Search NASA⌕ Search

SEARCH · Search NASA

Results for “grouting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Solidification Tests for LLW Sludges

Oak Ridge National laboratory has about 350,000 gallons of remote-handled (RH) sludge in ten liquid low-level waste (LLLW) tanks that must be solidified and stabilized for disposal at the Nevada Test Site. Samples of the waste sludge were collected from four tanks, and a total of 36 small-scale grouting tests were performed. The presence of free water during curing was evaluated, and the cured grouts were analyzed using the Toxicity Characteristic Leaching Procedure (TCLP) to determine if any of the hazardous metals in the sludge (Cd, Cr, Hg, Pb, etc.) would leach above the Resource Conservation and Recovery Act (RCRA) limits/ The grouting formulation used for these tests, with ratios of grout-forming additives weight to waste slurry weight ranging from 0.75:1 to 1.2:1, produced wet grout mixtures that were easy to stir and were self leveling. The grout mixtures cured with no free water visible at any time. The cured grout matrix was very effective at retaining the hazardous metals in the sludge, with TCLP leachate concentrations well below the RCRA limits. The addition of ferrous sulfide (FeS) to some of the sludge samples resulted in, at most, a minimal reduction in the amount of mercury that leached from the grout samples, and had no detectable impact on the other heavy metals present in the sludge (Cd, Cr, and Pb). The TCLP extraction was performed on three samples after 1 day and 7 days of curing, compared to the >28 days for the remaining samples. The metal concentrations for the short cure time samples were similar to the remaining samples, and were all well below the RCRA limits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Analysis Of Saltstone Disposal Units

SRR requested that SRNL develop a two-dimensional computer simulation model to be capable of predicting grout temperatures attained in Saltstone Disposal Units (SDUs) during the transient addition of saltstone grout and its subsequent storage period. A simulation model was developed to calculate the transient grout temperatures of the SDU facility by taking an axisymmetric and two-dimensional Computational Fluid Dynamics (CFD) approach. The final performance calculations were based on the conduction and radiation model without a convection cooling mechanism for conservative estimate of the grout temperatures and computational efficiency. While convection within the SDU is disabled in the current calculations, the simulation model has the capability of turning convection back on if desired by the user. Hence, the thermal model in its current configuration is best characterized as a finite-volume heat transfer model. However, given that the model can account for convection if desired by the user, it will be referred to as a CFD model. The grout material contains a transient heat source due to the exothermic hydration reactions of the cementitious material mixed with salt solution. The model can predict the transient temperatures at point locations within the poured grout and the overlying vapor space, and at the interior and exterior surfaces of the structure. The thermal model has been developed for two SDUs at the Savannah River Site (SRS); namely, SDU 2A and SDU 6. SDU 2A is a cylindrical unit measuring 150 feet (ft) in diameter, 22 ft tall, and holds approximately three million gallons of grout. SDU 6 is 375 ft in diameter and 43 ft high with a capacity of over thirty million gallons. Prior to performing the thermal calculations for the SDU 6 facility, the benchmarking test for the smaller SDU 2A unit was performed to establish the solution method and to verify the computational results using existing thermocouple data. Based on the Lagrangian discrete method and boundary conditions established by the SDU 2A benchmarking test, the CFD calculations were performed to predict the transient temperatures at local positions of the poured grout and air spaces within the SDU 6 structure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Formulation of Cast Stone for {sup 99}Tc Immobilization in Sulfate Rich Secondary Waste Stream - 16098

A low-temperature, cementitious waste form called Cast Stone (or grout) has been selected for solidification of the Effluent Treatment Facility (ETF)-treated wastes at the Hanford Site. Because the waste stream to be solidified may be relatively high in sulfate, the current Cast Stone dry blend formulation with ordinary Portland cement (OPC), fly ash (FA), and blast furnace slag (BFS) (47% BFS, 45% FA, and 8% OPC) may not be adequate. Thus a new formulation, called secondary waste grout, was proposed and tested. The secondary waste grout uses hydrated lime [Ca(OH){sub 2}] to tie up the sulfate initially such that ettringite [Ca{sub 6}Al{sub 2}(SO{sub 4}){sub 3}(OH){sub 12}.26(H{sub 2}O)] forms rapidly instead of forming as the cementitious waste form cures. Three different liquid waste simulants (242-A evaporator, Environmental Restoration Disposal Facility [ERDF] leachates, and Hanford Tank Waste Treatment and Immobilization Plant [WTP] off-gas condensates) were prepared and solidified using this new dry blend formulation. Baseline grout dry mixes were 20 wt% hydrated lime (HL), 35 wt% OPC, and 45 wt% BFS, and two different water-to-dry mix (w/dm) ratios (0.5 and 0.6) of free water mass to mass of dry blend were tested. After curing for a minimum of 28 days, the grout solidified waste forms were characterized and used for Tc leachability testing using the EPA 1315 Method. X-ray diffraction analysis confirmed that ∼12-15% of ettringite was formed in early stage of 28-day curing for the grouts prepared with the high sulfate WTP simulant and HL addition. In addition, the new formulation of secondary waste grout prepared with HL (20%), OPC (35%), and BFS (45%) at either 0.5 or 0.6 water to dry mix ratio yields higher average Tc interval leachability index (LI) values (12.5 to 13.9) after 28 to 90 days of leaching using deionized water, which is higher than the desired {sup 99}Tc LI value of 12 for grout destined for burial in the Integrated Disposal Facility at the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Progress on Tank Bottom Repair for the DOE EM Tank Waste R&D Program - 25089

Several years prior to the Lab23-EM001 Call Announcement, Washington River Protection Solutions (WRPS) had done a review in identifying tank repair feasibility. [1, 2] The most viable methods of repair identified for the Floor of a Primary Tank identified were Grout Stabilization and Polymer Grout. Grout Stabilization was described as a self-leveling grout which fills the entire bottom of the tank and creates a new or false bottom. These types of materials have been used at the Savannah River Site (SRS) to fill and close waste tanks as well as contaminated spaces within decommissioned reactors. No mention was made as to the chemical composition of these Stabilizing Grouts in the review, however, grouts used at SRS for the mentioned applications have always been a cementitious grout material. A thickness of approximately 12 inches was suggested in the review. It was also suggested that an additional polymeric coating could be applied to this fresh and clean grout surface.

BLUE, KAREEN↗

TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology (16 second flow cone value) from 0.25 cubic feet to 4.3 cubic feet. (Ten 0.43 cubic batches were produced because full-scale equipment was not available for the Tier 1A test.); (5) Demonstrating continuous gravity filling of the ADMP mock up test form; (6) Demonstrating continuous gravity filling of 1 inch and 2 inch schedule 40 pipe; and (7) Demonstrating filling of 1 inch and 2 inch schedule 40 pipe from the bottom up by discharging through a tube inserted into the pipes. The Tier 1A mock-up test focused on the ADMP and pipes at least one inch in diameter. The ADMP which is located in center riser of Tank 18-F is a concern because the column for this long-shaft (55 ft) pump is unique and modification to the pump prior to placing it in service limited the flow path options for filling by creating a single flow path for filling and venting the ADMP support column. The large size, vertical orientation, and complicated flow path in the ADMP warrants a detailed description of this piece of ancillary equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Stabilization of Inactive Low Level Waste Pipelines in the Melton Valley Watershed at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) contained an inactive waste pipeline system consisting of approximately 12 kilometers of buried waste pipelines and over 142 m{sup 3} in surface/subsurface appurtenances (e.g., vents, valve pits, pump vaults, etc.). Historically, the system was used to transport liquid low level and process waste between generator facilities in Melton Valley, storage and disposal sites in Melton Valley, and storage/treatment facilities in Bethel Valley. The selected remedy in the Melton Valley Record of Decision (ROD) for inactive pipelines was isolation, removal, or stabilization. Pipeline remediation activities began in the summer of 2005 and were completed in the spring of 2006. The task entailed an iterative process of selecting pipeline access points, excavating and exposing pipelines, performing tapping, draining and cutting activities, either installing fittings for grouting or plugging and capping the lines. Grouting was accomplished using paired access points, with one location serving as the grout injection point and the other as vent/drain and grout confirmation point. Grouting was conducted by pumping a cement-bentonite grout into the specially installed fittings and typically proceeded from a low point to a high point to ensure complete filling of the pipeline (i.e., no void space). The project successfully grouted a total of 8,454 meters (linear distance) of pipeline; another 3,573 meters of pipeline was stabilized through isolation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Characterization of Cementitious Waste Forms for Immobilization of Granular Activated Carbon, Silver Mordenite, and HEPA Filter Media Solid Secondary Waste

Solid secondary waste materials expected to be generated during Hanford Waste Treatment and Immobilization Plant (WTP) operations were characterized (using representative materials) with respect to their ability to retain technetium-99 (Tc), iodine-129 (I), and mercury (Hg) as input to future updates to the Integrated Disposal Facility (IDF) performance assessments (PAs). The waste materials included granular activated carbon (GAC), silver mordenite (AgM), and high-efficiency particulate air (HEPA) filter media; all are used for removal of contaminants and radionuclides from the gaseous effluent treatment systems within the WTP. It is expected that the GAC and AgM will be mixed into a cementitious waste form in which the GAC and AgM particles will be blended/stabilized into the cementitious material. It is also expected that the HEPA filter media will be compacted and placed in a container that is then backfilled with a grout to macroencapsulate the medium. Here we report Kds for all waste materials of interest, examine the physical properties of grout specimens containing the waste materials, and provide solid-state characterization information to further understand the interaction of the waste materials with the encapsulating grout. The Kds are used in PA calculations that estimate contaminant release from the disposal site. Monolithic test specimens were prepared with the GAC and AgM mixed in either a Cast Stone grout formulation (8 weight percent [wt%] ordinary Portland cement [OPC], 45 wt% fly ash [FA], 47 wt% blast furnace slag [BFS]) or a Hanford grout mix 5 (HGM-5) formulation (25 wt% OPC, 75 wt% FA). As the specimens were being prepared, the fluid grout mixes were characterized for processing properties including flowability, set time, and the presence of free liquids during curing. After curing, compressive strengths of the waste forms were measured; the compressive strengths were above 2000 psi, easily exceeding the 500 psi minimum requirement. The cured waste forms were also characterized for their density, porosity, hydraulic conductivity, and water characteristic curve—all properties needed in PA calculations of radionuclide release from the waste forms in the IDF. Finally, EPA Method 1315 leach tests were conducted on the GAC and AgM waste materials encapsulated in the Cast Stone and HGM-5 grouts to determine the rate of release of contaminants from the waste forms. Effective diffusivities are provided, which can be used in future PA analyses of the disposal of these solid secondary waste materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining the Release of Radionuclides from Tank 18F Waste Residual Solids: FY2016 Report

Pore water leaching studies were conducted on actual Savannah River Site (SRS) Tank 18F residual waste solids to support Liquid Waste tank closure efforts. A test methodology was developed during previous simulant testing to produce slurries of tank residual solids and grout-representative solids in grout pore water solutions (based on SRS groundwater compositions) with pH and E h values expected during the aging of the closed waste tank. The target conditions are provided below where the initial pore water has a reducing potential and a relatively high pH (Reducing Region II). The pore water is expected to become increasingly oxidizing with time (Oxidizing Region II) and during the latter stages of aging (Oxidizing Region III) the pH is expected to decrease. For the reducing case, tests were conducted with both unwashed and washed Tank 18F residual solids. For the oxidizing cases (Oxidizing Regions II and III), all samples were washed with simulated grout pore water solutions prior to testing, since it is expected that these conditions will occur after considerable pore water solution has passed through the system. For the reducing case, separate tests were conducted with representative ground grout solids and with calcium carbonate reagent, which is the grout phase believed to be controlling the pH. Ferrous sulfide (FeS) solids were also added to the reducing samples to lower the slurry E h value. Calcium carbonate solids were used as the grout-representative solid phase for each of the oxidizing cases. Air purge-gas with and without CO 2 removed was transferred through the oxidizing test samples and nitrogen purge-gas was transferred through the reducing test samples during leach testing. The target pH values were achieved to within 0.5 pH units for all samples. Leaching studies were conducted over an E h range of approximately 0.7 V. However, the highest and lowest E h values achieved of ~+0.5 V and ~-0.2 V were significantly less positive and less negative, respectively, than the target values. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALTERNATE APPROACH TO HAZARD CATEGORIZATION FOR SALTSTONE FACILITY AT SRS

The Saltstone Facility at Savannah River Site (SRS) was originally segmented into two segments: the Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). Based on the inventory of radionuclides available for release the SPF and SDF were categorized as Nonreactor Hazard Category (HC)-3. The hazard categorization recognized the SDF will contain contributions of radionuclides which would exceed the HC-2 Threshold Quantity (TQ) in the form of grout. However it was determined not to impact the facility hazard categorization based on the grout being in a solid, monolithic form which was not easily dispersible. But, the impact of a quantity of unset grout expected to be present at the vault following operation of the process was not addressed. A Potential Inadequacy in Safety Analysis (PISA) was later issued based on the hazard categorization determination for the facility not addressing unset grout. This initiated a re-evaluation of the accident scenarios within the hazards analysis. During this re-evaluation, the segmentation of the facility was challenged based on the potential interaction between facility segments; specifically, the leachate return line and the grout transfer line, which were considered separate segments, are located in close proximity at one point. such that for certain events (NPH as well as External Vehicle Impact) both could be damaged simultaneously and spill contents on the ground that could commingle. This would violate the guideline for segmentation. Therefore, the Hazard Categorization (HC) was reevaluated based on the facility being a single segment and including the additional unset grout as part of total inventory. This total inventory far exceeded the limit for HC-2 TQ and made the facility's initial categorization as HC-2. However, alternative analysis methodology based on credible release fractions allowed in DOE-STD-1027-92 (Ref.1) showed that the Saltstone facility could still be categorized as Hazard Category 3 Nuclear Facility with no segmentation. Since it was the first time any facility at SRS tried this alternate approach safety analyst had to face substantial resistance and reservations from both the facility and local DOE customers which were eventually overcome with approval and acceptance from DOE-HQ.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production of an impermeable composite of irradiated graphite and glass by hot isostatic pressing as a long term leach resistant waste form

Around 250,000 tons of irradiated graphite (i-graphite) exists worldwide and can be considered as a current waste or future waste stream. The largest national i-graphite inventory is located in UK (∼ 100,000 tons) with significant quantities also in Russia and France [5]. Most of the i-graphite remains in the cores of shutdown nuclear reactors including the MAGNOX type in UK and the UNGG in France. Whilst there are still operational power reactors with graphite cores, such as the Russian RBMKs and the AGRs in UK, all of them will reach their end of life during the next two decades. The most common reference waste management option of i-graphite is a wet or dry retrieval of the graphite blocks from the reactor core and the grouting of these blocks in a container without further conditioning. This produces large waste package volumes because the encapsulation capacity of the grout is limited and large cavities in the graphite blocks could reduce the packing densities. Packing densities from 0.5 to 1 tons per cubic meter have been assumed for grouting solutions. Furthermore the grout is permeable. This could over time allow the penetration of aqueous phases into the waste block and a potential dissolution and release of radionuclides. As a result particularly highly soluble radionuclides may not be retained by the grout. Vitrification could present an alternative, however a similar waste package volume increase may be expected since the encapsulation capacity of glass is potentially similar to or worse than that of grout. FNAG has developed a process for the production of a graphite-glass composite material called Impermeable Graphite Matrix (IGM) [3]. This process is also applicable to irradiated graphite which allows the manufacturing of an impermeable material without volume increase. Crushed i-graphite is mixed with 20 vol.% of glass and then pressed under vacuum at an elevated temperature in an axial hot vacuum press (HVP). The obtained product has zero or negligible porosity and a water impermeable structure. Structural analysis shows that the glass in the composite has replaced the pores in the graphite structure. The typical pore volume of a graphite material is in the range of 20 vol.%. Therefore no volume increase will occur in comparison with the former graphite material. This IGM material will allow the encapsulation of graphite with package densities larger than 1.5 ton per cubic meter. Therefore a huge volume saving can be achieved by such an alternative encapsulation method. Disposal performance is also enhanced since little or no leaching of radionuclides is observed due to the impermeability of the material NNL and FNAG have proved that IGM can be produced by hot isostatic pressing (HIP) which has several advantages for radioactive materials over the HVP process. - The sealed HIP container avoids the release of any radionuclides. - The outside of the waste package is not contaminated. - The HIP process time is shorter than the HVP process time. The isostatic press avoids anisotropic density distributions. - Simple filling of the HIP container has advantages over the filling of an axial die. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Package Report: Composite Analysis Solid Waste Release Model (CASWR Model)

This document describes the implementation of a solid waste form release model in GoldSim for the Hanford Site Composite Analysis (CA) Update. This Composite Analysis Solid Waste Release model (CASWR model) was designed to generate deterministic radionuclide release rates for Hanford’s Central Plateau solid waste disposal sites using single realizations of release model coefficients. Five generalized waste form types are used for the conceptual model of waste release: surplus reactor block, cement, soil-debris, grouted residual waste, and ancillary equipment. The surplus reactor block waste form consists of radionuclide leaching from surplus production graphite reactor core blocks via unspecified processes (White et al., 1984 as cited in PNNL-15965). The cement waste form represents solidified wastes whose permeability is much lower than that of the surrounding soil. The soil-debris waste form type is defined as unconsolidated waste mixed with soil material. Tanks and canyon complexes comprise the grouted residual waste form such that their solid waste will be grouted and capped with a surface barrier at the completion of their cleanup. Finally, the ancillary equipment waste form constitutes contaminant releases from ancillary and auxiliary waste form residues associated with tank farms at closure. Individual sub-models are implemented to numerically represent a respective waste form within the CASWR Model: Surplus Reactor Block Sub-model, Cement Sub-model, SoilDebris Sub-model, Grouted Residual Waste Sub-model, and Ancillary Equipment Submodel. Advection is assumed to be the primary transport process governing the release of radionuclides in the Ancillary Equipment and Soil-Debris Sub-models. Diffusion is assumed to be the primary release process in the Grouted Residual Waste and Cement Sub-models. An unspecified zero-order release process is considered in the Surplus Reactor Block Sub-model due to the lack of information regarding actual processes involved in irradiated graphite leaching. The Surplus Reactor Block, Cement, and SoilDebris Sub-models were compared against analytical solutions (PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site). The agreement between results of these analytical solutions and the corresponding waste form models verified their correct implementation in GoldSim. A 1-D modeling abstraction approach for the Grouted Residual Waste and Ancillary Equipment Sub-models was adopted from existing Performance Assessment (PA) models. Despite the simplifications made in these sub-models, they were found to be appropriate representations of the waste forms, similar to what was used in the Waste Management Area C PA model (RPP-ENV-58782, Performance Assessment of Waste Management Area C, Hanford Site, Washington, Rev. 0). A sensitivity analysis was conducted to identify the most influential parameters in each waste form sub-model. Suggestions for considering pH-dependent and redox-dependent release mechanisms are formulated through the development of a conditional constant approach in GoldSim.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Response Testing Takes a Step Forward

Oak Ridge National Labs has independently confirmed the accuracy of a new breakthrough Advanced Thermal Response Test (TRT) method that it claims “uses less than half of the test time, allows for a fluctuating or interruptible heat flux, performs quality validation of a GHEX installation, and yields new insights into ground thermal conductivity that warrant further research.” The new Advanced TRT approach will reduce costs and, for the first time, also determine the actual thermal conductivity of grout as it is installed. As everyone in the ground source heat pump (GSHP) industry knows, assuring the quality of the grout job of a ground heat exchanger (GHEX) is an especially vexing problem. Unless one is standing at the borehole head the entire time grouting is underway, they basically have no idea how good or bad the grouting job is or even if the loop pipe itself is installed correctly. This problem has been further brought to light with formal third party grout reports confirming that grout had been poured from the surface and that many loops were shorter than the specified depth in several projects

58 GEOSCIENCES↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗