconductors to the overall MMC system integration of multiple submodules, for grid-connected applications. Loss calculations are performed to estimate the cooling requirements and aid thermal design at different levels. The performance of a forced-air cooling approach is analyzed within a numerical modeling framework. Maximum temperature of the SiC power modules is predicted using numerical tools. Thermal design of the MMC cabinet with various arrangements of air inlet(s) and outlet(s) is investigated and compared from a cooling performance perspective. A fully resolved model of the arrangement that yields optimal results is developed to accurately predict the temperature profile of the essential components in the submodules.

computational fluid dynamics↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dispatching Grid-Forming Inverters in Grid-Connected and Islanded Mode

This paper explores the dispatchability of grid-forming (GFM) inverters in grid-connected and islanded mode. An innovative concept of dispatching GFM sources (inverters and synchronous generators) is proposed to output the target power by adjusting their droop intercepts. The fundamental principle is that the GFM inverter's active and reactive power is dictated by its frequency and voltage, and thus dispatching the active and reactive power of a GFM inverter can be achieved through dispatching its frequency and voltage. The concept is validated with an example microgrid system with two GFM inverters, one diesel generator, one GFL inverter, and the load in both grid-connected and islanded mode. This pioneering work results in practical guidance for the development of energy management systems for future electric grids with GFM and GFL inverters. The key findings are summarized as follows: 1) The GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power; 2) The dispatch rule for grid-connected and islanded mode is slightly different.

dispatch GFM inverter↗